SlideShare a Scribd company logo
1 of 8
CURRICULUM VITAE
PERSONAL DETAILS
Name: SATHASIVAM M PALANIANDY
Date of Birth: 18 Jun 1971
Marital Status: Married
Nationality: Malaysian
Passport no: A26167633
Email ADD: sivam6@yahoo.com
Phone Number: +60175455873
Correspondence Address: No1 Jalan Seri Emas 1 Taman Seri Emas
Sg. Chua 43000 Kajang Selangor
Educations: Diploma in Electrical & Electronic
C&G of London
Society of Engineers
WCDMA ERICSSON MALAYSIA
__________________________________________________________________________
03 September 2014 to 23 Febuary 2015 Ericsson Papua New Guinea.
• Assigned as Site Coordinator for Ericsson Papua New Guinea.
• Projects involved Installation of new RBS 6102 , TN upgrade and 3G RBS 3518.
• Responsible for Installation ,rbs swap, test and commissioning RBS6000 2/3G.
• Installation of Power Oasis, Delta Rectifier Cabinet, Battery cabinet Emerson and Solar Panel
• Responsible for Power Maintenance for Delta Rectifier, Battery Cabinet , Solar Panel System
• Power Oasis Monitoring, Generator fuel and start system and main incoming AC POWER.
• Testing and Commissioning all equipment’s plus prepared maintenance Reports.
• Installation of RBS 3518 in to RBS 6102,Node B 6601,6201 and 6601
• Installation of VSAT testing and commissioning.
• Use of i-site software, TCU and DUG.
• Do cross pole for VSAT and bring site ON AIR.
• Over all check list for Acceptances with customer.
1
05th 2013 August to 01st
August 2014 as Project Site Coordinator NGM Networks
Involved in SWAP MAXIS GABS PROJECTS from Motorola BTS to Huawei DBS3900.
• Responsibility in Test and commissioning DBS3900 and BTS3900 HUAWEI 3G/2G.
• Feeder test, field test using Test Phone, Ping Test ,Data Speed Test and UAT
• Supervise contractor for site Installation according to Site Survey Document.
• Supervise contractor on all kind of CIVIL WORKS such as Install boom
• Antenna Pole and Brackets, RRU Pole and Brackets, Cable Trays and I-beam.
• Prepare Documents and Acceptance for CIVIL WORKS.
• Use of software LMT WEB, LMT and M2K for Huawei BTS, DBS and BSC.
• Responsible for site ACCEPTANCE with customer.
01 March 2013 to 01 August 2013 as Senior Project Supervisor Ericsson Medan Indonesia.
Project involved: MODERNIZATION 2G/3G RBS 6601 6201 and TRANSMISSION SIU
• equipment Responsibility to overlook SWAP RBS 6000 Family for (3G)(2G)
• Responsibility for all equipment loading at site and checking all equipment needed to do
installation at site
• Monitoring installation in accordance with set value SIR include Fiber Optic and Power
cable RRU(RBS 6601)
• To monitor commissioning and integration (2G/3G) RBS6601,6201 and
transmission (SIU).
• Prepared all scrip for 3G to equipment node-B (RRU), RBS 6601 and transmission
equipment (SIU).
Test and commissioning New Harris Rectifier and completed with DC Power Cable to
RBS.
Transfer EXISTING E1 from old RBS to new RBS use FO FE Fiber Optic metro system.
• Testing RBS Internal & External alarm.
• Preparation all documents for accepted include print screen data and picture before and
after activity for installation.
• Do accepted test for all equipment and part installation with customer.
• Ensure that each installation in accordance with the SIR value is set done by installation
team.
• Responsible in supervise and monitoring the installation works, to ensure they are in
accordance with the SID, Client’s Specification and work method done by installer team
24 May 2012 to 24 August 2012Ericsson Papua New Guinea.
• Assigned as Team Leader for Ericsson Papua New Guinea.
• Projects involved Installation of new RBS 6102 , TN upgrade and 3G RBS 3518.
• Responsible for Installation ,rbs swap, test and commissioning RBS6000 2/3G.
2
• Installation of Power Oasis, Delta Rectifier Cabinet, Battery cabinet Emerson and Solar Panel
• Responsible for Power Maintenance for Delta Rectifier, Battery Cabinet , Solar Panel System
• Power Oasis Monitoring, Generator fuel and start system and main incoming AC POWER.
• Testing and Commissioning all equipment’s plus prepared maintenance Reports.
• Installation of RBS 3518 in to RBS 6102,Node B 6601,6201 and 6102.
01 March 2012 to 1 April 2012 Ericsson Malaysia.
Assigned as Site Coordinator for Ericsson Malaysia involved in Celcom LTE 2G/3G Projects
In West Malaysia.
Prepared all the necessary document for Acceptance and handover to customer.
• Responsible for network implementation and integration processes, Installation and achieve Targets.
• Responsible to give training to local staff and contractor, coordinate the whole rollout projects.
01 Jan 2011 to December 2011 Ericsson Papua New Guinea.
• Assigned as Team Leader for Ericsson Papua New Guinea.
• Projects involved Installation of new RBS 6102 , TN upgrade and 3G RBS 3518.
• Responsible for Installation ,rbs swap, test and commissioning RBS6000 2/3G.
• Installation of Power Oasis, Delta Rectifier Cabinet, Battery cabinet Emerson and Solar Panel
• Responsible for Power Maintenance for Delta Rectifier, Battery Cabinet , Solar Panel System
• Power Oasis Monitoring, Generator fuel and start system and main incoming AC POWER.
• Testing and Commissioning all equipment’s plus prepared maintenance Reports
• Responsible for overall Acceptance.
• Installation of RBS 3518 in to RBS 6102,Node B 6601,6201 and 6102.
• Prepared all the necessary document for Acceptance and handover to customer.
• Excellent knowledge about alarm handling and fault. Restoration in the RBS and Node B.
01 Feb 2010 to 30 Dis 2010 Maxis Malaysia
• Involved in Maxis W900 projects in Malaysia
• Upgrade software to P7 and configuration from 3 x 1 to 3 x 3.
• Responsible for Installation of new antenna system, feeder and CME works
• Involved n installing tripod boom for antenna tri band.
• Assigned for TSS and documents
• Overall commitment in this projects until ACCEPTANCE.
• Assigned to do cabin MNE work such as installed ACPDB, cable ladder in/outdoor
• Incoming AC main from 3 phase, lighting and power plug and air cons for Telecom Malaysia
• Installation, test and commissioning ZTE BBS for Syscom.
• Installation, test and commissioning NEC PASO LINK for Syscom.
20 Sept 2009 – 20 Jan Ericsson Vietnam
• Assigned as Node B Engineer in Ericsson Vietnam based in Ho Chi Minh City.
3
• Project involved is total rollout 2300 site 3G Networks for VINAPHONE operator.
• Responsible to Test, commissioning, and acceptance Ericsson Node B 3518,3018 and 3206.
• Excellent knowledge on P7.1 Software, Atm, Ip and Ethernet for transmission using fiber optic.
• Responsible in coordinate local Engineers and Asp in total rollout according to SID.
• Responsible to train local Ericsson Engineer and contractor on Node B and OAM.
02 Feb 2008 – 06 August 2009 – Ericsson Indonesia
• Assigned as RBS & TRM TN Engineer in Ericsson Indonesia, for NTS project related matters in the
network and total projects Rollout on 2G/3G and Traffic Node.
• Excellent knowledge about alarm handling and fault. Restoration in the RBS and Node B.
• Excellent knowledge in Minlink TN, traffic routing handling capabilities and traffic characteristics.
• Responsible for network implementation and integration processes, Installation and achieve Targets.
• Responsible to give training to local staff and contractor, coordinate the whole rollout projects.
• Project details- 2G/3G Ericsson WCDMA Node B such as 3116,3018,3206,3518,3418,3216.2116,2216.
• Test and commissioning, involved in deign plan spec sites Integration, full responsible on ITC rollout.
• 2G/3G Acceptance Test (PAT). Test calls 3G to 3G (Voice, Video), FTP, Video Streaming, Handover,
Test calls, Scripts ,Upgrade software P3 to P5 & Drive Test.
May 2007 to Jan 2008
Working for Ericsson Bangladesh as TI Supervisor involved in WARID Project
• Supervise & commissioning 2G EDGE 2206, 2106I, 2206V2,2116 ,2216 and Minilink E/ TN
• Support installation team for RBS2116.2216,2206, 2106I , 2206 and Transmission
Minilink TN, cross connection (mapping up to BSC) and on air sites assigned
• Responsible in total Rollout Projects until Handover. Prepare SID for Acceptance.
• Responsible for both CME and ITC site survey, rollout, operation & maintenance.
September 2006 to Jan 2007
Work for Ericsson Adelaide South Australia as test commissioning and installation Engineer involved
Project WCDMA 3206 commissioning and integration, Nortel CDMA and WCDMA3206 antenna
Integration, sweep test, E-1 verify, Ber Test, Feeder Test, alarms, Eltec rectifier commissioning and
Responsible for site Audit for Australia major Telecommunication Company TELSTRA.
• Project responsible for problem determination and problem resolution the NodeB/RBS itself and in
application related matters in the network.
Excellent knowledge about alarm handling and fault. Restoration in the RBS nodes.
• Excellent knowledge of the network topology, its traffic handling capabilities and traffic characteristics.
Good knowledge of network implementation and integration processes.
• Project details- 3.5G Ericsson WCDMA Node B such as RBS 3202, 3412, 3107 ,3106 & 3206.
Installations, commissioning with the HSDPA Technology in 2.1 GHz.
• Scripts making with IMA and without IMA by using the ultra edit Tool and script loading, New sites
Integration. 3x1 configurations with single carrier, TXB 128 CE, HSDPA 128 CE and RAXB 256 CE.
• 3G Acceptance Test (PAT). Test calls 3G to 3G (Voice, Video), FTP, Video Streaming, Handover,
Test calls, Upgrade software P4 to P5 & Drive Test.
4
• Change hardware if there is any fault in Node B unit. Responsible for 2nd
level maintenance after site swap
until site hand over to client.
January 2005 to Feb 2006
• Work for Ericsson Indonesia (Single network project) GSM-900-1880 (2202, 2206, 2207)
EDGE upgrading (RBS2202) as BTS Supervisor, Commissioning & testing.
• Complete knowledge on Installation and Commissioning of RBS 2000 Families and Mini-Link Equipment.
• Responsible also for re parenting of site from existing BSC to a new BSC
• Wide exposure and knowledge on Installation, Cabling and Termination of various types of
Telecommunication Equipment Such as PDH/SDH system. And GSM Radio Base Station / Base
Transmission System.
• To practice my profession with dedicated competence and responsibility in order to provide quality and
valuable services.
Feb 2000 to Dis 2004
• Work for Maxis GSM 900-1800 Project, As a BTS Installation, BTS commissioning&
Testing for Metro-site, Transmission (ber test & terms) Ultra-site Commissioning and testing also
Indoor and Outdoor trouble shooting.
• Work for DIGI Project GSM-900-1800 upgrading (Ericsson 200, 2202, 2206, 2102, and 2106) As BTS
installation and commissioning and testing indoor and outdoor.
• Ericsson 2206, 2106 and 2308 as installation supervisor, BTS testing and Site Master Feeder Check for Maxis Project
Malaysia
• Microwave installation for DMR and DMC for DIGI Telecommunication.
• Installation Supervisor for DIGI Telecommunication with Ericsson Equipment RBS 200 and RBS 205 and
Ericsson mini-link.
Jan 1994 to Dis 1999
• Work for Dancom (M) Sdn Bhd as RBS Engineer for DIGI project pervious Mutira Telecom.
Job responsibilities:
• Site survey prepares installation material and site documents.
• Site Proposal
• Supervised BTS installations;
• Supervised Antenna installations;
• Performed Antenna test result (VSWR, Return Loss and Distance to Fault)
• Performed BTS commissioning and integration;
• Performed Ber test(Ericsson microwave mini link) commissioning and link testing;
• Handled audit/quarry report acceptance testing for BTS and microwave links.
• Lightning protection system installation & supervision.
• AC/DC-power installation & supervision
• Trouble shooting.
• Update knowledge about new products of Ericsson.
• Supervised all kind civil works according to site plan.
• Performed Earth Test
5
• Documentation according to DIGI project procedures.
• Site folder documentation.
• Extensive deficiency report.
• Responsible in implementing the site audit/quarry and BTS & Antenna installation coordination of
BTS site.
ADDITIONAL INFORMATION
• Familiar with BSC SIM and BSC Simulator (2) UPSIM Equipment and TDR.
• Familiar with LMT and OMT version Commissioning.
• Perform the BSC/MSC during trouble shooting for further information to help reduce time delay for
certain problem that occurred on sites(BTS)
• Perform Test and analyzing fault and report the test report to the project manager.
• Continuously update software version of the latest BTS software version to avoid testing with BSC/MSC
and the BTS.
Languages:
• English
• Malay
• Tamil
SKILLS:
• PC with window version 95, 98, 2000, XP and Microsoft Office and VISTA.
• OMT version for RBS 2000 and LMT RBS 200.Emas.Moshell P5,P6 and P7.1
COURSES AND TRAINING ATTENDED
• Ericsson Education Malaysia (3G)WCDMA System Overview(LZT 1236208 R3A)
• Ericsson Education Malaysia (3G)WCDMA RBS 3000 – Installation Delta
• Ericsson Education Malaysia (3G)WCDMA RAN Node B Commissioning
• Ericsson Education Malaysia (3G)WCDMA RAN Field Maintenance
• Minilink and RBS2000 family Digi Telecommunication and Maxis.
References Persons:
Toni Chandra
Head of Network Roll-out
PT. Ericsson Indonesia
Network Services Division
Wisma Pondok Indah, 10 Floor
Jln. Sultan Iskandar Muda
Jakarta 12310 – Indonesia.
Tel No: +62217692222
Fax No: +62217519608
Mobile No: +62818199665
E-mail Add: toni.chandra@ericsson.com
6
THOMAS WIRSEEN
Projects Manager CELCOM PROJECTS
3420 Persiaran Sepang
63000 Cyberjaya, Malaysia
Phone +603-83146472
Mobile +60123965310
Thomas.wirseen@ericsson.com
www.ericsson.com
Mathiarasan Kandasamy
CPM Senior at Ericsson Singapore
Ericsson Bangladesh
Mobile No:+60162208781
E-mail add: mathiarasan.kandasamy@ericsson.com
: graphics_mk@yahoo.com
Yohanes Preasetyo [ Indonesia Projects]
Head of Radio Implementation Section
Pt Ericsson Indonesia
Network Roll Out Division
Mobile No: +62811862944
E-mail add: yohanes.preasetyo@ericsson.com
VICTOR KHOO [ Indonesia Projects]
TPM NTS PROJECTS 2G/3G
Pt Ericsson Indonesia
Network Roll Out Division
Mobile No: +628111661253
E-mail add: victor.kho@ericsson.com
OLIVER TUNGOL
Project Manager
Pt Ericsson Indonesia
Modernization Sumbagut Project Telekomsel
Mobile No: +628119304754
E-mail add: oliver.tungol@ericsson.com
Albert Madriaga
Implementation Manager
Ericsson Papua New Guinea.
Mobile No: +67570876304
E-mail add: albert.madriaga@ericsson.com
7
8

More Related Content

What's hot (17)

Cv meynard
Cv meynardCv meynard
Cv meynard
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
Isyak Yuzri Ahmad Resume
Isyak Yuzri Ahmad ResumeIsyak Yuzri Ahmad Resume
Isyak Yuzri Ahmad Resume
 
Khlau Rev0 150701
Khlau Rev0 150701Khlau Rev0 150701
Khlau Rev0 150701
 
ALABI Kola Samuel
ALABI Kola SamuelALABI Kola Samuel
ALABI Kola Samuel
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
Devesh CV
Devesh CVDevesh CV
Devesh CV
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Rakesh
RakeshRakesh
Rakesh
 
CV~Bayu Maindonald20150221
CV~Bayu Maindonald20150221CV~Bayu Maindonald20150221
CV~Bayu Maindonald20150221
 
CV~Bayu Maindonald_20150518
CV~Bayu Maindonald_20150518CV~Bayu Maindonald_20150518
CV~Bayu Maindonald_20150518
 
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
Eslam CV-19062016
Eslam CV-19062016Eslam CV-19062016
Eslam CV-19062016
 
pravendra -cv
pravendra -cvpravendra -cv
pravendra -cv
 
Mark G Quiambao's CV
Mark G Quiambao's CVMark G Quiambao's CV
Mark G Quiambao's CV
 

Viewers also liked

resume_anjuln
resume_anjulnresume_anjuln
resume_anjulnANJUL N
 
Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony Fan
 
Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015wan azri
 

Viewers also liked (8)

resume_anjuln
resume_anjulnresume_anjuln
resume_anjuln
 
Reden_CV
Reden_CVReden_CV
Reden_CV
 
SHAUN CUMMINGS RESUME
SHAUN CUMMINGS RESUMESHAUN CUMMINGS RESUME
SHAUN CUMMINGS RESUME
 
Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_Vitae
 
Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015
 
CV Yudi Syah Putra OS
CV Yudi Syah Putra OSCV Yudi Syah Putra OS
CV Yudi Syah Putra OS
 
CV A. Hadiyanto Suroso
CV A. Hadiyanto SurosoCV A. Hadiyanto Suroso
CV A. Hadiyanto Suroso
 
CV Azlimi_2016
CV Azlimi_2016CV Azlimi_2016
CV Azlimi_2016
 

Similar to CV_SIVAM OCT.doc 1 (20)

Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 
cv 2
cv 2cv 2
cv 2
 
VED RESUME(1)
VED RESUME(1)VED RESUME(1)
VED RESUME(1)
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
 
Practical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringPractical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineering
 
Irfan Ashraf CV
Irfan Ashraf CVIrfan Ashraf CV
Irfan Ashraf CV
 
Ibrar Hussain CV
Ibrar Hussain  CVIbrar Hussain  CV
Ibrar Hussain CV
 
jay prakash_Resume
jay prakash_Resumejay prakash_Resume
jay prakash_Resume
 
Wan_Mohd_Azri_-_CV_May_2015
Wan_Mohd_Azri_-_CV_May_2015Wan_Mohd_Azri_-_CV_May_2015
Wan_Mohd_Azri_-_CV_May_2015
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
Saeed Jalal CV
Saeed Jalal CVSaeed Jalal CV
Saeed Jalal CV
 
Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016
 
arun kumar
arun kumararun kumar
arun kumar
 
Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)
 
Isaac Williams CV
Isaac Williams CVIsaac Williams CV
Isaac Williams CV
 
Resume kasi
Resume kasiResume kasi
Resume kasi
 
KAMALJEET_SINGH_cv_NEW
KAMALJEET_SINGH_cv_NEWKAMALJEET_SINGH_cv_NEW
KAMALJEET_SINGH_cv_NEW
 
RAN_CV_Gyanendra Patel
RAN_CV_Gyanendra PatelRAN_CV_Gyanendra Patel
RAN_CV_Gyanendra Patel
 

CV_SIVAM OCT.doc 1

  • 1. CURRICULUM VITAE PERSONAL DETAILS Name: SATHASIVAM M PALANIANDY Date of Birth: 18 Jun 1971 Marital Status: Married Nationality: Malaysian Passport no: A26167633 Email ADD: sivam6@yahoo.com Phone Number: +60175455873 Correspondence Address: No1 Jalan Seri Emas 1 Taman Seri Emas Sg. Chua 43000 Kajang Selangor Educations: Diploma in Electrical & Electronic C&G of London Society of Engineers WCDMA ERICSSON MALAYSIA __________________________________________________________________________ 03 September 2014 to 23 Febuary 2015 Ericsson Papua New Guinea. • Assigned as Site Coordinator for Ericsson Papua New Guinea. • Projects involved Installation of new RBS 6102 , TN upgrade and 3G RBS 3518. • Responsible for Installation ,rbs swap, test and commissioning RBS6000 2/3G. • Installation of Power Oasis, Delta Rectifier Cabinet, Battery cabinet Emerson and Solar Panel • Responsible for Power Maintenance for Delta Rectifier, Battery Cabinet , Solar Panel System • Power Oasis Monitoring, Generator fuel and start system and main incoming AC POWER. • Testing and Commissioning all equipment’s plus prepared maintenance Reports. • Installation of RBS 3518 in to RBS 6102,Node B 6601,6201 and 6601 • Installation of VSAT testing and commissioning. • Use of i-site software, TCU and DUG. • Do cross pole for VSAT and bring site ON AIR. • Over all check list for Acceptances with customer. 1
  • 2. 05th 2013 August to 01st August 2014 as Project Site Coordinator NGM Networks Involved in SWAP MAXIS GABS PROJECTS from Motorola BTS to Huawei DBS3900. • Responsibility in Test and commissioning DBS3900 and BTS3900 HUAWEI 3G/2G. • Feeder test, field test using Test Phone, Ping Test ,Data Speed Test and UAT • Supervise contractor for site Installation according to Site Survey Document. • Supervise contractor on all kind of CIVIL WORKS such as Install boom • Antenna Pole and Brackets, RRU Pole and Brackets, Cable Trays and I-beam. • Prepare Documents and Acceptance for CIVIL WORKS. • Use of software LMT WEB, LMT and M2K for Huawei BTS, DBS and BSC. • Responsible for site ACCEPTANCE with customer. 01 March 2013 to 01 August 2013 as Senior Project Supervisor Ericsson Medan Indonesia. Project involved: MODERNIZATION 2G/3G RBS 6601 6201 and TRANSMISSION SIU • equipment Responsibility to overlook SWAP RBS 6000 Family for (3G)(2G) • Responsibility for all equipment loading at site and checking all equipment needed to do installation at site • Monitoring installation in accordance with set value SIR include Fiber Optic and Power cable RRU(RBS 6601) • To monitor commissioning and integration (2G/3G) RBS6601,6201 and transmission (SIU). • Prepared all scrip for 3G to equipment node-B (RRU), RBS 6601 and transmission equipment (SIU). Test and commissioning New Harris Rectifier and completed with DC Power Cable to RBS. Transfer EXISTING E1 from old RBS to new RBS use FO FE Fiber Optic metro system. • Testing RBS Internal & External alarm. • Preparation all documents for accepted include print screen data and picture before and after activity for installation. • Do accepted test for all equipment and part installation with customer. • Ensure that each installation in accordance with the SIR value is set done by installation team. • Responsible in supervise and monitoring the installation works, to ensure they are in accordance with the SID, Client’s Specification and work method done by installer team 24 May 2012 to 24 August 2012Ericsson Papua New Guinea. • Assigned as Team Leader for Ericsson Papua New Guinea. • Projects involved Installation of new RBS 6102 , TN upgrade and 3G RBS 3518. • Responsible for Installation ,rbs swap, test and commissioning RBS6000 2/3G. 2
  • 3. • Installation of Power Oasis, Delta Rectifier Cabinet, Battery cabinet Emerson and Solar Panel • Responsible for Power Maintenance for Delta Rectifier, Battery Cabinet , Solar Panel System • Power Oasis Monitoring, Generator fuel and start system and main incoming AC POWER. • Testing and Commissioning all equipment’s plus prepared maintenance Reports. • Installation of RBS 3518 in to RBS 6102,Node B 6601,6201 and 6102. 01 March 2012 to 1 April 2012 Ericsson Malaysia. Assigned as Site Coordinator for Ericsson Malaysia involved in Celcom LTE 2G/3G Projects In West Malaysia. Prepared all the necessary document for Acceptance and handover to customer. • Responsible for network implementation and integration processes, Installation and achieve Targets. • Responsible to give training to local staff and contractor, coordinate the whole rollout projects. 01 Jan 2011 to December 2011 Ericsson Papua New Guinea. • Assigned as Team Leader for Ericsson Papua New Guinea. • Projects involved Installation of new RBS 6102 , TN upgrade and 3G RBS 3518. • Responsible for Installation ,rbs swap, test and commissioning RBS6000 2/3G. • Installation of Power Oasis, Delta Rectifier Cabinet, Battery cabinet Emerson and Solar Panel • Responsible for Power Maintenance for Delta Rectifier, Battery Cabinet , Solar Panel System • Power Oasis Monitoring, Generator fuel and start system and main incoming AC POWER. • Testing and Commissioning all equipment’s plus prepared maintenance Reports • Responsible for overall Acceptance. • Installation of RBS 3518 in to RBS 6102,Node B 6601,6201 and 6102. • Prepared all the necessary document for Acceptance and handover to customer. • Excellent knowledge about alarm handling and fault. Restoration in the RBS and Node B. 01 Feb 2010 to 30 Dis 2010 Maxis Malaysia • Involved in Maxis W900 projects in Malaysia • Upgrade software to P7 and configuration from 3 x 1 to 3 x 3. • Responsible for Installation of new antenna system, feeder and CME works • Involved n installing tripod boom for antenna tri band. • Assigned for TSS and documents • Overall commitment in this projects until ACCEPTANCE. • Assigned to do cabin MNE work such as installed ACPDB, cable ladder in/outdoor • Incoming AC main from 3 phase, lighting and power plug and air cons for Telecom Malaysia • Installation, test and commissioning ZTE BBS for Syscom. • Installation, test and commissioning NEC PASO LINK for Syscom. 20 Sept 2009 – 20 Jan Ericsson Vietnam • Assigned as Node B Engineer in Ericsson Vietnam based in Ho Chi Minh City. 3
  • 4. • Project involved is total rollout 2300 site 3G Networks for VINAPHONE operator. • Responsible to Test, commissioning, and acceptance Ericsson Node B 3518,3018 and 3206. • Excellent knowledge on P7.1 Software, Atm, Ip and Ethernet for transmission using fiber optic. • Responsible in coordinate local Engineers and Asp in total rollout according to SID. • Responsible to train local Ericsson Engineer and contractor on Node B and OAM. 02 Feb 2008 – 06 August 2009 – Ericsson Indonesia • Assigned as RBS & TRM TN Engineer in Ericsson Indonesia, for NTS project related matters in the network and total projects Rollout on 2G/3G and Traffic Node. • Excellent knowledge about alarm handling and fault. Restoration in the RBS and Node B. • Excellent knowledge in Minlink TN, traffic routing handling capabilities and traffic characteristics. • Responsible for network implementation and integration processes, Installation and achieve Targets. • Responsible to give training to local staff and contractor, coordinate the whole rollout projects. • Project details- 2G/3G Ericsson WCDMA Node B such as 3116,3018,3206,3518,3418,3216.2116,2216. • Test and commissioning, involved in deign plan spec sites Integration, full responsible on ITC rollout. • 2G/3G Acceptance Test (PAT). Test calls 3G to 3G (Voice, Video), FTP, Video Streaming, Handover, Test calls, Scripts ,Upgrade software P3 to P5 & Drive Test. May 2007 to Jan 2008 Working for Ericsson Bangladesh as TI Supervisor involved in WARID Project • Supervise & commissioning 2G EDGE 2206, 2106I, 2206V2,2116 ,2216 and Minilink E/ TN • Support installation team for RBS2116.2216,2206, 2106I , 2206 and Transmission Minilink TN, cross connection (mapping up to BSC) and on air sites assigned • Responsible in total Rollout Projects until Handover. Prepare SID for Acceptance. • Responsible for both CME and ITC site survey, rollout, operation & maintenance. September 2006 to Jan 2007 Work for Ericsson Adelaide South Australia as test commissioning and installation Engineer involved Project WCDMA 3206 commissioning and integration, Nortel CDMA and WCDMA3206 antenna Integration, sweep test, E-1 verify, Ber Test, Feeder Test, alarms, Eltec rectifier commissioning and Responsible for site Audit for Australia major Telecommunication Company TELSTRA. • Project responsible for problem determination and problem resolution the NodeB/RBS itself and in application related matters in the network. Excellent knowledge about alarm handling and fault. Restoration in the RBS nodes. • Excellent knowledge of the network topology, its traffic handling capabilities and traffic characteristics. Good knowledge of network implementation and integration processes. • Project details- 3.5G Ericsson WCDMA Node B such as RBS 3202, 3412, 3107 ,3106 & 3206. Installations, commissioning with the HSDPA Technology in 2.1 GHz. • Scripts making with IMA and without IMA by using the ultra edit Tool and script loading, New sites Integration. 3x1 configurations with single carrier, TXB 128 CE, HSDPA 128 CE and RAXB 256 CE. • 3G Acceptance Test (PAT). Test calls 3G to 3G (Voice, Video), FTP, Video Streaming, Handover, Test calls, Upgrade software P4 to P5 & Drive Test. 4
  • 5. • Change hardware if there is any fault in Node B unit. Responsible for 2nd level maintenance after site swap until site hand over to client. January 2005 to Feb 2006 • Work for Ericsson Indonesia (Single network project) GSM-900-1880 (2202, 2206, 2207) EDGE upgrading (RBS2202) as BTS Supervisor, Commissioning & testing. • Complete knowledge on Installation and Commissioning of RBS 2000 Families and Mini-Link Equipment. • Responsible also for re parenting of site from existing BSC to a new BSC • Wide exposure and knowledge on Installation, Cabling and Termination of various types of Telecommunication Equipment Such as PDH/SDH system. And GSM Radio Base Station / Base Transmission System. • To practice my profession with dedicated competence and responsibility in order to provide quality and valuable services. Feb 2000 to Dis 2004 • Work for Maxis GSM 900-1800 Project, As a BTS Installation, BTS commissioning& Testing for Metro-site, Transmission (ber test & terms) Ultra-site Commissioning and testing also Indoor and Outdoor trouble shooting. • Work for DIGI Project GSM-900-1800 upgrading (Ericsson 200, 2202, 2206, 2102, and 2106) As BTS installation and commissioning and testing indoor and outdoor. • Ericsson 2206, 2106 and 2308 as installation supervisor, BTS testing and Site Master Feeder Check for Maxis Project Malaysia • Microwave installation for DMR and DMC for DIGI Telecommunication. • Installation Supervisor for DIGI Telecommunication with Ericsson Equipment RBS 200 and RBS 205 and Ericsson mini-link. Jan 1994 to Dis 1999 • Work for Dancom (M) Sdn Bhd as RBS Engineer for DIGI project pervious Mutira Telecom. Job responsibilities: • Site survey prepares installation material and site documents. • Site Proposal • Supervised BTS installations; • Supervised Antenna installations; • Performed Antenna test result (VSWR, Return Loss and Distance to Fault) • Performed BTS commissioning and integration; • Performed Ber test(Ericsson microwave mini link) commissioning and link testing; • Handled audit/quarry report acceptance testing for BTS and microwave links. • Lightning protection system installation & supervision. • AC/DC-power installation & supervision • Trouble shooting. • Update knowledge about new products of Ericsson. • Supervised all kind civil works according to site plan. • Performed Earth Test 5
  • 6. • Documentation according to DIGI project procedures. • Site folder documentation. • Extensive deficiency report. • Responsible in implementing the site audit/quarry and BTS & Antenna installation coordination of BTS site. ADDITIONAL INFORMATION • Familiar with BSC SIM and BSC Simulator (2) UPSIM Equipment and TDR. • Familiar with LMT and OMT version Commissioning. • Perform the BSC/MSC during trouble shooting for further information to help reduce time delay for certain problem that occurred on sites(BTS) • Perform Test and analyzing fault and report the test report to the project manager. • Continuously update software version of the latest BTS software version to avoid testing with BSC/MSC and the BTS. Languages: • English • Malay • Tamil SKILLS: • PC with window version 95, 98, 2000, XP and Microsoft Office and VISTA. • OMT version for RBS 2000 and LMT RBS 200.Emas.Moshell P5,P6 and P7.1 COURSES AND TRAINING ATTENDED • Ericsson Education Malaysia (3G)WCDMA System Overview(LZT 1236208 R3A) • Ericsson Education Malaysia (3G)WCDMA RBS 3000 – Installation Delta • Ericsson Education Malaysia (3G)WCDMA RAN Node B Commissioning • Ericsson Education Malaysia (3G)WCDMA RAN Field Maintenance • Minilink and RBS2000 family Digi Telecommunication and Maxis. References Persons: Toni Chandra Head of Network Roll-out PT. Ericsson Indonesia Network Services Division Wisma Pondok Indah, 10 Floor Jln. Sultan Iskandar Muda Jakarta 12310 – Indonesia. Tel No: +62217692222 Fax No: +62217519608 Mobile No: +62818199665 E-mail Add: toni.chandra@ericsson.com 6
  • 7. THOMAS WIRSEEN Projects Manager CELCOM PROJECTS 3420 Persiaran Sepang 63000 Cyberjaya, Malaysia Phone +603-83146472 Mobile +60123965310 Thomas.wirseen@ericsson.com www.ericsson.com Mathiarasan Kandasamy CPM Senior at Ericsson Singapore Ericsson Bangladesh Mobile No:+60162208781 E-mail add: mathiarasan.kandasamy@ericsson.com : graphics_mk@yahoo.com Yohanes Preasetyo [ Indonesia Projects] Head of Radio Implementation Section Pt Ericsson Indonesia Network Roll Out Division Mobile No: +62811862944 E-mail add: yohanes.preasetyo@ericsson.com VICTOR KHOO [ Indonesia Projects] TPM NTS PROJECTS 2G/3G Pt Ericsson Indonesia Network Roll Out Division Mobile No: +628111661253 E-mail add: victor.kho@ericsson.com OLIVER TUNGOL Project Manager Pt Ericsson Indonesia Modernization Sumbagut Project Telekomsel Mobile No: +628119304754 E-mail add: oliver.tungol@ericsson.com Albert Madriaga Implementation Manager Ericsson Papua New Guinea. Mobile No: +67570876304 E-mail add: albert.madriaga@ericsson.com 7
  • 8. 8