SlideShare a Scribd company logo
1 of 7
TYPE-1 AS NBC 2016
1. Our category moderate Hazard,
based on more then 1000m2 we
need 150m3 O/G tank. Overhead
tank 20m3.
2. Installation of negative suction
arrangement and submersible
pumps shall not be allowed.
Interconnecting overflow line
FIRE WATER TANK 1 : 150 KL
Fire Pump
Fire supply
Minimum water level to keep 150 KL
in tank 1.
75 KL
Water should
be always
available for
pump suction.
Overflow
Always feed
Maintain level
every time
b
75 KL
Maintain level
every time
1. MAXIMUM 7NOS OF HYDRANTS WILL
COME IN NEW FACTORY.
2. ORINARY HARAD IN OUR CASE
38LPS(2280LPM) PUMP IS REQUIRED.
3. TANK CAPACITY IN ORDINARY HAZARD
FOR 2HOURS (2280LPMX120MINUTES).
273.6M3 TANK IS REQUIRED.
4. 2NOS OF ELECTRIC 2280LPM, 1NO OF
DIESEL 2280 LPM & 2NOS OF ELECTRIC
PUMP 180LPM JOCKEY IS REQUIRED.
TYPE-2 AS PER IS 12469
Interconnecting overflow line
FIRE WATER TANK 1 : 150 KL FIRE WATER TANK 2 : 150 KL
Fire Pump
Fire supply
Minimum water level to keep 150 KL
in tank 2.
150 KL
150 KL
Maintain
Water should
be always
available for
pump suction.
Overflow
Always feed
Maintain level
every time
NBC 2016 31.Mar.23
Sr. No. Company Name Executed By Year of
completion
Fire Tank 1
(m3)
Fire Tank 2
(m3)
Remark
1 Mitsui Kinzoku TKIN 2014 (Exp 2020) 150 × U/G RCC
2 FCC Clutch TKIN 2017 100 × U/G RCC
3 Oji Packaging TKIN 2020 200 150 U/G RCC
4 INDIA JAPAN LIGHTING TKIN 2020 175 175 A/G RCC
5 MITSUBISHI AUTO TKIN 2021 175 175 A/G RCC
6 NIFCO INDIA TKIN 2022 150 150 A/G ZIRCONIUM
7 SECURE METER OTHERS 2021 160 × U/G RCC
8 VEGA INDIA OTHERS 2021 175 × U/G RCC
9 MITSUBA OTHERS 2018 120 × U/G RCC
10 HI-LEX OTHERS × 100 × U/G RCC
11 IDEX OTHERS 2021 175 175 O/H MODULAR
12 HI-TEMP FURNACE OTHERS × 100 × U/G RCC
Details Fire tank of Projects at Sanand GIDC
Sr. No. Company Name Executed By Year of
completion
Fire Tank 1
(m3)
Fire Tank
2
(m3)
Remark
13 Ball Corporation Others × 150 × OH Modular tank
14 VALEO Others × 200 × OH Modular Tank
15 Pinggao group power Others × 150 × OH RC Tank
Details Fire tank of Projects at Sanand GIDC
Conclusion :-
(i) The projects executed 2014- 2018 duration follow the regulation of providing tank capacity of 100 m3 .
(ii) The recent project after 2018 follow the new NBC 2016 regulation & provide tank capacity of 150 m3 +
(iii) The Provision of Fire tank separation wall / spare tank detail & how they manage not shared by other
organizations as listed.

More Related Content

Similar to Fire pump as per the national building code of india

Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable PowerFeasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable PowerClean Energy Canada
 
internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOCqazi faisal
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportsushi roy
 
PRESENTATION AT MSU CASE STUDIES in CHEMICAL INDUSTRIES
PRESENTATION AT MSU CASE STUDIES in CHEMICAL INDUSTRIESPRESENTATION AT MSU CASE STUDIES in CHEMICAL INDUSTRIES
PRESENTATION AT MSU CASE STUDIES in CHEMICAL INDUSTRIESJIGNESH PATEL
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal ComplexKumar Saurabh
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013Sean Chen, PMP, MBA
 
GSHP Training for Plumbcenter - Delivered by Kensa Heat Pumps - November 2011
GSHP Training for Plumbcenter - Delivered by Kensa Heat Pumps - November 2011GSHP Training for Plumbcenter - Delivered by Kensa Heat Pumps - November 2011
GSHP Training for Plumbcenter - Delivered by Kensa Heat Pumps - November 2011kensaheatpumps
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingPRAN-RFL Group
 
700 bars H2 Storage Cylinders - ISO
700 bars H2 Storage Cylinders - ISO700 bars H2 Storage Cylinders - ISO
700 bars H2 Storage Cylinders - ISOfmjpguerrero
 
EGing projects references
EGing projects referencesEGing projects references
EGing projects referencesLeo Lu
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
Slotted anodes project
Slotted anodes projectSlotted anodes project
Slotted anodes projectsrvrulz
 
Underground cavern project
Underground cavern projectUnderground cavern project
Underground cavern projectManveer Shetty
 
Gas installation bio gas LPG
Gas installation bio gas LPGGas installation bio gas LPG
Gas installation bio gas LPGDeepak Verma
 

Similar to Fire pump as per the national building code of india (20)

Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
bpcl
bpclbpcl
bpcl
 
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable PowerFeasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
 
internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOC
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant report
 
PRESENTATION AT MSU CASE STUDIES in CHEMICAL INDUSTRIES
PRESENTATION AT MSU CASE STUDIES in CHEMICAL INDUSTRIESPRESENTATION AT MSU CASE STUDIES in CHEMICAL INDUSTRIES
PRESENTATION AT MSU CASE STUDIES in CHEMICAL INDUSTRIES
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013
 
Nitin
NitinNitin
Nitin
 
GSHP Training for Plumbcenter - Delivered by Kensa Heat Pumps - November 2011
GSHP Training for Plumbcenter - Delivered by Kensa Heat Pumps - November 2011GSHP Training for Plumbcenter - Delivered by Kensa Heat Pumps - November 2011
GSHP Training for Plumbcenter - Delivered by Kensa Heat Pumps - November 2011
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
700 bars H2 Storage Cylinders - ISO
700 bars H2 Storage Cylinders - ISO700 bars H2 Storage Cylinders - ISO
700 bars H2 Storage Cylinders - ISO
 
EGing projects references
EGing projects referencesEGing projects references
EGing projects references
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Dalmia cement Dalmiapuram.pdf
Dalmia cement Dalmiapuram.pdfDalmia cement Dalmiapuram.pdf
Dalmia cement Dalmiapuram.pdf
 
Slotted anodes project
Slotted anodes projectSlotted anodes project
Slotted anodes project
 
Underground cavern project
Underground cavern projectUnderground cavern project
Underground cavern project
 
Gas installation bio gas LPG
Gas installation bio gas LPGGas installation bio gas LPG
Gas installation bio gas LPG
 
Hindalco Mahan CPP.pdf
Hindalco Mahan CPP.pdfHindalco Mahan CPP.pdf
Hindalco Mahan CPP.pdf
 

Recently uploaded

Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfJNTUA
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentationsj9399037128
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxMustafa Ahmed
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...AshwaniAnuragi1
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfJNTUA
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书c3384a92eb32
 
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...Christo Ananth
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Studentskannan348865
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 

Recently uploaded (20)

Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
 
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 

Fire pump as per the national building code of india

  • 1. TYPE-1 AS NBC 2016 1. Our category moderate Hazard, based on more then 1000m2 we need 150m3 O/G tank. Overhead tank 20m3. 2. Installation of negative suction arrangement and submersible pumps shall not be allowed.
  • 2. Interconnecting overflow line FIRE WATER TANK 1 : 150 KL Fire Pump Fire supply Minimum water level to keep 150 KL in tank 1. 75 KL Water should be always available for pump suction. Overflow Always feed Maintain level every time b 75 KL Maintain level every time
  • 3. 1. MAXIMUM 7NOS OF HYDRANTS WILL COME IN NEW FACTORY. 2. ORINARY HARAD IN OUR CASE 38LPS(2280LPM) PUMP IS REQUIRED. 3. TANK CAPACITY IN ORDINARY HAZARD FOR 2HOURS (2280LPMX120MINUTES). 273.6M3 TANK IS REQUIRED. 4. 2NOS OF ELECTRIC 2280LPM, 1NO OF DIESEL 2280 LPM & 2NOS OF ELECTRIC PUMP 180LPM JOCKEY IS REQUIRED. TYPE-2 AS PER IS 12469
  • 4. Interconnecting overflow line FIRE WATER TANK 1 : 150 KL FIRE WATER TANK 2 : 150 KL Fire Pump Fire supply Minimum water level to keep 150 KL in tank 2. 150 KL 150 KL Maintain Water should be always available for pump suction. Overflow Always feed Maintain level every time
  • 6. Sr. No. Company Name Executed By Year of completion Fire Tank 1 (m3) Fire Tank 2 (m3) Remark 1 Mitsui Kinzoku TKIN 2014 (Exp 2020) 150 × U/G RCC 2 FCC Clutch TKIN 2017 100 × U/G RCC 3 Oji Packaging TKIN 2020 200 150 U/G RCC 4 INDIA JAPAN LIGHTING TKIN 2020 175 175 A/G RCC 5 MITSUBISHI AUTO TKIN 2021 175 175 A/G RCC 6 NIFCO INDIA TKIN 2022 150 150 A/G ZIRCONIUM 7 SECURE METER OTHERS 2021 160 × U/G RCC 8 VEGA INDIA OTHERS 2021 175 × U/G RCC 9 MITSUBA OTHERS 2018 120 × U/G RCC 10 HI-LEX OTHERS × 100 × U/G RCC 11 IDEX OTHERS 2021 175 175 O/H MODULAR 12 HI-TEMP FURNACE OTHERS × 100 × U/G RCC Details Fire tank of Projects at Sanand GIDC
  • 7. Sr. No. Company Name Executed By Year of completion Fire Tank 1 (m3) Fire Tank 2 (m3) Remark 13 Ball Corporation Others × 150 × OH Modular tank 14 VALEO Others × 200 × OH Modular Tank 15 Pinggao group power Others × 150 × OH RC Tank Details Fire tank of Projects at Sanand GIDC Conclusion :- (i) The projects executed 2014- 2018 duration follow the regulation of providing tank capacity of 100 m3 . (ii) The recent project after 2018 follow the new NBC 2016 regulation & provide tank capacity of 150 m3 + (iii) The Provision of Fire tank separation wall / spare tank detail & how they manage not shared by other organizations as listed.