SlideShare a Scribd company logo
1 of 20
i
INTERNATIONAL ISLAMIC UNIVERSITY MALAYSIA
KULLIYYAH OF INFORMATION AND
COMMUNICATION TECHNOLOGY
DEPARTMENT OF COMPUTER SCIENCE
FYP REPORT
FYP TITLE
STUDENT’S NAME
MATRIC NO
SUPERVISED BY
SUPERVISOR’S NAME
NOVEMBER 2012
SEMESTER X, 2012/2013
i
FINAL YEAR PROJECT REPORT
FYP TITLE
by
<Student’s name>
<Matric no>
Supervised by
<Supervisor’s name>
In partial fulfilment of the requirement for the
Bachelor of Computer Science
Department of Computer Science
Kulliyyah of Information and Communication Technology
International Islamic University Malaysia
<Month> <Year>
Semester X, 2012/2013
i
FYP TITLE
by
<Student’s name>
<Matric no>
A project paper submitted to the
Department of Computer Science
Kulliyyah of Information and Communication Technology
in partial fulfilment of the requirement for the
Bachelor of Computer Science
Approved by the Examining Committee:
_____________________________
<Supervisor’s name>, Project Supervisor
_____________________________
<Committee-1>, Member
_____________________________
<Committee-2>, Member
International Islamic University Malaysia
<Month> <Year>
Semester X, 2012/2013
i
ACKNOWLEDGMENT
i
ABSTRACT
i
TABLE OF CONTENT
PAGE
TABLE OF CONTENT .................................................................................................................. i
LIST OF FIGURES.......................................................................................................................iii
LIST OF TABLES.........................................................................................................................iv
LIST OF ABBREVIATIONS ...........................................................................................................v
1. INTRODUCTION................................................................................................................ 1
1.1. Preamble.................................................................................................................. 1
1.2. Problem Statement.................................................................................................. 1
1.3. Project Objective...................................................................................................... 1
1.4. Project Scope ........................................................................................................... 1
1.4.1. Area of Specification........................................................................................ 1
1.4.2. Targeted Users................................................................................................. 1
1.4.3. Specific Platform .............................................................................................. 1
1.5. Project Stages........................................................................................................... 1
1.6. Expected Output...................................................................................................... 1
2. PROBLEM / OPPORTUNITY DESCRIPTION........................................................................ 2
3. LITERATURE REVIEW / CASE STUDY................................................................................. 3
4. PROPOSED SOLUTION...................................................................................................... 4
4.1. Project Methodology ............................................................................................... 4
4.2. Project Goal.............................................................................................................. 4
4.3. Project Scope ........................................................................................................... 4
4.4. Project Objectives.................................................................................................... 4
4.5. Potential Benefits..................................................................................................... 4
4.6. Hardware & Software Requirements....................................................................... 4
5. PROJECT DESIGN.............................................................................................................. 5
5.1. System Flow ............................................................................................................. 5
5.2. Input and Output ..................................................................................................... 5
5.3. Database Design / Algorithm / Hardware Technology / Storyboard....................... 5
6. PROTOTYPE DEVELOPMENT ............................................................................................ 6
7. CONCLUSION.................................................................................................................... 7
7.1. Assumption & Constraint......................................................................................... 7
7.2. Potential Future Enhancement................................................................................ 7
ii
REFERENCES............................................................................................................................. 8
APPENDICES............................................................................................................................. 9
iii
LIST OF FIGURES
iv
LIST OF TABLES
v
LIST OF ABBREVIATIONS
1
1. INTRODUCTION
1.1. Preamble
1.2. Problem Statement
1.3. Project Objective
1.4. Project Scope
1.4.1. Area of Specification
1.4.2. Targeted Users
1.4.3. Specific Platform
1.5. Project Stages
1.6. Expected Output
2
2. PROBLEM / OPPORTUNITY DESCRIPTION
3
3. LITERATURE REVIEW / CASE STUDY
4
4. PROPOSED SOLUTION
4.1.Project Methodology
4.2.Project Goal
4.3.Project Scope
4.4.Project Objectives
4.5.Potential Benefits
4.6.Hardware & Software Requirements
5
5. PROJECT DESIGN
5.1.System Flow
5.2.Input and Output
5.3.Database Design / Algorithm / Hardware Technology /
Storyboard
6
6. PROTOTYPE DEVELOPMENT
7
7. CONCLUSION
7.1.Assumption & Constraint
7.2.Potential Future Enhancement
8
REFERENCES
9
APPENDICES
10
APPENDICES (Gantt Chart to be included as Appendix)
GLOSSARY
INDEX
Soft copy of the system in diskette or CD (placed in a paper pocket attached to the
back cover of the report). This format is just a guideline. The actual finalized report
should be made as being advised by the supervisors except for the Front Page – Table of
Content in which the sequence and format must be followed.

More Related Content

What's hot

Unit 3 Network Layer PPT
Unit 3 Network Layer PPTUnit 3 Network Layer PPT
Unit 3 Network Layer PPTKalpanaC14
 
Network architecture
Network architectureNetwork architecture
Network architectureOnline
 
User datagram protocol (udp)
User datagram protocol (udp)User datagram protocol (udp)
User datagram protocol (udp)Ramola Dhande
 
Physical layer of OSI model
Physical layer of OSI modelPhysical layer of OSI model
Physical layer of OSI modelfarwa sahar
 
Remote procedure call on client server computing
Remote procedure call on client server computingRemote procedure call on client server computing
Remote procedure call on client server computingSatya P. Joshi
 
TCP protocol flow control
TCP protocol flow control TCP protocol flow control
TCP protocol flow control anuragjagetiya
 
IP addressing seminar ppt
IP addressing seminar pptIP addressing seminar ppt
IP addressing seminar pptSmriti Rastogi
 
The ISO_OSI Reference Model
The ISO_OSI Reference ModelThe ISO_OSI Reference Model
The ISO_OSI Reference ModelVishnu Vardhan
 
Distributed Systems Introduction and Importance
Distributed Systems Introduction and Importance Distributed Systems Introduction and Importance
Distributed Systems Introduction and Importance SHIKHA GAUTAM
 
Circular wait - Operating Systems
Circular wait - Operating SystemsCircular wait - Operating Systems
Circular wait - Operating SystemsOmair Imtiaz Ansari
 

What's hot (20)

Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Computer networks
Computer networksComputer networks
Computer networks
 
Ethernet
EthernetEthernet
Ethernet
 
Unit 3 Network Layer PPT
Unit 3 Network Layer PPTUnit 3 Network Layer PPT
Unit 3 Network Layer PPT
 
Network architecture
Network architectureNetwork architecture
Network architecture
 
TCP and UDP
TCP and UDP TCP and UDP
TCP and UDP
 
User datagram protocol (udp)
User datagram protocol (udp)User datagram protocol (udp)
User datagram protocol (udp)
 
Chapter 2: Network Models
Chapter 2: Network ModelsChapter 2: Network Models
Chapter 2: Network Models
 
Remote procedure call
Remote procedure callRemote procedure call
Remote procedure call
 
02 protocol architecture
02 protocol architecture02 protocol architecture
02 protocol architecture
 
Physical layer of OSI model
Physical layer of OSI modelPhysical layer of OSI model
Physical layer of OSI model
 
Remote procedure call on client server computing
Remote procedure call on client server computingRemote procedure call on client server computing
Remote procedure call on client server computing
 
TCP protocol flow control
TCP protocol flow control TCP protocol flow control
TCP protocol flow control
 
IP addressing seminar ppt
IP addressing seminar pptIP addressing seminar ppt
IP addressing seminar ppt
 
TCP/IP – Transmission Control Protocol/ Internet Protocol
TCP/IP – Transmission Control Protocol/ Internet ProtocolTCP/IP – Transmission Control Protocol/ Internet Protocol
TCP/IP – Transmission Control Protocol/ Internet Protocol
 
The ISO_OSI Reference Model
The ISO_OSI Reference ModelThe ISO_OSI Reference Model
The ISO_OSI Reference Model
 
Message passing in Distributed Computing Systems
Message passing in Distributed Computing SystemsMessage passing in Distributed Computing Systems
Message passing in Distributed Computing Systems
 
Distributed Systems Introduction and Importance
Distributed Systems Introduction and Importance Distributed Systems Introduction and Importance
Distributed Systems Introduction and Importance
 
Topic Packet switching
Topic Packet switchingTopic Packet switching
Topic Packet switching
 
Circular wait - Operating Systems
Circular wait - Operating SystemsCircular wait - Operating Systems
Circular wait - Operating Systems
 

Viewers also liked

Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project ReportChongKit liew
 
report_FYP_Nikko_23582685
report_FYP_Nikko_23582685report_FYP_Nikko_23582685
report_FYP_Nikko_23582685Nikko Hermawan
 
Final Year Project Report Example
Final Year Project Report ExampleFinal Year Project Report Example
Final Year Project Report ExampleMuhd Mu'izuddin
 
Hand gesture recognition system(FYP REPORT)
Hand gesture recognition system(FYP REPORT)Hand gesture recognition system(FYP REPORT)
Hand gesture recognition system(FYP REPORT)Afnan Rehman
 
GSM BASED e-NOTICE BOARD final year project report
GSM BASED e-NOTICE BOARD final year project reportGSM BASED e-NOTICE BOARD final year project report
GSM BASED e-NOTICE BOARD final year project reportVenkatesh Agnihotri
 
FYP1 Progress Report (final)
FYP1 Progress Report (final)FYP1 Progress Report (final)
FYP1 Progress Report (final)waqas khan
 
Project report format
Project report formatProject report format
Project report formatrohtb2010
 
47533870 final-project-report
47533870 final-project-report47533870 final-project-report
47533870 final-project-reportMohammed Meraj
 
Project report-on-student-information-management-system-php-mysql
Project report-on-student-information-management-system-php-mysqlProject report-on-student-information-management-system-php-mysql
Project report-on-student-information-management-system-php-mysqlRaj Sharma
 
Customer Relationship Management Module Project Report
Customer Relationship Management Module Project ReportCustomer Relationship Management Module Project Report
Customer Relationship Management Module Project Reportsachinkumar Bharadva
 

Viewers also liked (11)

Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project Report
 
report_FYP_Nikko_23582685
report_FYP_Nikko_23582685report_FYP_Nikko_23582685
report_FYP_Nikko_23582685
 
Final Year Project Report Example
Final Year Project Report ExampleFinal Year Project Report Example
Final Year Project Report Example
 
Hand gesture recognition system(FYP REPORT)
Hand gesture recognition system(FYP REPORT)Hand gesture recognition system(FYP REPORT)
Hand gesture recognition system(FYP REPORT)
 
GSM BASED e-NOTICE BOARD final year project report
GSM BASED e-NOTICE BOARD final year project reportGSM BASED e-NOTICE BOARD final year project report
GSM BASED e-NOTICE BOARD final year project report
 
FYP1 Progress Report (final)
FYP1 Progress Report (final)FYP1 Progress Report (final)
FYP1 Progress Report (final)
 
Project report format
Project report formatProject report format
Project report format
 
Project report format
Project report formatProject report format
Project report format
 
47533870 final-project-report
47533870 final-project-report47533870 final-project-report
47533870 final-project-report
 
Project report-on-student-information-management-system-php-mysql
Project report-on-student-information-management-system-php-mysqlProject report-on-student-information-management-system-php-mysql
Project report-on-student-information-management-system-php-mysql
 
Customer Relationship Management Module Project Report
Customer Relationship Management Module Project ReportCustomer Relationship Management Module Project Report
Customer Relationship Management Module Project Report
 

Similar to Final fyp report template

FINAL REPORT DEC
FINAL REPORT DECFINAL REPORT DEC
FINAL REPORT DECAxis Bank
 
online examination management system
online examination management systemonline examination management system
online examination management systemPraveen Patel
 
Using ADO.NET Entity Framework in Domain Driven Design: A Pattern Approach
Using ADO.NET Entity Framework in Domain Driven Design: A Pattern ApproachUsing ADO.NET Entity Framework in Domain Driven Design: A Pattern Approach
Using ADO.NET Entity Framework in Domain Driven Design: A Pattern ApproachHoan Phuc
 
A PROJECT REPORT ON quot Hotel Managment quot Using Php for Master Of Compu...
A PROJECT REPORT ON  quot Hotel Managment quot  Using Php for Master Of Compu...A PROJECT REPORT ON  quot Hotel Managment quot  Using Php for Master Of Compu...
A PROJECT REPORT ON quot Hotel Managment quot Using Php for Master Of Compu...Tiffany Daniels
 
Chat Application [Full Documentation]
Chat Application [Full Documentation]Chat Application [Full Documentation]
Chat Application [Full Documentation]Rajon
 
Document Archiving & Sharing System
Document Archiving & Sharing SystemDocument Archiving & Sharing System
Document Archiving & Sharing SystemAshik Iqbal
 
Final Year Project (ISP),Project Demo
Final Year Project (ISP),Project DemoFinal Year Project (ISP),Project Demo
Final Year Project (ISP),Project DemoAbdul Aslam
 
PROJECT FAST INVENTORY Delivere.docx
PROJECT FAST INVENTORY  Delivere.docxPROJECT FAST INVENTORY  Delivere.docx
PROJECT FAST INVENTORY Delivere.docxwoodruffeloisa
 
INDUSTRIAL REPORT ON DELHI METRO
INDUSTRIAL REPORT ON DELHI METROINDUSTRIAL REPORT ON DELHI METRO
INDUSTRIAL REPORT ON DELHI METRONAVEEN12JOSHI
 
Internship-Report-sample-6.pdf
Internship-Report-sample-6.pdfInternship-Report-sample-6.pdf
Internship-Report-sample-6.pdfAbhiAry
 
Internship-Report-sample-6 (1).pdf
Internship-Report-sample-6 (1).pdfInternship-Report-sample-6 (1).pdf
Internship-Report-sample-6 (1).pdfShankarYadav75
 
Project final report
Project final reportProject final report
Project final reportALIN BABU
 
Ensuring Distributed Accountability in the Cloud
Ensuring Distributed Accountability in the CloudEnsuring Distributed Accountability in the Cloud
Ensuring Distributed Accountability in the CloudSuraj Mehta
 
Sample Report Format
Sample Report FormatSample Report Format
Sample Report Formatvikram singh
 
IT Project Planning Standards V 1.2
IT Project Planning Standards V 1.2IT Project Planning Standards V 1.2
IT Project Planning Standards V 1.2Ahmed303
 

Similar to Final fyp report template (20)

FINAL REPORT DEC
FINAL REPORT DECFINAL REPORT DEC
FINAL REPORT DEC
 
report-1.pdf
report-1.pdfreport-1.pdf
report-1.pdf
 
online examination management system
online examination management systemonline examination management system
online examination management system
 
Using ADO.NET Entity Framework in Domain Driven Design: A Pattern Approach
Using ADO.NET Entity Framework in Domain Driven Design: A Pattern ApproachUsing ADO.NET Entity Framework in Domain Driven Design: A Pattern Approach
Using ADO.NET Entity Framework in Domain Driven Design: A Pattern Approach
 
A PROJECT REPORT ON quot Hotel Managment quot Using Php for Master Of Compu...
A PROJECT REPORT ON  quot Hotel Managment quot  Using Php for Master Of Compu...A PROJECT REPORT ON  quot Hotel Managment quot  Using Php for Master Of Compu...
A PROJECT REPORT ON quot Hotel Managment quot Using Php for Master Of Compu...
 
Chat Application [Full Documentation]
Chat Application [Full Documentation]Chat Application [Full Documentation]
Chat Application [Full Documentation]
 
Document Archiving & Sharing System
Document Archiving & Sharing SystemDocument Archiving & Sharing System
Document Archiving & Sharing System
 
Abrek_Thesis
Abrek_ThesisAbrek_Thesis
Abrek_Thesis
 
Final Year Project (ISP),Project Demo
Final Year Project (ISP),Project DemoFinal Year Project (ISP),Project Demo
Final Year Project (ISP),Project Demo
 
PROJECT FAST INVENTORY Delivere.docx
PROJECT FAST INVENTORY  Delivere.docxPROJECT FAST INVENTORY  Delivere.docx
PROJECT FAST INVENTORY Delivere.docx
 
INDUSTRIAL REPORT ON DELHI METRO
INDUSTRIAL REPORT ON DELHI METROINDUSTRIAL REPORT ON DELHI METRO
INDUSTRIAL REPORT ON DELHI METRO
 
rip 1.pdf
rip 1.pdfrip 1.pdf
rip 1.pdf
 
Internship-Report-sample-6.pdf
Internship-Report-sample-6.pdfInternship-Report-sample-6.pdf
Internship-Report-sample-6.pdf
 
Internship-Report-sample-6 (1).pdf
Internship-Report-sample-6 (1).pdfInternship-Report-sample-6 (1).pdf
Internship-Report-sample-6 (1).pdf
 
Cs internship report file 1.pdf
Cs internship report file 1.pdfCs internship report file 1.pdf
Cs internship report file 1.pdf
 
Project final report
Project final reportProject final report
Project final report
 
Ensuring Distributed Accountability in the Cloud
Ensuring Distributed Accountability in the CloudEnsuring Distributed Accountability in the Cloud
Ensuring Distributed Accountability in the Cloud
 
Sample Report Format
Sample Report FormatSample Report Format
Sample Report Format
 
Msp
MspMsp
Msp
 
IT Project Planning Standards V 1.2
IT Project Planning Standards V 1.2IT Project Planning Standards V 1.2
IT Project Planning Standards V 1.2
 

Recently uploaded

Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Hyundai Motor Group
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetEnjoy Anytime
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 

Recently uploaded (20)

Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 

Final fyp report template

  • 1. i INTERNATIONAL ISLAMIC UNIVERSITY MALAYSIA KULLIYYAH OF INFORMATION AND COMMUNICATION TECHNOLOGY DEPARTMENT OF COMPUTER SCIENCE FYP REPORT FYP TITLE STUDENT’S NAME MATRIC NO SUPERVISED BY SUPERVISOR’S NAME NOVEMBER 2012 SEMESTER X, 2012/2013
  • 2. i FINAL YEAR PROJECT REPORT FYP TITLE by <Student’s name> <Matric no> Supervised by <Supervisor’s name> In partial fulfilment of the requirement for the Bachelor of Computer Science Department of Computer Science Kulliyyah of Information and Communication Technology International Islamic University Malaysia <Month> <Year> Semester X, 2012/2013
  • 3. i FYP TITLE by <Student’s name> <Matric no> A project paper submitted to the Department of Computer Science Kulliyyah of Information and Communication Technology in partial fulfilment of the requirement for the Bachelor of Computer Science Approved by the Examining Committee: _____________________________ <Supervisor’s name>, Project Supervisor _____________________________ <Committee-1>, Member _____________________________ <Committee-2>, Member International Islamic University Malaysia <Month> <Year> Semester X, 2012/2013
  • 6. i TABLE OF CONTENT PAGE TABLE OF CONTENT .................................................................................................................. i LIST OF FIGURES.......................................................................................................................iii LIST OF TABLES.........................................................................................................................iv LIST OF ABBREVIATIONS ...........................................................................................................v 1. INTRODUCTION................................................................................................................ 1 1.1. Preamble.................................................................................................................. 1 1.2. Problem Statement.................................................................................................. 1 1.3. Project Objective...................................................................................................... 1 1.4. Project Scope ........................................................................................................... 1 1.4.1. Area of Specification........................................................................................ 1 1.4.2. Targeted Users................................................................................................. 1 1.4.3. Specific Platform .............................................................................................. 1 1.5. Project Stages........................................................................................................... 1 1.6. Expected Output...................................................................................................... 1 2. PROBLEM / OPPORTUNITY DESCRIPTION........................................................................ 2 3. LITERATURE REVIEW / CASE STUDY................................................................................. 3 4. PROPOSED SOLUTION...................................................................................................... 4 4.1. Project Methodology ............................................................................................... 4 4.2. Project Goal.............................................................................................................. 4 4.3. Project Scope ........................................................................................................... 4 4.4. Project Objectives.................................................................................................... 4 4.5. Potential Benefits..................................................................................................... 4 4.6. Hardware & Software Requirements....................................................................... 4 5. PROJECT DESIGN.............................................................................................................. 5 5.1. System Flow ............................................................................................................. 5 5.2. Input and Output ..................................................................................................... 5 5.3. Database Design / Algorithm / Hardware Technology / Storyboard....................... 5 6. PROTOTYPE DEVELOPMENT ............................................................................................ 6 7. CONCLUSION.................................................................................................................... 7 7.1. Assumption & Constraint......................................................................................... 7 7.2. Potential Future Enhancement................................................................................ 7
  • 11. 1 1. INTRODUCTION 1.1. Preamble 1.2. Problem Statement 1.3. Project Objective 1.4. Project Scope 1.4.1. Area of Specification 1.4.2. Targeted Users 1.4.3. Specific Platform 1.5. Project Stages 1.6. Expected Output
  • 12. 2 2. PROBLEM / OPPORTUNITY DESCRIPTION
  • 13. 3 3. LITERATURE REVIEW / CASE STUDY
  • 14. 4 4. PROPOSED SOLUTION 4.1.Project Methodology 4.2.Project Goal 4.3.Project Scope 4.4.Project Objectives 4.5.Potential Benefits 4.6.Hardware & Software Requirements
  • 15. 5 5. PROJECT DESIGN 5.1.System Flow 5.2.Input and Output 5.3.Database Design / Algorithm / Hardware Technology / Storyboard
  • 17. 7 7. CONCLUSION 7.1.Assumption & Constraint 7.2.Potential Future Enhancement
  • 20. 10 APPENDICES (Gantt Chart to be included as Appendix) GLOSSARY INDEX Soft copy of the system in diskette or CD (placed in a paper pocket attached to the back cover of the report). This format is just a guideline. The actual finalized report should be made as being advised by the supervisors except for the Front Page – Table of Content in which the sequence and format must be followed.