Grant Writing 101
Agenda
ď‚— The Givens
ď‚— Locating Grants
ď‚— Assessing Eligibility
ď‚— Planning a Grant
ď‚— Writing the Grant
ď‚— Proposal Review and Follow-up
ď‚— Grant Management
ď‚— Hiring and Selecting Grant Writers
The Givens
ď‚— Grant Writing is part of your fundraising plan

ď‚— Grant Writing is a necessity

ď‚— Grant Writing should be ongoing
ď‚— Grant Writing should be performed by someone who knows how to write

ď‚— Grant Writing should yield results

ď‚— Grant Writing is NEVER last minute

ď‚— Funders will always tell you what they want

ď‚— Grant proposals in the pipeline should be 200% of actual need -- double
Categories of Support
 Operating – running program to meet
  community needs
 Special Project – new project or project with
  limited timeframe
 Capital/Equipment – specified amount for
  construction, renovation, expansion, purchase
  land or equipment
ď‚— Endowments - planned gifts, will or trust
Basic Grant Sources
ď‚— Government - Federal, Provincial, Local
ď‚— Foundations
ď‚— Corporation
ď‚— Family
Assessing Funding Eligibility
ď‚— Eligibility
  ď‚— Type of organization
  ď‚— Geographic restrictions
  ď‚— Population served
ď‚— Size of Award
  ď‚— Sufficient amount to complete program activities
  ď‚— Number of grants
  ď‚— Award size and duration
ď‚— Project Focus
   Project complements funder’s goals and priorities
Assessing Funding Eligibility
           Cont.
ď‚— Type of Activity
  ď‚— Specified use of funds


ď‚— Restrictions
  ď‚— Matching funds
  ď‚— Expenditure limitations
  ď‚— Evaluation requirements
Searching For and
     Locating Grants
Finding the right grant opportunity is most of the time
consuming work in grantsmanship. Plan to spend at
least half your time in:
    ď‚— finding the agency
    ď‚— investigating previous projects that the agency
       has funded
    ď‚— learning about the grant proposal requirements

5. Become familiar with your chosen grant funders
6. Search locally first
Grant Information Sources

ď‚— Annual Reports
ď‚— Funder Guidelines
ď‚— Donor Website
ď‚— Contact the Funding Agency by phone or email
Grant Information Sources Cont.
Paid Subscription Databases

Ajah Fundtracker            http://ajah.ca/

Donate2Charities            http://donate2charities.ca

BIG Online                  http://www.bigdatabase.ca/

Foundation Search Canada http://www.foundationsearch.ca/

Imagine Canada              http://www.imaginecanada.ca/en/node/22

Charity Can - Aggregates all of Canada Revenue Agency T3010 data and allows you
   to search, rank, and compare all of Canada’s 85,000 plus charities, including
   charitable foundations. Also includes Noza Database-Canada, which has 2.1
   million Canadian donation records. See also Canadian Donor’s Guide.
   https://www.charitycan.ca/default.aspx
Grant Information Sources Cont.
Free Databases

Canadian Environmental Grantmakers Network - Grants database:
   http://www.cegn.org/English/grantmaking/dbsearch_public.cfm

The Green Source: A Quick Reference to Funding Sources for Environmental Projects
   by Non-Profit Organizations is available on the websites of Environment Canada's
   regional offices. For links to each of the regional offices, check the national website:
   www.ec.gc.ca/ecoaction

Environmental Grantmaking Foundations is an American directory that provides
   information on environmental grantmakers, and includes U.S. foundations that grant in
   Canada, and some Canadian foundations: www.environmentalgrants.com

Funding Sources for British Columbia Communities:
   http://www.communityfutures.com/cms/Funding_Sources.2.0.html

Charity Village - contains links to online databases and directories of funding agencies and
   foundations, plus online tools and resources:
   http://www.charityvillage.com/cv/ires/fund.asp
Grant Information Sources Cont.
Service Clubs:
  http://www.charityvillage.com/cv/nonpr/nonpr29.html

Canada Revenue Agency – Charities Listings:
  http://www.cra-arc.gc.ca/chrts-gvng/lstngs/menu-eng.html

Charity Focus - run by Imagine Canada and funded by CRA, this
  site makes CRA charities listings more accessible:
  http://www.charityfocus.ca

Open Charity takes information from the CRA website and puts it in
  a more accessible format: http://www.opencharity.ca
Grant Information Sources Cont.
Fundsnet Services.com (US)

Canadian Funders:

ď‚— http://www.fundsnetservices.com/searchresult/29/Canada-Foundatio




International Funders:


ď‚— http://www.fundsnetservices.com/searchresult/30/International-Gran
5 Top Ways to Get Funded
t    Read the RFP

t    Read the RFP

a    READ THE RFP

a READ THE RFP!
a READ THE RFP!!!
Letters of Inquiry
ď‚— Alternative to a call or visit
ď‚— Do homework before the letter for previous
ď‚— funding history, types of projects, amounts
ď‚— Provide information about your organization
ď‚— Provide information about your proposed project
Letters of Inquiry
ď‚— 1-2 pages!
ď‚— Who are you? Mission, organization, you are seeking
   funds
ď‚— Why this agency? You understand their priorities
ď‚— What is the need? Clear and brief
ď‚— What's the plan? Bullet goals/objectives
ď‚— Why fund you? Uniqueness, qualifications
ď‚— How much? Broad categories
 Closing – thank you, contact information, whether you
   will follow up with a phone call
Letters of Intent
ď‚— Introduction
  ď‚— Why you are writing
  ď‚— Mission and population served
ď‚— Needs
  ď‚— Demographic and statistical evidence
ď‚— Project Description
   Link funder’s priorities and project goals
ď‚— Solution
  ď‚— How it addresses need
  ď‚— Best practices
Letters of Intent
ď‚— Project Plan
  ď‚— Activities, timetables, methodology
ď‚— Organizational Capacity
  ď‚— Ability and commitment
  ď‚— Previous work and staff qualifications
ď‚— Budget
  ď‚— Funding request, organizational support and
     other resources
ď‚— Sustainability
  ď‚— Project continuation
Planning the Grant
ď‚— Start with an innovative idea that addresses
  a specific challenge and/or need (purpose)
ď‚— Start documenting need. Social/economic
  costs, beneficiaries, nature of the problem,
  impending implications?
ď‚— Scan and identify grant opportunities
Planning the Grant
ď‚— Target a grant
  ď‚— Make sure your focus aligns to the grant
    criteria
  ď‚— Make contact with grantor agency!
    ď‚— Review successful and recent awards
    ď‚— Identify partners, define roles and build
      partnerships as well as community support
Proposal Components
ď‚— Organization/Partner Organization Descriptions
ď‚— Proposal Summary/Abstract
 Statement of Need – Problem and Background
ď‚— Project Description: Goals and Objectives
ď‚— Methodology (Design and Timeframe)
ď‚— Evaluation - Outside Evaluators, Quantitative and
   Qualitative Measures Aligned to Goals
ď‚— Budget and Sustainability
 Attachments – Commitment letters, Resumes of all
   Partners, Information Charts, References
Using Statistics
ď‚— Statistics Tell
  ď‚— How much?
  ď‚— How many?
  ď‚— How often?
  ď‚— How severe?
   How costly? …but don’t overwhelm!
   Short!
Project Description
ď‚— What?
  ď‚— Goals and Objectives
ď‚— Why?
  ď‚— Best Practices/Effectiveness
ď‚— How?
  ď‚— Tasks/Activities
ď‚— Who?
  ď‚— Program Personnel
ď‚— When?
  ď‚— Time Line
Effective Goals/Objectives
ď‚— Goals - Broad statements reflecting ultimate
  results of accomplishment
 Objectives – Measurement of what the
  organization will do to accomplish goal
ď‚— Activities - Specific Tasks or Strategies
 Outcomes – Measure change as a result of
  project
Project Personnel
ď‚— Who will manage the project?
ď‚— Who will be involved in the project?
ď‚— What are their qualifications?
ď‚— What are their responsibilities?
ď‚— What is the management/organizational structure
  for the project?
ď‚— Are you using existing personnel or hiring
  someone after the award? If hiring, add a job
  description
Management Plan
ď‚— How organization is structured and the
  resources available
  ď‚— Key personnel
  ď‚— Organizational structure
  ď‚— Finance
  ď‚— HR
  ď‚— Unique features, i.e. volunteers, student
    workers, leveraging other workers
Evaluation Benefits
ď‚— Strengthens proposals in eye of reviewers
  ď‚— What works best
ď‚— Learn what is going well and what is not
  ď‚— Program improvement during the project



ď‚— Ensures project is operating effectively
  ď‚— Recipients of public trust
ď‚— Create a replicable model for others to use
Planning Evaluation
ď‚— What questions will evaluation answer?

ď‚— What are the specific evaluation plans and time frames?

ď‚— What data will be collected?

ď‚— Who will be evaluated/what will be measured?

ď‚— When will data be collected?

ď‚— What strategies/ tools/instruments will be used?

ď‚— Who will conduct the evaluation?

ď‚— Who will write and receive the report?

ď‚— How will the information be used to improve the project?
Assessment Measures
    ď‚— Quantitative
      ď‚— Number driven
      ď‚— Bottom line
      ď‚— Products

    ď‚— Qualitative
      ď‚— Quality
      ď‚— Perceptions and
        experiences of
        participants
      ď‚— Adjust programs and
        procedures
Budget

Budget justifies expenses and
aligns with proposal narrative
Budgeting Steps
ď‚— Establish budget period
ď‚— Estimate expenses
ď‚— Decide whether and how to include overhead or
  indirect costs. Remember that overhead costs are
  real!
ď‚— Estimate donated goods and services based on
  real costs and valid sources
ď‚— Estimate project revenues
Direct Expenses
ď‚— Consider: Implementation, continuation, and
  phase-down costs
  ď‚— Salaries and increases
  ď‚— Utilities, insurance, rental space, and
    equipment
  ď‚— Food, transportation, and telephone
  ď‚— Evaluation systems, audits, accounting
    systems, and dissemination activities
  ď‚— Materials and supplies
Indirect or Overhead Costs
ď‚— Shared by all of the program and entity but difficult to
  assign specific amounts to any one program, i.e.:
  ď‚— Liability Insurance
  ď‚— Copier Lease
  ď‚— Financial Management
ď‚— Recovery of indirect costs
  ď‚— Funders guidelines
  ď‚— Organization guidelines
In-Kind Matching Funds
 Read funder’s definition carefully
  ď‚— Can the match be an in-kind contribution (i.e.,
     goods, facilities or services)?
      Personnel             • Contractual
      Fringe benefits       • Construction
      Travel                • Miscellaneous
      Equipment             • Indirect Charges
     ď‚— Supplies
Cash Match
ď‚— Cash match (hard cash)
ď‚— Work with business manager to explore:
  ď‚— General operating funds
  ď‚— Specialized allocations
  ď‚— Other state or federal grants (allowable)
  ď‚— Private sector grants
  ď‚— Set up a fund internally for matching
Budget Principles
s   0 mistakes! (at least 3 proofers)

o   Consistent format – numbers, dollar signs, decimals, commas

a   Ask for enough, but just enough

e   Clearly justify your figures with real estimates, real travel
    locations, real mileage, real salaries (no estimates)

m   Tell your story. If someone cannot understand your project
    from reading your budget, start over.

r   Include ALL project costs, ALL internal contributions, ALL
    partner contributions, and plans for sustaining the project

t   When you do not have a person hired for a position, include a
    clear job description
Budget Presentation
You should present your budget in four different ways:

ď‚— Narrative format (a short summary that refers to
  percentages and precedes the standard format)

ď‚— Visual format, such as a pie chart that reflects the
  percentages mentioned in the narrative

ď‚— Standard numerical format
ď‚— Budget justification (details about each numerical item and
  follows the standard format)
Narrative
 The overall annual budget for the Center for
      Women and Children is projected to
be$465,000. Of this amount 53% is for salaries
and benefits, 37% is for programs and services
    to women and children, and 10% is for
  administration and fundraising expenses.
Visual Format
Standard Form
Item Annual Expense
A.       Personnel (Salaries, Wages)
     ď‚—   Executive Director                   $ 65,000
     ď‚—   Administrative Assistant, .5 FTE      $22,000
     ď‚—   Program Director                     $38,000
     ď‚—   Program Assistant                    $32,000
     ď‚—   Development Director                 $38,000
     ď‚—   Membership Coordinator               $32,000
     ď‚—   Office Assistant                     $26,500
     Total Personnel                        $183,500

B.       Benefits Medical/dental coverage   $22,000

C.       Contractual
     ď‚— 1. Web design and maintenance          $11,500
     ď‚— 2. Accounting (monthly)                $   500
Budget Justification
ď‚—   Thoughtful narrative per each item
ď‚—   Summary overview
ď‚—   Discuss any significant increases or
    decreases compared with last year's or next
    year's budget
ď‚—   Important figures (such as a high per unit
    cost).
For example, if your $250,000 organization
    has$75,000 increase in rent, explain why
Sample Budget Justification
Executive Director, Dr. Joan Smith
  The budget request is for .5 FTE director @
  $95,000 annual salary plus fringe at 28%.
Administrative Assistant, Ms. Mary Smith
  The budget request is for .5 FTE administrative
  assistant @ $37,500 annual salary plus fringe at
  22%. She will be .5 FTE for the Oklahoma GEAR
  UP Program at the same time. Office space is
  being contributed to the project by the Oklahoma
  GEAR UP program.
Abstract or Summary
ď‚— Proposal initiative
  ď‚— Project name, funding competition
ď‚— Statement of need
ď‚— Goals
ď‚— Measurable objectives
ď‚— Key activities
ď‚— Impact on problem
  ď‚— What will improve and how many will project impact over
    project duration
Double Check
ď‚— Create checklist of required items and supplements
  ď‚—   Proposal elements
  ď‚—   Criteria
  ď‚—   Technical requirements (proof font, tabs, margins, style)
  ď‚—   Submittal requirements (hard copy, e-copy)
  ď‚—   Budget

ď‚— Outside readers evaluate
ď‚— New pair of eyes to evaluate work. Get three persons to
  review: one close, one semi-close, and one cold. Try a teen-
  ager or a grandmother.
ď‚— Track submission with follow-up note, call, or electronic
  verification
Proposal Review Process
 ď‚— Guidelines vary by entity
 ď‚— Selection criteria and scoring
   ď‚— Published in solicitation and federal
     register
   ď‚— Available from Program Director
 ď‚— Peer review
Life After the Grant
ď‚— Grant is Accepted
  ď‚— YEAH!!!
  ď‚— Negotiated. This is VERY OK!!!
ď‚— Grant is Rejected
  ď‚—   Have 8 hours of depression and regroup
  ď‚—   Obtain reviewer comments
  ď‚—   Make personal visit
  ď‚—   All might not be lost...
ď‚— Write Thank You
  In either case, keep writing. BE PERSISTENT!
Remember…..


REJECTION IS GOOD!
        plans
    development
   learning curve
       contact
Hiring and Selecting Grant Writers
  Using an outside grant writer may seem like a good
    idea but maybe not… Ask:
  ď‚— Does our organization have the skills required for
    this project? (no = hire)
  ď‚— Is this a short term project or require long term
    commitment? (long term = in house)
  ď‚— Does this project require outside objectivity?
    (yes = hire)
Hiring and Selecting Grant Writers
           PROs                         CONs
   ď‚— On time                  ď‚— External values
   ď‚— On budget                ď‚— Have to gain knowledge
   ď‚— Honest                   ď‚— Lack of passion
   ď‚— Attention & time given   ď‚— Lack of relationships
     to project
                              ď‚— Expensive with no
   ď‚— Experience                 guarantee
Principles of Working
           With a Grant writer
ď‚— Prepare a one-page Scope of Work
ď‚— Get referrals
ď‚— Cost, Confidentiality Statement, Code of Ethics
ď‚— Pay a fee, not a % - same amount whether grant is funded or not
ď‚— Interview 3
ď‚— Select based on chemistry, calendar, cost
ď‚— Turn loose! Let the professional work
ď‚— Final report - hours spent on meetings, research, writing - costs of
   materials, postage, copying
Thank You!



  Cindy Pandini

cpandini@bcsvp.org

  604-568-9420

Grantwriting 101

  • 1.
  • 2.
    Agenda ď‚— The Givens ď‚—Locating Grants ď‚— Assessing Eligibility ď‚— Planning a Grant ď‚— Writing the Grant ď‚— Proposal Review and Follow-up ď‚— Grant Management ď‚— Hiring and Selecting Grant Writers
  • 3.
    The Givens ď‚— GrantWriting is part of your fundraising plan ď‚— Grant Writing is a necessity ď‚— Grant Writing should be ongoing ď‚— Grant Writing should be performed by someone who knows how to write ď‚— Grant Writing should yield results ď‚— Grant Writing is NEVER last minute ď‚— Funders will always tell you what they want ď‚— Grant proposals in the pipeline should be 200% of actual need -- double
  • 4.
    Categories of Support Operating – running program to meet community needs  Special Project – new project or project with limited timeframe  Capital/Equipment – specified amount for construction, renovation, expansion, purchase land or equipment  Endowments - planned gifts, will or trust
  • 5.
    Basic Grant Sources ď‚—Government - Federal, Provincial, Local ď‚— Foundations ď‚— Corporation ď‚— Family
  • 6.
    Assessing Funding Eligibility Eligibility  Type of organization  Geographic restrictions  Population served  Size of Award  Sufficient amount to complete program activities  Number of grants  Award size and duration  Project Focus  Project complements funder’s goals and priorities
  • 7.
    Assessing Funding Eligibility Cont. ď‚— Type of Activity ď‚— Specified use of funds ď‚— Restrictions ď‚— Matching funds ď‚— Expenditure limitations ď‚— Evaluation requirements
  • 8.
    Searching For and Locating Grants Finding the right grant opportunity is most of the time consuming work in grantsmanship. Plan to spend at least half your time in: ď‚— finding the agency ď‚— investigating previous projects that the agency has funded ď‚— learning about the grant proposal requirements 5. Become familiar with your chosen grant funders 6. Search locally first
  • 9.
    Grant Information Sources ď‚—Annual Reports ď‚— Funder Guidelines ď‚— Donor Website ď‚— Contact the Funding Agency by phone or email
  • 10.
    Grant Information SourcesCont. Paid Subscription Databases Ajah Fundtracker http://ajah.ca/ Donate2Charities http://donate2charities.ca BIG Online http://www.bigdatabase.ca/ Foundation Search Canada http://www.foundationsearch.ca/ Imagine Canada http://www.imaginecanada.ca/en/node/22 Charity Can - Aggregates all of Canada Revenue Agency T3010 data and allows you to search, rank, and compare all of Canada’s 85,000 plus charities, including charitable foundations. Also includes Noza Database-Canada, which has 2.1 million Canadian donation records. See also Canadian Donor’s Guide. https://www.charitycan.ca/default.aspx
  • 11.
    Grant Information SourcesCont. Free Databases Canadian Environmental Grantmakers Network - Grants database: http://www.cegn.org/English/grantmaking/dbsearch_public.cfm The Green Source: A Quick Reference to Funding Sources for Environmental Projects by Non-Profit Organizations is available on the websites of Environment Canada's regional offices. For links to each of the regional offices, check the national website: www.ec.gc.ca/ecoaction Environmental Grantmaking Foundations is an American directory that provides information on environmental grantmakers, and includes U.S. foundations that grant in Canada, and some Canadian foundations: www.environmentalgrants.com Funding Sources for British Columbia Communities: http://www.communityfutures.com/cms/Funding_Sources.2.0.html Charity Village - contains links to online databases and directories of funding agencies and foundations, plus online tools and resources: http://www.charityvillage.com/cv/ires/fund.asp
  • 12.
    Grant Information SourcesCont. Service Clubs: http://www.charityvillage.com/cv/nonpr/nonpr29.html Canada Revenue Agency – Charities Listings: http://www.cra-arc.gc.ca/chrts-gvng/lstngs/menu-eng.html Charity Focus - run by Imagine Canada and funded by CRA, this site makes CRA charities listings more accessible: http://www.charityfocus.ca Open Charity takes information from the CRA website and puts it in a more accessible format: http://www.opencharity.ca
  • 13.
    Grant Information SourcesCont. Fundsnet Services.com (US) Canadian Funders: ď‚— http://www.fundsnetservices.com/searchresult/29/Canada-Foundatio International Funders: ď‚— http://www.fundsnetservices.com/searchresult/30/International-Gran
  • 14.
    5 Top Waysto Get Funded t Read the RFP t Read the RFP a READ THE RFP a READ THE RFP! a READ THE RFP!!!
  • 15.
    Letters of Inquiry ď‚—Alternative to a call or visit ď‚— Do homework before the letter for previous ď‚— funding history, types of projects, amounts ď‚— Provide information about your organization ď‚— Provide information about your proposed project
  • 16.
    Letters of Inquiry 1-2 pages!  Who are you? Mission, organization, you are seeking funds  Why this agency? You understand their priorities  What is the need? Clear and brief  What's the plan? Bullet goals/objectives  Why fund you? Uniqueness, qualifications  How much? Broad categories  Closing – thank you, contact information, whether you will follow up with a phone call
  • 17.
    Letters of Intent Introduction  Why you are writing  Mission and population served  Needs  Demographic and statistical evidence  Project Description  Link funder’s priorities and project goals  Solution  How it addresses need  Best practices
  • 18.
    Letters of Intent ď‚—Project Plan ď‚— Activities, timetables, methodology ď‚— Organizational Capacity ď‚— Ability and commitment ď‚— Previous work and staff qualifications ď‚— Budget ď‚— Funding request, organizational support and other resources ď‚— Sustainability ď‚— Project continuation
  • 19.
    Planning the Grant ď‚—Start with an innovative idea that addresses a specific challenge and/or need (purpose) ď‚— Start documenting need. Social/economic costs, beneficiaries, nature of the problem, impending implications? ď‚— Scan and identify grant opportunities
  • 20.
    Planning the Grant ď‚—Target a grant ď‚— Make sure your focus aligns to the grant criteria ď‚— Make contact with grantor agency! ď‚— Review successful and recent awards ď‚— Identify partners, define roles and build partnerships as well as community support
  • 21.
    Proposal Components  Organization/PartnerOrganization Descriptions  Proposal Summary/Abstract  Statement of Need – Problem and Background  Project Description: Goals and Objectives  Methodology (Design and Timeframe)  Evaluation - Outside Evaluators, Quantitative and Qualitative Measures Aligned to Goals  Budget and Sustainability  Attachments – Commitment letters, Resumes of all Partners, Information Charts, References
  • 22.
    Using Statistics  StatisticsTell  How much?  How many?  How often?  How severe?  How costly? …but don’t overwhelm! Short!
  • 23.
    Project Description ď‚— What? ď‚— Goals and Objectives ď‚— Why? ď‚— Best Practices/Effectiveness ď‚— How? ď‚— Tasks/Activities ď‚— Who? ď‚— Program Personnel ď‚— When? ď‚— Time Line
  • 24.
    Effective Goals/Objectives  Goals- Broad statements reflecting ultimate results of accomplishment  Objectives – Measurement of what the organization will do to accomplish goal  Activities - Specific Tasks or Strategies  Outcomes – Measure change as a result of project
  • 25.
    Project Personnel ď‚— Whowill manage the project? ď‚— Who will be involved in the project? ď‚— What are their qualifications? ď‚— What are their responsibilities? ď‚— What is the management/organizational structure for the project? ď‚— Are you using existing personnel or hiring someone after the award? If hiring, add a job description
  • 26.
    Management Plan ď‚— Howorganization is structured and the resources available ď‚— Key personnel ď‚— Organizational structure ď‚— Finance ď‚— HR ď‚— Unique features, i.e. volunteers, student workers, leveraging other workers
  • 27.
    Evaluation Benefits ď‚— Strengthensproposals in eye of reviewers ď‚— What works best ď‚— Learn what is going well and what is not ď‚— Program improvement during the project ď‚— Ensures project is operating effectively ď‚— Recipients of public trust ď‚— Create a replicable model for others to use
  • 28.
    Planning Evaluation ď‚— Whatquestions will evaluation answer? ď‚— What are the specific evaluation plans and time frames? ď‚— What data will be collected? ď‚— Who will be evaluated/what will be measured? ď‚— When will data be collected? ď‚— What strategies/ tools/instruments will be used? ď‚— Who will conduct the evaluation? ď‚— Who will write and receive the report? ď‚— How will the information be used to improve the project?
  • 29.
    Assessment Measures ď‚— Quantitative ď‚— Number driven ď‚— Bottom line ď‚— Products ď‚— Qualitative ď‚— Quality ď‚— Perceptions and experiences of participants ď‚— Adjust programs and procedures
  • 30.
    Budget Budget justifies expensesand aligns with proposal narrative
  • 31.
    Budgeting Steps ď‚— Establishbudget period ď‚— Estimate expenses ď‚— Decide whether and how to include overhead or indirect costs. Remember that overhead costs are real! ď‚— Estimate donated goods and services based on real costs and valid sources ď‚— Estimate project revenues
  • 32.
    Direct Expenses ď‚— Consider:Implementation, continuation, and phase-down costs ď‚— Salaries and increases ď‚— Utilities, insurance, rental space, and equipment ď‚— Food, transportation, and telephone ď‚— Evaluation systems, audits, accounting systems, and dissemination activities ď‚— Materials and supplies
  • 33.
    Indirect or OverheadCosts ď‚— Shared by all of the program and entity but difficult to assign specific amounts to any one program, i.e.: ď‚— Liability Insurance ď‚— Copier Lease ď‚— Financial Management ď‚— Recovery of indirect costs ď‚— Funders guidelines ď‚— Organization guidelines
  • 34.
    In-Kind Matching Funds Read funder’s definition carefully  Can the match be an in-kind contribution (i.e., goods, facilities or services)?  Personnel • Contractual  Fringe benefits • Construction  Travel • Miscellaneous  Equipment • Indirect Charges  Supplies
  • 35.
    Cash Match ď‚— Cashmatch (hard cash) ď‚— Work with business manager to explore: ď‚— General operating funds ď‚— Specialized allocations ď‚— Other state or federal grants (allowable) ď‚— Private sector grants ď‚— Set up a fund internally for matching
  • 36.
    Budget Principles s 0 mistakes! (at least 3 proofers) o Consistent format – numbers, dollar signs, decimals, commas a Ask for enough, but just enough e Clearly justify your figures with real estimates, real travel locations, real mileage, real salaries (no estimates) m Tell your story. If someone cannot understand your project from reading your budget, start over. r Include ALL project costs, ALL internal contributions, ALL partner contributions, and plans for sustaining the project t When you do not have a person hired for a position, include a clear job description
  • 37.
    Budget Presentation You shouldpresent your budget in four different ways: ď‚— Narrative format (a short summary that refers to percentages and precedes the standard format) ď‚— Visual format, such as a pie chart that reflects the percentages mentioned in the narrative ď‚— Standard numerical format ď‚— Budget justification (details about each numerical item and follows the standard format)
  • 38.
    Narrative The overallannual budget for the Center for Women and Children is projected to be$465,000. Of this amount 53% is for salaries and benefits, 37% is for programs and services to women and children, and 10% is for administration and fundraising expenses.
  • 39.
  • 40.
    Standard Form Item AnnualExpense A. Personnel (Salaries, Wages) ď‚— Executive Director $ 65,000 ď‚— Administrative Assistant, .5 FTE $22,000 ď‚— Program Director $38,000 ď‚— Program Assistant $32,000 ď‚— Development Director $38,000 ď‚— Membership Coordinator $32,000 ď‚— Office Assistant $26,500 Total Personnel $183,500 B. Benefits Medical/dental coverage $22,000 C. Contractual ď‚— 1. Web design and maintenance $11,500 ď‚— 2. Accounting (monthly) $ 500
  • 41.
    Budget Justification ď‚— Thoughtful narrative per each item ď‚— Summary overview ď‚— Discuss any significant increases or decreases compared with last year's or next year's budget ď‚— Important figures (such as a high per unit cost). For example, if your $250,000 organization has$75,000 increase in rent, explain why
  • 42.
    Sample Budget Justification ExecutiveDirector, Dr. Joan Smith The budget request is for .5 FTE director @ $95,000 annual salary plus fringe at 28%. Administrative Assistant, Ms. Mary Smith The budget request is for .5 FTE administrative assistant @ $37,500 annual salary plus fringe at 22%. She will be .5 FTE for the Oklahoma GEAR UP Program at the same time. Office space is being contributed to the project by the Oklahoma GEAR UP program.
  • 43.
    Abstract or Summary ď‚—Proposal initiative ď‚— Project name, funding competition ď‚— Statement of need ď‚— Goals ď‚— Measurable objectives ď‚— Key activities ď‚— Impact on problem ď‚— What will improve and how many will project impact over project duration
  • 44.
    Double Check ď‚— Createchecklist of required items and supplements ď‚— Proposal elements ď‚— Criteria ď‚— Technical requirements (proof font, tabs, margins, style) ď‚— Submittal requirements (hard copy, e-copy) ď‚— Budget ď‚— Outside readers evaluate ď‚— New pair of eyes to evaluate work. Get three persons to review: one close, one semi-close, and one cold. Try a teen- ager or a grandmother. ď‚— Track submission with follow-up note, call, or electronic verification
  • 45.
    Proposal Review Process ď‚— Guidelines vary by entity ď‚— Selection criteria and scoring ď‚— Published in solicitation and federal register ď‚— Available from Program Director ď‚— Peer review
  • 46.
    Life After theGrant ď‚— Grant is Accepted ď‚— YEAH!!! ď‚— Negotiated. This is VERY OK!!! ď‚— Grant is Rejected ď‚— Have 8 hours of depression and regroup ď‚— Obtain reviewer comments ď‚— Make personal visit ď‚— All might not be lost... ď‚— Write Thank You In either case, keep writing. BE PERSISTENT!
  • 47.
    Remember….. REJECTION IS GOOD! plans development learning curve contact
  • 48.
    Hiring and SelectingGrant Writers Using an outside grant writer may seem like a good idea but maybe not… Ask:  Does our organization have the skills required for this project? (no = hire)  Is this a short term project or require long term commitment? (long term = in house)  Does this project require outside objectivity? (yes = hire)
  • 49.
    Hiring and SelectingGrant Writers PROs CONs ď‚— On time ď‚— External values ď‚— On budget ď‚— Have to gain knowledge ď‚— Honest ď‚— Lack of passion ď‚— Attention & time given ď‚— Lack of relationships to project ď‚— Expensive with no ď‚— Experience guarantee
  • 50.
    Principles of Working With a Grant writer ď‚— Prepare a one-page Scope of Work ď‚— Get referrals ď‚— Cost, Confidentiality Statement, Code of Ethics ď‚— Pay a fee, not a % - same amount whether grant is funded or not ď‚— Interview 3 ď‚— Select based on chemistry, calendar, cost ď‚— Turn loose! Let the professional work ď‚— Final report - hours spent on meetings, research, writing - costs of materials, postage, copying
  • 51.
    Thank You! Cindy Pandini cpandini@bcsvp.org 604-568-9420

Editor's Notes

  • #7 Not uncommon for family and corporate foundation to limit grants to organization located in regions, state, city or towns where they do business. What activities the funder will and will not fund – Fund tutoring, scholarships, construction, funding categories, populations
  • #10 IRS Form 990 – How foundation distribute funds – Who, Size, duration Get copy of 990 by contacting IRS, directly form the public charity or Internet databases such as Guidestar (www.guidestar.org)
  • #18 Letter of Intent or Inquiry Often foundation and cooperation request a letter of intent to screen out projects that do not meet their funding guidelines and avoid length proposal writing. Funder may also want to preselect projects in which it has an interest and request full proposals Letters of Intent are brief and should be written on letterhead
  • #19 Letter of Intent or Inquiry Often foundation and cooperation request a letter of intent to screen out projects that do not meet their funding guidelines and avoid length proposal writing. Funder may also want to preselect projects in which it has an interest and request full proposals Letters of Intent are brief and should be written on letterhead
  • #23 Use statistics judiciously…Do not use dramatic figures that paint a negative picture of an area or target population just to demonstrate how bad things are. May backfire…. Tie statistics directly to the problem that you are trying to solve. Start a file that includes items such as statistical data, reports, newspaper articles, white papers and other pertinent info you come across throughout the year.
  • #24 Solution: What are you going to do to fix “the Need” Review of literature- Why did you decide on this solution? What are the best practices? Goals/Objectives/Activities/Outcomes – how are you going to accomplish the project Program/Project personnel – Who is going to administer the project? What are there qualifications? Timeline/Schedule of Activities- When will the project take place? What are the mile stones?
  • #32 Estimate project length six months or a year.
  • #34 Budget detail should include what is covered under indirect costs. For example, if telephone is covered as a direct expense it should not be covered included in indirect costs. Indirect costs are usually calculated as a percentage of total direct costs. Indirect costs can range from as little as 5 percent for a charter school to as much as 60 percent for a major university. Your agency may already have an approved indirect cost rate from a state or federal agency. Contact your business manager or contact the US Office of Management and Budget or your state’s Fiscal Agency.
  • #35 Cash Match: When your are trying to find available money for hard cash match, check with financial officer and
  • #44 Brief one page review of what the reviewer will find in the application/proposal Written after grant narrative Key sentences from the main sections
  • #46 Foundations and state and local government review quicker than federal government. Federal government six to 12 months Amount of points assigned to each session indicates importance