SlideShare a Scribd company logo
Type of vessel : XYZ
Class notation :
Class :
Owner : XYZ
Hull no. :
Builder : XYZ
Ref:
International Convention on Load Lines, 1966
and protocol of 1988
CONSOLIDATED EDITION, 2002
and
Rules for Classification and Construction, Part - 1, Annex - A
Edition 2002
Tabular freeboard for 29.80 m ship = 248.3 mm
Correction for block coefficient
Actual Cb= 0.811
If Cb>0.68
The freeboard shall be multiplied by = 1.0963
L = 29.800 m
Moulded Depth = 1.800 m
Stringer Plate = 0.006 m
Depth, D = 1.806 m
L / 15 = 1.987
As L / 15 > D, so correction for depth is not applicable.
Not Applicable for the Ship
Correction for Sheer
Station SM Standard Product Actual Product
Ordinate Ordinate
A.P 1 498.3333 498.333333 0 0
L/6 from A.P 3 221.26 663.78 0 0
L / 3 from A.P 3 55.81333 167.44 0 0
1 0 0 0 0
Freeboard Calculation
XYZ
Correction to the freeboard for Ships under 100 meters in length
Correction for Depth
┼ Hull ┼ Machinery
Amidships
XYZ
Page 1 Freeboard Calculation
1 0 0 0 0
L / 3 from F.P 3 111.6267 334.88 0 0
L / 6 from F.P 3 442.52 1327.56 0 0
F.P 1 996.6667 996.667 0 0
A.P 1329.553 A.P 0
F.P 2659.107 F.P 0
Deficiency of sheer = 498.5825
Correction for sheer = 242.5989 mm
Minimum Bow Height
Minimum Bow Height Required = 1431.457 mm
Actual Bow Height = 1800 mm
No correction is needed for this ship
Summary
Tabular Freeboard = 248.30 mm
Correction For Block Coefficient = 23.92 mm
Sheer Correction = 242.60 mm
The Minimum Summer Freeboard = 514.82 mm
Fresh Water Freeboard
Displacement in salt water in tons at the summer load line = 119.41
TPC in salt water at the summer load waterline = 1.7076
Deduction = 17.48214 mm
The Minimum Fresh Water Freeboard = 497.33 mm
Summary of freeboards
Summar freeboard S amidships from
centre of disk to top of deck line 514.82 mm
Fresh water line above centre of disk 497.33 mm
Amidships
Page 2 Freeboard Calculation

More Related Content

What's hot

Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck plating
Corrodere
 
NAME 338 ( Ship Design Project and Presentation )
NAME 338 ( Ship Design Project and Presentation )NAME 338 ( Ship Design Project and Presentation )
NAME 338 ( Ship Design Project and Presentation )
mortuja05
 
double bottom structure
double bottom structuredouble bottom structure
double bottom structure
Medha Jog Katdare
 
Tugas merancang kapal ii floodable length
Tugas merancang kapal ii    floodable lengthTugas merancang kapal ii    floodable length
Tugas merancang kapal ii floodable length
Yogga Haw
 
Ship Loads and stresses
Ship Loads and stressesShip Loads and stresses
Ship Loads and stresses
dhanabenz
 
Ship Form Coefficients
Ship Form CoefficientsShip Form Coefficients
Ship Form Coefficients
Mohammud Hanif Dewan M.Phil.
 
Wk 2 weight estimate
Wk 2 weight estimateWk 2 weight estimate
Wk 2 weight estimate
Muhammad Adli Bin Ja'affar
 
Preliminary ship-design
Preliminary ship-designPreliminary ship-design
4 195-suryo-adji-engine propeller matching
4 195-suryo-adji-engine propeller matching4 195-suryo-adji-engine propeller matching
4 195-suryo-adji-engine propeller matching
Jojo Han
 
Ship Motion and Stresses
Ship Motion and StressesShip Motion and Stresses
Ship Motion and Stresses
Mohammud Hanif Dewan M.Phil.
 
Konstruksi geladak
Konstruksi geladakKonstruksi geladak
Konstruksi geladak
tanalialayubi
 
Ejemplo escantillonado
Ejemplo escantillonadoEjemplo escantillonado
Ejemplo escantillonado
Pablo Joost
 
Ship building process & shipyard productivity
Ship building process & shipyard productivityShip building process & shipyard productivity
Ship building process & shipyard productivity
Fatimatuzzahra Zaza
 
Ship terms
Ship termsShip terms
Ship terms
Birhane Gher
 
Introduction to Ship Resistance and Propulsion.pdf
Introduction to Ship Resistance and Propulsion.pdfIntroduction to Ship Resistance and Propulsion.pdf
Introduction to Ship Resistance and Propulsion.pdf
MUswahPawara
 
Kostruksi sekat
Kostruksi sekatKostruksi sekat
Kostruksi sekat
tanalialayubi
 
71800938 errors-gyro-compass
71800938 errors-gyro-compass71800938 errors-gyro-compass
71800938 errors-gyro-compass
Dheeraj Kaushal
 
Hull form geometry
Hull form geometryHull form geometry
Hull form geometry
Unikl MIMET
 
Naval arch incline test
Naval arch incline testNaval arch incline test
Naval arch incline test
Dheeraj Kaushal
 
Hydrostatics 1 n 2
Hydrostatics 1 n 2 Hydrostatics 1 n 2
Hydrostatics 1 n 2
Muhammad Adli Bin Ja'affar
 

What's hot (20)

Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck plating
 
NAME 338 ( Ship Design Project and Presentation )
NAME 338 ( Ship Design Project and Presentation )NAME 338 ( Ship Design Project and Presentation )
NAME 338 ( Ship Design Project and Presentation )
 
double bottom structure
double bottom structuredouble bottom structure
double bottom structure
 
Tugas merancang kapal ii floodable length
Tugas merancang kapal ii    floodable lengthTugas merancang kapal ii    floodable length
Tugas merancang kapal ii floodable length
 
Ship Loads and stresses
Ship Loads and stressesShip Loads and stresses
Ship Loads and stresses
 
Ship Form Coefficients
Ship Form CoefficientsShip Form Coefficients
Ship Form Coefficients
 
Wk 2 weight estimate
Wk 2 weight estimateWk 2 weight estimate
Wk 2 weight estimate
 
Preliminary ship-design
Preliminary ship-designPreliminary ship-design
Preliminary ship-design
 
4 195-suryo-adji-engine propeller matching
4 195-suryo-adji-engine propeller matching4 195-suryo-adji-engine propeller matching
4 195-suryo-adji-engine propeller matching
 
Ship Motion and Stresses
Ship Motion and StressesShip Motion and Stresses
Ship Motion and Stresses
 
Konstruksi geladak
Konstruksi geladakKonstruksi geladak
Konstruksi geladak
 
Ejemplo escantillonado
Ejemplo escantillonadoEjemplo escantillonado
Ejemplo escantillonado
 
Ship building process & shipyard productivity
Ship building process & shipyard productivityShip building process & shipyard productivity
Ship building process & shipyard productivity
 
Ship terms
Ship termsShip terms
Ship terms
 
Introduction to Ship Resistance and Propulsion.pdf
Introduction to Ship Resistance and Propulsion.pdfIntroduction to Ship Resistance and Propulsion.pdf
Introduction to Ship Resistance and Propulsion.pdf
 
Kostruksi sekat
Kostruksi sekatKostruksi sekat
Kostruksi sekat
 
71800938 errors-gyro-compass
71800938 errors-gyro-compass71800938 errors-gyro-compass
71800938 errors-gyro-compass
 
Hull form geometry
Hull form geometryHull form geometry
Hull form geometry
 
Naval arch incline test
Naval arch incline testNaval arch incline test
Naval arch incline test
 
Hydrostatics 1 n 2
Hydrostatics 1 n 2 Hydrostatics 1 n 2
Hydrostatics 1 n 2
 

Similar to Freeboard Calculation

Tugas 3 Contoh Perhitungan Pompa.pptx
Tugas 3 Contoh Perhitungan Pompa.pptxTugas 3 Contoh Perhitungan Pompa.pptx
Tugas 3 Contoh Perhitungan Pompa.pptx
Rihfa
 
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
subhashini214160
 
offshore support vessel design
offshore support vessel designoffshore support vessel design
offshore support vessel design
Ahmed Taha
 
friction loss along a pipe
friction loss along a pipefriction loss along a pipe
friction loss along a pipe
Saif al-din ali
 
Linea de carga - Diseños de barcos ship desing
Linea de carga - Diseños de barcos ship desingLinea de carga - Diseños de barcos ship desing
Linea de carga - Diseños de barcos ship desing
willianeduardo17
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments Design
Pratik Patel
 
Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019
Oleg Buyanov
 
LinkedIn
LinkedInLinkedIn
LinkedIn
Col Andrews
 
Ship design project & presentation 3
Ship design project &  presentation 3Ship design project &  presentation 3
Ship design project & presentation 3
Kifayath Chowdhury
 
All hvac calculation
All hvac calculationAll hvac calculation
All hvac calculation
Vidyanand Shrivastava
 
DESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRODESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRO
civilEngineering9966
 
Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn Presentation
Steven Polowy
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
Hamza Waheed
 
M.i tank
M.i  tankM.i  tank
M.i tank
beerappa143
 
mix design m30
mix design m30mix design m30
mix design m30
Er.BASAVARAJ Pachhapure
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Dhaka University of Engineering & Technology, Gazipur
 
Chap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdfChap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdf
AberaMamoJaleta
 
Rectangular tank example_latest
Rectangular tank example_latestRectangular tank example_latest
Rectangular tank example_latest
Vedachalam Mani
 
SARNATH-PROFILE-CAE
SARNATH-PROFILE-CAESARNATH-PROFILE-CAE
SARNATH-PROFILE-CAE
Sarnath R
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection Calcs
Magdel Kotze
 

Similar to Freeboard Calculation (20)

Tugas 3 Contoh Perhitungan Pompa.pptx
Tugas 3 Contoh Perhitungan Pompa.pptxTugas 3 Contoh Perhitungan Pompa.pptx
Tugas 3 Contoh Perhitungan Pompa.pptx
 
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
 
offshore support vessel design
offshore support vessel designoffshore support vessel design
offshore support vessel design
 
friction loss along a pipe
friction loss along a pipefriction loss along a pipe
friction loss along a pipe
 
Linea de carga - Diseños de barcos ship desing
Linea de carga - Diseños de barcos ship desingLinea de carga - Diseños de barcos ship desing
Linea de carga - Diseños de barcos ship desing
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments Design
 
Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
Ship design project & presentation 3
Ship design project &  presentation 3Ship design project &  presentation 3
Ship design project & presentation 3
 
All hvac calculation
All hvac calculationAll hvac calculation
All hvac calculation
 
DESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRODESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRO
 
Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn Presentation
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
M.i tank
M.i  tankM.i  tank
M.i tank
 
mix design m30
mix design m30mix design m30
mix design m30
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Chap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdfChap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdf
 
Rectangular tank example_latest
Rectangular tank example_latestRectangular tank example_latest
Rectangular tank example_latest
 
SARNATH-PROFILE-CAE
SARNATH-PROFILE-CAESARNATH-PROFILE-CAE
SARNATH-PROFILE-CAE
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection Calcs
 

Freeboard Calculation

  • 1. Type of vessel : XYZ Class notation : Class : Owner : XYZ Hull no. : Builder : XYZ Ref: International Convention on Load Lines, 1966 and protocol of 1988 CONSOLIDATED EDITION, 2002 and Rules for Classification and Construction, Part - 1, Annex - A Edition 2002 Tabular freeboard for 29.80 m ship = 248.3 mm Correction for block coefficient Actual Cb= 0.811 If Cb>0.68 The freeboard shall be multiplied by = 1.0963 L = 29.800 m Moulded Depth = 1.800 m Stringer Plate = 0.006 m Depth, D = 1.806 m L / 15 = 1.987 As L / 15 > D, so correction for depth is not applicable. Not Applicable for the Ship Correction for Sheer Station SM Standard Product Actual Product Ordinate Ordinate A.P 1 498.3333 498.333333 0 0 L/6 from A.P 3 221.26 663.78 0 0 L / 3 from A.P 3 55.81333 167.44 0 0 1 0 0 0 0 Freeboard Calculation XYZ Correction to the freeboard for Ships under 100 meters in length Correction for Depth ┼ Hull ┼ Machinery Amidships XYZ Page 1 Freeboard Calculation
  • 2. 1 0 0 0 0 L / 3 from F.P 3 111.6267 334.88 0 0 L / 6 from F.P 3 442.52 1327.56 0 0 F.P 1 996.6667 996.667 0 0 A.P 1329.553 A.P 0 F.P 2659.107 F.P 0 Deficiency of sheer = 498.5825 Correction for sheer = 242.5989 mm Minimum Bow Height Minimum Bow Height Required = 1431.457 mm Actual Bow Height = 1800 mm No correction is needed for this ship Summary Tabular Freeboard = 248.30 mm Correction For Block Coefficient = 23.92 mm Sheer Correction = 242.60 mm The Minimum Summer Freeboard = 514.82 mm Fresh Water Freeboard Displacement in salt water in tons at the summer load line = 119.41 TPC in salt water at the summer load waterline = 1.7076 Deduction = 17.48214 mm The Minimum Fresh Water Freeboard = 497.33 mm Summary of freeboards Summar freeboard S amidships from centre of disk to top of deck line 514.82 mm Fresh water line above centre of disk 497.33 mm Amidships Page 2 Freeboard Calculation