System Calculations
SystemSizing:
Customerwantsto offset100 percentof energyusage:
Annual EnergyUsage = 6,000 KWh/ 365 days= 16.44 KWh per day
16.44 KWhper day / 5.35 PeakSunHours / .9 (STCto PTC) / .86 (DC to AC) = 3.97 Kw systemneeded
MaximumNumberof ModulesperString:
Ashrae Extreme Min.Temp.= -23°C - 25 = -48 x -.33 (Temp.Coefficientof Vocperdegree) = 15.84% x
38.4V = 6.08V
Module Voc= 38.4V + 6.08V = 44.48V (Temp.CorrectedVoc)
500V (InverterVmax Input) /44.48V = 11.24  (RoundDown) 11 MaximumPanelsperString
MaximumPanels=11 > 8 Panelsperstring OK
MinimumNumberof ModulesperString:
Ashrae Extreme Max.Temp.= 56°C – 25 = 31 x -.45 (Temp.Cofficientof Vmppperdegree)=13.95% x
30.4V (Vmpof Module) =4.24V
Module Vmp= 30.4V – 4.24v = 26.16V (Temp.CorrectedVmp)
150V (InverterVminInput)/26.16V = 5.73  (RoundUp) 6 MinimumPanelsperString
MinimumPanels=6 < 8 Panelsperstring OK
DC Side:
Array to Combiner
Module ISC= 8.79A x 1.25 (ContinuousUse) x 1.25 (Irradiance overSTC) = 13.73A
#12AWG PV wire ampacity= 30A > 13.73A  so itis okto use
CombinertoInverter
Module ISC= 8.79A x 1.25 (ContinuousUse) x 1.25 (Irradiance overSTC) x 2 (Stringsinparallel) =27.47A
#10AWG THWN ampacity= 40A > 27.47A  so it isok to use
DC OCPD: 8.79A x 1.25 x 1.25 x 2 = 27.47A  30A Breakeron DC Disconnect
AC Side:
InvertertoMain Panel
InverterOutputPower=4000 watts / 240V = 16.667A x 1.25 = 20.83A
#10AWG THWN wire ampacity= 40A  20.83A so it isok to use
AC OCPD:4000w /240v x 1.25 = 20.83A  25A breakeronAC Disconnect
EGC Calculation:
OCPDdoesn’texceed60A  #10AWG Copperisok
GEC Calculation:
LargestOCPD is30A  #6AWG Copperisok
Main Panel:
Main Panel isratedfor 200A with160A used
200A x 120% = 240A available –160A used= 80A available space
20.83A < 80A  OK to connectto mainpanel busbar

More Related Content

What's hot

14.3.2 Power Delta
14.3.2 Power Delta14.3.2 Power Delta
14.3.2 Power DeltaTalia Carbis
 
L9 solutions to problems
L9 solutions to problemsL9 solutions to problems
L9 solutions to problems
Mohammad Umar Rehman
 
Example 12.1
Example 12.1Example 12.1
Example 12.1
Hossam Elkholy
 
Condition Monitoring of a Large-scale PV Power Plant in Australia
Condition Monitoring of a Large-scale PV Power Plant in AustraliaCondition Monitoring of a Large-scale PV Power Plant in Australia
Condition Monitoring of a Large-scale PV Power Plant in Australia
Amit Dhoke
 
22 2017 7th-pvpm_herrmann_final
22 2017 7th-pvpm_herrmann_final22 2017 7th-pvpm_herrmann_final
Let's Build A Particle Accelerator
Let's Build A Particle AcceleratorLet's Build A Particle Accelerator
Let's Build A Particle Accelerator
twopoint718
 
Sutherland.Malad Audit Results Electrical (Second Floor).Final.18 Mar 08
Sutherland.Malad Audit Results    Electrical (Second Floor).Final.18 Mar 08Sutherland.Malad Audit Results    Electrical (Second Floor).Final.18 Mar 08
Sutherland.Malad Audit Results Electrical (Second Floor).Final.18 Mar 08pavang
 
Lab assignment
Lab assignmentLab assignment
Lab assignment
akash shinde
 
Solaria s6 p235 - Datasheet
Solaria s6 p235 - DatasheetSolaria s6 p235 - Datasheet
Solaria s6 p235 - Datasheet
Vítor Augusto Mota
 
MET 211 Gasturbines problems
MET 211 Gasturbines problemsMET 211 Gasturbines problems
MET 211 Gasturbines problemsIbrahim AboKhalil
 
Ejercicios pares cap2
Ejercicios pares cap2Ejercicios pares cap2
Ejercicios pares cap2Cheyey Jc
 
Presentation On Solar Installation Project
Presentation On Solar Installation ProjectPresentation On Solar Installation Project
Presentation On Solar Installation ProjectDHiraj Bohara
 

What's hot (15)

14.3.2 Power Delta
14.3.2 Power Delta14.3.2 Power Delta
14.3.2 Power Delta
 
L9 solutions to problems
L9 solutions to problemsL9 solutions to problems
L9 solutions to problems
 
14.4.3 Example
14.4.3 Example14.4.3 Example
14.4.3 Example
 
Example 12.1
Example 12.1Example 12.1
Example 12.1
 
Condition Monitoring of a Large-scale PV Power Plant in Australia
Condition Monitoring of a Large-scale PV Power Plant in AustraliaCondition Monitoring of a Large-scale PV Power Plant in Australia
Condition Monitoring of a Large-scale PV Power Plant in Australia
 
22 2017 7th-pvpm_herrmann_final
22 2017 7th-pvpm_herrmann_final22 2017 7th-pvpm_herrmann_final
22 2017 7th-pvpm_herrmann_final
 
Let's Build A Particle Accelerator
Let's Build A Particle AcceleratorLet's Build A Particle Accelerator
Let's Build A Particle Accelerator
 
Sutherland.Malad Audit Results Electrical (Second Floor).Final.18 Mar 08
Sutherland.Malad Audit Results    Electrical (Second Floor).Final.18 Mar 08Sutherland.Malad Audit Results    Electrical (Second Floor).Final.18 Mar 08
Sutherland.Malad Audit Results Electrical (Second Floor).Final.18 Mar 08
 
Lab assignment
Lab assignmentLab assignment
Lab assignment
 
Solaria s6 p235 - Datasheet
Solaria s6 p235 - DatasheetSolaria s6 p235 - Datasheet
Solaria s6 p235 - Datasheet
 
Vtoibuffer Cdr Ym
Vtoibuffer Cdr YmVtoibuffer Cdr Ym
Vtoibuffer Cdr Ym
 
MET 211 Gasturbines problems
MET 211 Gasturbines problemsMET 211 Gasturbines problems
MET 211 Gasturbines problems
 
Ejercicios pares cap2
Ejercicios pares cap2Ejercicios pares cap2
Ejercicios pares cap2
 
Presentation On Solar Installation Project
Presentation On Solar Installation ProjectPresentation On Solar Installation Project
Presentation On Solar Installation Project
 
356 tadhg
356 tadhg356 tadhg
356 tadhg
 

Viewers also liked

Manual electrolux campana efb70566ox
Manual electrolux   campana efb70566oxManual electrolux   campana efb70566ox
Manual electrolux campana efb70566ox
Alsako Electrodomésticos
 
My alexia jaira
My alexia jairaMy alexia jaira
My alexia jaira
alexiajaira
 
Manual electrolux encimera egg7253nox
Manual electrolux   encimera egg7253noxManual electrolux   encimera egg7253nox
Manual electrolux encimera egg7253nox
Alsako Electrodomésticos
 
Giải pháp phòng ngừa rủi ro tín dụng tại ngân hàng thương mại cổ phần á châu ...
Giải pháp phòng ngừa rủi ro tín dụng tại ngân hàng thương mại cổ phần á châu ...Giải pháp phòng ngừa rủi ro tín dụng tại ngân hàng thương mại cổ phần á châu ...
Giải pháp phòng ngừa rủi ro tín dụng tại ngân hàng thương mại cổ phần á châu ...
NOT
 
Nevera Aeg S74010KDX0
Nevera Aeg S74010KDX0Nevera Aeg S74010KDX0
Nevera Aeg S74010KDX0
Alsako Electrodomésticos
 
Manual electrolux campana efc60467ox
Manual electrolux   campana efc60467oxManual electrolux   campana efc60467ox
Manual electrolux campana efc60467ox
Alsako Electrodomésticos
 
0531 981 01 90 AYŞE HATUN KİTAP ALANLAR-PLAK-KİTAP-ANTİKA EŞYA SATIN ALANLAR ...
0531 981 01 90 AYŞE HATUN KİTAP ALANLAR-PLAK-KİTAP-ANTİKA EŞYA SATIN ALANLAR ...0531 981 01 90 AYŞE HATUN KİTAP ALANLAR-PLAK-KİTAP-ANTİKA EŞYA SATIN ALANLAR ...
0531 981 01 90 AYŞE HATUN KİTAP ALANLAR-PLAK-KİTAP-ANTİKA EŞYA SATIN ALANLAR ...
Antika Alanlar
 
0531-981-01-90 VE 0532-335-75-06 İKİNCİ EL KİTAP ALANLAR HALASKARGAZİ KİTAP ...
0531-981-01-90 VE  0532-335-75-06 İKİNCİ EL KİTAP ALANLAR HALASKARGAZİ KİTAP ...0531-981-01-90 VE  0532-335-75-06 İKİNCİ EL KİTAP ALANLAR HALASKARGAZİ KİTAP ...
0531-981-01-90 VE 0532-335-75-06 İKİNCİ EL KİTAP ALANLAR HALASKARGAZİ KİTAP ...
antika alanlar
 
Pat Long – 'Spotlight': Why The Times is betting on an editions-based digital...
Pat Long – 'Spotlight': Why The Times is betting on an editions-based digital...Pat Long – 'Spotlight': Why The Times is betting on an editions-based digital...
Pat Long – 'Spotlight': Why The Times is betting on an editions-based digital...
Journalism.co.uk
 
Evaluation question-1
Evaluation question-1Evaluation question-1
Evaluation question-1emilymoose
 
Regresa al refugio
Regresa al refugioRegresa al refugio
Regresa al refugio
Sabino Marquez
 
P.e. danko, a.g. popov, t.ya. kozhevnikova matematicas superiores en ejercici...
P.e. danko, a.g. popov, t.ya. kozhevnikova matematicas superiores en ejercici...P.e. danko, a.g. popov, t.ya. kozhevnikova matematicas superiores en ejercici...
P.e. danko, a.g. popov, t.ya. kozhevnikova matematicas superiores en ejercici...
Alvaro Miguel Naupay Gusukuma
 
Mohammad ravi updated resume.
Mohammad ravi updated resume.Mohammad ravi updated resume.
Mohammad ravi updated resume.
Mohammad Ravi
 
Ousama Itani – ‘Spotlight’: The success and challenges of AJ+, and its new di...
Ousama Itani – ‘Spotlight’: The success and challenges of AJ+, and its new di...Ousama Itani – ‘Spotlight’: The success and challenges of AJ+, and its new di...
Ousama Itani – ‘Spotlight’: The success and challenges of AJ+, and its new di...
Journalism.co.uk
 
PNL
PNLPNL
Văn hóa giao tiếp ứng xử nơi công sở
Văn hóa giao tiếp ứng xử nơi công sởVăn hóa giao tiếp ứng xử nơi công sở
Văn hóa giao tiếp ứng xử nơi công sở
Khiet Nguyen
 

Viewers also liked (20)

Manual electrolux campana efb70566ox
Manual electrolux   campana efb70566oxManual electrolux   campana efb70566ox
Manual electrolux campana efb70566ox
 
My alexia jaira
My alexia jairaMy alexia jaira
My alexia jaira
 
Manual electrolux encimera egg7253nox
Manual electrolux   encimera egg7253noxManual electrolux   encimera egg7253nox
Manual electrolux encimera egg7253nox
 
Giải pháp phòng ngừa rủi ro tín dụng tại ngân hàng thương mại cổ phần á châu ...
Giải pháp phòng ngừa rủi ro tín dụng tại ngân hàng thương mại cổ phần á châu ...Giải pháp phòng ngừa rủi ro tín dụng tại ngân hàng thương mại cổ phần á châu ...
Giải pháp phòng ngừa rủi ro tín dụng tại ngân hàng thương mại cổ phần á châu ...
 
HNC certificate
HNC certificateHNC certificate
HNC certificate
 
Nevera Aeg S74010KDX0
Nevera Aeg S74010KDX0Nevera Aeg S74010KDX0
Nevera Aeg S74010KDX0
 
Manual electrolux campana efc60467ox
Manual electrolux   campana efc60467oxManual electrolux   campana efc60467ox
Manual electrolux campana efc60467ox
 
3LINEdiag
3LINEdiag3LINEdiag
3LINEdiag
 
0531 981 01 90 AYŞE HATUN KİTAP ALANLAR-PLAK-KİTAP-ANTİKA EŞYA SATIN ALANLAR ...
0531 981 01 90 AYŞE HATUN KİTAP ALANLAR-PLAK-KİTAP-ANTİKA EŞYA SATIN ALANLAR ...0531 981 01 90 AYŞE HATUN KİTAP ALANLAR-PLAK-KİTAP-ANTİKA EŞYA SATIN ALANLAR ...
0531 981 01 90 AYŞE HATUN KİTAP ALANLAR-PLAK-KİTAP-ANTİKA EŞYA SATIN ALANLAR ...
 
0531-981-01-90 VE 0532-335-75-06 İKİNCİ EL KİTAP ALANLAR HALASKARGAZİ KİTAP ...
0531-981-01-90 VE  0532-335-75-06 İKİNCİ EL KİTAP ALANLAR HALASKARGAZİ KİTAP ...0531-981-01-90 VE  0532-335-75-06 İKİNCİ EL KİTAP ALANLAR HALASKARGAZİ KİTAP ...
0531-981-01-90 VE 0532-335-75-06 İKİNCİ EL KİTAP ALANLAR HALASKARGAZİ KİTAP ...
 
Pat Long – 'Spotlight': Why The Times is betting on an editions-based digital...
Pat Long – 'Spotlight': Why The Times is betting on an editions-based digital...Pat Long – 'Spotlight': Why The Times is betting on an editions-based digital...
Pat Long – 'Spotlight': Why The Times is betting on an editions-based digital...
 
780112
780112780112
780112
 
Evaluation question-1
Evaluation question-1Evaluation question-1
Evaluation question-1
 
Regresa al refugio
Regresa al refugioRegresa al refugio
Regresa al refugio
 
780122
780122780122
780122
 
P.e. danko, a.g. popov, t.ya. kozhevnikova matematicas superiores en ejercici...
P.e. danko, a.g. popov, t.ya. kozhevnikova matematicas superiores en ejercici...P.e. danko, a.g. popov, t.ya. kozhevnikova matematicas superiores en ejercici...
P.e. danko, a.g. popov, t.ya. kozhevnikova matematicas superiores en ejercici...
 
Mohammad ravi updated resume.
Mohammad ravi updated resume.Mohammad ravi updated resume.
Mohammad ravi updated resume.
 
Ousama Itani – ‘Spotlight’: The success and challenges of AJ+, and its new di...
Ousama Itani – ‘Spotlight’: The success and challenges of AJ+, and its new di...Ousama Itani – ‘Spotlight’: The success and challenges of AJ+, and its new di...
Ousama Itani – ‘Spotlight’: The success and challenges of AJ+, and its new di...
 
PNL
PNLPNL
PNL
 
Văn hóa giao tiếp ứng xử nơi công sở
Văn hóa giao tiếp ứng xử nơi công sởVăn hóa giao tiếp ứng xử nơi công sở
Văn hóa giao tiếp ứng xử nơi công sở
 

Similar to Final_Calcs

Design and performance analysis of 500 KWp on-grid solar PV system
Design and performance analysis of 500 KWp on-grid solar PV systemDesign and performance analysis of 500 KWp on-grid solar PV system
Design and performance analysis of 500 KWp on-grid solar PV system
AmroSadulQuddus
 
Spring 2011 final project master
Spring 2011 final project  masterSpring 2011 final project  master
Spring 2011 final project masterbobmcgonigle
 
17 mse014 pv syst
17 mse014 pv syst17 mse014 pv syst
17 mse014 pv syst
paneliya sagar
 
Dimensioning Of Dc Power Systems
Dimensioning Of Dc Power SystemsDimensioning Of Dc Power Systems
Dimensioning Of Dc Power Systemsankit29aggarwal
 
CoolPV Benefits
CoolPV BenefitsCoolPV Benefits
CoolPV Benefits
Plug it In Solar
 
1,128.96 Kw Toubasenegalw98 Inverters11000 Tl 3162010(En) Checklist
1,128.96 Kw Toubasenegalw98 Inverters11000 Tl 3162010(En) Checklist1,128.96 Kw Toubasenegalw98 Inverters11000 Tl 3162010(En) Checklist
1,128.96 Kw Toubasenegalw98 Inverters11000 Tl 3162010(En) Checklist
TOUBASOLUTIONS
 
FreqLeak
FreqLeakFreqLeak
FreqLeak
Arun Joseph
 
project.pptx
project.pptxproject.pptx
project.pptx
anaveenkumar4
 
Bank kapasitor
Bank kapasitorBank kapasitor
Bank kapasitor
ikmkualalumpur
 
Fly Smarter - Intelligent Power System & Starter Generators from ePropelled
Fly Smarter - Intelligent Power System & Starter Generators from ePropelledFly Smarter - Intelligent Power System & Starter Generators from ePropelled
Fly Smarter - Intelligent Power System & Starter Generators from ePropelled
Lakshmi Narsimhan
 
Emmvee Crystal Off-grid Module:
Emmvee Crystal Off-grid Module:Emmvee Crystal Off-grid Module:
Emmvee Crystal Off-grid Module:
Emmvee India
 
Designing of smart battery enclosure development
Designing of smart battery enclosure developmentDesigning of smart battery enclosure development
Designing of smart battery enclosure development
DeepakChahar12
 
Optimization of Thermal Systems
Optimization of Thermal SystemsOptimization of Thermal Systems
Optimization of Thermal Systems
pmghadge
 
Trina Honey Datasheet
Trina Honey Datasheet Trina Honey Datasheet
Trina Honey Datasheet
Optimus Energy Philippines
 
Original IGBT N-CHANNEL STGP7NC60HD GP7NC60HD 7NC60 14A 600V TO-220 New
Original IGBT N-CHANNEL STGP7NC60HD GP7NC60HD 7NC60 14A 600V TO-220 NewOriginal IGBT N-CHANNEL STGP7NC60HD GP7NC60HD 7NC60 14A 600V TO-220 New
Original IGBT N-CHANNEL STGP7NC60HD GP7NC60HD 7NC60 14A 600V TO-220 New
authelectroniccom
 
KEMET Webinar -C44U_C44P-R Power Can Film Capacitors
KEMET Webinar -C44U_C44P-R Power Can Film CapacitorsKEMET Webinar -C44U_C44P-R Power Can Film Capacitors
KEMET Webinar -C44U_C44P-R Power Can Film Capacitors
Ivana Ivanovska
 
ACC_2014_Yasha_Parvini
ACC_2014_Yasha_ParviniACC_2014_Yasha_Parvini
ACC_2014_Yasha_ParviniYasha Parvini
 
Tools to Architect, Analyze and Optimize Power Chains
Tools to Architect, Analyze and Optimize Power ChainsTools to Architect, Analyze and Optimize Power Chains
Tools to Architect, Analyze and Optimize Power Chains
Vicor Corporation
 
ニッケル水素電池のスパイスモデル
ニッケル水素電池のスパイスモデルニッケル水素電池のスパイスモデル
ニッケル水素電池のスパイスモデル
Tsuyoshi Horigome
 

Similar to Final_Calcs (20)

Design and performance analysis of 500 KWp on-grid solar PV system
Design and performance analysis of 500 KWp on-grid solar PV systemDesign and performance analysis of 500 KWp on-grid solar PV system
Design and performance analysis of 500 KWp on-grid solar PV system
 
Spring 2011 final project master
Spring 2011 final project  masterSpring 2011 final project  master
Spring 2011 final project master
 
17 mse014 pv syst
17 mse014 pv syst17 mse014 pv syst
17 mse014 pv syst
 
Dimensioning Of Dc Power Systems
Dimensioning Of Dc Power SystemsDimensioning Of Dc Power Systems
Dimensioning Of Dc Power Systems
 
CoolPV Benefits
CoolPV BenefitsCoolPV Benefits
CoolPV Benefits
 
1,128.96 Kw Toubasenegalw98 Inverters11000 Tl 3162010(En) Checklist
1,128.96 Kw Toubasenegalw98 Inverters11000 Tl 3162010(En) Checklist1,128.96 Kw Toubasenegalw98 Inverters11000 Tl 3162010(En) Checklist
1,128.96 Kw Toubasenegalw98 Inverters11000 Tl 3162010(En) Checklist
 
FreqLeak
FreqLeakFreqLeak
FreqLeak
 
project.pptx
project.pptxproject.pptx
project.pptx
 
Bank kapasitor
Bank kapasitorBank kapasitor
Bank kapasitor
 
Fly Smarter - Intelligent Power System & Starter Generators from ePropelled
Fly Smarter - Intelligent Power System & Starter Generators from ePropelledFly Smarter - Intelligent Power System & Starter Generators from ePropelled
Fly Smarter - Intelligent Power System & Starter Generators from ePropelled
 
Emmvee Crystal Off-grid Module:
Emmvee Crystal Off-grid Module:Emmvee Crystal Off-grid Module:
Emmvee Crystal Off-grid Module:
 
Designing of smart battery enclosure development
Designing of smart battery enclosure developmentDesigning of smart battery enclosure development
Designing of smart battery enclosure development
 
Optimization of Thermal Systems
Optimization of Thermal SystemsOptimization of Thermal Systems
Optimization of Thermal Systems
 
Trina Honey Datasheet
Trina Honey Datasheet Trina Honey Datasheet
Trina Honey Datasheet
 
Original IGBT N-CHANNEL STGP7NC60HD GP7NC60HD 7NC60 14A 600V TO-220 New
Original IGBT N-CHANNEL STGP7NC60HD GP7NC60HD 7NC60 14A 600V TO-220 NewOriginal IGBT N-CHANNEL STGP7NC60HD GP7NC60HD 7NC60 14A 600V TO-220 New
Original IGBT N-CHANNEL STGP7NC60HD GP7NC60HD 7NC60 14A 600V TO-220 New
 
KEMET Webinar -C44U_C44P-R Power Can Film Capacitors
KEMET Webinar -C44U_C44P-R Power Can Film CapacitorsKEMET Webinar -C44U_C44P-R Power Can Film Capacitors
KEMET Webinar -C44U_C44P-R Power Can Film Capacitors
 
System Modeling
System ModelingSystem Modeling
System Modeling
 
ACC_2014_Yasha_Parvini
ACC_2014_Yasha_ParviniACC_2014_Yasha_Parvini
ACC_2014_Yasha_Parvini
 
Tools to Architect, Analyze and Optimize Power Chains
Tools to Architect, Analyze and Optimize Power ChainsTools to Architect, Analyze and Optimize Power Chains
Tools to Architect, Analyze and Optimize Power Chains
 
ニッケル水素電池のスパイスモデル
ニッケル水素電池のスパイスモデルニッケル水素電池のスパイスモデル
ニッケル水素電池のスパイスモデル
 

Final_Calcs

  • 1. System Calculations SystemSizing: Customerwantsto offset100 percentof energyusage: Annual EnergyUsage = 6,000 KWh/ 365 days= 16.44 KWh per day 16.44 KWhper day / 5.35 PeakSunHours / .9 (STCto PTC) / .86 (DC to AC) = 3.97 Kw systemneeded MaximumNumberof ModulesperString: Ashrae Extreme Min.Temp.= -23°C - 25 = -48 x -.33 (Temp.Coefficientof Vocperdegree) = 15.84% x 38.4V = 6.08V Module Voc= 38.4V + 6.08V = 44.48V (Temp.CorrectedVoc) 500V (InverterVmax Input) /44.48V = 11.24  (RoundDown) 11 MaximumPanelsperString MaximumPanels=11 > 8 Panelsperstring OK MinimumNumberof ModulesperString: Ashrae Extreme Max.Temp.= 56°C – 25 = 31 x -.45 (Temp.Cofficientof Vmppperdegree)=13.95% x 30.4V (Vmpof Module) =4.24V Module Vmp= 30.4V – 4.24v = 26.16V (Temp.CorrectedVmp) 150V (InverterVminInput)/26.16V = 5.73  (RoundUp) 6 MinimumPanelsperString MinimumPanels=6 < 8 Panelsperstring OK DC Side: Array to Combiner Module ISC= 8.79A x 1.25 (ContinuousUse) x 1.25 (Irradiance overSTC) = 13.73A #12AWG PV wire ampacity= 30A > 13.73A  so itis okto use CombinertoInverter Module ISC= 8.79A x 1.25 (ContinuousUse) x 1.25 (Irradiance overSTC) x 2 (Stringsinparallel) =27.47A #10AWG THWN ampacity= 40A > 27.47A  so it isok to use DC OCPD: 8.79A x 1.25 x 1.25 x 2 = 27.47A  30A Breakeron DC Disconnect AC Side: InvertertoMain Panel InverterOutputPower=4000 watts / 240V = 16.667A x 1.25 = 20.83A #10AWG THWN wire ampacity= 40A  20.83A so it isok to use
  • 2. AC OCPD:4000w /240v x 1.25 = 20.83A  25A breakeronAC Disconnect EGC Calculation: OCPDdoesn’texceed60A  #10AWG Copperisok GEC Calculation: LargestOCPD is30A  #6AWG Copperisok Main Panel: Main Panel isratedfor 200A with160A used 200A x 120% = 240A available –160A used= 80A available space 20.83A < 80A  OK to connectto mainpanel busbar