Stages
• Mixing of coating material
• Surface preparation
• Application
• Joint fit‐up
• Welding
• Testing
Prepared By          V.Johnson Prabu
Coating Material
SINMAST
• SINMAST joining compound is used for 
bonding cement lined piping components.
• Sinmast is a 2 component , solvent free 
product based on Epoxy Resins
• Component A – Resin (0.945kg)
• Component B – Hardener (Ethylamine , 
Isopropylideendifenol) (0.055kg )
Prepared By          V.Johnson Prabu
Coating material
• Component A
• Component B 
Prepared By          V.Johnson Prabu
Coating Material
Mixing
• Both component A & B mixed together
• To avoid wastage it can be divided into 10 
parts and use it as required.
• The pot life of mixed component is 25min @ 
20o C approx. ( Working Time )
• The hardening time is 8hrs @ 20o C approx.
Prepared By          V.Johnson Prabu
Coating Material
Mixing
• Component A 
Total weight  = 945 gm
1/10 part  = 94.5 gm
Prepared By          V.Johnson Prabu
Coating Material
Mixing
• Usually One full cap of the can is equal to 1/10 
part. ( Measure it before mixing and conform)
Prepared By          V.Johnson Prabu
Coating Material
Mixing
Prepared By          V.Johnson Prabu
Surface Preparation
• The mating steel surface shall be free from oil, 
rust, burs and other foreign material.
Prepared By          V.Johnson Prabu
Application 
• Apply the mixed coating material gentily on 
the sleeve side at an angle of 45o approx.
• Remove the excess material.
• The join the mating surface and apply slight 
pressure. ( usually after joining you can find 
3mm difference )
Prepared By          V.Johnson Prabu
Application 
Prepared By          V.Johnson Prabu
Joint Fit‐up
Prepared By          V.Johnson Prabu
Joint Fit‐up
• Only tack weld the joint at three locations
• Remember : Joint shall be weld after 12 hrs
Prepared By          V.Johnson Prabu
Welding
• Do not move the joint after fit up.
• Support the line adequately to restrict the 
movement.
• After 12 hrs (ie; hardening time of coating 
material ) the joint is ready for welding.
Prepared By          V.Johnson Prabu
Welding
• Now the joint is ready for Further Testing
Prepared By          V.Johnson Prabu
Thank you !
Prepared By          V.Johnson Prabu

More Related Content

What's hot

Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas EngineerPiping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Varun Patel
 
DP acco. to DS1-converti.pptx
DP acco. to DS1-converti.pptxDP acco. to DS1-converti.pptx
DP acco. to DS1-converti.pptx
majdijerbi3
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
ram111eg
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
David H Moloney
 
7) hydro test 3
7) hydro test 37) hydro test 3
7) hydro test 3
ALISAB123
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works
Shaik Mohsin
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
MOHAMMAD ATIF ALI
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
Aanand Subi
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
AshifuddinAli
 
Piping handbook
Piping handbookPiping handbook
Piping handbook
pdmsguy
 
Material approval procedure
Material approval procedureMaterial approval procedure
Material approval procedure
Mohammad Eyaz Ansari
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
Jithu John
 
valve maintenance-packing-replacement
valve maintenance-packing-replacementvalve maintenance-packing-replacement
valve maintenance-packing-replacement
Izzuwan Yusoff
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paint
Minh Bui Si
 
Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginners
MOHAMMAD ATIF ALI
 
Itp
ItpItp
Method of Statement - Road furniture works
Method of Statement - Road furniture worksMethod of Statement - Road furniture works
Method of Statement - Road furniture works
Mohd Nizam Mohd Zan
 
WPS & WPQ
WPS & WPQWPS & WPQ
Method statement painting
Method statement painting Method statement painting
Method statement painting
Daniel SLSA CLA
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001
Minh Bui Si
 

What's hot (20)

Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas EngineerPiping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
 
DP acco. to DS1-converti.pptx
DP acco. to DS1-converti.pptxDP acco. to DS1-converti.pptx
DP acco. to DS1-converti.pptx
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
 
7) hydro test 3
7) hydro test 37) hydro test 3
7) hydro test 3
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
 
Piping handbook
Piping handbookPiping handbook
Piping handbook
 
Material approval procedure
Material approval procedureMaterial approval procedure
Material approval procedure
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
 
valve maintenance-packing-replacement
valve maintenance-packing-replacementvalve maintenance-packing-replacement
valve maintenance-packing-replacement
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paint
 
Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginners
 
Itp
ItpItp
Itp
 
Method of Statement - Road furniture works
Method of Statement - Road furniture worksMethod of Statement - Road furniture works
Method of Statement - Road furniture works
 
WPS & WPQ
WPS & WPQWPS & WPQ
WPS & WPQ
 
Method statement painting
Method statement painting Method statement painting
Method statement painting
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001
 

Viewers also liked

CSWIP 3.2.2 renewal after 10 years exam Tips.
CSWIP 3.2.2 renewal after 10 years exam Tips.CSWIP 3.2.2 renewal after 10 years exam Tips.
CSWIP 3.2.2 renewal after 10 years exam Tips.
Johnson Prabu
 
458
458458
Lethal service quick guide
Lethal service   quick guideLethal service   quick guide
Lethal service quick guide
José Juan Jiménez Alejandro
 
Pipe Welding Procedures
Pipe Welding ProceduresPipe Welding Procedures
Pipe Welding Procedures
miguel angel villarroel zabala
 
Welding of pipelines
Welding of pipelinesWelding of pipelines
Welding of pipelines
kannanrajagopal
 
WeldingBook - Management and control of plant welds
WeldingBook - Management and control of plant weldsWeldingBook - Management and control of plant welds
WeldingBook - Management and control of plant welds
Gian Mario Tagliaretti
 
Digital photo slide project
Digital photo slide projectDigital photo slide project
Digital photo slide project
BigPanda64
 
Fady CV
Fady CVFady CV
Fady CV
Fady Rady
 
Sense and Sensitivities: A Review of David J. Linden's Touch: The Science of ...
Sense and Sensitivities: A Review of David J. Linden's Touch: The Science of ...Sense and Sensitivities: A Review of David J. Linden's Touch: The Science of ...
Sense and Sensitivities: A Review of David J. Linden's Touch: The Science of ...
Susanne Thomas, PhD
 
1maghasad s l_ncreakci_sazatomreaktor
1maghasad s l_ncreakci_sazatomreaktor1maghasad s l_ncreakci_sazatomreaktor
1maghasad s l_ncreakci_sazatomreaktorSzekelyDavid54
 
My future vacation
My future vacationMy future vacation
My future vacation
21kpro427w
 
Alessandra jo haber
Alessandra jo haberAlessandra jo haber
Alessandra jo haber
L Ghawdxija Grace
 

Viewers also liked (12)

CSWIP 3.2.2 renewal after 10 years exam Tips.
CSWIP 3.2.2 renewal after 10 years exam Tips.CSWIP 3.2.2 renewal after 10 years exam Tips.
CSWIP 3.2.2 renewal after 10 years exam Tips.
 
458
458458
458
 
Lethal service quick guide
Lethal service   quick guideLethal service   quick guide
Lethal service quick guide
 
Pipe Welding Procedures
Pipe Welding ProceduresPipe Welding Procedures
Pipe Welding Procedures
 
Welding of pipelines
Welding of pipelinesWelding of pipelines
Welding of pipelines
 
WeldingBook - Management and control of plant welds
WeldingBook - Management and control of plant weldsWeldingBook - Management and control of plant welds
WeldingBook - Management and control of plant welds
 
Digital photo slide project
Digital photo slide projectDigital photo slide project
Digital photo slide project
 
Fady CV
Fady CVFady CV
Fady CV
 
Sense and Sensitivities: A Review of David J. Linden's Touch: The Science of ...
Sense and Sensitivities: A Review of David J. Linden's Touch: The Science of ...Sense and Sensitivities: A Review of David J. Linden's Touch: The Science of ...
Sense and Sensitivities: A Review of David J. Linden's Touch: The Science of ...
 
1maghasad s l_ncreakci_sazatomreaktor
1maghasad s l_ncreakci_sazatomreaktor1maghasad s l_ncreakci_sazatomreaktor
1maghasad s l_ncreakci_sazatomreaktor
 
My future vacation
My future vacationMy future vacation
My future vacation
 
Alessandra jo haber
Alessandra jo haberAlessandra jo haber
Alessandra jo haber
 

Field Joint of Cement lined Pipe