i
INTERNATIONAL ISLAMIC UNIVERSITY MALAYSIA
KULLIYYAH OF INFORMATION AND
COMMUNICATION TECHNOLOGY
DEPARTMENT OF COMPUTER SCIENCE
FYP REPORT
FYP TITLE
STUDENT’S NAME
MATRIC NO
SUPERVISED BY
SUPERVISOR’S NAME
NOVEMBER 2012
SEMESTER X, 2012/2013
i
FINAL YEAR PROJECT REPORT
FYP TITLE
by
<Student’s name>
<Matric no>
Supervised by
<Supervisor’s name>
In partial fulfilment of the requirement for the
Bachelor of Computer Science
Department of Computer Science
Kulliyyah of Information and Communication Technology
International Islamic University Malaysia
<Month> <Year>
Semester X, 2012/2013
i
FYP TITLE
by
<Student’s name>
<Matric no>
A project paper submitted to the
Department of Computer Science
Kulliyyah of Information and Communication Technology
in partial fulfilment of the requirement for the
Bachelor of Computer Science
Approved by the Examining Committee:
_____________________________
<Supervisor’s name>, Project Supervisor
_____________________________
<Committee-1>, Member
_____________________________
<Committee-2>, Member
International Islamic University Malaysia
<Month> <Year>
Semester X, 2012/2013
i
ACKNOWLEDGMENT
i
ABSTRACT
i
TABLE OF CONTENT
PAGE
TABLE OF CONTENT .................................................................................................................. i
LIST OF FIGURES.......................................................................................................................iii
LIST OF TABLES.........................................................................................................................iv
LIST OF ABBREVIATIONS ...........................................................................................................v
1. INTRODUCTION................................................................................................................ 1
1.1. Preamble.................................................................................................................. 1
1.2. Problem Statement.................................................................................................. 1
1.3. Project Objective...................................................................................................... 1
1.4. Project Scope ........................................................................................................... 1
1.4.1. Area of Specification........................................................................................ 1
1.4.2. Targeted Users................................................................................................. 1
1.4.3. Specific Platform .............................................................................................. 1
1.5. Project Stages........................................................................................................... 1
1.6. Expected Output...................................................................................................... 1
2. PROBLEM / OPPORTUNITY DESCRIPTION........................................................................ 2
3. LITERATURE REVIEW / CASE STUDY................................................................................. 3
4. PROPOSED SOLUTION...................................................................................................... 4
4.1. Project Methodology ............................................................................................... 4
4.2. Project Goal.............................................................................................................. 4
4.3. Project Scope ........................................................................................................... 4
4.4. Project Objectives.................................................................................................... 4
4.5. Potential Benefits..................................................................................................... 4
4.6. Hardware & Software Requirements....................................................................... 4
5. PROJECT DESIGN.............................................................................................................. 5
5.1. System Flow ............................................................................................................. 5
5.2. Input and Output ..................................................................................................... 5
5.3. Database Design / Algorithm / Hardware Technology / Storyboard....................... 5
6. PROTOTYPE DEVELOPMENT ............................................................................................ 6
7. CONCLUSION.................................................................................................................... 7
7.1. Assumption & Constraint......................................................................................... 7
7.2. Potential Future Enhancement................................................................................ 7
ii
REFERENCES............................................................................................................................. 8
APPENDICES............................................................................................................................. 9
iii
LIST OF FIGURES
iv
LIST OF TABLES
v
LIST OF ABBREVIATIONS
1
1. INTRODUCTION
1.1. Preamble
1.2. Problem Statement
1.3. Project Objective
1.4. Project Scope
1.4.1. Area of Specification
1.4.2. Targeted Users
1.4.3. Specific Platform
1.5. Project Stages
1.6. Expected Output
2
2. PROBLEM / OPPORTUNITY DESCRIPTION
3
3. LITERATURE REVIEW / CASE STUDY
4
4. PROPOSED SOLUTION
4.1.Project Methodology
4.2.Project Goal
4.3.Project Scope
4.4.Project Objectives
4.5.Potential Benefits
4.6.Hardware & Software Requirements
5
5. PROJECT DESIGN
5.1.System Flow
5.2.Input and Output
5.3.Database Design / Algorithm / Hardware Technology /
Storyboard
6
6. PROTOTYPE DEVELOPMENT
7
7. CONCLUSION
7.1.Assumption & Constraint
7.2.Potential Future Enhancement
8
REFERENCES
9
APPENDICES
10
APPENDICES (Gantt Chart to be included as Appendix)
GLOSSARY
INDEX
Soft copy of the system in diskette or CD (placed in a paper pocket attached to the
back cover of the report). This format is just a guideline. The actual finalized report
should be made as being advised by the supervisors except for the Front Page – Table of
Content in which the sequence and format must be followed.

Final fyp report template

  • 1.
    i INTERNATIONAL ISLAMIC UNIVERSITYMALAYSIA KULLIYYAH OF INFORMATION AND COMMUNICATION TECHNOLOGY DEPARTMENT OF COMPUTER SCIENCE FYP REPORT FYP TITLE STUDENT’S NAME MATRIC NO SUPERVISED BY SUPERVISOR’S NAME NOVEMBER 2012 SEMESTER X, 2012/2013
  • 2.
    i FINAL YEAR PROJECTREPORT FYP TITLE by <Student’s name> <Matric no> Supervised by <Supervisor’s name> In partial fulfilment of the requirement for the Bachelor of Computer Science Department of Computer Science Kulliyyah of Information and Communication Technology International Islamic University Malaysia <Month> <Year> Semester X, 2012/2013
  • 3.
    i FYP TITLE by <Student’s name> <Matricno> A project paper submitted to the Department of Computer Science Kulliyyah of Information and Communication Technology in partial fulfilment of the requirement for the Bachelor of Computer Science Approved by the Examining Committee: _____________________________ <Supervisor’s name>, Project Supervisor _____________________________ <Committee-1>, Member _____________________________ <Committee-2>, Member International Islamic University Malaysia <Month> <Year> Semester X, 2012/2013
  • 4.
  • 5.
  • 6.
    i TABLE OF CONTENT PAGE TABLEOF CONTENT .................................................................................................................. i LIST OF FIGURES.......................................................................................................................iii LIST OF TABLES.........................................................................................................................iv LIST OF ABBREVIATIONS ...........................................................................................................v 1. INTRODUCTION................................................................................................................ 1 1.1. Preamble.................................................................................................................. 1 1.2. Problem Statement.................................................................................................. 1 1.3. Project Objective...................................................................................................... 1 1.4. Project Scope ........................................................................................................... 1 1.4.1. Area of Specification........................................................................................ 1 1.4.2. Targeted Users................................................................................................. 1 1.4.3. Specific Platform .............................................................................................. 1 1.5. Project Stages........................................................................................................... 1 1.6. Expected Output...................................................................................................... 1 2. PROBLEM / OPPORTUNITY DESCRIPTION........................................................................ 2 3. LITERATURE REVIEW / CASE STUDY................................................................................. 3 4. PROPOSED SOLUTION...................................................................................................... 4 4.1. Project Methodology ............................................................................................... 4 4.2. Project Goal.............................................................................................................. 4 4.3. Project Scope ........................................................................................................... 4 4.4. Project Objectives.................................................................................................... 4 4.5. Potential Benefits..................................................................................................... 4 4.6. Hardware & Software Requirements....................................................................... 4 5. PROJECT DESIGN.............................................................................................................. 5 5.1. System Flow ............................................................................................................. 5 5.2. Input and Output ..................................................................................................... 5 5.3. Database Design / Algorithm / Hardware Technology / Storyboard....................... 5 6. PROTOTYPE DEVELOPMENT ............................................................................................ 6 7. CONCLUSION.................................................................................................................... 7 7.1. Assumption & Constraint......................................................................................... 7 7.2. Potential Future Enhancement................................................................................ 7
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
    1 1. INTRODUCTION 1.1. Preamble 1.2.Problem Statement 1.3. Project Objective 1.4. Project Scope 1.4.1. Area of Specification 1.4.2. Targeted Users 1.4.3. Specific Platform 1.5. Project Stages 1.6. Expected Output
  • 12.
    2 2. PROBLEM /OPPORTUNITY DESCRIPTION
  • 13.
  • 14.
    4 4. PROPOSED SOLUTION 4.1.ProjectMethodology 4.2.Project Goal 4.3.Project Scope 4.4.Project Objectives 4.5.Potential Benefits 4.6.Hardware & Software Requirements
  • 15.
    5 5. PROJECT DESIGN 5.1.SystemFlow 5.2.Input and Output 5.3.Database Design / Algorithm / Hardware Technology / Storyboard
  • 16.
  • 17.
    7 7. CONCLUSION 7.1.Assumption &Constraint 7.2.Potential Future Enhancement
  • 18.
  • 19.
  • 20.
    10 APPENDICES (Gantt Chartto be included as Appendix) GLOSSARY INDEX Soft copy of the system in diskette or CD (placed in a paper pocket attached to the back cover of the report). This format is just a guideline. The actual finalized report should be made as being advised by the supervisors except for the Front Page – Table of Content in which the sequence and format must be followed.