Front Page for black book (this line to be deleted )

                         PROJECT REPORT ON



                          <<PROJECT NAME>>




                              SUBMITTED BY

                   <<NAMES OF GROUP MEMBERS>>
                            T.Y.B.SC.IT



                       ACADEMIC YEAR 2010-2011



                             PROJECT GUIDE

                            <<GUIDE NAME>>




                            SUBMITTED TO
                        UNIVERSITY OF MUMBAI



     VIDYALANKAR SCHOOL OF INFORMATION TECHNOLOGY
               WADALA (E), MUMBAI 400037.
<<PROJECT NAME>>




                              SUBMITTED BY

         <<NAMES OF GROUP MEMBERS WITH SEAT NO’S>>




                        DATE OF SUBMISSION
                              <<date>>




Submitted in partial fulfillment of the requirements for qualifying BSc-IT,
                            Sem VI- examination




     VIDYALANKAR SCHOOL OF INFORMATION TECHNOLOGY
               WADALA (E), MUMBAI 400037.
Acknowledgement
VIDYALANKAR SCHOOL OF INFORMATION TECHNOLOGY
                     WADALA (E), MUMBAI 400037.




                 Project certificate for BSc-IT students



This is to certify that the project entitled   ___<<project title>>___by
Mr./Ms._________<<students name>>___ Seat no. __________________in
partial fulfillment of BSc IT degree (Sem VI) examination had not been
submitted for any other examination and does not form any other course
undergone by the candidate.




Internal Guide          Internal examiner             External Examiner




Co-ordinator                                                College Seal
STATEMENT BY THE CANDIDATE




         I wish to state that the work embodied in this project titled “AAA
BBB” forms my own contribution to the project work carried out under the
guidance of Prof. X.Y ABCD at the Department of Information Technology.
This work has not been submitted for any other degree of this or any other
University. Wherever references have been made to previous work of others,
it has been clearly indicated as such and included in the Bibliography.




                                             Signature of the candidate


Certified by




Signature of the Guide
Date
Include Certificate of the company /organization(if any)
Synopsis of the project
Table of contents

    Sr. No.                           Topic                      Page. No.
1             Introduction

1.1           Organizational profile (Write in short)

1.2           Introduction to project


2             System study and analysis

2.1           Problem definition
2.2           Feasibility
2.3           System analysis
2.4           Current system
2.5           Proposed system

              System development
3
3.1           Gantt chart
3.2           Event table
3.3           E-R diagram(or Use Case )

3.4           Data flow diagrams (or Class Diagram )
3.4.1         Context diagrams

3.4.2         Diagram 0

3.4.3         DFD fragments

3.4.4         Structure chart (or Activity & Sequence diagram)

3.4.5         System flowchart (or Deployment diagram)
3.4.6         Menu tree


4             Program list
5             Table list
6             Report list
7             System testing and conclusion
8             Data entry form
9             Coding conventions
10    Source code
11    Screen layout with test data and test results
12    Report layouts
13    References/ bibliography/websites used


      Annexure
      Brief background of the organization where the
i
      student has developed the project
      Data dictionary This should give a catalogue of
      the data elements used in the system/sub system
ii
      Data name, aliases if any, length (size), type
      numeric, alpha,binary,etc.
iii   List of abbreviations, figures, tables
iv    References: bibliography, websites used
v     Soft copy of the project on CD

Project report format

  • 1.
    Front Page forblack book (this line to be deleted ) PROJECT REPORT ON <<PROJECT NAME>> SUBMITTED BY <<NAMES OF GROUP MEMBERS>> T.Y.B.SC.IT ACADEMIC YEAR 2010-2011 PROJECT GUIDE <<GUIDE NAME>> SUBMITTED TO UNIVERSITY OF MUMBAI VIDYALANKAR SCHOOL OF INFORMATION TECHNOLOGY WADALA (E), MUMBAI 400037.
  • 2.
    <<PROJECT NAME>> SUBMITTED BY <<NAMES OF GROUP MEMBERS WITH SEAT NO’S>> DATE OF SUBMISSION <<date>> Submitted in partial fulfillment of the requirements for qualifying BSc-IT, Sem VI- examination VIDYALANKAR SCHOOL OF INFORMATION TECHNOLOGY WADALA (E), MUMBAI 400037.
  • 3.
  • 4.
    VIDYALANKAR SCHOOL OFINFORMATION TECHNOLOGY WADALA (E), MUMBAI 400037. Project certificate for BSc-IT students This is to certify that the project entitled ___<<project title>>___by Mr./Ms._________<<students name>>___ Seat no. __________________in partial fulfillment of BSc IT degree (Sem VI) examination had not been submitted for any other examination and does not form any other course undergone by the candidate. Internal Guide Internal examiner External Examiner Co-ordinator College Seal
  • 5.
    STATEMENT BY THECANDIDATE I wish to state that the work embodied in this project titled “AAA BBB” forms my own contribution to the project work carried out under the guidance of Prof. X.Y ABCD at the Department of Information Technology. This work has not been submitted for any other degree of this or any other University. Wherever references have been made to previous work of others, it has been clearly indicated as such and included in the Bibliography. Signature of the candidate Certified by Signature of the Guide Date
  • 6.
    Include Certificate ofthe company /organization(if any)
  • 7.
  • 8.
    Table of contents Sr. No. Topic Page. No. 1 Introduction 1.1 Organizational profile (Write in short) 1.2 Introduction to project 2 System study and analysis 2.1 Problem definition 2.2 Feasibility 2.3 System analysis 2.4 Current system 2.5 Proposed system System development 3 3.1 Gantt chart 3.2 Event table 3.3 E-R diagram(or Use Case ) 3.4 Data flow diagrams (or Class Diagram ) 3.4.1 Context diagrams 3.4.2 Diagram 0 3.4.3 DFD fragments 3.4.4 Structure chart (or Activity & Sequence diagram) 3.4.5 System flowchart (or Deployment diagram) 3.4.6 Menu tree 4 Program list 5 Table list 6 Report list 7 System testing and conclusion 8 Data entry form 9 Coding conventions
  • 9.
    10 Source code 11 Screen layout with test data and test results 12 Report layouts 13 References/ bibliography/websites used Annexure Brief background of the organization where the i student has developed the project Data dictionary This should give a catalogue of the data elements used in the system/sub system ii Data name, aliases if any, length (size), type numeric, alpha,binary,etc. iii List of abbreviations, figures, tables iv References: bibliography, websites used v Soft copy of the project on CD