Resume Summary: Electrical Engineer
1. 1 | P a g e
RESUME OF QUALIFICATION
Name : ENDIMAFI UTIH
Place, Date of birth : Jakarta, December 31st ,1984
Gender : Male
Religion : Islam
Address : Jl KH Balqi no.250 Rt.23 Rw.19 Talang Banten,seberang ulu II Plaju
Palembang- Sumatera Selatan.
Mobile number : +62 812 248 300 34
Passport no. : A7435349
E-mail : endi_utih@yahoo.com
endi.utih@gmail.com
Marital status : Married + 3 children
Education : * Elementary school (1990 - 1996)
* Junior high school (1996 – 1999)
* Senior high school (1999 – 2002)
Computer skill : * Microsoft Office Word 2007, Excel 2007,
PowerPoint 2007.
* World Wide Web.
Language : * English
* Arabic
* Bahasa Indonesia
2. 2 | P a g e
APRIL 12th
,2016 – DECEMBER18th
,2017
Worked with PT. TRAKINDO UTAMA on Gosowong Gold Minning Project.
In Gosowong, Ternate,Maluku.
As an FOREMAN ELECTRIC MAINTENANCE.
Job Description :
In that capacities responsible to 6 craft electrician for all electrical equipment such as
motor equipment,generator electrical,panel electrical in site and whork shop work for
maintenance and repair service.
Maintenance panel control in substation for power plant.
Activity for maintenance and repair in MCC and panel control in every Main distribution
panel and distribution boar panel.
Activity for maintenance and repair electric motor 3 phase in site area,work shop area
and generator area.
Continuity and mugger all electric motor and generator motor for every 3 month schedule
of all motor electric maintenance.
Report and submit to mechanical electrician supervisor due to return or full services for
replacement every equipment in site area.
Electric motor services and maintenance for welding machine.
I was released in December 20th , 2017 due to completion of contract.
3. 3 | P a g e
January 05th
,2015 – March 27th
, 2016
Worked with ELMEC CONTRACTING COMPANY as subcontractor of SAUDI BIN
LADEN GROUP ABCD for a part from Al-Masjid Al-Haram Mataf Expansion project on
Makah First Ring Road project (MFFR-910011 Project). Makkah.Kingdom Saudi Arabia (KSA).
As an SUPERVISOR ELECTRICAL
Responsibilities:
In that capacities responsible to all electrical construction work progress.
Fabrication and installation support and ladder cable tray 300mm up to 900mm for medium
and high voltage.
Installation UPVC PIPE size 25mm up to 150mm for slab pipe, sleevepipe, lighting pole
foundation pipe and duct bank lay out pipe for cable lay out.
Cable pulling cable size 2.5 3core up to 400 single cores for panel instrument, Panel
Distribution Center, control room and electrical substation room.
Insulation testing and continuity cable for pre termination progress schedule.
Wiring, termination, Installation and maintenance lighting, on all areas site, insideTunnel
Street and road project using a luminaire lighting 100 – 1000watt, halogen lighting150 -
1000watt,LED lighting 40watt-4000watt,fluorescentlighting 40wattanddoom
lighting1000watt.
Termination in substation room, control room and panel room for every panel such as
Lighting panel, Pump Fire Fighting panel,MDP panel,EMDP panel and accessories
electrical equipment panel.
Cable Termination in every motor 3 phase 220/380V.-50Hz for firefighting pump and
tunnel jet fan ventilation 3 phase 400/690V.-50Hz
Installation cable grounding 150mm – 240mm for main grounding cable and stainless steel
Earth lattice.
Installation cable grounding 70mm – 150mmin every panel room, grounding jumper cable
tray, andequipment motor using C clamp hydraulic joint & Cad Weld cable grounding
joint.
Trouble shooting and maintenance during execution ritual month of hajj for support
electrical source power to keep stabilize provide electrical city and service all hajj activity.
Responsible to electrical department main contractor, electrical engineer and to quality
control department for daily and weekly report progress.
I was release from Elmec Contracting Companyin March 27th,2016 due to completion of
contract.
4. 4 | P a g e
March 21st
, 2014 – May 31st
, 2014
Worked with SAMSUNG C&T CORPORATION in Qurayya Independent Power Plant
(QIPP). Kingdom Saudi Arabia (KSA).
As an SUPERVISOR ELECTRICAL
Responsibilities :
In that capacities responsible to leading 3 Foreman and 20 Electrician.
Fabrication and installation support ladder cable tray 900mm for medium and high voltage.
Fabrication and installation ladder cable tray 900mm for medium and high voltage.
Cable pulling cable size 2.5 3core – 400 single core for panel instrument and Panel
Distribution Center.
Insulation testing and continuity cable for pre termination progress schedule.
Cable Termination in Steam Turbine Generator, Panel Distribution Center and House
Room Steam Generator.
Installation cable grounding 120mm – 240mm in every panel room, grounding jumper
cable tray, and equipment motor using C clamp hydraulic joint & Cad Weld cable
grounding joint.
Punch list and fixing the balance progress for support pre commissioning progress
Pre commissioning and commissioning activities due finishing the project.
I was release from Samsung C&T Corporation in May 31th, 2014 due to completion of
contract.
February 12th
,2012 - January30th,2014
Worked with SAUDI BIN LADIN GROUP
1.February 12th
,2012 – July20th
,2013
Worked with SAUDI BIN LADIN GROUPon PSC SHUMAYSI ILLEGAL LOGGING
CENTER PROJECT. In MakahCity, Kingdomof Saudi Arabia.
2. July 21st
,2013 - January30th,2014
Worked with SAUDI BIN LADIN GROUPon KING ABDULLAH FINANCIAL
DISTRIC PROJECT.In Riyadh City,Kingdom of Saudi Arabia.
As an ELECTRICAL FOREMAN.
Responsibilities:
In that capacities responsible to leading 3 leadman electrical and 26 electricianfor every
system electric in all area site and building to installation cable tray size 200mm2 until
900mm2, installation conduit pipe PVC and EMT size ½” until 2” for LAY OUT POWER
5. 5 | P a g e
SUPPLY , DATA , FIRE ALARM , CCTV,ACCES DOOR CONTROL, BMS, UPS,
LIGHTING and medium voltage for supply power.
Installation support for cable tray and conduit pipe.
Mugger and continuity cable main power supply for electric room to main supply power
room.
Pulling cable for lighting, Fan, FCU unit, and Panel control.
Installation Smoke Detector Fire Alarm,MM,CM,BREAK GLASS,BELL ALARM &
F.A.C PANEL for FIRE ALARM SYSTEM in all building.
Setting and installation panel control in control panel room.
Wiring, termination, Installation and maintenance lighting, on areas site project.
Install grounding system on all area site work and all building area, grounding cable for all
electric motor, install chatodic grounding rod, grounding rod, & join using exothermic cad
welding. Wire size 70mm2 until 95mm2.
Continuity and Mugger cable in main panel control room and all control room.
Wiring and installation cable gland conduit pipe and cable flexible to junction box module.
Wiring and Termination cable for LIGHTING,FAN,FCU,PACU, UPS, DATA,
TELEPHONE, CCTV,ACCES DOOR,FIRE ALARM System and BMS system.
Terminationthe entire of all panel DP,EDP,UPP,DP-AC PANEL, PS MAIN and, DOOR
CONTROL PANEL.
Responsible for every system electric in all area site and building.
Responsible to electrical supervisor for daily and weekly report progress.
I was released in January 30th 2014 due to completion of work.
APRIL 01th
, 2011 – AUGUST 05th
, 2011
Worked with PT. CAKRAWALA DUA BENUA on PLTD Project in Ni’u,Bima,NTB.
As an SUPERVISOR ELECTRICAL.
Job description :
Wiring and installation additional of generators Deutchz capacity 125 kw,400volt. 55 Hz
to the panel for electric power supply and junction box panel in area project.
Wiring and installation of panel supply power from the generator to the work area,
offices,warehouse and fabrication work shop in lay down yard project area.
6. 6 | P a g e
Installation and fabrication support for the ladder cable tray for lay outcable HV and LV
from motors,generator engine, switch gear, control panels and transformer room.size
200mm up to 900mm.
Termination cable transformer welding machine, capacity from 220v, 1 phaseup to380V,
2 phase 200A-500A to work shop and fabrication wellding area.
Installation and maintenance of lighting in all work area project,using halogen
lighting150 -1000watt,fluorescen lighting 40watt and doom lighting1000watt.
Installation and termination thermocouple from generator engine NIIGATA 3,5
MVA.setting and installation exciter generator to the panel control room.
Installation and termination panel pressure from generator engine NIIGATA 3,5 MVA to
the panel control room.
Setting and installation panel control in motor control panel room.
Connection power cable from the generator to the switch gear and from switch gear to the
bus bar. Continuity and mugger cable in panel control and all electric motor.
Termination the entire motor to the panel installation.termination and installation of panel
boxes, junction box panel,and galvanize conduit pipe.
Trouble shooting and handling all electrical problems for electric supply power and
installation of electric power equipment and electrical equipment.
Cable pulling, cableN2XSY 1 core – 300mm.20kV from switch gear PLN to the control
panel, transformer areas, & generators engine in substation building PLTD.
Cable pulling, cable N2XSY 1 core – 300mm.20 kV and 3, 6kV from panel generator
engine NIIGATA to transformers areas. And from transformers 3500 kva areas to the
panel control. Termination in all module to MCC panel in power station
Installation and termination of rail busbar, power supply to the main panels power supply
and motors DEMAG crane hoist capacity 2.3 tons and 5 tons until ready to use.
Responsible for daily and weekly reports to electrical department.
I was released in august 05th, 2011 due to completion of work.
7. 7 | P a g e
July 31th
,2010 – Augustus 30th
,2010
Worked with PT. TRAKINDO UTAMA on Gosowong Extension Project.
In Ternate,Maluku.
As an ELECTRICIAN.
Job Description :
Setting and installation panel control in substation for power plant.
Wiring and installation MCC common in power station
Continuity test cable power control MCC for power station.
Continuity and mugger cable in panel control and all electric motor.
Termination control cable engine in all panel.
Wiring and installation grounding cable on transformer engine.
Wiring and installation cable gland conduit pipe and cable flexible to junction box
module.
Termination in all module to MCC panel in power station.
Wiring and installation cable trays for HV and LV in all area power station.
I was released in August 30th , 2010 due to completion of contract.
September 09th
, 2007 – February 18TH
, 2010
Worked with MOHAMMAD AL-MOJIL GROUP (MMG) on Saudi Kayan K-022
Petrochemical Complex under Flour Arabia LTD. (FAL) in Jubail Industrial City.
Saudi arabia.KSA.
As an LEADMAN ELECTRICAL.
Job Description :
Setting and installation panel control in substation for power plant.
Installation and maintenance lighting, on areas project and base camp.
8. 8 | P a g e
Grounding cable for all electric motor, chaotic ro Installation d grounding on all areas sub
station.
Continuity and mugger cable in panel control and all electric motor.
Connection power cable from generator to switch gear and
from switch gear to bus bar.
Connection thermocouple cables and instrumentation.
Pre commissioning and commissioning for substation power plant petrochemical
complex areas.
Responsible to Electrical Supervisor for daily and weekly report.
I was released in February 18th, 2010 due to completion of contract.
August 03th
, 2005 – May27th
, 2007
Work with PT. GEMILANG ENGINEERING on Maxus offshore platform project in
pabelokan, West Java.
As an ELECTRICIAN.
Job Description :
Installation additional generator General Electric capacity 1485kw 600volts.
Connection thermocouple cables and instrumentation. Installation galvanizes pipe
conduit, terminal boxes and connection cable ground. Connection cables at terminal
strips in all control panels.
Installation and maintenance lighting, on areas project and base camp.
Connection power cable from generator to switch gear and from switch gear to bus bar
and cable pulling from panel control to all electrical motors.
I was released in May 27th, 2007 due to completion of work.
9. 9 | P a g e
December17th
, 2002 – March27th
,2005
Worked with PT. REKAYASA ENGINEERING on Wayang Windu Geothermal Project in
Pengalengan, West Java.
As an ELECTRICIAN.
Job deskription :
Installation and wiring of galvanize pipe conduit ¾” until size 3” in power plant areas,
motor control Centre (MCC) and transformer areas.
Pulling cable from panel control to all electrical motors.
Installation panel and terminationin Panel Control Room.
I was released in March 27th 2005 due to completion of work.
So I created this brief with the actual line with the experience and knowledge I have, where I will
continue to learn and explore science in the field am I in this.
Palembang, April 04th, 2022
Sincerely
ENDI MAFI UTIH