Requirement:
Ship type : General Cargo
Dead Weight : 20,000 tonnes
Route :
Distances : Chittagong Port to Keppel Harbor Port, Singapore 1863 Nautical mile
Distance from Bangladesh to China 3231
Distance from Bangladesh to Hong kong 3038
Distance from Bangladesh to Japan 4284
Distance from Bangladesh to Malaysia 2021
Average distance : 3500 Nautical mile
Speed : 17 knots
Endurance : 10 days
There is some restriction to design our ship. Which are given below:
1. The Maximum permissible draft for entering Chittagong Port is 9.15 m.
2. The Maximum permissible length for entering Chittagong Port is 186 m.
3. The Maximum permissible entry length for night navigation is 153 m.
4. The Maximum permissible draft for Main Jetty areas i.e. Jetty No. 2 to Jetty
No.13 is 8.55 m.
The entry permissible draft would however depend on the day’s maximum
permissible draft
Basis Ship Data:
Ship Type : General Cargo
Length, LOA : 142 m
Length, LBP : 132 m
Breadth, BMLD : 22.23 m
Depth, D : 11.30 m
Draught, T : 8.25 m
Dead weight, DWT : 15000 tonnes
Speed : 13.8 Knots
Complement : 18 persons
Power : 4,900KW
Principal Particulars Calculation:
Displacement of basis ship, Δ = 132 × 22.23 × 8.25 × 1.025 × 0.775
= 10106.53 tonnes
Dead weight coefficient, Cd =
15000
10106.53
= 0.78
L/B = 5.93
B/T = 2.69
T/D = 0.72
Taking same Ac for basis sip & model ship :
∇1
2
3×V13
𝑝1
=
∇2
2
3×V23
𝑝2
P2= 11097 kw
Deadweightofnew ship:
 Weight of crew: 75 kg/person
Number of crew = 18
Weight = 75 × 18 = 1350 kg
= 1.35 tonnes
 Stores & Provisions: 5 kg/person/day
Weight = 5 × 18 × 10 × 1.20 kg
= 1080 kg
= 1.08 tonnes
 Fresh Water:
1. Consumption for crew = 20 kg/person/day
= 20 × 18 × 10 × 1.20 kg
= 4320 kg
= 4.32 tonnes
2. Bath & Laundry: 200 kg/person/day
= 200 × 18 × 10× 1.20 kg
= 43200 kg
= 43.2 tonnes
3. Cooking: 4 kg/person/day
= 4 × 18 × 10× 1.20 kg
= 862.85 kg = 863 kg
= 0.863 tonnes
4. Main engine Cooling: 7 g/ kwh
= 7 × 7300×10× 24 × 1.20 g
= 15207kg
= 15.3 tonnes
5. Auxiliary engine Cooling: 0.20 × Main engine cooling water
= 0.20 × 15.3 tonnes
= 3 tonnes
Total fresh water needed : 4.32+43.2 +0.863 +15.3 +3 = 66.7 tonnes
 Fuel Oil:
Engine: B32:40V12P
Engine power: 7300 kw
SFC : 184 g/kwh
Fuel needed : 184 × 6000× 10 × 24 × 1.20
= 318 tonnes
 Lubricating Oil:
Specific lubricating oil consumption = 0.8 g/BHPh
Weight = 0.8 × 7300 ×10× 24 × 1.20 g
= 1560 kg
= 1.23 tonnes
 Generator Fuel:
Model : 6090HF484
SFC : 59.1 l/h( 15.6g/h)
Generator power : 2x250 kw
Fuel needed : 59.1 × 2 × 10× 18 × 1.20 g
= 25528.5 kg
= 25.52 tonnes
[Source :
https://www.deere.com/en_US/products/engines_and_drivetrain/marine/marine_di
esel_engines.page]
Summary:
DWT : 20000 tonnes
Fresh Water : 66.7 tonnes
Engine Fuel : 318 tonnes
Generator Fuel : 25.52 tonnes
Lubricating Oil : 1.23 tonnes
TOTAL = 414.53 TONNES
CAPACITY = 20000 – 415 = 19585 TONNES
Crew : 1.35 tonnes
Store & Provisions : 1.08 tonnes
Displacement, Δ =
𝐷𝑊𝑇
Cd
=
20000
0.7733
= 25863.183 𝑡𝑜𝑛𝑛𝑒𝑠
Lightweight, LWT = 25863.183 – 20000 = 5863.183 tonnes
We know,
Δ = (L/B) × (B/T)2 × T3 × Cb
Or, T =√
Δ
𝐶𝑏×(
𝐿
𝐵
)×(
𝐵
𝑇
)2
3
= √
26692.105
0.795×(5.93)× 2.692
3
= 9.21 m
And,
B/T = 2.69
Or, B = 2.69 × 9.21 = 24.78 m
And,
L/B = 5.93
Or, L = 5.93 × 24.78 = 145.28 m
And,
T/D = 0.72
Or, D = 8.35 /.72= 12.79 m
Summary of Principal Particulars:
Displacement, Δ = 25863.183 tonnes = 26103 tonnes
CARGO CAPACITY = 20000 – 485 = 19515 TONNES
Dead weight, DWT = 20000tonnes
Light weight, LWT = 5863.183 tonnes
Length, LOA = 149.77 m
Length, LBP = 145.28 m
Breadth, BMLD = 24.78 m
Depth, D = 12.79 m
Draught, T = 9.21 m
Block coefficient, Cb =0 .775
Free Board Calculation:
[According to :ILLC 1966, Bulk Carrier: Type ‘B’ Vessel.]
Length Free board
243 3893
244 3934
245 3949
246 3965
247 3975
248 3978
289 3992
[source : Rules for Ships, January2001 ; Pt.3 Ch.5 Sec.3 – Page17]
By liniear inter pulation for length L = 145.28 FreeBoard Is 3953.48 mm
Sheer Calculation :
Minimum Bow Height:
As Length, L < 250m
=
56𝐿(1 −
𝐿
500
)1.36
𝐶 𝐵 + 0.68
𝑚𝑚
=
8135.7(1 −
145.28
500
)1.36
0.79 + 0.68
𝑚𝑚
= 5339.89 𝑚𝑚
AP
1
6
𝐿
1
3
𝐿
Midship
2
3
𝐿
5
6
𝐿
FP
25(
𝐿
3
+ 10) 11.1(
𝐿
3
+ 10) 2.8(
𝐿
3
+ 10)
0
5.6(
𝐿
3
+ 10) 22.2(
𝐿
3
+ 10) 25(
𝐿
3
+ 10)
2066 648.5 163.59 0 327.189 1297 1460.676.65
Wheel House Height:
[According to https: panama-canal-bridge-visibility-requirements]
[source : https://officerofthewatch.com/2012/10/10/panama-canal-bridge-
visibility-requirements/ ]
AC = 2× 145.28 m = 290560 mm
Bow height h = 5339.89 𝑚𝑚
Length of Poop Deck :
[According to: Ship Construction By David J.Eyres,George J. Bruce ;
page -238 ]
Poop deckcovers 15% of ships length & Pood Deck’s front should not
exceed 50% Of Length Amitship.
For Our ship Poop deckHeight =
36.25+2×145.28
2×145.28
× (5.3+ 12.79) m = 20 m
(maximum)
Dimention for Bulbusbow:
Length of Bulbusbow Will be calculated by subtracting at X distance forward per
pendicular .
𝑋 =
a
2
= 0.015L = 2.175 m
a = 4.35m (maximum)
Length of collision bulkhead should not be more than 7% of L
So 0.07×145.28 m = 10.15 m
[According to: Ship Construction By David J.Eyres,George J. Bruce ;
page -237 ]
Hc = Height Of Hatchways = 600mm
Calculation of Determining the Distance of Cargo holds
from Collision Bulkhead:
For Position 1 : Hatchway height Hc = 600 mm
𝐿 𝑓 = 5 × ( 𝐻𝑓 − 𝐻𝑐)0.5
𝑚 = 3.53 m
Hf = (Hc+0.5) mm = 600.5 mm
Navigation In Ice:
Angles Ranges ( °) For Our Ship
Α ( A1) 15 ˜ 55 45
Awf = Area of waterplane in Bow
B/4 = Breadth /4 = 6.133 m
Length Of Cargo Hold :
Length remaining = L - (7% of L For Forcastle ) –( 15% of L/2 For
Poop deck) – Lf
= 145.28 – ( .07×145.28+.15×(145.28/2)+3.53)m
= 145.28 – 25.59 m
ß (A2) 25 ˜ 90 48
=120.68 m
So Length of Cargo hold = 120/5 = 24 m (minimum)

More Related Content

What's hot

Design of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran HullDesign of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran HullHtike Aung Kyaw
 
Tugas merancang kapal ii kontruksi - source (bki)
Tugas merancang kapal ii   kontruksi - source (bki)Tugas merancang kapal ii   kontruksi - source (bki)
Tugas merancang kapal ii kontruksi - source (bki)Yogga Haw
 
Rudders and propellers
Rudders and propellersRudders and propellers
Rudders and propellersRishi Vrmn
 
Konstruksi kapal ii
Konstruksi kapal iiKonstruksi kapal ii
Konstruksi kapal iiJokoMiranto2
 
Ship design project &amp; presentation 3
Ship design project &amp;  presentation 3Ship design project &amp;  presentation 3
Ship design project &amp; presentation 3Kifayath Chowdhury
 
0 kekuatan kapal (2014)
0 kekuatan kapal (2014)0 kekuatan kapal (2014)
0 kekuatan kapal (2014)Niko Sh
 
Teknik Konstruksi kapal
Teknik Konstruksi kapalTeknik Konstruksi kapal
Teknik Konstruksi kapaltanalialayubi
 
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiSHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiJishnu Saji
 
Ukuran utama makalah
Ukuran utama makalahUkuran utama makalah
Ukuran utama makalahSurya Wardana
 
Perencanaan dermaga ponton
Perencanaan dermaga pontonPerencanaan dermaga ponton
Perencanaan dermaga pontonDeska Uliyani
 
propulsion engineering-02-resistance of ships
propulsion engineering-02-resistance of shipspropulsion engineering-02-resistance of ships
propulsion engineering-02-resistance of shipsfahrenheit
 

What's hot (20)

Design of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran HullDesign of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran Hull
 
Tugas merancang kapal ii kontruksi - source (bki)
Tugas merancang kapal ii   kontruksi - source (bki)Tugas merancang kapal ii   kontruksi - source (bki)
Tugas merancang kapal ii kontruksi - source (bki)
 
Rudders and propellers
Rudders and propellersRudders and propellers
Rudders and propellers
 
F1.1.16 manovrering
F1.1.16 manovreringF1.1.16 manovrering
F1.1.16 manovrering
 
Konstruksi kapal ii
Konstruksi kapal iiKonstruksi kapal ii
Konstruksi kapal ii
 
Displacemnt
DisplacemntDisplacemnt
Displacemnt
 
Ship design project &amp; presentation 3
Ship design project &amp;  presentation 3Ship design project &amp;  presentation 3
Ship design project &amp; presentation 3
 
0 kekuatan kapal (2014)
0 kekuatan kapal (2014)0 kekuatan kapal (2014)
0 kekuatan kapal (2014)
 
Ship resistance in confined water
Ship resistance in confined waterShip resistance in confined water
Ship resistance in confined water
 
Teknik Konstruksi kapal
Teknik Konstruksi kapalTeknik Konstruksi kapal
Teknik Konstruksi kapal
 
Propeller
PropellerPropeller
Propeller
 
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiSHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
 
Ukuran utama makalah
Ukuran utama makalahUkuran utama makalah
Ukuran utama makalah
 
Perhitungan propulsi kapal
Perhitungan propulsi kapalPerhitungan propulsi kapal
Perhitungan propulsi kapal
 
Motion Response Project pdf
Motion Response Project pdfMotion Response Project pdf
Motion Response Project pdf
 
Scantling of Ship
Scantling of ShipScantling of Ship
Scantling of Ship
 
Perencanaan dermaga ponton
Perencanaan dermaga pontonPerencanaan dermaga ponton
Perencanaan dermaga ponton
 
Ship Form Coefficients
Ship Form CoefficientsShip Form Coefficients
Ship Form Coefficients
 
propulsion engineering-02-resistance of ships
propulsion engineering-02-resistance of shipspropulsion engineering-02-resistance of ships
propulsion engineering-02-resistance of ships
 
Kepelautan1
Kepelautan1Kepelautan1
Kepelautan1
 

Similar to Determination of principal particulars of ship

Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationSteven Polowy
 
Watertaxi 2-2nd Project Presentation-BUET
Watertaxi 2-2nd Project Presentation-BUETWatertaxi 2-2nd Project Presentation-BUET
Watertaxi 2-2nd Project Presentation-BUETshisalsunny
 
Master Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology CourseMaster Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology CourseSevar Dilkhaz
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentescarlos
 
1. atr42 uso de hoja de carga mecanizada
1. atr42   uso de hoja de carga mecanizada1. atr42   uso de hoja de carga mecanizada
1. atr42 uso de hoja de carga mecanizadaSwiftAir S.A.
 
Stability DWA and over loaded
Stability DWA and over loadedStability DWA and over loaded
Stability DWA and over loadedAgi Subakti
 
Tugas 3 Contoh Perhitungan Pompa.pptx
Tugas 3 Contoh Perhitungan Pompa.pptxTugas 3 Contoh Perhitungan Pompa.pptx
Tugas 3 Contoh Perhitungan Pompa.pptxRihfa
 
material handling in mines numerical problems
material handling in mines numerical problems material handling in mines numerical problems
material handling in mines numerical problems Ashok Kumar
 
Diseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDiseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDavid Chavez Huerto
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments DesignPratik Patel
 
Mechanics Of Fluids 4th Edition Potter Solutions Manual
Mechanics Of Fluids 4th Edition Potter Solutions ManualMechanics Of Fluids 4th Edition Potter Solutions Manual
Mechanics Of Fluids 4th Edition Potter Solutions Manualfexerona
 

Similar to Determination of principal particulars of ship (20)

Notas de calculo
Notas de calculoNotas de calculo
Notas de calculo
 
Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn Presentation
 
Watertaxi 2-2nd Project Presentation-BUET
Watertaxi 2-2nd Project Presentation-BUETWatertaxi 2-2nd Project Presentation-BUET
Watertaxi 2-2nd Project Presentation-BUET
 
Sea Angler Spec
Sea Angler SpecSea Angler Spec
Sea Angler Spec
 
Master Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology CourseMaster Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology Course
 
Preliminary ship-design
Preliminary ship-designPreliminary ship-design
Preliminary ship-design
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentes
 
1. atr42 uso de hoja de carga mecanizada
1. atr42   uso de hoja de carga mecanizada1. atr42   uso de hoja de carga mecanizada
1. atr42 uso de hoja de carga mecanizada
 
Stability DWA and over loaded
Stability DWA and over loadedStability DWA and over loaded
Stability DWA and over loaded
 
Tugas 3 Contoh Perhitungan Pompa.pptx
Tugas 3 Contoh Perhitungan Pompa.pptxTugas 3 Contoh Perhitungan Pompa.pptx
Tugas 3 Contoh Perhitungan Pompa.pptx
 
Example 22
Example 22Example 22
Example 22
 
Shore Power Presentation
Shore Power PresentationShore Power Presentation
Shore Power Presentation
 
material handling in mines numerical problems
material handling in mines numerical problems material handling in mines numerical problems
material handling in mines numerical problems
 
Data barge 300ft
Data barge 300ftData barge 300ft
Data barge 300ft
 
Diseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDiseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigas
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments Design
 
Condenser design
Condenser designCondenser design
Condenser design
 
Metalicas
MetalicasMetalicas
Metalicas
 
1st Presentation NAME 338
1st Presentation NAME 338 1st Presentation NAME 338
1st Presentation NAME 338
 
Mechanics Of Fluids 4th Edition Potter Solutions Manual
Mechanics Of Fluids 4th Edition Potter Solutions ManualMechanics Of Fluids 4th Edition Potter Solutions Manual
Mechanics Of Fluids 4th Edition Potter Solutions Manual
 

Recently uploaded

Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 

Recently uploaded (20)

Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 

Determination of principal particulars of ship

  • 1. Requirement: Ship type : General Cargo Dead Weight : 20,000 tonnes Route : Distances : Chittagong Port to Keppel Harbor Port, Singapore 1863 Nautical mile Distance from Bangladesh to China 3231 Distance from Bangladesh to Hong kong 3038 Distance from Bangladesh to Japan 4284 Distance from Bangladesh to Malaysia 2021 Average distance : 3500 Nautical mile Speed : 17 knots Endurance : 10 days There is some restriction to design our ship. Which are given below: 1. The Maximum permissible draft for entering Chittagong Port is 9.15 m. 2. The Maximum permissible length for entering Chittagong Port is 186 m. 3. The Maximum permissible entry length for night navigation is 153 m. 4. The Maximum permissible draft for Main Jetty areas i.e. Jetty No. 2 to Jetty No.13 is 8.55 m. The entry permissible draft would however depend on the day’s maximum permissible draft
  • 2. Basis Ship Data: Ship Type : General Cargo Length, LOA : 142 m Length, LBP : 132 m Breadth, BMLD : 22.23 m Depth, D : 11.30 m Draught, T : 8.25 m Dead weight, DWT : 15000 tonnes Speed : 13.8 Knots Complement : 18 persons Power : 4,900KW Principal Particulars Calculation: Displacement of basis ship, Δ = 132 × 22.23 × 8.25 × 1.025 × 0.775 = 10106.53 tonnes
  • 3. Dead weight coefficient, Cd = 15000 10106.53 = 0.78 L/B = 5.93 B/T = 2.69 T/D = 0.72 Taking same Ac for basis sip & model ship : ∇1 2 3×V13 𝑝1 = ∇2 2 3×V23 𝑝2 P2= 11097 kw Deadweightofnew ship:  Weight of crew: 75 kg/person Number of crew = 18 Weight = 75 × 18 = 1350 kg = 1.35 tonnes  Stores & Provisions: 5 kg/person/day Weight = 5 × 18 × 10 × 1.20 kg = 1080 kg = 1.08 tonnes  Fresh Water: 1. Consumption for crew = 20 kg/person/day = 20 × 18 × 10 × 1.20 kg
  • 4. = 4320 kg = 4.32 tonnes 2. Bath & Laundry: 200 kg/person/day = 200 × 18 × 10× 1.20 kg = 43200 kg = 43.2 tonnes 3. Cooking: 4 kg/person/day = 4 × 18 × 10× 1.20 kg = 862.85 kg = 863 kg = 0.863 tonnes 4. Main engine Cooling: 7 g/ kwh = 7 × 7300×10× 24 × 1.20 g = 15207kg = 15.3 tonnes 5. Auxiliary engine Cooling: 0.20 × Main engine cooling water = 0.20 × 15.3 tonnes = 3 tonnes Total fresh water needed : 4.32+43.2 +0.863 +15.3 +3 = 66.7 tonnes  Fuel Oil: Engine: B32:40V12P Engine power: 7300 kw SFC : 184 g/kwh Fuel needed : 184 × 6000× 10 × 24 × 1.20
  • 5. = 318 tonnes  Lubricating Oil: Specific lubricating oil consumption = 0.8 g/BHPh Weight = 0.8 × 7300 ×10× 24 × 1.20 g = 1560 kg = 1.23 tonnes  Generator Fuel: Model : 6090HF484 SFC : 59.1 l/h( 15.6g/h) Generator power : 2x250 kw Fuel needed : 59.1 × 2 × 10× 18 × 1.20 g = 25528.5 kg = 25.52 tonnes [Source : https://www.deere.com/en_US/products/engines_and_drivetrain/marine/marine_di esel_engines.page] Summary: DWT : 20000 tonnes Fresh Water : 66.7 tonnes Engine Fuel : 318 tonnes Generator Fuel : 25.52 tonnes Lubricating Oil : 1.23 tonnes
  • 6. TOTAL = 414.53 TONNES CAPACITY = 20000 – 415 = 19585 TONNES Crew : 1.35 tonnes Store & Provisions : 1.08 tonnes Displacement, Δ = 𝐷𝑊𝑇 Cd = 20000 0.7733 = 25863.183 𝑡𝑜𝑛𝑛𝑒𝑠 Lightweight, LWT = 25863.183 – 20000 = 5863.183 tonnes We know, Δ = (L/B) × (B/T)2 × T3 × Cb Or, T =√ Δ 𝐶𝑏×( 𝐿 𝐵 )×( 𝐵 𝑇 )2 3 = √ 26692.105 0.795×(5.93)× 2.692 3 = 9.21 m And, B/T = 2.69 Or, B = 2.69 × 9.21 = 24.78 m
  • 7. And, L/B = 5.93 Or, L = 5.93 × 24.78 = 145.28 m And, T/D = 0.72 Or, D = 8.35 /.72= 12.79 m Summary of Principal Particulars: Displacement, Δ = 25863.183 tonnes = 26103 tonnes CARGO CAPACITY = 20000 – 485 = 19515 TONNES Dead weight, DWT = 20000tonnes Light weight, LWT = 5863.183 tonnes Length, LOA = 149.77 m Length, LBP = 145.28 m Breadth, BMLD = 24.78 m Depth, D = 12.79 m Draught, T = 9.21 m Block coefficient, Cb =0 .775 Free Board Calculation: [According to :ILLC 1966, Bulk Carrier: Type ‘B’ Vessel.]
  • 8. Length Free board 243 3893 244 3934 245 3949 246 3965 247 3975 248 3978 289 3992 [source : Rules for Ships, January2001 ; Pt.3 Ch.5 Sec.3 – Page17] By liniear inter pulation for length L = 145.28 FreeBoard Is 3953.48 mm Sheer Calculation : Minimum Bow Height: As Length, L < 250m = 56𝐿(1 − 𝐿 500 )1.36 𝐶 𝐵 + 0.68 𝑚𝑚 = 8135.7(1 − 145.28 500 )1.36 0.79 + 0.68 𝑚𝑚 = 5339.89 𝑚𝑚 AP 1 6 𝐿 1 3 𝐿 Midship 2 3 𝐿 5 6 𝐿 FP 25( 𝐿 3 + 10) 11.1( 𝐿 3 + 10) 2.8( 𝐿 3 + 10) 0 5.6( 𝐿 3 + 10) 22.2( 𝐿 3 + 10) 25( 𝐿 3 + 10) 2066 648.5 163.59 0 327.189 1297 1460.676.65
  • 9. Wheel House Height: [According to https: panama-canal-bridge-visibility-requirements] [source : https://officerofthewatch.com/2012/10/10/panama-canal-bridge- visibility-requirements/ ] AC = 2× 145.28 m = 290560 mm Bow height h = 5339.89 𝑚𝑚 Length of Poop Deck : [According to: Ship Construction By David J.Eyres,George J. Bruce ; page -238 ] Poop deckcovers 15% of ships length & Pood Deck’s front should not exceed 50% Of Length Amitship. For Our ship Poop deckHeight = 36.25+2×145.28 2×145.28 × (5.3+ 12.79) m = 20 m (maximum)
  • 10. Dimention for Bulbusbow: Length of Bulbusbow Will be calculated by subtracting at X distance forward per pendicular . 𝑋 = a 2 = 0.015L = 2.175 m a = 4.35m (maximum) Length of collision bulkhead should not be more than 7% of L So 0.07×145.28 m = 10.15 m [According to: Ship Construction By David J.Eyres,George J. Bruce ; page -237 ]
  • 11. Hc = Height Of Hatchways = 600mm Calculation of Determining the Distance of Cargo holds from Collision Bulkhead: For Position 1 : Hatchway height Hc = 600 mm 𝐿 𝑓 = 5 × ( 𝐻𝑓 − 𝐻𝑐)0.5 𝑚 = 3.53 m Hf = (Hc+0.5) mm = 600.5 mm Navigation In Ice: Angles Ranges ( °) For Our Ship Α ( A1) 15 ˜ 55 45
  • 12. Awf = Area of waterplane in Bow B/4 = Breadth /4 = 6.133 m Length Of Cargo Hold : Length remaining = L - (7% of L For Forcastle ) –( 15% of L/2 For Poop deck) – Lf = 145.28 – ( .07×145.28+.15×(145.28/2)+3.53)m = 145.28 – 25.59 m ß (A2) 25 ˜ 90 48
  • 13. =120.68 m So Length of Cargo hold = 120/5 = 24 m (minimum)