RESUME
SAMPURIZAN B. AWANG
CURRENT ADDRESS:
No.496,LorongSepakat 9,
PerumahanPanalex,
24300 Kerteh,
Kemaman,
Terengganu.
PERMANENT ADDRESS:
Kg. KubangPuyu,Chalok,
21450 Setiu,Terengganu.
Phone No: +6017-2913828/+6012-3903224
Email: sam_tganu@yahoo.com.my
PERSONAL DETAILS
Age : 39 years olds.
Nationality : Malaysian
Race/Religion : Malay/ Islam
Gender : Male
I/C No. : 751124-11-5545
Marital Status: Married
EDUCATIONAL BACKGROUND
1988 – 1992 Secondary Sek.Men.SriNering, Jertih, Besut, Terengganu.
SijilRendahPelajaran (SRP) 1990 - Grade A
SijilPelajaran Malaysia (SPM) 1992 - Grade 2
1994 – 1996 Tertiary INDUTRIALl TRAINING INSTITUTE,
• NATIONAL VOCATIONAL TRAINING COUNCIL
(NVTC)
* BASIC ELECTRICIAN CERTIFICATE
* INTERMEDIATE ELECTRICIAN CERTIFICATE
* INDUSTRAL TECHNICIAN CERTIFICATE
- ELECTRICAL
1998 ENERGY COMMISSION OF MALAYSIA
• PenjagaJenteraA1(Chargeman Certificate)
2013 – 2014 UNIVERSITI MALAYSIA PAHANG
CENTRE FOR CONTINUING EDUCATION & PROFESIONAL
DEVELOPMENT (CENFAD)
• EXECUTIVE DIPLOMA IN PROJECT MANAGEMENT
- OIL AND GAS
EMPLOYMENT BACKGROUND
JANUARY 2013 - JANUARY 2015
Company : PETRONAS GAS BERHAD,
TECHNICAL & FACILITIES DEVELOPMENT DIVISION,
km105,JalanKuantan-K.Terengganu,
24300 Kerteh,Kemaman,
Terengganu.
Project involved:-
Project : PLANT REJUVENATION & REVAMP 2 (PRR2) PROJECT
Position : ELECTRICAL QA/QC INSPECTOR
Scope of work:-
1. Inspection and testing hold points, responsibility, and procedure method statement.
2. Inspection and test record form reference.
3. Quality record masterlist.
4. Inspection, measuring and test equipment masterlist.
5. Project quality plan amendment record.
APRIL 2011 – DECEMBER 2012
Company : ASEAN BINTULU FERTILIZER SDN, BHD,
18THKM,TanjungKidurung,
P.O BOX 482, 97007 Bintulu
Sarawak.
Project Involved:-
Project : ABF REJUVENATION PROJECT (DIRECT HIRED)
Position : ELECTRICAL SUPERVISOR CUM QC/QA INSPECTOR
Scope of work:
• Inspection and testing hold points, responsibility, and procedure method statement.
• Inspection and test record form reference.
• Quality record masterlist.
• Inspection, measuring and test equipment masterlist.
• Project quality plan amendment record.
SEPTEMBER 2009 – MARCH 2011
Company : CARIMIN SDN BHD.
C-3-3, Megan Avenue 1,
189 JalanTunRazak,
50400 Kuala Lumpur.
Client : SECONDED TO EXXONMOBIL EXPLORATIONAND PRODUCTION
MALAYSIA INC.
Position :ELECTRICAL& INSTRUMENT TECHNICIAN
Scope of work:
• Perform CDFT(critical device functioning test), troubleshooting, corrective and
preventive maintenance work for electrical and instrument field. On-line calibration.
Servicing electrical equipment for motor control centre (MCC). Normal and
emergency lighting system, navigational aid lighting system, LV/MV motor
equipment.
• Servicing instruments equipment for shut-down and blow-down valve, control
valve, pressure transmitter, level transmitter and flow transmitter and fire and gas
system.
MARCH 2009 – JULY 2009
Company : PETRONAS FERTILIZER KEDAH SDN BHD.,
Gurun, Kedah.
Project Involved:-
Project : PFKSB PLANT DEBOTTLENECKING PROJECT
EPCC GAS TURBINE COGENERATION SYSTEM
Position : ELECTRICAL SUPERVISOR CUM QA/QC INSPECTOR
Scope of work:
• Inspection and testing hold points, responsibility, and procedure method statement.
• Inspection and test record form reference.
• Quality record masterlist.
• Inspection, measuring and test equipment masterlist.
• Project quality plan amendment record.
OCTOBER 2008 – FEBRUARY 2009
Company : J&M POWER SDN BHD,
NO.11 Jalan PJU 1A/10,
AraDamasara, 46050 Petaling Jaya,
Selangor.
Client : FPG OLEOCHEMICAL SDN. BHD.,
Gebeng, Pahang
Project Involved:-
Project : FPG POST HYDROGENATION PROJECT.
Position : E&I QA/QC INSPECTOR
Scope of work:
• Inspection and testing hold points, responsibility, and procedure method statement.
• Inspection and test record form reference.
• Quality record masterlist.
• Inspection, measuring and test equipment masterlist.
• Project quality plan amendment record.
APRIL 2008-MAY 2008
Company : TOTAL AUTOMATION PTE.LTD.,
43/45/47 Gul Drive, Jurong
Singapore 629492.
Client : CONOCOPHILIPS INDONESIA LIMITED,
Cilandak Commercial Estate,
N0. 401 Cilandak, Jakarta 12075,
Indonesia.
Project Involved:-
Project : FPSO BELANAK NATUNA
Position : Electrical Technician
Scope of work:
• Involved with the department of testing and commissioning to carried out the
electrical function test e.g control, Hi-Pot testing, insulation test, ducter test,
glanding and termination of power and control cable, tagging, loop check, continuity
check, trouble-shooting, red mark-up drawing, documentations and other testing
parameter.
JANUARY 2008-MARCH 2008
Client : CONSOLIDATED PROJECTS LTD,
Part C-Suite 1409, No 85 Lau Shan Guan Rd,
Shanghai, China.
Project Involved :-
Project : JASCON 30
DP3, Accommodation, Hook-Up, Pipe-Lay Barge
Position : Electrical Technician Commissioning.
Scope of work:
• Involved with the department of testing and commissioning to carried out the
electrical function test e.g control, Hi-Pot testing, insulation test, ducter test,
glanding and termination of power and control cable, agging, loop check, continuity
check, trouble-shooting, red mark-up drawing, documentations and other testing
parameter.
JANUARY 2007- AUGUST 2007
Client : MALAYSIA DEEPWATER FLOATING TERMINAL (L) LTD.
(A MISC BHD – SBM INC, JOINT VENTURE COMPANY)
Project Involved:-
Project : MALAYSIA DEEPWATER FLOATING TERMINAL (L) LTD
(FPSO KIKEH)
Position : Electrical Technician Commissioning.
Scope of work:
• Involved with the department of commissioning (MDFT) to carried out the electrical
function test e.g control, Hi-Pot testing, insulation test, ducter test, glanding and
termination of power and control cable, tagging, loop check, continuity check,
trouble-shooting, red mark-up drawing, documentations and other testing
parameter.
OCTOBER 2006 – DECEMBER 2006
Company : MARINE AND HEAVY ENGINEERING SDN.BHD
PLO 3, JalanPekeliling, P.O Box 77,81700PasirGudang, Johor,
Malaysia.
(Marine Conversion Department.)
Position : Electrical Technician (Testing And Commissioning Dept.)
Project Involved:-
Project : FSO ABU CLUSTER
Client : MALAYSIA INTERNATIONAL SHIPPING COORPERATION(MISC)
Scope of work:
• Involved with the department of testing and commissioning to carried out the
electrical function test e.g control, Hi-Pot testing, insulation test, ducter test,
glanding and termination of power and control cable, tagging, loop check, continuity
check, trouble-shooting, red mark-up drawing, documentations and other testing
parameter.
NOVEMBER 2004 – SEPTEMBER 2006
Company : SIME DARBY ENGINEERING SDN.BHD,
PLO 336 JLN SUASA, P.O.B 56,
81700 PASIR GUDANG, JOHOR.
(Formerly known as SIME SEMBCORP ENGINEERING SDN.BHD)
Position : Electrical Technician (Hook-up and Commissioning Dept.)
Project Involved:-
Project : BR-E CO2 REMOVAL PLATFORM (onshore &offshore )
- PasirGudang Yard
Client : TALISMAN MALYSIA LIMITED
Project : DI WELL CUM WATER INJECTION PLATFORM PROJECT
(onshore)- TelukRamunia Yard.
Client : OIL AND GAS CORPORATION LIMITED, INDIA.
Project : YOHO DEVELOPMENT PROJECT EPC2- PRODUCTIONFACILITIES
(onshore)-PasirGudang Yard
Client : Nigerian National Petroleum Corporation (NNPC)/Mobil Producing
Nigeria Unlimited (MPN), NNPC/MPN Joint-Ventures
Project : GUNTONG E TOP SIDE PROJECT(onshore)-PasirGudangYard.
Client : EXXONMOBIL PRODUCTION AND EXPLORATION (M) INC.
Scope of work:
• Involved with the department of commissioning (SDE) to carried out the electrical
function test e.g control, Hi-Pot testing, insulation test, ducter test, glanding and
termination of power and control cable, tagging, loop check, continuity check,
trouble-shooting, red mark-up drawing, documentations and other testing
parameter.
MARCH 2004-OCTOBER 2004
Company : DAYANG ENTERPRISE SDN. BHD. Kemaman, Terengganu.
Position : E & I Technician (offshore)
Client : EXXONMOBIL PRODUCTION AND EXPLORATION (M) INC.
Scope of work:
• Perform corrective and preventive maintenance work. On-line calibration. Shut-
down activities. Servicing electrical equipment for motor control centre (MCC).
Normal and emergency lighting system, navigational aid lighting system, LV/MV
motor equipment.
• Servicing instruments equipment for shut-off valve, control valve, pressure
transmitter, level transmitter and flow transmitter.
MAY 2002 – JANUARY 2004
Company : PURNAMA ELEKTRIK. Machang, Kelantan.
Position : SITE SUPERVISOR
Scope of work:
• Perform in job planning and activities, consulter of worker, preparation of job
materials and equipments, follow up outstanding with other authorize departments
like JabatanKerja Raya (JKR), TenagaNasionalBerhad (TNB), and
PihakBerkuasaTempatan (PBT). Also do others management work.
SEPTEMBER 1996 – NOVEMBER 1998
Company : CHUNG HWA PICTURE TUBES (M) SDN.BHD, Shah Alam, Selangor
Position : Electrical Technician (Chargeman Assistant)
DECEMBER 1998 – MARCH 2002
Company : CHUNG HWA PICTURE TUBES (M) SDN. BHD,
Shah Alam, Selangor.
Position : Chargeman
Scope of work:
• Operator and maintain 1 nos, of 33KV outdoor sub-station, which consist of 5 nos. of
33/11KV, 10 MVA transformer, 33KV vacuum circuit breakers and safety protection
relays.
• Operate 14 nos, of 11KV indoor sub-station, which consist of 11KV vacuum circuit
breaker, Transformer Step-Down 11KV /415V, 11KV /220V. Low voltage 415V
/220V switch-board both essential and non-essential system with Air Circuit
Breaker (ABC) rating from 1500A to 1400A,Mould Case Circuit Breaker (MCCB) and
over current / earth fault protection relays etc.
• Operate and maintain 8 nos of 1000KVA/3.3KV Standby Generator with Automatic
Main Failure (AMF) panel system which connected to 3.3KV panels as essential
supply.
• In-charge of Fire Protection System with Fire Alarm Panel, Halon Panel, Sprinkler /
Hydrant Switch Board Panel with pressure control pumps.
• Oversees 10 nos of Air Compressors and Cooling Tower Control Panels.
• Oversees 4 nos of Steam Boilers and Control Panels.
• In-charge 8 nos of UPS and Batteries System.
• Servicing, maintenance and trouble-shooting automation system such likes as
pressure switch, level switch, level probe, limit switch, sensors and solenoid valve.
JUN 1995 – DECEMBER 1995
Company : PURNAMA ELEKTRIK, Machang Kelantan.
Position : Electrician (on job training)
Scope of work:
• Install DB consisted of MCB, RCCB, wiring, lying and termination 1 phase and 3
Phase power cable activity. Low voltage overhead line, loop check and functional
test of the equipment.
COURSES AND TRAINING
IN-HOUSE TRAINING AT CHUNG HWA PICTURE TUBES SDN. BHD
02 SEPT 1996 - NEW IN STAFF TRAINING PROGRAME
21 OCT 1997 - TECH COURSE I (MECHANICAL MAINTENANCE COURSE)
22 OCT 1997 - TECH COURSE II (OSHA ACT & CCRT PROCESS)
23 DEC 1997 - BASIC MAINTENANCE (PNEUMATICS PART SYSTEM)
01 OCT 1998 - TECHNICIAN COURSE
04 MAY 1999 - ISO 14001 AWARENESS COURSE
25 APRIL 2000 - TPM CONCEPT COURSE
COURSES AND TRAINING
MAY 1997 : OVERSEA TECHNICAL SERVICE (M) SDN. BHD.
- Basic Personal Survivor At Sea
- Offshore Safety Orientation.
MAY 2000 : TAMCO CORPORATE HOLDINGS SDN. BHD.
- Switchgear Appreciation Course
MARCH 2002 : TERENGGANU SAFETY TRAINING CENTRE SDN BHD
- Basic Personal Survivor At Sea and Helicopter Underwater Escape Training.
MARCH 2005 : MSTS ASIA SDN .BHD
- OFFSHORE SAFETY INDUCTION (refresher)
• Basic Sea Survival
• Helicopter Underwater Escape Training.
MARCH 2009 : NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH -
Oil And Gas Safety Passport (OGSP)
SKILLS
MANAGEMENT SKILLS
1. Focal point on planning daily jobs, organize team, update progress, current status and
defectiveitem.
2. Red Line Mark-up, System Limit, Dossier, Procedure, Electrical commissioning query,
Check sheet , Mod Pack, DAC
3. Prepare work permit as per plan and review JSA (Job safety Analysis) and JHA (Job
Hazard Analysis) before submit forapproval.
4. Coordinate with Engineer and prepare daily report forEngineer daily update.
5. Ensure that subordinate, performing job as per plan and follow rules and regulation of
Safety & Health.
6. Handle, Check and verify at site any defect electrical field and make a report to submit to
Engineer/Superior.
7. Liaise with Vendor during testing and commissioning activities at site.
8. Establish database from documentation as E&I drawing, P&ID, System Limit, System
Definition and etc.for main record reference.
ACCOUNTABILITIES
1. Ability to simplify and explain to Client/team about technical problems in an easily
understood way and write meaningful technicalreport.
2. Ability to resolving technical issues raised by client concerning and archiving in a
professional manner and to agreed time frames.
3. Communicates to impart adequate information to Supervisors, Technician, Engineers,
Management, and Clients.
PROFESSIONAL REFERENCES LIST
• Name : MD. TAIB HANAPI
Position : Head Department,
Testing And Commissioning Marine Conversion,
MALAYSIA MARINE AND HEAVY ENGINEERING.
Phone : 013-7730934
• Name : MOHD HAMIZI MOHD SAMSI
Position : Electrical Engineer,
Hook-up And Commissioning Department,
SIME DARBY ENGINEERING SDN.BHD
Phone : 012-6682822
• Name : JAMURI BIN ZEN
Position : PROJECT MANAGER,
ABF REJUVENATION PROJECT TEAM,
ASEAN BINTULU FERTILIZER SDN,BHD.
Phone : 0198553854

MY RESUME

  • 1.
    RESUME SAMPURIZAN B. AWANG CURRENTADDRESS: No.496,LorongSepakat 9, PerumahanPanalex, 24300 Kerteh, Kemaman, Terengganu. PERMANENT ADDRESS: Kg. KubangPuyu,Chalok, 21450 Setiu,Terengganu. Phone No: +6017-2913828/+6012-3903224 Email: sam_tganu@yahoo.com.my PERSONAL DETAILS Age : 39 years olds. Nationality : Malaysian Race/Religion : Malay/ Islam Gender : Male I/C No. : 751124-11-5545 Marital Status: Married EDUCATIONAL BACKGROUND 1988 – 1992 Secondary Sek.Men.SriNering, Jertih, Besut, Terengganu. SijilRendahPelajaran (SRP) 1990 - Grade A SijilPelajaran Malaysia (SPM) 1992 - Grade 2 1994 – 1996 Tertiary INDUTRIALl TRAINING INSTITUTE, • NATIONAL VOCATIONAL TRAINING COUNCIL (NVTC) * BASIC ELECTRICIAN CERTIFICATE * INTERMEDIATE ELECTRICIAN CERTIFICATE
  • 2.
    * INDUSTRAL TECHNICIANCERTIFICATE - ELECTRICAL 1998 ENERGY COMMISSION OF MALAYSIA • PenjagaJenteraA1(Chargeman Certificate) 2013 – 2014 UNIVERSITI MALAYSIA PAHANG CENTRE FOR CONTINUING EDUCATION & PROFESIONAL DEVELOPMENT (CENFAD) • EXECUTIVE DIPLOMA IN PROJECT MANAGEMENT - OIL AND GAS EMPLOYMENT BACKGROUND JANUARY 2013 - JANUARY 2015 Company : PETRONAS GAS BERHAD, TECHNICAL & FACILITIES DEVELOPMENT DIVISION, km105,JalanKuantan-K.Terengganu, 24300 Kerteh,Kemaman, Terengganu. Project involved:- Project : PLANT REJUVENATION & REVAMP 2 (PRR2) PROJECT Position : ELECTRICAL QA/QC INSPECTOR Scope of work:- 1. Inspection and testing hold points, responsibility, and procedure method statement. 2. Inspection and test record form reference. 3. Quality record masterlist. 4. Inspection, measuring and test equipment masterlist. 5. Project quality plan amendment record. APRIL 2011 – DECEMBER 2012 Company : ASEAN BINTULU FERTILIZER SDN, BHD, 18THKM,TanjungKidurung, P.O BOX 482, 97007 Bintulu Sarawak. Project Involved:- Project : ABF REJUVENATION PROJECT (DIRECT HIRED) Position : ELECTRICAL SUPERVISOR CUM QC/QA INSPECTOR Scope of work:
  • 3.
    • Inspection andtesting hold points, responsibility, and procedure method statement. • Inspection and test record form reference. • Quality record masterlist. • Inspection, measuring and test equipment masterlist. • Project quality plan amendment record. SEPTEMBER 2009 – MARCH 2011 Company : CARIMIN SDN BHD. C-3-3, Megan Avenue 1, 189 JalanTunRazak, 50400 Kuala Lumpur. Client : SECONDED TO EXXONMOBIL EXPLORATIONAND PRODUCTION MALAYSIA INC. Position :ELECTRICAL& INSTRUMENT TECHNICIAN Scope of work: • Perform CDFT(critical device functioning test), troubleshooting, corrective and preventive maintenance work for electrical and instrument field. On-line calibration. Servicing electrical equipment for motor control centre (MCC). Normal and emergency lighting system, navigational aid lighting system, LV/MV motor equipment. • Servicing instruments equipment for shut-down and blow-down valve, control valve, pressure transmitter, level transmitter and flow transmitter and fire and gas system. MARCH 2009 – JULY 2009 Company : PETRONAS FERTILIZER KEDAH SDN BHD., Gurun, Kedah. Project Involved:- Project : PFKSB PLANT DEBOTTLENECKING PROJECT EPCC GAS TURBINE COGENERATION SYSTEM Position : ELECTRICAL SUPERVISOR CUM QA/QC INSPECTOR Scope of work: • Inspection and testing hold points, responsibility, and procedure method statement. • Inspection and test record form reference. • Quality record masterlist. • Inspection, measuring and test equipment masterlist. • Project quality plan amendment record.
  • 4.
    OCTOBER 2008 –FEBRUARY 2009 Company : J&M POWER SDN BHD, NO.11 Jalan PJU 1A/10, AraDamasara, 46050 Petaling Jaya, Selangor. Client : FPG OLEOCHEMICAL SDN. BHD., Gebeng, Pahang Project Involved:- Project : FPG POST HYDROGENATION PROJECT. Position : E&I QA/QC INSPECTOR Scope of work: • Inspection and testing hold points, responsibility, and procedure method statement. • Inspection and test record form reference. • Quality record masterlist. • Inspection, measuring and test equipment masterlist. • Project quality plan amendment record. APRIL 2008-MAY 2008 Company : TOTAL AUTOMATION PTE.LTD., 43/45/47 Gul Drive, Jurong Singapore 629492. Client : CONOCOPHILIPS INDONESIA LIMITED, Cilandak Commercial Estate, N0. 401 Cilandak, Jakarta 12075, Indonesia. Project Involved:- Project : FPSO BELANAK NATUNA Position : Electrical Technician Scope of work: • Involved with the department of testing and commissioning to carried out the electrical function test e.g control, Hi-Pot testing, insulation test, ducter test, glanding and termination of power and control cable, tagging, loop check, continuity check, trouble-shooting, red mark-up drawing, documentations and other testing parameter. JANUARY 2008-MARCH 2008
  • 5.
    Client : CONSOLIDATEDPROJECTS LTD, Part C-Suite 1409, No 85 Lau Shan Guan Rd, Shanghai, China. Project Involved :- Project : JASCON 30 DP3, Accommodation, Hook-Up, Pipe-Lay Barge Position : Electrical Technician Commissioning. Scope of work: • Involved with the department of testing and commissioning to carried out the electrical function test e.g control, Hi-Pot testing, insulation test, ducter test, glanding and termination of power and control cable, agging, loop check, continuity check, trouble-shooting, red mark-up drawing, documentations and other testing parameter. JANUARY 2007- AUGUST 2007 Client : MALAYSIA DEEPWATER FLOATING TERMINAL (L) LTD. (A MISC BHD – SBM INC, JOINT VENTURE COMPANY) Project Involved:- Project : MALAYSIA DEEPWATER FLOATING TERMINAL (L) LTD (FPSO KIKEH) Position : Electrical Technician Commissioning. Scope of work: • Involved with the department of commissioning (MDFT) to carried out the electrical function test e.g control, Hi-Pot testing, insulation test, ducter test, glanding and termination of power and control cable, tagging, loop check, continuity check, trouble-shooting, red mark-up drawing, documentations and other testing parameter. OCTOBER 2006 – DECEMBER 2006 Company : MARINE AND HEAVY ENGINEERING SDN.BHD PLO 3, JalanPekeliling, P.O Box 77,81700PasirGudang, Johor, Malaysia. (Marine Conversion Department.) Position : Electrical Technician (Testing And Commissioning Dept.) Project Involved:- Project : FSO ABU CLUSTER Client : MALAYSIA INTERNATIONAL SHIPPING COORPERATION(MISC)
  • 6.
    Scope of work: •Involved with the department of testing and commissioning to carried out the electrical function test e.g control, Hi-Pot testing, insulation test, ducter test, glanding and termination of power and control cable, tagging, loop check, continuity check, trouble-shooting, red mark-up drawing, documentations and other testing parameter. NOVEMBER 2004 – SEPTEMBER 2006 Company : SIME DARBY ENGINEERING SDN.BHD, PLO 336 JLN SUASA, P.O.B 56, 81700 PASIR GUDANG, JOHOR. (Formerly known as SIME SEMBCORP ENGINEERING SDN.BHD) Position : Electrical Technician (Hook-up and Commissioning Dept.) Project Involved:- Project : BR-E CO2 REMOVAL PLATFORM (onshore &offshore ) - PasirGudang Yard Client : TALISMAN MALYSIA LIMITED Project : DI WELL CUM WATER INJECTION PLATFORM PROJECT (onshore)- TelukRamunia Yard. Client : OIL AND GAS CORPORATION LIMITED, INDIA. Project : YOHO DEVELOPMENT PROJECT EPC2- PRODUCTIONFACILITIES (onshore)-PasirGudang Yard Client : Nigerian National Petroleum Corporation (NNPC)/Mobil Producing Nigeria Unlimited (MPN), NNPC/MPN Joint-Ventures Project : GUNTONG E TOP SIDE PROJECT(onshore)-PasirGudangYard. Client : EXXONMOBIL PRODUCTION AND EXPLORATION (M) INC. Scope of work: • Involved with the department of commissioning (SDE) to carried out the electrical function test e.g control, Hi-Pot testing, insulation test, ducter test, glanding and termination of power and control cable, tagging, loop check, continuity check, trouble-shooting, red mark-up drawing, documentations and other testing parameter. MARCH 2004-OCTOBER 2004 Company : DAYANG ENTERPRISE SDN. BHD. Kemaman, Terengganu. Position : E & I Technician (offshore)
  • 7.
    Client : EXXONMOBILPRODUCTION AND EXPLORATION (M) INC. Scope of work: • Perform corrective and preventive maintenance work. On-line calibration. Shut- down activities. Servicing electrical equipment for motor control centre (MCC). Normal and emergency lighting system, navigational aid lighting system, LV/MV motor equipment. • Servicing instruments equipment for shut-off valve, control valve, pressure transmitter, level transmitter and flow transmitter. MAY 2002 – JANUARY 2004 Company : PURNAMA ELEKTRIK. Machang, Kelantan. Position : SITE SUPERVISOR Scope of work: • Perform in job planning and activities, consulter of worker, preparation of job materials and equipments, follow up outstanding with other authorize departments like JabatanKerja Raya (JKR), TenagaNasionalBerhad (TNB), and PihakBerkuasaTempatan (PBT). Also do others management work. SEPTEMBER 1996 – NOVEMBER 1998 Company : CHUNG HWA PICTURE TUBES (M) SDN.BHD, Shah Alam, Selangor Position : Electrical Technician (Chargeman Assistant) DECEMBER 1998 – MARCH 2002 Company : CHUNG HWA PICTURE TUBES (M) SDN. BHD, Shah Alam, Selangor. Position : Chargeman Scope of work: • Operator and maintain 1 nos, of 33KV outdoor sub-station, which consist of 5 nos. of 33/11KV, 10 MVA transformer, 33KV vacuum circuit breakers and safety protection relays. • Operate 14 nos, of 11KV indoor sub-station, which consist of 11KV vacuum circuit breaker, Transformer Step-Down 11KV /415V, 11KV /220V. Low voltage 415V /220V switch-board both essential and non-essential system with Air Circuit Breaker (ABC) rating from 1500A to 1400A,Mould Case Circuit Breaker (MCCB) and over current / earth fault protection relays etc. • Operate and maintain 8 nos of 1000KVA/3.3KV Standby Generator with Automatic Main Failure (AMF) panel system which connected to 3.3KV panels as essential supply. • In-charge of Fire Protection System with Fire Alarm Panel, Halon Panel, Sprinkler / Hydrant Switch Board Panel with pressure control pumps. • Oversees 10 nos of Air Compressors and Cooling Tower Control Panels.
  • 8.
    • Oversees 4nos of Steam Boilers and Control Panels. • In-charge 8 nos of UPS and Batteries System. • Servicing, maintenance and trouble-shooting automation system such likes as pressure switch, level switch, level probe, limit switch, sensors and solenoid valve. JUN 1995 – DECEMBER 1995 Company : PURNAMA ELEKTRIK, Machang Kelantan. Position : Electrician (on job training) Scope of work: • Install DB consisted of MCB, RCCB, wiring, lying and termination 1 phase and 3 Phase power cable activity. Low voltage overhead line, loop check and functional test of the equipment. COURSES AND TRAINING IN-HOUSE TRAINING AT CHUNG HWA PICTURE TUBES SDN. BHD 02 SEPT 1996 - NEW IN STAFF TRAINING PROGRAME 21 OCT 1997 - TECH COURSE I (MECHANICAL MAINTENANCE COURSE) 22 OCT 1997 - TECH COURSE II (OSHA ACT & CCRT PROCESS) 23 DEC 1997 - BASIC MAINTENANCE (PNEUMATICS PART SYSTEM) 01 OCT 1998 - TECHNICIAN COURSE 04 MAY 1999 - ISO 14001 AWARENESS COURSE 25 APRIL 2000 - TPM CONCEPT COURSE COURSES AND TRAINING MAY 1997 : OVERSEA TECHNICAL SERVICE (M) SDN. BHD. - Basic Personal Survivor At Sea - Offshore Safety Orientation. MAY 2000 : TAMCO CORPORATE HOLDINGS SDN. BHD. - Switchgear Appreciation Course MARCH 2002 : TERENGGANU SAFETY TRAINING CENTRE SDN BHD - Basic Personal Survivor At Sea and Helicopter Underwater Escape Training. MARCH 2005 : MSTS ASIA SDN .BHD - OFFSHORE SAFETY INDUCTION (refresher) • Basic Sea Survival
  • 9.
    • Helicopter UnderwaterEscape Training. MARCH 2009 : NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH - Oil And Gas Safety Passport (OGSP) SKILLS MANAGEMENT SKILLS 1. Focal point on planning daily jobs, organize team, update progress, current status and defectiveitem. 2. Red Line Mark-up, System Limit, Dossier, Procedure, Electrical commissioning query, Check sheet , Mod Pack, DAC 3. Prepare work permit as per plan and review JSA (Job safety Analysis) and JHA (Job Hazard Analysis) before submit forapproval. 4. Coordinate with Engineer and prepare daily report forEngineer daily update. 5. Ensure that subordinate, performing job as per plan and follow rules and regulation of Safety & Health. 6. Handle, Check and verify at site any defect electrical field and make a report to submit to Engineer/Superior. 7. Liaise with Vendor during testing and commissioning activities at site. 8. Establish database from documentation as E&I drawing, P&ID, System Limit, System Definition and etc.for main record reference. ACCOUNTABILITIES 1. Ability to simplify and explain to Client/team about technical problems in an easily understood way and write meaningful technicalreport. 2. Ability to resolving technical issues raised by client concerning and archiving in a professional manner and to agreed time frames. 3. Communicates to impart adequate information to Supervisors, Technician, Engineers, Management, and Clients. PROFESSIONAL REFERENCES LIST • Name : MD. TAIB HANAPI Position : Head Department, Testing And Commissioning Marine Conversion, MALAYSIA MARINE AND HEAVY ENGINEERING. Phone : 013-7730934 • Name : MOHD HAMIZI MOHD SAMSI Position : Electrical Engineer,
  • 10.
    Hook-up And CommissioningDepartment, SIME DARBY ENGINEERING SDN.BHD Phone : 012-6682822 • Name : JAMURI BIN ZEN Position : PROJECT MANAGER, ABF REJUVENATION PROJECT TEAM, ASEAN BINTULU FERTILIZER SDN,BHD. Phone : 0198553854