Green(er)
Green(er) Computing
    • Steve Young, CTO, Judson ISD
    • Green Computing Think Tank
       San Antonio, Texas, 9/17/2009
About Judson ISD
• 4th largest public school district in Bexar County, Texas
  (San Antonio area)
• About 21 000 students and 3 000 employees
          21,000               3,000
• 30 IT staff members
• Over 6,800 desktops and laptops
• Additional 2,550 virtual desktops (includes library desktops, which are not included on slide 11)




• 59 physical servers, 39 virtual servers
• More info at http://www.judsonisd.org
Green Computing – the Misnomer
• Can computing really be “green”?
• Technology is not particularly green
by
b most measures
          t
• While technology can offer enormous
productivity and efficiency gains….
• It can have a huge negative impact on
the environment:
     • Materials use
     • Energy consumption
     • H t creation (and need for
       Heat      ti ( d       df
     cooling)
     • Discarding of old devices
                 g
Making Technology Greener
• B t t h l
  But, technology can be made much greener by
                        b      d     h         b
  managing its negative impacts on the environment
• Look at how it makes sense for your organization to
  limit or improve:
          • Materials consumption
          • Energy use
          • Heat creation (and need for cooling)
          • Di
             Discarding of old d i
                   di     f ld devices
Reasons for IT to be Greener
 • Economics – Save $$$
 • Reduce electricity consumption
 • IT now responsible for paying its
                  ibl f       i it
   utility bills
 • Social responsibility
 • Concern for environment
 • Can be good for public relations
 • Cooling already at capacity
Major Green Economic Driver
• Energy Costs
• Energy costs often not seen
  by IT
• But are a major
  organizational expense
• In San Antonio, CPS Energy
  estimates 50% increase in
  bills in just 10 years
• Bills projected to rise at an
  even faster rate after 2020
• Many utilities now offer
  rebates for conserving
  energy                          mysanantonio.com 09/06/2009
Green Computing Initiative (GCI) at Judson ISD
Judson ISD Green(er) Computing Steps:
1. Running virtual servers with VMWare, which reduces: number of
   physical servers, power consumption, cooling, and data center
   space requirements.
2. Remote management of desktops, servers and network equipment
3. Consolidating and virtualizing storage on SAN
4. Upgrading to more energy efficient servers
    pg       g              gy
5. Purchasing Energy Star rated and EPEAT certified computers
6. Utilizing energy efficient LCD monitors and phasing out CRT
   monitors
7. Eliminating almost all ink jet printers and providing a much smaller
   quantity of shared laser printers and networked copiers
Judson ISD Green(er) Computing Steps:
8. Automating shutdown of most district computers
9. Recycling toner cartridges
10. Establishing procedures for redistribution, reuse, and recycling of
                 gp                            ,      ,       y    g
    technology assets
11. Recycling of disposed technology assets with company which
    certifies that is uses responsible environmental practices and tries
                              p                      p
    to reuse as many parts as possible
12. Pushing large volumes of student data to Judson ISD parents via
    web applications, decreasing paper usage
           pp          ,         gp p        g
13. Intensive desktop virtualization using nComputing X-Series
    devices, saving the district money on acquisition, energy, cooling,
    and network wiring   g
Desktop Virtualization at Judson ISD
•   Chose non-traditional approach
    Ch        t diti    l        h
    • Virtualized a host PC locally and increased PC access by 300%
•   Why go the route we did?
    • Needed to offer increased computer access, but cost was the key factor
    • We chose the…
        • lowest deployment cost option
        • most staff supportable option
                  ff         bl     i
        • most green option
•   What we chose
    • nComputing X300
       C    ti
•   What it is?
    • Modified thin client
    • It virtualizes the host OS and shares the host’s resources
• What we deployed –
    • Deployed 761 X Series sets for an additional 2283 computing seats.
How desktop virtualization benefitted JISD
• Lower Acquisition Costs for 3,044 Seats
   Acquisition for a PC only deployment
     q                     y p y                                      $ 2,374,320

     Possible additional network growth                               $   776,220
   Acquisition cost for X Series Deployment
    Shared PC's                                                           $      593,580
    Access Terminals (X Series)                                           $      152,200
    Extra Monitors                                                        $      285,375
                                                                                 285 375
    Keyboards & Mice                                                      $       45,660
    MS OS Licensing                                                       $      108,594
   Total X Series Acquisition Cost                                    $       1,185,409


    Savings of                                                                            50%

                          Numbers calculated in house by Judson ISD
How desktop virtualization was greener
• Th
  There was much less physical hardware deployed
               hl      h i lh d         d l    d
   • Resulting in:
      • less natural resources, packaging, etc are used at the onset
      • less materials that need recycling and end up in land fills at the end
        of the life cycle
• Purchased greener host computers
            g               p
   • EPEAT gold/Energy Star computers with LCDs
   • Much more energy efficient than older computers
• X S i virtual machines use 1 watt electricity per seat
    Series i t l      hi              tt l t i it      t
• At least 70% less HVAC capacity was needed
• 75% less building electrical capacity was needed per
  computing seat
• Network port needs trimmed by 75%
Energy costs with desktop virtualization
                 Judson ISD's School Year Energy Cost Comparison
                                                                          $29.78

                      $27.60
  $30.00
  $30 00


  $25.00


  $20.00


  $15.00                                     $11.78



                                                                                                 $7.44
  $10.00


   $5.00
   $


     $-
           Annual Energy Cost of   Annual Energy Cost of     Annual Energy Cost of    JISD's Annual Energy
            P3 and CRT Monitor
                 d     M it        a"
                                    "green" D l C
                                          " Dual Core PC        Dual Core w/ 3
                                                                D lC        /          Cost Per Seat using
                                                                                       C tP S t i
                                          w/LCD                   terminals           nComputing X-Series


                                          Numbers calculated in house by Judson ISD
Energy savings with desktop virtualization
               One Year Energy Cost & Savings for Judson ISD for 3044
                               Total Computing Seats

  $90,000
                $84,014
                $84 014

  $80,000


  $70,000
                                                                                 $61,354
                                                                                 $61 354
  $60,000
                                                                                                       And this does
  $50,000                                                                                              not include
                                                                                                       associated A/C
  $40,000
                                     $35,852
                                     $35 852                                                           savings

  $30,000                                                  $22,661
  $20,000                                                                                            $13,191
  $10,000


      $-
            Yearly operating    Yearly operating     Yearly operating      Energy savings by     Energy savings
            cost for 3044 P3   cost for 3044 green   cost - Using Core    using X Series with     using X Series
                  PC's              Core Duo          Duo's hosting X     Core Duo (instead of   instead of all an
                                                           Series                 P3)             Core Duo fleet


                                            Numbers calculated in house by Judson ISD
nComputing Green TCO Calculator – JISD Project

                                    Equivalent Gasoline Usage (5 yrs)
                     ons)




                            70000
  Gasoline (U.S. gallo




                            60000
                            50000
                            40000
           (




                            30000
                            20000
                            10000
  G




                                0
                                            All PC                               NComputing incl. shared PCs
                                                                 Solution Type


                                        Numbers calculated by Judson ISD using nComputing Green TCO Calculator
nComputing Green TCO Calculator – JISD Project

                      Carbon Dioxide Emissions (5 yrs)



              1,800
              1,600
              1 600
  Metr Tons




              1,400
              1,200
     ric




              1,000
                800
                600
                400
                200
                 -
                              All PC                              NComputing incl. shared PCs
                                                 Solution Type

                         Numbers calculated by Judson ISD using nComputing Green TCO Calculator
nComputing Green TCO Calculator – JISD Project

                        e-Waste Comparison



              35.0
              30 0
              30.0
  Metr Tons




              25.0
              20.0
     ric




              15.0
              10.0
               5.0
               0.0
                        All PC                              NComputing incl. shared PCs
                                            Solution Type

                     Numbers calculated by Judson ISD using nComputing Green TCO Calculator
How automated PC shutdown helps
  • Judson ISD started automated shutdown of school computers
    in 2007
  • Numbers based on 25% of 4000 machines left on
  • Over time savings are less as PC base becomes more green
      $200,000

      $150,000

      $100,000
      $100 000

       $50,000                                                            $155,111
                  $54,000
                            $43,649
                            $43 649
            $-                            $33,907
                                                            $23,556
                  Year 1
                            Year 2
                      g
                 Savings                 Year 3
                           Savings                         Year 4
                                        Savings                           Total
                                                          Savings
                                                                         Savings
                             Numbers calculated in house by Judson ISD
In Conclusion
• Go green(er) with a purpose in mind
• Calculate savings and TCO for large projects
• A project that makes sense for one organization, may
        j t th t     k         f             i ti
  not be right for another
• Sell your initiatives & successes – IT often does not
  excel at public relations

• Questions
   •   Steve Young
   •   CTO, Judson ISD
   •   syoung@judsonisd.org
   •   (210) 945-5562

Green(Er) Computing

  • 1.
    Green(er) Green(er) Computing • Steve Young, CTO, Judson ISD • Green Computing Think Tank San Antonio, Texas, 9/17/2009
  • 2.
    About Judson ISD •4th largest public school district in Bexar County, Texas (San Antonio area) • About 21 000 students and 3 000 employees 21,000 3,000 • 30 IT staff members • Over 6,800 desktops and laptops • Additional 2,550 virtual desktops (includes library desktops, which are not included on slide 11) • 59 physical servers, 39 virtual servers • More info at http://www.judsonisd.org
  • 3.
    Green Computing –the Misnomer • Can computing really be “green”? • Technology is not particularly green by b most measures t • While technology can offer enormous productivity and efficiency gains…. • It can have a huge negative impact on the environment: • Materials use • Energy consumption • H t creation (and need for Heat ti ( d df cooling) • Discarding of old devices g
  • 4.
    Making Technology Greener •B t t h l But, technology can be made much greener by b d h b managing its negative impacts on the environment • Look at how it makes sense for your organization to limit or improve: • Materials consumption • Energy use • Heat creation (and need for cooling) • Di Discarding of old d i di f ld devices
  • 5.
    Reasons for ITto be Greener • Economics – Save $$$ • Reduce electricity consumption • IT now responsible for paying its ibl f i it utility bills • Social responsibility • Concern for environment • Can be good for public relations • Cooling already at capacity
  • 6.
    Major Green EconomicDriver • Energy Costs • Energy costs often not seen by IT • But are a major organizational expense • In San Antonio, CPS Energy estimates 50% increase in bills in just 10 years • Bills projected to rise at an even faster rate after 2020 • Many utilities now offer rebates for conserving energy mysanantonio.com 09/06/2009
  • 7.
    Green Computing Initiative(GCI) at Judson ISD
  • 8.
    Judson ISD Green(er)Computing Steps: 1. Running virtual servers with VMWare, which reduces: number of physical servers, power consumption, cooling, and data center space requirements. 2. Remote management of desktops, servers and network equipment 3. Consolidating and virtualizing storage on SAN 4. Upgrading to more energy efficient servers pg g gy 5. Purchasing Energy Star rated and EPEAT certified computers 6. Utilizing energy efficient LCD monitors and phasing out CRT monitors 7. Eliminating almost all ink jet printers and providing a much smaller quantity of shared laser printers and networked copiers
  • 9.
    Judson ISD Green(er)Computing Steps: 8. Automating shutdown of most district computers 9. Recycling toner cartridges 10. Establishing procedures for redistribution, reuse, and recycling of gp , , y g technology assets 11. Recycling of disposed technology assets with company which certifies that is uses responsible environmental practices and tries p p to reuse as many parts as possible 12. Pushing large volumes of student data to Judson ISD parents via web applications, decreasing paper usage pp , gp p g 13. Intensive desktop virtualization using nComputing X-Series devices, saving the district money on acquisition, energy, cooling, and network wiring g
  • 10.
    Desktop Virtualization atJudson ISD • Chose non-traditional approach Ch t diti l h • Virtualized a host PC locally and increased PC access by 300% • Why go the route we did? • Needed to offer increased computer access, but cost was the key factor • We chose the… • lowest deployment cost option • most staff supportable option ff bl i • most green option • What we chose • nComputing X300 C ti • What it is? • Modified thin client • It virtualizes the host OS and shares the host’s resources • What we deployed – • Deployed 761 X Series sets for an additional 2283 computing seats.
  • 11.
    How desktop virtualizationbenefitted JISD • Lower Acquisition Costs for 3,044 Seats Acquisition for a PC only deployment q y p y $ 2,374,320 Possible additional network growth $ 776,220 Acquisition cost for X Series Deployment Shared PC's $ 593,580 Access Terminals (X Series) $ 152,200 Extra Monitors $ 285,375 285 375 Keyboards & Mice $ 45,660 MS OS Licensing $ 108,594 Total X Series Acquisition Cost $ 1,185,409 Savings of 50% Numbers calculated in house by Judson ISD
  • 12.
    How desktop virtualizationwas greener • Th There was much less physical hardware deployed hl h i lh d d l d • Resulting in: • less natural resources, packaging, etc are used at the onset • less materials that need recycling and end up in land fills at the end of the life cycle • Purchased greener host computers g p • EPEAT gold/Energy Star computers with LCDs • Much more energy efficient than older computers • X S i virtual machines use 1 watt electricity per seat Series i t l hi tt l t i it t • At least 70% less HVAC capacity was needed • 75% less building electrical capacity was needed per computing seat • Network port needs trimmed by 75%
  • 13.
    Energy costs withdesktop virtualization Judson ISD's School Year Energy Cost Comparison $29.78 $27.60 $30.00 $30 00 $25.00 $20.00 $15.00 $11.78 $7.44 $10.00 $5.00 $ $- Annual Energy Cost of Annual Energy Cost of Annual Energy Cost of JISD's Annual Energy P3 and CRT Monitor d M it a" "green" D l C " Dual Core PC Dual Core w/ 3 D lC / Cost Per Seat using C tP S t i w/LCD terminals nComputing X-Series Numbers calculated in house by Judson ISD
  • 14.
    Energy savings withdesktop virtualization One Year Energy Cost & Savings for Judson ISD for 3044 Total Computing Seats $90,000 $84,014 $84 014 $80,000 $70,000 $61,354 $61 354 $60,000 And this does $50,000 not include associated A/C $40,000 $35,852 $35 852 savings $30,000 $22,661 $20,000 $13,191 $10,000 $- Yearly operating Yearly operating Yearly operating Energy savings by Energy savings cost for 3044 P3 cost for 3044 green cost - Using Core using X Series with using X Series PC's Core Duo Duo's hosting X Core Duo (instead of instead of all an Series P3) Core Duo fleet Numbers calculated in house by Judson ISD
  • 15.
    nComputing Green TCOCalculator – JISD Project Equivalent Gasoline Usage (5 yrs) ons) 70000 Gasoline (U.S. gallo 60000 50000 40000 ( 30000 20000 10000 G 0 All PC NComputing incl. shared PCs Solution Type Numbers calculated by Judson ISD using nComputing Green TCO Calculator
  • 16.
    nComputing Green TCOCalculator – JISD Project Carbon Dioxide Emissions (5 yrs) 1,800 1,600 1 600 Metr Tons 1,400 1,200 ric 1,000 800 600 400 200 - All PC NComputing incl. shared PCs Solution Type Numbers calculated by Judson ISD using nComputing Green TCO Calculator
  • 17.
    nComputing Green TCOCalculator – JISD Project e-Waste Comparison 35.0 30 0 30.0 Metr Tons 25.0 20.0 ric 15.0 10.0 5.0 0.0 All PC NComputing incl. shared PCs Solution Type Numbers calculated by Judson ISD using nComputing Green TCO Calculator
  • 18.
    How automated PCshutdown helps • Judson ISD started automated shutdown of school computers in 2007 • Numbers based on 25% of 4000 machines left on • Over time savings are less as PC base becomes more green $200,000 $150,000 $100,000 $100 000 $50,000 $155,111 $54,000 $43,649 $43 649 $- $33,907 $23,556 Year 1 Year 2 g Savings Year 3 Savings Year 4 Savings Total Savings Savings Numbers calculated in house by Judson ISD
  • 19.
    In Conclusion • Gogreen(er) with a purpose in mind • Calculate savings and TCO for large projects • A project that makes sense for one organization, may j t th t k f i ti not be right for another • Sell your initiatives & successes – IT often does not excel at public relations • Questions • Steve Young • CTO, Judson ISD • syoung@judsonisd.org • (210) 945-5562