   ARCHITECTURAL DESIGN

                     - PROJECT BRIEF
                     - DESIGN APPROACH
                     - LIFT PROPOSAL
                     - PRIVACY
                     - DESIGN CONSIDERATION
                     - CONSTRUCTION
                     - HOME IMPROVEMENT PROGRAMME
                     (HIP)
                     - SITE MANAGEMENT
                     - DESIGN PROPOSAL

ARCHITECTURAL          
                       
                              PRECINT A
                              PRECINT B


    DESIGN
                             PRECINT C
                             PRECINT D
                             PRECINT E
                             PRECINT F


                    STRUCTURAL DESIGN

                    DESIGN CRITERIA & LIFT SHAFT DESIGN

                    M&E DESIGN




                HDB LIFT UPGRADING PROGRAM
                D&B OF UPGRADING PROJECTS FOR G8B

  FONDA
DESIGN & BUILD LUP + HIP FOR
                             HOLLAND CLOSE PRECINT




                            HDB LIFT UPGRADING PROGRAM
INTRODUCTION DESIGN SCOPE   D&B OF UPGRADING PROJECTS FOR G8B

                FONDA
PROJECT BRIEF

  The Design and built proposal for G8 involves Lift
  upgrading Program (LUP) for the following Precinct;

  Precinct A
  Bedok North Avenue 3 Blocks 401 to 404

  Precinct B
  Ang Mo Kio Avenue 4 Blocks 108 to 111

  Precinct C
  Ang Mo Kio Avenue 1 /3 Blocks 221, 222, 229 to 235

  Precinct D
  Ang Mo Kio Avenue 3 Blocks 301, 302, 322 to 327

  Precinct E
  Commonwealth Avenue West Blocks 410 to 412

  Precinct F
  Holland Close / Avenue / Drive Blocks 6, 9 to 13, 40 to 43, 45 to 47 and;


  (HIP) Home Improvement program for

  Precinct G
  Holland Close Blocks 31 and 32


                                                                              HDB LIFT UPGRADING PROGRAM
INTRODUCTION DESIGN SCOPE                                                     D&B OF UPGRADING PROJECTS FOR G8B

                                FONDA
1.0 DESIGN APPROACH

 1.1 The solution derived for the project is a result
     of close co-ordination and integration of the
     expertise of the various professional
     disciplines, focusing on achieving a most
     optimal ‘value engineering’ solution meeting all
     fundamental requirements, standards set by
     HDB. Most importantly, to ensure design is
     meets stringently to all mandatory building
     bylaws set by the relevant authorities, and also
     be able to address security and privacy issues
     thru well integrated design features.

 1.2 The LUP’s proposal consists of new lift shaft
     constructed primarily of steel structure and
     cladding panels. Fundamentally, the choice of
     construction methodology is to achieve
     speedier and neater construction process. Due
     consideration is also given to environmental
     friendliness thru usage of material selection
     which are recyclable and deriving good
     detailing for ease of construction, as well as
     mitigating future maintenance cost.




                                                        HDB LIFT UPGRADING PROGRAM
INTRODUCTION DESIGN SCOPE                               D&B OF UPGRADING PROJECTS FOR G8B

                             FONDA
2.0             LIFTS PROPOSAL                                      3.0 PRIVACY
2.1             The location for the new lifts, shutting down of    3.1 This is an important design consideration, which
existing lifts and replacement of new lifts, generally shall            fundamentally, the new lift position must not open within
complies with the given design brief.                                   the sight of the dwelling units windows and doors
                                                                        compromising the resident’s privacy. The lift shaft should
                                                                        also be strategically plan such that views and ventilation
2.2              Each new lift locations shall be designed within       to the dwelling units are nit affected.
it’s specific site constraint, such that ventilations and setback
meets the requirement stipulated by FSSD.
                                                                    3.2 Where there is occurrence of angled view into the
                                                                        window of the dwelling units, design features like vertical
2.3            Ramps of not more than 1:12 shall be provided            louvers screen/fins wall shall be strategically placed to
to bridge differences in levels or to replace existing steps            cut off visibility, yet maintaining cross air flow through the
where occurred, in comply with the barrier free accessibility           new lift lobby.
code stipulated by BCA.

2.4            Careful studies and planning shall be make to
each individual blocks to ensure disruption to existing
infrastructure and inconveniences to the resident are
minimize.




                                                                                       HDB LIFT UPGRADING PROGRAM
INTRODUCTION DESIGN SCOPE                                                              D&B OF UPGRADING PROJECTS FOR G8B

                                    FONDA
3.3   PROTECTION FROM KILLER LITTER

      Generally, this is to mitigate risk of falling litter to any
      existing facilities or amenities that is located within
      close proximity to new lift lobbies. As a rule of thumb,
      such amenities within 5m radius of the lift lobbies shall
                                                                                            5M
      be relocated.                                                                                      5M




4.0   CONSTRUCTION

4.1   The use of mainly steel materials and aluminium                4.2 Existing trees will be required to be pruned or removed,
      cladding shall contribute to a speedier and neater                 where affected by the new lifts. However, every attempt
      construction process, being that most work will be                 will be make to minimize tree felling, where possible.
      fabricated and constructed offsite and installed on site.
      Upon the installation of the new steel frame, the              4.3 Survey shall be conducted on underground Services,
      cladding shall follow consequentially, to avoid the                and shall be diverted at the first phase of the work, if
      image of the incomplete steel frame of the lift shaft.             determined to affect the new lift position.
      The proposed construction methodology will result in a
      reduced time frame for the construction period, and
      also entail a more efficient and safe working                  .4.5 Detailed Planning and Construction Phasing shall be
      environment within the estate.                                      planned to run concurrently within the dwelling units to
                                                                          reduce the construction period. Proper co-ordination and
                                                                          close liaison with the residents during the execution of
                                                                          the work shall be the primary focus by the contractor’s
                                                                          management team.




                                                                                       HDB LIFT UPGRADING PROGRAM
INTRODUCTION DESIGN SCOPE                                                              D&B OF UPGRADING PROJECTS FOR G8B

                                     FONDA
5.0   HOME IMPROVEMENT PROGRAMME (HIP)                            6.0 SITE MANAGEMENT
                                                                       A well managed site shall be the key success to the
 5.1   materials specification + Quality                               project execution, and minimising inconvenience and
                                                                       disturbance to the resident.
       Essentially, Materials and products proposed for the
       HIP shall comply with the specification stipulated under        The use of mainly prefabricated steel structure will
       the contract and the requirement set by HDB.                    contribute to a neat and tidy site, as such materials are
                                                                       fabricated off site and will have very quick installation on
       Material’s selection should also consider high durability       site. Where possible, prefab components will be
       and easy maintenance. The followings are a summary              encouraged to reduce on site casting works. Proper
       of items included under HIP;                                    hoarding shall be maintained at all time to allow a safe
                                                                       pedestrian routes at all time.
       1) PVC sliding or Bi-fold door to toilet
       2) Sanitary Ware and sanitary pipes replacement
       3) Ceramic wall and floor tiles (HDB approved type)
       4)Aluminium Glass louvers window
       5) New aluminium clothes drying racks
       6) Replacement of pipe socket
       7) Aluminium refuse chute hopper


                                .




                                                                                    HDB LIFT UPGRADING PROGRAM
INTRODUCTION DESIGN SCOPE                                                           D&B OF UPGRADING PROJECTS FOR G8B

                                    FONDA
SITE LAYOUT
    PLAN




                                                PRECINT A
                                      HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                       D&B OF UPGRADING PROJECTS FOR G8B
BEDOK NORTH AVENUE 3 block 401- 404
                        FONDA
BLOCK 401 & 402
 TYPICAL GROUND FLOOR PLAN




   BLOCK 403 & 404
   TYPICAL GROUND FLOOR PLAN                    PRECINT A
                                      HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                       D&B OF UPGRADING PROJECTS FOR G8B
BEDOK NORTH AVENUE 3 block 401- 404
                        FONDA
PRECINT A
  TYPICAL GROUND                      TYPICAL UPPER
  FLOOR PLAN                          FLOOR PLAN


                                                                            ELEVATION OF LIFT




                                                                          Full wall tiles on ground floor
                                                                          up to the edge of staircase
 Entrance Canopy and canopy           Privacy fins and ledge to be
 will be provided                     provided on the upper floors        Tile bands to typical floor lift
                                                                          lobbies and entrance canopy
                                                                          will be provided
                                                                     HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                                      D&B OF UPGRADING PROJECTS FOR G8B
BEDOK NORTH AVENUE 3 block 401- 404
                              FONDA
BLOCK 404                       ARTIST IMPRESSION
                                        HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                         D&B OF UPGRADING PROJECTS FOR G8B
BEDOK NORTH AVENUE 3 block 401- 404
                        FONDA
SITE LAYOUT PLAN             PRECINT B
                                                       HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                        D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 4 blocks 108 - 111
                          FONDA
BLOCK 108
          TYPICAL UPPER STOREY FLOOR PLAN




   BLOCK 111
   TYPICAL GROUND FLOOR
                                                      PRECINT B
                                            HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                             D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 4 blocks 108 - 111
                          FONDA
BLOCK 109
                         TYPICAL UPPER STOREY FLOOR PLAN


                  PRECINT B




                                                                 BLOCK 110
                                                                 TYPICAL GROUND FLOOR PLAN
                                                           HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                            D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 4 blocks 108 - 111
                          FONDA
PRECINT B
   TYPICAL GROUND                      TYPICAL UPPER
   FLOOR PLAN                          FLOOR PLAN


                                                                             ELEVATION OF LIFT




                                                                           Full wall tiles on ground floor
                                                                           up to the edge of staircase
  Entrance Canopy and canopy           Privacy fins and ledge to be
  will be provided                     provided on the upper floors        Tile bands to typical floor lift
                                                                           lobbies and entrance canopy
                                                                           will be provided
                                                                      HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                                       D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 4 blocks 108 - 111
                               FONDA
BLOCK 111                   ARTIST IMPRESSION
                                     HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                      D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 4 blocks 108 - 111
                          FONDA
PRECINT C




                                                                       SITE LAYOUT PLAN

                                                            HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                             D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235
                          FONDA
BLOCK 221 & 222
TYPICAL UPPER STOREY FLOOR PLAN




      BLOCK 229 & 231
      TYPICAL UPPER STOREY FLOOR PLAN                      PRECINT C

                                                HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                 D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235
                          FONDA
BLOCK 234
TYPICAL UPPER STOREY FLOOR PLAN




  BLOCK 230
  TYPICAL UPPER STOREY FLOOR PLAN
                                                           PRECINT C

                                                HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                 D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235
                          FONDA
BLOCK 232, 233 & 235
  TYPICAL UPPER STOREY FLOOR PLAN




                                                           PRECINT C

                                                HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                 D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235
                          FONDA
PRECINT C
   TYPICAL GROUND                      TYPICAL UPPER
   FLOOR PLAN                          FLOOR PLAN


                                                                             ELEVATION OF LIFT




                                                                           Full wall tiles on ground floor
                                                                           up to the edge of staircase
  Entrance Canopy and canopy           Privacy fins and ledge to be
  will be provided                     provided on the upper floors        Tile bands to typical floor lift
                                                                           lobbies and entrance canopy
                                                                           will be provided
                                                                      HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                                       D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235
                               FONDA
BLOCK 233                                   ARTIST IMPRESSION
                                                HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                 D&B OF UPGRADING PROJECTS FOR G8B
ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235
                          FONDA
SITE LAYOUT PLAN
                                                                   PRECINT D
                                                    HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                     D&B OF UPGRADING PROJECTS FOR G8B
LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327
                         FONDA
BLOCK 301 & 302
 TYPICAL UPPER STOREY FLOOR PLAN




    BLOCK 324 & 325
    TYPICAL UPPER STOREY FLOOR PLAN
                                                               PRECINT D

                                                    HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                     D&B OF UPGRADING PROJECTS FOR G8B
LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327
                         FONDA
BLOCK 326
   TYPICAL UPPER STOREY FLOOR PLAN




    BLOCK 327
    TYPICAL UPPER STOREY FLOOR PLAN                            PRECINT D

                                                    HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                     D&B OF UPGRADING PROJECTS FOR G8B
LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327
                         FONDA
BLOCK 322
   TYPICAL UPPER STOREY FLOOR PLAN




                                                               PRECINT D

                                                    HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                     D&B OF UPGRADING PROJECTS FOR G8B
LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327
                         FONDA
BLOCK 323
     TYPICAL UPPER STOREY FLOOR PLAN




                                                               PRECINT D

                                                    HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                     D&B OF UPGRADING PROJECTS FOR G8B
LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327
                         FONDA
BLOCK 302                              ARTIST IMPRESSION
                                                       HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                        D&B OF UPGRADING PROJECTS FOR G8B
LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327
                         FONDA
SITE LAYOUT PLAN

                                                        PRECINT E

                                             HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                              D&B OF UPGRADING PROJECTS FOR G8B
COMMONWEALTH AVENUE WEST blocks 410 to 412
                      FONDA
BLOCK 410, 411 & 412
   TYPICAL UPPER STOREY FLOOR PLAN




                                                        PRECINT E

                                             HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                              D&B OF UPGRADING PROJECTS FOR G8B
COMMONWEALTH AVENUE WEST blocks 410 to 412
                        FONDA
BLOCK 410                             ARTIST IMPRESSION
                                              HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                               D&B OF UPGRADING PROJECTS FOR G8B
COMMONWEALTH AVENUE WEST blocks 410 to 412
                      FONDA
SITE LAYOUT
           PLAN                                                  PRECINT F

                                                      HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                       D&B OF UPGRADING PROJECTS FOR G8B
HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47
                           FONDA
BLOCK 6 & 9
                                         TYPICAL GROUNDFLOOR PLAN




                                                                        PRECINT F

                                                             HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                              D&B OF UPGRADING PROJECTS FOR G8B
HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47
                           FONDA
BLOCK 11
                                     TYPICAL GROUNDFLOOR PLAN




                                                                       PRECINT F

                                                            HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                             D&B OF UPGRADING PROJECTS FOR G8B
HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47
                           FONDA
BLOCK 12
    TYPICAL GROUNDFLOOR PLAN                                     PRECINT F

                                                      HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                       D&B OF UPGRADING PROJECTS FOR G8B
HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47
                           FONDA
BLOCK 13
                                                      TYPICAL GROUNDFLOOR PLAN




                                                                        PRECINT F

                                                           HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                            D&B OF UPGRADING PROJECTS FOR G8B
HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47
                           FONDA
BLOCK 10
     TYPICAL UPPER STOREY FLOOR PLAN




   BLOCK 47
   TYPICAL GROUND FLOOR PLAN                                     PRECINT F

                                                      HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                       D&B OF UPGRADING PROJECTS FOR G8B
HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47
                           FONDA
Lift Upgrading Proposal
                                                           Existing 3 steps located at the upper
                                                           storey does not allow for barrier free
                                                           access to the common corridor as well
                                               NEW STEPS
                                                           as does not allow a new lift opening to
                                                           be created at one of the existing lift
                                                           shaft. The creation of a single ramp to
                                                           replace the steps proves to be too long
                                                           and will also stretch beyond the
                                                           nearest main door opening of the
                                                           nearest dwelling unit. Our proposal is
                                                           to raise the floor level of the existing
                                RAISED FLOOR               corridor landing leading in front of the
                                    LEVEL                  new lifts and create ramps on both
   EXISTING 3 STEPS                                        sides of the common corridor so as to
    TO BE REMOVED                                          shorten the length of ramps created for
                                                           better barrier free accessibility.



                      TYPICAL UPPER STOREY PLAN                               PRECINT F

                                                                HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                                 D&B OF UPGRADING PROJECTS FOR G8B
HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47
                              FONDA
Lift Upgrading Proposal
                                       EXISTING           Existing 3 steps located at the upper
                                       STEPS TO           storey does not allow for barrier free
           NEW LIFT
                                       CONVERT
                                                          access to the common corridor as well
                                       TO RAMP
                                                          as does not allow a new lift opening to
                                                          be created. The creation of a single
                                                          ramp to replace the steps proves to be
                                                          too long and will also stretch beyond
                                                          the nearest main door opening of the
                   TO RECTIFY THE EXISTING BEAM TO MEET   nearest dwelling unit. Our proposal is
                   THE MINIMUM HEADROOM CLEARANCE
                   REQUIREMENT OF 2 METERS
                                                          to raise the floor level of the existing
                                                          corridor landing leading in front of the
                                                          existing lifts, and create ramps on both
                                                          sides of the common corridor so as to
            NEW LIFT                                      shorten the length of ramps created for
                            NEW RAMP                      better barrier free accessibility.

                   PROPOSED
                   RAISING OF
                   FLOOR LEVEL
                                                                             PRECINT F

                                                               HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                                D&B OF UPGRADING PROJECTS FOR G8B
HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47
                           FONDA
HDB LIFT UPGRADING PROGRAM
DESIGN PROPOSAL                                       D&B OF UPGRADING PROJECTS FOR G8B
HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47
                           FONDA

More Related Content

What's hot

Sdc Leed V3 Workshop F1
Sdc   Leed V3 Workshop F1Sdc   Leed V3 Workshop F1
Sdc Leed V3 Workshop F1
Sustainable Design Collaborative LLC
 
HPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal PresentationHPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal Presentation
Josh Progar
 
Prince 2 + XLPM - Semcon - Bert Hedeman
Prince 2 + XLPM - Semcon - Bert HedemanPrince 2 + XLPM - Semcon - Bert Hedeman
Prince 2 + XLPM - Semcon - Bert Hedeman
Svenskt Projektforum
 
Dimitri's Project Portfolio
Dimitri's Project PortfolioDimitri's Project Portfolio
Dimitri's Project Portfolio
dkakaletris
 
Building LIFE
Building LIFEBuilding LIFE
Building LIFE
CannonDesign
 
Change management
Change managementChange management
Change management
Iben Engenharia
 
zk resume
zk resumezk resume
zk resume
zafrulla khan
 
Leed ga question
Leed ga questionLeed ga question
Leed ga question
Bilal Mohamed
 
Design Build Intro
Design Build IntroDesign Build Intro
Design Build Intro
semackler
 
Integrated Operations io-PMO
Integrated Operations io-PMOIntegrated Operations io-PMO
Integrated Operations io-PMO
Harjono Zainal-Abidin
 
Resume And Detailed Project History
Resume And Detailed Project HistoryResume And Detailed Project History
Resume And Detailed Project History
sgarrison1960
 
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
McKenney's Inc
 
Inbalance Buildings Services
Inbalance Buildings ServicesInbalance Buildings Services
Inbalance Buildings Services
mccartmp
 
Fallon Gateway Uses
Fallon Gateway UsesFallon Gateway Uses
Fallon Gateway Uses
arounddublin
 
5D Macro BIM Project Profiles Using DProfiler
5D Macro BIM Project Profiles Using DProfiler5D Macro BIM Project Profiles Using DProfiler
5D Macro BIM Project Profiles Using DProfiler
Beck Technology, Ltd.
 
06.05.2009 Wojciech Design And Projects
06.05.2009   Wojciech Design And Projects06.05.2009   Wojciech Design And Projects
06.05.2009 Wojciech Design And Projects
WojciechMickowski
 
Dbright Pamphlet
Dbright PamphletDbright Pamphlet
Dbright Pamphlet
jcornwell
 
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility StudiesGSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
Beck Technology, Ltd.
 
Architectural Engineering Construction AEC Projects
Architectural Engineering Construction AEC ProjectsArchitectural Engineering Construction AEC Projects
Architectural Engineering Construction AEC Projects
Sunny Marks
 
T03 river crossing-misterly
T03 river crossing-misterlyT03 river crossing-misterly

What's hot (20)

Sdc Leed V3 Workshop F1
Sdc   Leed V3 Workshop F1Sdc   Leed V3 Workshop F1
Sdc Leed V3 Workshop F1
 
HPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal PresentationHPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal Presentation
 
Prince 2 + XLPM - Semcon - Bert Hedeman
Prince 2 + XLPM - Semcon - Bert HedemanPrince 2 + XLPM - Semcon - Bert Hedeman
Prince 2 + XLPM - Semcon - Bert Hedeman
 
Dimitri's Project Portfolio
Dimitri's Project PortfolioDimitri's Project Portfolio
Dimitri's Project Portfolio
 
Building LIFE
Building LIFEBuilding LIFE
Building LIFE
 
Change management
Change managementChange management
Change management
 
zk resume
zk resumezk resume
zk resume
 
Leed ga question
Leed ga questionLeed ga question
Leed ga question
 
Design Build Intro
Design Build IntroDesign Build Intro
Design Build Intro
 
Integrated Operations io-PMO
Integrated Operations io-PMOIntegrated Operations io-PMO
Integrated Operations io-PMO
 
Resume And Detailed Project History
Resume And Detailed Project HistoryResume And Detailed Project History
Resume And Detailed Project History
 
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
 
Inbalance Buildings Services
Inbalance Buildings ServicesInbalance Buildings Services
Inbalance Buildings Services
 
Fallon Gateway Uses
Fallon Gateway UsesFallon Gateway Uses
Fallon Gateway Uses
 
5D Macro BIM Project Profiles Using DProfiler
5D Macro BIM Project Profiles Using DProfiler5D Macro BIM Project Profiles Using DProfiler
5D Macro BIM Project Profiles Using DProfiler
 
06.05.2009 Wojciech Design And Projects
06.05.2009   Wojciech Design And Projects06.05.2009   Wojciech Design And Projects
06.05.2009 Wojciech Design And Projects
 
Dbright Pamphlet
Dbright PamphletDbright Pamphlet
Dbright Pamphlet
 
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility StudiesGSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
 
Architectural Engineering Construction AEC Projects
Architectural Engineering Construction AEC ProjectsArchitectural Engineering Construction AEC Projects
Architectural Engineering Construction AEC Projects
 
T03 river crossing-misterly
T03 river crossing-misterlyT03 river crossing-misterly
T03 river crossing-misterly
 

Similar to G8 Part 1 R2 030709

BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
Graham H Stewart
 
PRE ENGINEERED BUILDING DESIGN SERVICES.pptx
PRE ENGINEERED BUILDING DESIGN SERVICES.pptxPRE ENGINEERED BUILDING DESIGN SERVICES.pptx
PRE ENGINEERED BUILDING DESIGN SERVICES.pptx
Silicon Valley Infomedia Pvt Ltd
 
5 peter trebilcock, balfour beattie
5   peter trebilcock, balfour beattie5   peter trebilcock, balfour beattie
5 peter trebilcock, balfour beattie
Faculty of Art, Design and the Built Environment
 
Pepsi Project Phasing
Pepsi Project PhasingPepsi Project Phasing
Pepsi Project Phasing
AlexiaLevite
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
lmelaine
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
mecklenburgstrelitzh
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
Russell and Dawson
 
Business basis of design
Business basis of design Business basis of design
Business basis of design
Bob Prieto
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
NASAPMC
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
NASAPMC
 
PTS service proposal for Ericsson
PTS service proposal for EricssonPTS service proposal for Ericsson
PTS service proposal for Ericsson
abbasz
 
Driving down Energy Consumption within Complex Facilities - Professor Matthew...
Driving down Energy Consumption within Complex Facilities - Professor Matthew...Driving down Energy Consumption within Complex Facilities - Professor Matthew...
Driving down Energy Consumption within Complex Facilities - Professor Matthew...
School of the Built Environment - University of Salford
 
Togaf9 Refcard1
Togaf9 Refcard1Togaf9 Refcard1
Togaf9 Refcard1
jucaab
 
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate DevelopersIRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET Journal
 
Pishro Telecom Solutions
Pishro Telecom SolutionsPishro Telecom Solutions
Pishro Telecom Solutions
abbasz
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
DavidJPCChai
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
RICHBUTKUS
 
Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
British Institute of Facilities Management
 
PreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupPreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroup
Todd Sullivan
 
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
Fabio Roberti
 

Similar to G8 Part 1 R2 030709 (20)

BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
 
PRE ENGINEERED BUILDING DESIGN SERVICES.pptx
PRE ENGINEERED BUILDING DESIGN SERVICES.pptxPRE ENGINEERED BUILDING DESIGN SERVICES.pptx
PRE ENGINEERED BUILDING DESIGN SERVICES.pptx
 
5 peter trebilcock, balfour beattie
5   peter trebilcock, balfour beattie5   peter trebilcock, balfour beattie
5 peter trebilcock, balfour beattie
 
Pepsi Project Phasing
Pepsi Project PhasingPepsi Project Phasing
Pepsi Project Phasing
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
 
Business basis of design
Business basis of design Business basis of design
Business basis of design
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
PTS service proposal for Ericsson
PTS service proposal for EricssonPTS service proposal for Ericsson
PTS service proposal for Ericsson
 
Driving down Energy Consumption within Complex Facilities - Professor Matthew...
Driving down Energy Consumption within Complex Facilities - Professor Matthew...Driving down Energy Consumption within Complex Facilities - Professor Matthew...
Driving down Energy Consumption within Complex Facilities - Professor Matthew...
 
Togaf9 Refcard1
Togaf9 Refcard1Togaf9 Refcard1
Togaf9 Refcard1
 
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate DevelopersIRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
 
Pishro Telecom Solutions
Pishro Telecom SolutionsPishro Telecom Solutions
Pishro Telecom Solutions
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
 
Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
PreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupPreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroup
 
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
 

Recently uploaded

一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理
peuce
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
Techno Merch
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
Chiara Aliotta
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
Bianca Woods
 
Timeless Principles of Good Design
Timeless Principles of Good DesignTimeless Principles of Good Design
Timeless Principles of Good Design
Carolina de Bartolo
 
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
k7nm6tk
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
qo1as76n
 
Divertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8djDivertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8dj
lunaemel03
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
184804
 
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptxUNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
GOWSIKRAJA PALANISAMY
 
Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1
Decomart Studio
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
Kyungeun Sung
 
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptxUNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
GOWSIKRAJA PALANISAMY
 
Impact of Fonts: in Web and Apps Design
Impact of Fonts:  in Web and Apps DesignImpact of Fonts:  in Web and Apps Design
Impact of Fonts: in Web and Apps Design
contactproperweb2014
 
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
kecekev
 
Virtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburghVirtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburgh
millarj46
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
Jaime Brown
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
TE Studio
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
pmgdscunsri
 
PDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in NoidaPDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in Noida
PoojaSaini954651
 

Recently uploaded (20)

一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
 
Timeless Principles of Good Design
Timeless Principles of Good DesignTimeless Principles of Good Design
Timeless Principles of Good Design
 
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
 
Divertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8djDivertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8dj
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
 
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptxUNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
 
Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
 
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptxUNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
 
Impact of Fonts: in Web and Apps Design
Impact of Fonts:  in Web and Apps DesignImpact of Fonts:  in Web and Apps Design
Impact of Fonts: in Web and Apps Design
 
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
 
Virtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburghVirtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburgh
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
 
PDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in NoidaPDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in Noida
 

G8 Part 1 R2 030709

  • 1. ARCHITECTURAL DESIGN - PROJECT BRIEF - DESIGN APPROACH - LIFT PROPOSAL - PRIVACY - DESIGN CONSIDERATION - CONSTRUCTION - HOME IMPROVEMENT PROGRAMME (HIP) - SITE MANAGEMENT - DESIGN PROPOSAL ARCHITECTURAL   PRECINT A PRECINT B DESIGN  PRECINT C  PRECINT D  PRECINT E  PRECINT F  STRUCTURAL DESIGN  DESIGN CRITERIA & LIFT SHAFT DESIGN  M&E DESIGN HDB LIFT UPGRADING PROGRAM D&B OF UPGRADING PROJECTS FOR G8B FONDA
  • 2. DESIGN & BUILD LUP + HIP FOR HOLLAND CLOSE PRECINT HDB LIFT UPGRADING PROGRAM INTRODUCTION DESIGN SCOPE D&B OF UPGRADING PROJECTS FOR G8B FONDA
  • 3. PROJECT BRIEF The Design and built proposal for G8 involves Lift upgrading Program (LUP) for the following Precinct; Precinct A Bedok North Avenue 3 Blocks 401 to 404 Precinct B Ang Mo Kio Avenue 4 Blocks 108 to 111 Precinct C Ang Mo Kio Avenue 1 /3 Blocks 221, 222, 229 to 235 Precinct D Ang Mo Kio Avenue 3 Blocks 301, 302, 322 to 327 Precinct E Commonwealth Avenue West Blocks 410 to 412 Precinct F Holland Close / Avenue / Drive Blocks 6, 9 to 13, 40 to 43, 45 to 47 and; (HIP) Home Improvement program for Precinct G Holland Close Blocks 31 and 32 HDB LIFT UPGRADING PROGRAM INTRODUCTION DESIGN SCOPE D&B OF UPGRADING PROJECTS FOR G8B FONDA
  • 4. 1.0 DESIGN APPROACH 1.1 The solution derived for the project is a result of close co-ordination and integration of the expertise of the various professional disciplines, focusing on achieving a most optimal ‘value engineering’ solution meeting all fundamental requirements, standards set by HDB. Most importantly, to ensure design is meets stringently to all mandatory building bylaws set by the relevant authorities, and also be able to address security and privacy issues thru well integrated design features. 1.2 The LUP’s proposal consists of new lift shaft constructed primarily of steel structure and cladding panels. Fundamentally, the choice of construction methodology is to achieve speedier and neater construction process. Due consideration is also given to environmental friendliness thru usage of material selection which are recyclable and deriving good detailing for ease of construction, as well as mitigating future maintenance cost. HDB LIFT UPGRADING PROGRAM INTRODUCTION DESIGN SCOPE D&B OF UPGRADING PROJECTS FOR G8B FONDA
  • 5. 2.0 LIFTS PROPOSAL 3.0 PRIVACY 2.1 The location for the new lifts, shutting down of 3.1 This is an important design consideration, which existing lifts and replacement of new lifts, generally shall fundamentally, the new lift position must not open within complies with the given design brief. the sight of the dwelling units windows and doors compromising the resident’s privacy. The lift shaft should also be strategically plan such that views and ventilation 2.2 Each new lift locations shall be designed within to the dwelling units are nit affected. it’s specific site constraint, such that ventilations and setback meets the requirement stipulated by FSSD. 3.2 Where there is occurrence of angled view into the window of the dwelling units, design features like vertical 2.3 Ramps of not more than 1:12 shall be provided louvers screen/fins wall shall be strategically placed to to bridge differences in levels or to replace existing steps cut off visibility, yet maintaining cross air flow through the where occurred, in comply with the barrier free accessibility new lift lobby. code stipulated by BCA. 2.4 Careful studies and planning shall be make to each individual blocks to ensure disruption to existing infrastructure and inconveniences to the resident are minimize. HDB LIFT UPGRADING PROGRAM INTRODUCTION DESIGN SCOPE D&B OF UPGRADING PROJECTS FOR G8B FONDA
  • 6. 3.3 PROTECTION FROM KILLER LITTER Generally, this is to mitigate risk of falling litter to any existing facilities or amenities that is located within close proximity to new lift lobbies. As a rule of thumb, such amenities within 5m radius of the lift lobbies shall 5M be relocated. 5M 4.0 CONSTRUCTION 4.1 The use of mainly steel materials and aluminium 4.2 Existing trees will be required to be pruned or removed, cladding shall contribute to a speedier and neater where affected by the new lifts. However, every attempt construction process, being that most work will be will be make to minimize tree felling, where possible. fabricated and constructed offsite and installed on site. Upon the installation of the new steel frame, the 4.3 Survey shall be conducted on underground Services, cladding shall follow consequentially, to avoid the and shall be diverted at the first phase of the work, if image of the incomplete steel frame of the lift shaft. determined to affect the new lift position. The proposed construction methodology will result in a reduced time frame for the construction period, and also entail a more efficient and safe working .4.5 Detailed Planning and Construction Phasing shall be environment within the estate. planned to run concurrently within the dwelling units to reduce the construction period. Proper co-ordination and close liaison with the residents during the execution of the work shall be the primary focus by the contractor’s management team. HDB LIFT UPGRADING PROGRAM INTRODUCTION DESIGN SCOPE D&B OF UPGRADING PROJECTS FOR G8B FONDA
  • 7. 5.0 HOME IMPROVEMENT PROGRAMME (HIP) 6.0 SITE MANAGEMENT A well managed site shall be the key success to the 5.1 materials specification + Quality project execution, and minimising inconvenience and disturbance to the resident. Essentially, Materials and products proposed for the HIP shall comply with the specification stipulated under The use of mainly prefabricated steel structure will the contract and the requirement set by HDB. contribute to a neat and tidy site, as such materials are fabricated off site and will have very quick installation on Material’s selection should also consider high durability site. Where possible, prefab components will be and easy maintenance. The followings are a summary encouraged to reduce on site casting works. Proper of items included under HIP; hoarding shall be maintained at all time to allow a safe pedestrian routes at all time. 1) PVC sliding or Bi-fold door to toilet 2) Sanitary Ware and sanitary pipes replacement 3) Ceramic wall and floor tiles (HDB approved type) 4)Aluminium Glass louvers window 5) New aluminium clothes drying racks 6) Replacement of pipe socket 7) Aluminium refuse chute hopper . HDB LIFT UPGRADING PROGRAM INTRODUCTION DESIGN SCOPE D&B OF UPGRADING PROJECTS FOR G8B FONDA
  • 8. SITE LAYOUT PLAN PRECINT A HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B BEDOK NORTH AVENUE 3 block 401- 404 FONDA
  • 9. BLOCK 401 & 402 TYPICAL GROUND FLOOR PLAN BLOCK 403 & 404 TYPICAL GROUND FLOOR PLAN PRECINT A HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B BEDOK NORTH AVENUE 3 block 401- 404 FONDA
  • 10. PRECINT A TYPICAL GROUND TYPICAL UPPER FLOOR PLAN FLOOR PLAN ELEVATION OF LIFT Full wall tiles on ground floor up to the edge of staircase Entrance Canopy and canopy Privacy fins and ledge to be will be provided provided on the upper floors Tile bands to typical floor lift lobbies and entrance canopy will be provided HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B BEDOK NORTH AVENUE 3 block 401- 404 FONDA
  • 11. BLOCK 404 ARTIST IMPRESSION HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B BEDOK NORTH AVENUE 3 block 401- 404 FONDA
  • 12. SITE LAYOUT PLAN PRECINT B HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 4 blocks 108 - 111 FONDA
  • 13. BLOCK 108 TYPICAL UPPER STOREY FLOOR PLAN BLOCK 111 TYPICAL GROUND FLOOR PRECINT B HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 4 blocks 108 - 111 FONDA
  • 14. BLOCK 109 TYPICAL UPPER STOREY FLOOR PLAN PRECINT B BLOCK 110 TYPICAL GROUND FLOOR PLAN HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 4 blocks 108 - 111 FONDA
  • 15. PRECINT B TYPICAL GROUND TYPICAL UPPER FLOOR PLAN FLOOR PLAN ELEVATION OF LIFT Full wall tiles on ground floor up to the edge of staircase Entrance Canopy and canopy Privacy fins and ledge to be will be provided provided on the upper floors Tile bands to typical floor lift lobbies and entrance canopy will be provided HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 4 blocks 108 - 111 FONDA
  • 16. BLOCK 111 ARTIST IMPRESSION HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 4 blocks 108 - 111 FONDA
  • 17. PRECINT C SITE LAYOUT PLAN HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235 FONDA
  • 18. BLOCK 221 & 222 TYPICAL UPPER STOREY FLOOR PLAN BLOCK 229 & 231 TYPICAL UPPER STOREY FLOOR PLAN PRECINT C HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235 FONDA
  • 19. BLOCK 234 TYPICAL UPPER STOREY FLOOR PLAN BLOCK 230 TYPICAL UPPER STOREY FLOOR PLAN PRECINT C HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235 FONDA
  • 20. BLOCK 232, 233 & 235 TYPICAL UPPER STOREY FLOOR PLAN PRECINT C HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235 FONDA
  • 21. PRECINT C TYPICAL GROUND TYPICAL UPPER FLOOR PLAN FLOOR PLAN ELEVATION OF LIFT Full wall tiles on ground floor up to the edge of staircase Entrance Canopy and canopy Privacy fins and ledge to be will be provided provided on the upper floors Tile bands to typical floor lift lobbies and entrance canopy will be provided HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235 FONDA
  • 22. BLOCK 233 ARTIST IMPRESSION HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B ANG MO KIO AVE 1/3 blocks 221,222, 229 to 235 FONDA
  • 23. SITE LAYOUT PLAN PRECINT D HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327 FONDA
  • 24. BLOCK 301 & 302 TYPICAL UPPER STOREY FLOOR PLAN BLOCK 324 & 325 TYPICAL UPPER STOREY FLOOR PLAN PRECINT D HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327 FONDA
  • 25. BLOCK 326 TYPICAL UPPER STOREY FLOOR PLAN BLOCK 327 TYPICAL UPPER STOREY FLOOR PLAN PRECINT D HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327 FONDA
  • 26. BLOCK 322 TYPICAL UPPER STOREY FLOOR PLAN PRECINT D HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327 FONDA
  • 27. BLOCK 323 TYPICAL UPPER STOREY FLOOR PLAN PRECINT D HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327 FONDA
  • 28. BLOCK 302 ARTIST IMPRESSION HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B LUP B7 ANG MO KIO AVE 3 blocks 301,302,322 TO 327 FONDA
  • 29. SITE LAYOUT PLAN PRECINT E HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B COMMONWEALTH AVENUE WEST blocks 410 to 412 FONDA
  • 30. BLOCK 410, 411 & 412 TYPICAL UPPER STOREY FLOOR PLAN PRECINT E HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B COMMONWEALTH AVENUE WEST blocks 410 to 412 FONDA
  • 31. BLOCK 410 ARTIST IMPRESSION HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B COMMONWEALTH AVENUE WEST blocks 410 to 412 FONDA
  • 32. SITE LAYOUT PLAN PRECINT F HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47 FONDA
  • 33. BLOCK 6 & 9 TYPICAL GROUNDFLOOR PLAN PRECINT F HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47 FONDA
  • 34. BLOCK 11 TYPICAL GROUNDFLOOR PLAN PRECINT F HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47 FONDA
  • 35. BLOCK 12 TYPICAL GROUNDFLOOR PLAN PRECINT F HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47 FONDA
  • 36. BLOCK 13 TYPICAL GROUNDFLOOR PLAN PRECINT F HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47 FONDA
  • 37. BLOCK 10 TYPICAL UPPER STOREY FLOOR PLAN BLOCK 47 TYPICAL GROUND FLOOR PLAN PRECINT F HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47 FONDA
  • 38. Lift Upgrading Proposal Existing 3 steps located at the upper storey does not allow for barrier free access to the common corridor as well NEW STEPS as does not allow a new lift opening to be created at one of the existing lift shaft. The creation of a single ramp to replace the steps proves to be too long and will also stretch beyond the nearest main door opening of the nearest dwelling unit. Our proposal is to raise the floor level of the existing RAISED FLOOR corridor landing leading in front of the LEVEL new lifts and create ramps on both EXISTING 3 STEPS sides of the common corridor so as to TO BE REMOVED shorten the length of ramps created for better barrier free accessibility. TYPICAL UPPER STOREY PLAN PRECINT F HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47 FONDA
  • 39. Lift Upgrading Proposal EXISTING Existing 3 steps located at the upper STEPS TO storey does not allow for barrier free NEW LIFT CONVERT access to the common corridor as well TO RAMP as does not allow a new lift opening to be created. The creation of a single ramp to replace the steps proves to be too long and will also stretch beyond the nearest main door opening of the TO RECTIFY THE EXISTING BEAM TO MEET nearest dwelling unit. Our proposal is THE MINIMUM HEADROOM CLEARANCE REQUIREMENT OF 2 METERS to raise the floor level of the existing corridor landing leading in front of the existing lifts, and create ramps on both sides of the common corridor so as to NEW LIFT shorten the length of ramps created for NEW RAMP better barrier free accessibility. PROPOSED RAISING OF FLOOR LEVEL PRECINT F HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47 FONDA
  • 40. HDB LIFT UPGRADING PROGRAM DESIGN PROPOSAL D&B OF UPGRADING PROJECTS FOR G8B HOLLAND CLOSE blocks 6, 9 to 13, 40 to 43, 45 to 47 FONDA