Project Management is the dynamic process that
utilizes the appropriate resources of the organization
in a controlled and structured manner, to achieve
some clearly defined objectives identified as strategic
needs. It is always conducted within a defined set of
constraints.
8/7/2014 Gagan Gupta
• st et expedita distinctio. Nam libero tempore,
cum soluta nobis est eligendi optio cumque
nihil impedit quo minus id quod maxime
placeat facere possimus, omnis voluptas as
8/7/2014 Gagan Gupta
Planning
Implementation
Monitoring &
Control
Evaluation
8/7/2014 Gagan Gupta
• A Project is considered as Failure……
Whenever a project
doesn’t meet to the
expectation of the
Stakeholders.
8/7/2014 Gagan Gupta
• Cost & Time Over-runs
• Quality Degradation
• Frustration & Stress: sometime resulting in people
quitting
• Low Job Satisfaction
• Low Corporate Market Value
• Low Public Opinion
• Negative Media Campaigns
• May even force the company into Closure
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
Also Known as “You’d like it, just a bit bigger.
No Problem.”
Oh Still a bit Bigger……. OK
Even Bigger? It wasn’t in the plan but Okay….
8/7/2014 Gagan Gupta
When Scope creeps, the end
results is always more work
than expected.
• Problems:
– The changes that were not initially planned for, are added to project.
– The Project takes longer and costs more than planned and there is no
record of WHY??
• Causes:
– Not having a method to handle or recognize changes.
• What to do:
– Document the change management process to be used and followed
by Project Team.
– Educate the project Team to recognize a change or deviation from the
Plan.
– Follow the Change Management Process.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• Problems:
– Team Members do not have the information they need when they
need it.
– Issues or changes do not get escalated.
– Project reporting is sluggish
• Causes:
– The project’s communication plan was not completed.
– The project’s communication plan doesn’t have enough details.
• What to do:
– Find out the communication requirements of all team members, and
stakeholders, then document them in a common plan, and then follow
the Plan.
8/7/2014 Gagan Gupta
• You do not have enough people, the right skill-sets, or the
team is not committed to the projects.
• Problems:
– Tasks take longer than expected
to complete.
– Deadlines and milestones get
missed.
– Project completion date comes
into jeopardy.
– You end up working double shifts to
complete all the works.
• Causes:
– There was no pre-commitment of resources to the projects.
– The Project was not supported.
– There was no analysis and documentation of all skill-set required.
• What to do:
– Get executives Sponsorship for the project.
– Document which resources and skill-sets are needed to get the job
done.
– Create a plan that gives enough time to get the job done with the
allocated resources.
– Pre-assign the required resources to the team.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• “I would like a set of stairs that leads up to a bridge.”
• Problems:
– Customer will be unhappy.
– Customer will complain and you will end up doing the what they want-
at your expense.
• Causes:
– What the customer wants, was not clearly documented.
– What you believe the customer wants is different that what the
customer believes they have asked for?
• What to do:
– Find out and document exactly what the customer wants.
– Inform everybody of the project scope.
– Document Business, Functional and technical requirements.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• How do you figure out how long the project will take?
• Problems:
– An unrealistic timeline or budget will be agreed to.
– You will not be able to do all the work in the time allocated.
• Causes:
– No formal estimating method
– Estimate confidence is law.
– Volume of work not understood
• What to do:
– List all the work as well as possible.
– Estimate each work package.
– Add up all work packages.
– Always give answer using a range of dates
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• Sorry about the project, I left it in my car & there was a bit of
an incidents.
• Problems:
– Unexpected events cause delays.
– Domino effect of thing going wrong.
• Causes:
– No Formal Risk Management.
– Just try to predict the big things that can go wrong.
– It’s the sum of the all little things that make a project late.
– Nothing is more stressful than trying to keep on schedule when
unexpected things keep happening.
• What to do:
– List all the work as well as possible.
– Figure out what can go wrong with each piece of work.
– Prioritize each risk as High/ Medium/ Low Probability or impact.
– Sort the list.
– Create a plan to deal with the risks at the top of list.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• “Emergency Phone installed, Deliverable completed”
• Problems:
– Difficult to get the agreement that the product is finished.
– Customer Keep wanting more, saying you didn’t do it to their
Specification.
• Causes:
– The Milestones or deliverables were not measurable.
– The customer never told us How many they wanted So we just
assumed 1,
• What to do:
– Ensure Milestones or Deliverables are:
Clearly Defined
Measurable (Quantifiable)
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• Of course we Can do that for you.
• Problems:
– There was little or no planning before deciding you can get the job
done.
– The task you agree to turns out to be more work than expected.
– It takes you longer and jeopardizes other deliverables.
• Causes:
– Not enough time spent planning.
– You may have been pressured into giving an answer right then and
there.
– Didn’t have a full understanding of the work involved before
committing.
• What to do:
– Take the time to fully understand the work before agreeing to it.
– Its okay to say the work is not possible or will take too long
– Only agree to work when you’re sure it can be done, this will benefit
you and your managers.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• Hurry .... We have a tight deadline. No time to plan. Just start digging.
• Problems:
– The plan is flawed from the start.
– The project gets out of control and can’t be recovered.
• Causes:
– You have to do the work and weren’t also given time for project
management.
– Perhaps you only have 10% or 20% allotment for the project
management duties.
• What to do:
– Planning a project is like setting out a roadmap. Without it you will
likely get lost.
– Controlling a project is like driving a car. You have to continuously
watch the road (the Plan) and make little adjustments.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• I think I know how this helmet goes on. I have been riding scooters for two
years now.
• Problems:
– Your project don’t finish on time.
– Your project are always squeezed at the end.
– Your project are stressful.
– You have to deal with unrealistic expectation or customers.
– You feel your projects are out of control.
• Causes:
– People often don’t know what they don’t know.
– Their project are out of control but they don’t know WHY??
– They feel they are doing okay but could benefit from formal project
management education.
• What to do:
– Learn the methods, tools, and techniques successful Project manager
use to initiate, plan, execute and control their projects.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
Presented by Gagan Gupta

More Related Content

What's hot

Agile UX
Agile UXAgile UX
Agile UX
Rob Keefer
 
This one weird trick will fix all your Agile problems
This one weird trick will fix all your Agile problemsThis one weird trick will fix all your Agile problems
This one weird trick will fix all your Agile problems
Anthony Marter
 
Intro agile for PO's
Intro agile for PO'sIntro agile for PO's
Intro agile for PO's
Anat (Alon) Salhov
 
Agile And Your Business V2
Agile And Your Business V2Agile And Your Business V2
Agile And Your Business V2
edward1968
 
Achieve your 12 month development roadmap in 10 months
Achieve your 12 month development roadmap in 10 monthsAchieve your 12 month development roadmap in 10 months
Achieve your 12 month development roadmap in 10 months
Amy Van de Klippe
 
7 Killer tips to manage things at work
7 Killer tips to manage things at work7 Killer tips to manage things at work
7 Killer tips to manage things at work
ProofHub
 
Succeeding with Agile in the Federal Government: A Coach's Perspective
Succeeding with Agile in the Federal Government: A Coach's PerspectiveSucceeding with Agile in the Federal Government: A Coach's Perspective
Succeeding with Agile in the Federal Government: A Coach's Perspective
Ed Seidewitz
 
Software Project Estimation Survival Guide
Software Project Estimation Survival GuideSoftware Project Estimation Survival Guide
Software Project Estimation Survival Guide
michaelcummings
 
Got work to do? Zest thoughts on making a process
Got work to do? Zest thoughts on making a processGot work to do? Zest thoughts on making a process
Got work to do? Zest thoughts on making a process
Tim Pennells
 
Starting Smarterer
Starting SmartererStarting Smarterer
Starting Smarterer
Matthew Mamet
 
What's the Product Manager Role Like by PlayStation former PM
What's the Product Manager Role Like by PlayStation former PMWhat's the Product Manager Role Like by PlayStation former PM
What's the Product Manager Role Like by PlayStation former PM
Product School
 
Task 3
Task 3Task 3
Task 3
12lawrs
 
Agile at enterprice level
Agile at enterprice levelAgile at enterprice level
Agile at enterprice level
Jan De Baere
 
Managing The Delivery Of Zero Defect Software
Managing The Delivery Of Zero Defect SoftwareManaging The Delivery Of Zero Defect Software
Managing The Delivery Of Zero Defect Software
srikanthrao14
 
Dr. house would be a great product management
Dr. house would be a great product managementDr. house would be a great product management
Dr. house would be a great product management
Tautvydas Gylys
 
The Trickle Down Effect of Effective Internal Processes
The Trickle Down Effect of Effective Internal ProcessesThe Trickle Down Effect of Effective Internal Processes
The Trickle Down Effect of Effective Internal Processes
Nate Plaunt
 
Meetup preso may 2012
Meetup preso may 2012Meetup preso may 2012
Meetup preso may 2012
jmcaddell
 
Project Procurement - Supplier intent
Project Procurement - Supplier intentProject Procurement - Supplier intent
Project Procurement - Supplier intent
Meagan Paterson
 
Delight Your Customers: The #noestimates Way
Delight Your Customers: The #noestimates WayDelight Your Customers: The #noestimates Way
Delight Your Customers: The #noestimates Way
troytuttle
 
Designing business outcomes
Designing business outcomesDesigning business outcomes
Designing business outcomes
Evan Leybourn
 

What's hot (20)

Agile UX
Agile UXAgile UX
Agile UX
 
This one weird trick will fix all your Agile problems
This one weird trick will fix all your Agile problemsThis one weird trick will fix all your Agile problems
This one weird trick will fix all your Agile problems
 
Intro agile for PO's
Intro agile for PO'sIntro agile for PO's
Intro agile for PO's
 
Agile And Your Business V2
Agile And Your Business V2Agile And Your Business V2
Agile And Your Business V2
 
Achieve your 12 month development roadmap in 10 months
Achieve your 12 month development roadmap in 10 monthsAchieve your 12 month development roadmap in 10 months
Achieve your 12 month development roadmap in 10 months
 
7 Killer tips to manage things at work
7 Killer tips to manage things at work7 Killer tips to manage things at work
7 Killer tips to manage things at work
 
Succeeding with Agile in the Federal Government: A Coach's Perspective
Succeeding with Agile in the Federal Government: A Coach's PerspectiveSucceeding with Agile in the Federal Government: A Coach's Perspective
Succeeding with Agile in the Federal Government: A Coach's Perspective
 
Software Project Estimation Survival Guide
Software Project Estimation Survival GuideSoftware Project Estimation Survival Guide
Software Project Estimation Survival Guide
 
Got work to do? Zest thoughts on making a process
Got work to do? Zest thoughts on making a processGot work to do? Zest thoughts on making a process
Got work to do? Zest thoughts on making a process
 
Starting Smarterer
Starting SmartererStarting Smarterer
Starting Smarterer
 
What's the Product Manager Role Like by PlayStation former PM
What's the Product Manager Role Like by PlayStation former PMWhat's the Product Manager Role Like by PlayStation former PM
What's the Product Manager Role Like by PlayStation former PM
 
Task 3
Task 3Task 3
Task 3
 
Agile at enterprice level
Agile at enterprice levelAgile at enterprice level
Agile at enterprice level
 
Managing The Delivery Of Zero Defect Software
Managing The Delivery Of Zero Defect SoftwareManaging The Delivery Of Zero Defect Software
Managing The Delivery Of Zero Defect Software
 
Dr. house would be a great product management
Dr. house would be a great product managementDr. house would be a great product management
Dr. house would be a great product management
 
The Trickle Down Effect of Effective Internal Processes
The Trickle Down Effect of Effective Internal ProcessesThe Trickle Down Effect of Effective Internal Processes
The Trickle Down Effect of Effective Internal Processes
 
Meetup preso may 2012
Meetup preso may 2012Meetup preso may 2012
Meetup preso may 2012
 
Project Procurement - Supplier intent
Project Procurement - Supplier intentProject Procurement - Supplier intent
Project Procurement - Supplier intent
 
Delight Your Customers: The #noestimates Way
Delight Your Customers: The #noestimates WayDelight Your Customers: The #noestimates Way
Delight Your Customers: The #noestimates Way
 
Designing business outcomes
Designing business outcomesDesigning business outcomes
Designing business outcomes
 

Viewers also liked

Qa course total pdf
Qa course total pdfQa course total pdf
Qa course total pdf
test prod1
 
File 5 extra slide 1
File 5 extra slide 1File 5 extra slide 1
File 5 extra slide 1
test prod1
 
File 3 extra four slides 2
File 3 extra four slides 2File 3 extra four slides 2
File 3 extra four slides 2
test prod1
 
Unique file 3
Unique file 3Unique file 3
Unique file 3
test prod1
 
File 5 original copy 1
File 5 original copy 1File 5 original copy 1
File 5 original copy 1
test prod1
 
File 2 removed 5 words 1
File 2 removed 5 words 1File 2 removed 5 words 1
File 2 removed 5 words 1
test prod1
 
File 5 extra four slides 1
File 5 extra four slides 1File 5 extra four slides 1
File 5 extra four slides 1
test prod1
 
Unique file 7
Unique file 7Unique file 7
Unique file 7
test prod1
 
File 5 extra slide 2
File 5 extra slide 2File 5 extra slide 2
File 5 extra slide 2
test prod1
 
Unique file 15
Unique file 15Unique file 15
Unique file 15
test prod1
 
Unique file 14
Unique file 14Unique file 14
Unique file 14
test prod1
 
Unique file 11
Unique file 11Unique file 11
Unique file 11
test prod1
 
File 2 removed word 2
File 2 removed word 2File 2 removed word 2
File 2 removed word 2
test prod1
 
File 2 four extra slides 2
File 2 four extra slides 2File 2 four extra slides 2
File 2 four extra slides 2
test prod1
 
File 5 removed 1 slide 1
File 5 removed 1 slide 1File 5 removed 1 slide 1
File 5 removed 1 slide 1
test prod1
 
Lead form geo testing eu -DO NOT DELETE
Lead form geo testing eu -DO NOT DELETELead form geo testing eu -DO NOT DELETE
Lead form geo testing eu -DO NOT DELETE
test prod1
 

Viewers also liked (18)

Unique file 5
Unique file 5Unique file 5
Unique file 5
 
Qa course total pdf
Qa course total pdfQa course total pdf
Qa course total pdf
 
File 5 extra slide 1
File 5 extra slide 1File 5 extra slide 1
File 5 extra slide 1
 
File 3 extra four slides 2
File 3 extra four slides 2File 3 extra four slides 2
File 3 extra four slides 2
 
Unique file 3
Unique file 3Unique file 3
Unique file 3
 
File 5 original copy 1
File 5 original copy 1File 5 original copy 1
File 5 original copy 1
 
File 2 removed 5 words 1
File 2 removed 5 words 1File 2 removed 5 words 1
File 2 removed 5 words 1
 
File 5 extra four slides 1
File 5 extra four slides 1File 5 extra four slides 1
File 5 extra four slides 1
 
Unique file 7
Unique file 7Unique file 7
Unique file 7
 
File 5 extra slide 2
File 5 extra slide 2File 5 extra slide 2
File 5 extra slide 2
 
Unique file 15
Unique file 15Unique file 15
Unique file 15
 
Unique file 14
Unique file 14Unique file 14
Unique file 14
 
Unique file 4
Unique file 4Unique file 4
Unique file 4
 
Unique file 11
Unique file 11Unique file 11
Unique file 11
 
File 2 removed word 2
File 2 removed word 2File 2 removed word 2
File 2 removed word 2
 
File 2 four extra slides 2
File 2 four extra slides 2File 2 four extra slides 2
File 2 four extra slides 2
 
File 5 removed 1 slide 1
File 5 removed 1 slide 1File 5 removed 1 slide 1
File 5 removed 1 slide 1
 
Lead form geo testing eu -DO NOT DELETE
Lead form geo testing eu -DO NOT DELETELead form geo testing eu -DO NOT DELETE
Lead form geo testing eu -DO NOT DELETE
 

Similar to File 1 extra slide 1

File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2
test prod1
 
File 1 word removed 2
File 1 word removed 2File 1 word removed 2
File 1 word removed 2
test prod1
 
File 1 original
File 1 originalFile 1 original
File 1 original
test prod1
 
File 1 copy 1
File 1 copy 1File 1 copy 1
File 1 copy 1
test prod1
 
File 1 copy 2
File 1 copy 2File 1 copy 2
File 1 copy 2
test prod1
 
File 1 removed 5 words 2
File 1 removed 5 words 2File 1 removed 5 words 2
File 1 removed 5 words 2
test prod1
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1
test prod1
 
File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1
test prod1
 
File 1 word removed 1
File 1 word removed 1File 1 word removed 1
File 1 word removed 1
test prod1
 
File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2
test prod1
 
Risk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your ProjectRisk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your Project
Gagan Gupta
 
C03.10-ProjectClosing.key.pdf
C03.10-ProjectClosing.key.pdfC03.10-ProjectClosing.key.pdf
C03.10-ProjectClosing.key.pdf
ssuser8babb7
 
PMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for ProfessionalsPMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for Professionals
Daniel_Mccrea
 
The art of execution
The art of executionThe art of execution
The art of execution
Crystal Taggart
 
SGCI Extended Developer Support All Hands 15march2017
SGCI Extended Developer Support All Hands 15march2017SGCI Extended Developer Support All Hands 15march2017
SGCI Extended Developer Support All Hands 15march2017
Marlon Pierce
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya g
Satyanarayana Gande
 
Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)
Arvin Dela Cruz
 
Rescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software ProjectsRescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software Projects
Barry Curry
 
Project management by example
Project management by exampleProject management by example
Project management by example
Sarah Eggleston
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
SAMPREET3
 

Similar to File 1 extra slide 1 (20)

File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2
 
File 1 word removed 2
File 1 word removed 2File 1 word removed 2
File 1 word removed 2
 
File 1 original
File 1 originalFile 1 original
File 1 original
 
File 1 copy 1
File 1 copy 1File 1 copy 1
File 1 copy 1
 
File 1 copy 2
File 1 copy 2File 1 copy 2
File 1 copy 2
 
File 1 removed 5 words 2
File 1 removed 5 words 2File 1 removed 5 words 2
File 1 removed 5 words 2
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1
 
File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1
 
File 1 word removed 1
File 1 word removed 1File 1 word removed 1
File 1 word removed 1
 
File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2
 
Risk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your ProjectRisk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your Project
 
C03.10-ProjectClosing.key.pdf
C03.10-ProjectClosing.key.pdfC03.10-ProjectClosing.key.pdf
C03.10-ProjectClosing.key.pdf
 
PMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for ProfessionalsPMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for Professionals
 
The art of execution
The art of executionThe art of execution
The art of execution
 
SGCI Extended Developer Support All Hands 15march2017
SGCI Extended Developer Support All Hands 15march2017SGCI Extended Developer Support All Hands 15march2017
SGCI Extended Developer Support All Hands 15march2017
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya g
 
Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)
 
Rescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software ProjectsRescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software Projects
 
Project management by example
Project management by exampleProject management by example
Project management by example
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
 

More from test prod1

Ppt11
Ppt11Ppt11
Ppt11
test prod1
 
Do notdelete
Do notdeleteDo notdelete
Do notdelete
test prod1
 
Do notdelete
Do notdeleteDo notdelete
Do notdelete
test prod1
 
7
77
Lead form geo testing us -DO NOT DELETE
Lead form geo testing us -DO NOT DELETELead form geo testing us -DO NOT DELETE
Lead form geo testing us -DO NOT DELETE
test prod1
 
Lead form geo testing in -DO NOT DELETE
Lead form geo testing in -DO NOT DELETELead form geo testing in -DO NOT DELETE
Lead form geo testing in -DO NOT DELETE
test prod1
 
Unique file 12
Unique file 12Unique file 12
Unique file 12
test prod1
 
Unique file 10
Unique file 10Unique file 10
Unique file 10
test prod1
 
Unique file 9
Unique file 9Unique file 9
Unique file 9
test prod1
 
Unique file 8
Unique file 8Unique file 8
Unique file 8
test prod1
 
File 5 removed 5 words 2
File 5 removed 5 words 2File 5 removed 5 words 2
File 5 removed 5 words 2
test prod1
 
File 5 removed 5 words 1
File 5 removed 5 words 1File 5 removed 5 words 1
File 5 removed 5 words 1
test prod1
 
File 5 removed 4 slides 2
File 5 removed 4 slides 2File 5 removed 4 slides 2
File 5 removed 4 slides 2
test prod1
 
File 5 removed 4 slides 1
File 5 removed 4 slides 1File 5 removed 4 slides 1
File 5 removed 4 slides 1
test prod1
 
File 5 removed 1 word from 5 slides 2
File 5 removed 1 word from 5 slides 2File 5 removed 1 word from 5 slides 2
File 5 removed 1 word from 5 slides 2
test prod1
 
File 5 removed 1 word from 5 slides 1
File 5 removed 1 word from 5 slides 1File 5 removed 1 word from 5 slides 1
File 5 removed 1 word from 5 slides 1
test prod1
 
File 5 removed 1 word 2
File 5 removed 1 word 2File 5 removed 1 word 2
File 5 removed 1 word 2
test prod1
 
File 5 removed 1 word 1
File 5 removed 1 word 1File 5 removed 1 word 1
File 5 removed 1 word 1
test prod1
 

More from test prod1 (20)

Ppt11
Ppt11Ppt11
Ppt11
 
Do notdelete
Do notdeleteDo notdelete
Do notdelete
 
Do notdelete
Do notdeleteDo notdelete
Do notdelete
 
7
77
7
 
Lead form geo testing us -DO NOT DELETE
Lead form geo testing us -DO NOT DELETELead form geo testing us -DO NOT DELETE
Lead form geo testing us -DO NOT DELETE
 
Lead form geo testing in -DO NOT DELETE
Lead form geo testing in -DO NOT DELETELead form geo testing in -DO NOT DELETE
Lead form geo testing in -DO NOT DELETE
 
Unique file 12
Unique file 12Unique file 12
Unique file 12
 
Unique file 10
Unique file 10Unique file 10
Unique file 10
 
Unique file 9
Unique file 9Unique file 9
Unique file 9
 
Unique file 8
Unique file 8Unique file 8
Unique file 8
 
Unique file 2
Unique file 2Unique file 2
Unique file 2
 
Unique file 1
Unique file 1Unique file 1
Unique file 1
 
File 5 removed 5 words 2
File 5 removed 5 words 2File 5 removed 5 words 2
File 5 removed 5 words 2
 
File 5 removed 5 words 1
File 5 removed 5 words 1File 5 removed 5 words 1
File 5 removed 5 words 1
 
File 5 removed 4 slides 2
File 5 removed 4 slides 2File 5 removed 4 slides 2
File 5 removed 4 slides 2
 
File 5 removed 4 slides 1
File 5 removed 4 slides 1File 5 removed 4 slides 1
File 5 removed 4 slides 1
 
File 5 removed 1 word from 5 slides 2
File 5 removed 1 word from 5 slides 2File 5 removed 1 word from 5 slides 2
File 5 removed 1 word from 5 slides 2
 
File 5 removed 1 word from 5 slides 1
File 5 removed 1 word from 5 slides 1File 5 removed 1 word from 5 slides 1
File 5 removed 1 word from 5 slides 1
 
File 5 removed 1 word 2
File 5 removed 1 word 2File 5 removed 1 word 2
File 5 removed 1 word 2
 
File 5 removed 1 word 1
File 5 removed 1 word 1File 5 removed 1 word 1
File 5 removed 1 word 1
 

File 1 extra slide 1

  • 2. Project Management is the dynamic process that utilizes the appropriate resources of the organization in a controlled and structured manner, to achieve some clearly defined objectives identified as strategic needs. It is always conducted within a defined set of constraints. 8/7/2014 Gagan Gupta
  • 3. • st et expedita distinctio. Nam libero tempore, cum soluta nobis est eligendi optio cumque nihil impedit quo minus id quod maxime placeat facere possimus, omnis voluptas as 8/7/2014 Gagan Gupta
  • 5. • A Project is considered as Failure…… Whenever a project doesn’t meet to the expectation of the Stakeholders. 8/7/2014 Gagan Gupta
  • 6. • Cost & Time Over-runs • Quality Degradation • Frustration & Stress: sometime resulting in people quitting • Low Job Satisfaction • Low Corporate Market Value • Low Public Opinion • Negative Media Campaigns • May even force the company into Closure 8/7/2014 Gagan Gupta
  • 8. Also Known as “You’d like it, just a bit bigger. No Problem.” Oh Still a bit Bigger……. OK Even Bigger? It wasn’t in the plan but Okay…. 8/7/2014 Gagan Gupta When Scope creeps, the end results is always more work than expected.
  • 9. • Problems: – The changes that were not initially planned for, are added to project. – The Project takes longer and costs more than planned and there is no record of WHY?? • Causes: – Not having a method to handle or recognize changes. • What to do: – Document the change management process to be used and followed by Project Team. – Educate the project Team to recognize a change or deviation from the Plan. – Follow the Change Management Process. 8/7/2014 Gagan Gupta
  • 10. 8/7/2014 Gagan Gupta • Problems: – Team Members do not have the information they need when they need it. – Issues or changes do not get escalated. – Project reporting is sluggish • Causes: – The project’s communication plan was not completed. – The project’s communication plan doesn’t have enough details. • What to do: – Find out the communication requirements of all team members, and stakeholders, then document them in a common plan, and then follow the Plan.
  • 11. 8/7/2014 Gagan Gupta • You do not have enough people, the right skill-sets, or the team is not committed to the projects. • Problems: – Tasks take longer than expected to complete. – Deadlines and milestones get missed. – Project completion date comes into jeopardy. – You end up working double shifts to complete all the works.
  • 12. • Causes: – There was no pre-commitment of resources to the projects. – The Project was not supported. – There was no analysis and documentation of all skill-set required. • What to do: – Get executives Sponsorship for the project. – Document which resources and skill-sets are needed to get the job done. – Create a plan that gives enough time to get the job done with the allocated resources. – Pre-assign the required resources to the team. 8/7/2014 Gagan Gupta
  • 13. 8/7/2014 Gagan Gupta • “I would like a set of stairs that leads up to a bridge.” • Problems: – Customer will be unhappy. – Customer will complain and you will end up doing the what they want- at your expense.
  • 14. • Causes: – What the customer wants, was not clearly documented. – What you believe the customer wants is different that what the customer believes they have asked for? • What to do: – Find out and document exactly what the customer wants. – Inform everybody of the project scope. – Document Business, Functional and technical requirements. 8/7/2014 Gagan Gupta
  • 15. 8/7/2014 Gagan Gupta • How do you figure out how long the project will take? • Problems: – An unrealistic timeline or budget will be agreed to. – You will not be able to do all the work in the time allocated.
  • 16. • Causes: – No formal estimating method – Estimate confidence is law. – Volume of work not understood • What to do: – List all the work as well as possible. – Estimate each work package. – Add up all work packages. – Always give answer using a range of dates 8/7/2014 Gagan Gupta
  • 17. 8/7/2014 Gagan Gupta • Sorry about the project, I left it in my car & there was a bit of an incidents. • Problems: – Unexpected events cause delays. – Domino effect of thing going wrong.
  • 18. • Causes: – No Formal Risk Management. – Just try to predict the big things that can go wrong. – It’s the sum of the all little things that make a project late. – Nothing is more stressful than trying to keep on schedule when unexpected things keep happening. • What to do: – List all the work as well as possible. – Figure out what can go wrong with each piece of work. – Prioritize each risk as High/ Medium/ Low Probability or impact. – Sort the list. – Create a plan to deal with the risks at the top of list. 8/7/2014 Gagan Gupta
  • 19. 8/7/2014 Gagan Gupta • “Emergency Phone installed, Deliverable completed” • Problems: – Difficult to get the agreement that the product is finished. – Customer Keep wanting more, saying you didn’t do it to their Specification.
  • 20. • Causes: – The Milestones or deliverables were not measurable. – The customer never told us How many they wanted So we just assumed 1, • What to do: – Ensure Milestones or Deliverables are: Clearly Defined Measurable (Quantifiable) 8/7/2014 Gagan Gupta
  • 21. 8/7/2014 Gagan Gupta • Of course we Can do that for you. • Problems: – There was little or no planning before deciding you can get the job done. – The task you agree to turns out to be more work than expected. – It takes you longer and jeopardizes other deliverables.
  • 22. • Causes: – Not enough time spent planning. – You may have been pressured into giving an answer right then and there. – Didn’t have a full understanding of the work involved before committing. • What to do: – Take the time to fully understand the work before agreeing to it. – Its okay to say the work is not possible or will take too long – Only agree to work when you’re sure it can be done, this will benefit you and your managers. 8/7/2014 Gagan Gupta
  • 23. 8/7/2014 Gagan Gupta • Hurry .... We have a tight deadline. No time to plan. Just start digging. • Problems: – The plan is flawed from the start. – The project gets out of control and can’t be recovered.
  • 24. • Causes: – You have to do the work and weren’t also given time for project management. – Perhaps you only have 10% or 20% allotment for the project management duties. • What to do: – Planning a project is like setting out a roadmap. Without it you will likely get lost. – Controlling a project is like driving a car. You have to continuously watch the road (the Plan) and make little adjustments. 8/7/2014 Gagan Gupta
  • 25. 8/7/2014 Gagan Gupta • I think I know how this helmet goes on. I have been riding scooters for two years now. • Problems: – Your project don’t finish on time. – Your project are always squeezed at the end. – Your project are stressful. – You have to deal with unrealistic expectation or customers. – You feel your projects are out of control.
  • 26. • Causes: – People often don’t know what they don’t know. – Their project are out of control but they don’t know WHY?? – They feel they are doing okay but could benefit from formal project management education. • What to do: – Learn the methods, tools, and techniques successful Project manager use to initiate, plan, execute and control their projects. 8/7/2014 Gagan Gupta