Project Overview
Organizational Chart
2
Motor Fuel
and Tax Evasion
Ralph Davis
Team Lead
Highway System
Performance
Vacant
Team Lead
Highway Finance
and Recovery Act
Chris Allen
Team Lead
Travel Monitoring
and Surveys
Tianjia Tang, PE
Team Lead
Mike Slattery
Clarissa Smith
Monique Snow
Ron Vaughn
Maria Bonilla
Tychelle Staten
Paolo Angulo
Chris Lehner
Justin Clarke
Ron Erickson
Joe Hausman
Tom Roff
Rob Rozycki
Ron Vaughn
Mike Dougherty
Bryant Gross
Dawn Edwards
Brad Gudzinas
Danny Jenkins, PE
Steven Jessberger
David Jones
Adella Santos
Patrick Zhang, PE
Danielle Gray
Project Introduction
• On August 7, 2012, FHWA announced that the HPMS is
expanding the requirement for State DOTs to submit their LRS
to include all public roads, and to provide facilities that are
divided highways or dual carriageways (as independent
features where applicable)
• This requirement will be referred to as the All Road Network
of Linear Referenced Data (ARNOLD)
• Many states will be challenged by this requirement, but this
project will produce guidance materials to help implement
ARNOLD at the state level
3
Project Team
• US DOT
• Joe Hausman (Project Manager)
• Tom Roff (ARNOLD Lead)
• Justin Clarke (Team Lead)
• Contractors
• Applied Geographics, Inc. (Prime Contractor)
• David R. Fletcher (Subcontractor)
• Michael Baker Jr., Inc. (Subcontractor)
• Expert Panel
• Mark Sarmiento – FHWA Planning
• Mike Neathery – FHWA Planning
• Robert Pollack – FHWA Safety
• Stuart Thompson – FHWA Safety
• Maria Chau – FHWA NY Division
• Dave Blackstone – Ohio DOT
• Frank Pisani – Utah DOT
• Frank DeSendi – Pennsylvania DOT
• Keith Dotson – Kentucky Transportation
• Sharon Hawkins – Arkansas HDT
• James Meyer – Arizona DOT
• Michele Barnes – University of Michigan
4
Project Overview
• Task 1: Project Schedule, Risk Assessment and leverage the US DOT
–GIO TFTN Strategic Plan
• Task 2: Local Road LRS Development
• Task 3: Statewide government and private LRS Best Practices
• Task 4: LRS Temporal Maintenance
• Task 5: LRS System Component Reference
• Task 6: Technical Reference manual assembling information
gathered from tasks 2-5
- in progress
- in progress
5
Overall Project Workplan
6
Task 1
Work Plan and
Compliance
Task 2
Local Road Collection
Task 3
LRS Components and
Best Practices
Task 4
Examine LRS Temporal
Maintenance
Task 5
LRS System Component
Reference
Task 6
Technical Reference Manual
All Tasks inform the final
Reference Manual
Information gathered
builds on previous tasks
Task 1 – Project Website
7
Task 1 – Risk Assessment
8
1. State
Compliance with
ARNOLD
requirements
3. Impact on
Potential
Consumers of
ARNOLD
2. USDOT/FHWA’s
ability to produce
the nationwide
ARNOLD
Risks
Considered
Task 1 – RiskAssessment
Risk 1: State Compliance
Most frequently cited challenges
• Limited resources
• Data maintenance
• Data collection
• LRS technical issues
• Understanding of methodology and
requirements
• Communicating benefits of program
to stakeholders and leadership
Based on review of State HPMS Plans
9
59%
10%
31%
Likelihood of States Implementing
ARNOLD
by June 2014 Deadline
High
Med
Low
Task 1 – RiskAssessment
Likelihood of States Implementing ARNOLD
Based on review of State HPMS Plans
10
Green States are most
likely to meet the June
2014 due date for
having All Public Roads
Linear Referenced
Task 1 – RiskAssessment
Risk 2: USDOT/FHWA’s Ability to Produce
Nationwide ARNOLD
FHWA needs to be able to build and maintain a
complex integrated dataset, which requires:
11
ARNOLD
FHWA Technology
and Methods
FHWA Staff
and Expertise
FHWA Policy Support
and Leadership
FHWA
Budget
Task 1 – Risk Assessment
Risk3: Impacton PotentialConsumersof
ARNOLD
"build once, use many times"
Certain systems and products are at risk if ARNOLD does not succeed
Systems at Risk: Internal to USDOT
• USDOT RITA/BTS: National Transportation Data Atlas
• USDOT Office of Planning, Environment, and Realty: National Highway
Planning Network
12
Task 1 – Risk Assessment
Risk3: Impacton PotentialConsumersof
ARNOLD
Systems at Risk: External to USDOT
• The following provides an overview of non-USDOT
systems that are at risk, or face higher costs if
ARNOLD does not come into being:
• National Spatial Data Infrastructure, the Geospatial
Platform, and The National Map
• US Census Bureau TIGER and LUCA data
• FCC National Broadband Map (which currently uses
TIGER data)
• Open Street Map
• Commercial Navigation Data Systems
13
Task 1 – TFTN Alignment
• The Study supports and is aligned
with the following TFTN Next Steps:
• Continue working with
Stakeholders/advocates to sustain support
for TFTN
• Work with Stakeholders/advocates to gain
support for TFTN implementation
The Study is aimed at State DOT business and data processes to
support HPMS reporting requirements, whereas the TFTN is a national
initiative. Consequently while the Study may provide precedent data
necessary for the TFTN, it is not directly concerned with the strategy
or next steps laid out in the TFTN Strategic Plan.
14
Task 1 – TFTN Alignment
• Alignment occurs along several axes:
• The overall Study goals are consistent with the TFTN Strategic Vision.
• Technical tasks of the Study support the TFTN goal to establish LRS
guidelines.
• Technical tasks of the Study also support TFTN Phase 2 (statewide
production of LRS data).
• The Contractor for this Study was also involved with the development of
the TFTN Strategic Plan, ensuring institutional continuity of the deep
knowledge implicitly incorporated in the TFTN.
15
Task 1 – TFTN Alignment
TFTN Direct ARNOLD Alignment Indirect ARNOLD Alignment
Development Strategy
Catalyze development of TFTN via FHWA HPMS reporting requirements
X
Support States in developing statewide inventories
X
Aggregate state-level data into nationwide map and publish data to stakeholders.
X
Keep the TFTN current: data update and maintenance
X
Next Steps
Continue working with Stakeholders/advocates to sustain support for TFTN
X
FHWA determination on whether to require states to provide complete, statewide
road geometry X
Assemble Internal USDOT TFTN Committee to establish inter-departmental
cooperative agreements X
Assemble funding necessary for Business Planning and prototyping
X
Development of Detailed Business & Implementation Plan
X
Formally engage US Census, and other potential partners, for inter-departmental
agreements
X
Work with Stakeholders/advocates to gain support for TFTN implementation
X
Commence TFTN operational implementation
X 16
Assessing alignment of various TFTN goals with ARNOLD goals
Task 2 - Local Road Collection
Currently in Progress
• Interview FHWA approved entities on Business Processes and
viability
• DOT (5)
• Local Government (2)
• MPOs (2)
• Develop Approach for States for All Public Roads LRS
• Must include on-going maintenance of roadways
• Write and Deliver Systematic Approach Report
• Circa November
17
Task 3 - LRS Components and Best
Practices
Currently in Progress
• Literature Review
• Document Best Overall Practices from Task 2 respondents +
private industry
• Write and Deliver Current Best Practices Assessment Report
• Circa December
18
Task 2 + 3
Best Practices Framework
Assess States Supply Chain Patterns
1. Local governments supply geospatial road data to the DOT
2. A third party (non-DOT) creates statewide data and supplies
it to the DOT
3. Hybrid approach whereas the state gathers as much as
possible from a non-DOT entity (e.g regional agency or
clearinghouse), and then gets the rest from locals
4. The DOT does it all
19
Task 2 + 3
Supply Chain Pattern #1
20
State
DOT
County
DOT
City
DOT
MPO
Federal
Land
Agency
Private
Land
Owner
Local governments supply geospatial road data to the DOT
Task 2 + 3
Supply Chain Pattern #2
21
A third party (non-DOT) creates statewide
data and supplies it to the DOT
State
DOT
Geodata
Supplier
County
DOT
City
DOT
MPO
Federal
Land
Agency
Private
Land
Owner
Volunteer
Geographic
Data (VGI)
Task 2 + 3
Supply Chain Pattern #3
22
Hybrid approach
Volunteer
Geographic
Data (VGI)
Geodata
Supplier
County
DOT
City
DOT
MPO
Federal
Land
Agency
Private
Land
Owner
State
DOT
County
DOT
City
DOT
Task 2 + 3
Supply Chain Pattern #4
23
The DOT does it all
State
DOT
Task 2 + 3
Best Practices Framework
Categorize Local Roads Level of Maturity using
Common Baseline Network Requirements
24
Road
Centerline
Geometry
All public and
private highways,
roads and streets
Dual carriageway
representation
Updated/certified
annually
1:24,000 scale
Basic Road
Centerline
Attributes
Persistent road ID
number
Road/street name
Functional Class
Year
State
Address
Ranges
Right side/left side
address ranges
Urban and rural
addresses used for
E911
LRS Control
Linear precision:
0.001 miles
Centerline Mileage
Begin/ End
accuracy: 0.001
miles
Network/
Linear
Topology
Common topology
for road network
models (e.g. spatial
analysis, buffering)
(D R A F T)
Task 4
Examine LRS Temporal Maintenance
• Identify mechanisms (methods, tools, best
practices) for ongoing data maintenance
• Use NCHRP 2027
• Develop recommendations informed by tasks 2
and 3
• Consider existing cost/ benefit analysis
• Write and Deliver Maintenance Plan Report
Document
• Completed six (6) months after award (1/18/14)
25
Task 5
LRS System Components reference
• Literature review of LRS business rules based on respondents from Task 2
• Federal
• State (DOT)
• Local Governments
• MPO’s
• Private Sector
• Develop technical requirements for LRS systems
• Research existing best practices and business rules
• Synthesis and simplification of existing technical instruction manuals
• Consider impact of enterprise business factors
• Write and Deliver Technical Instructions Manual
• Completed eight (8) months after award (3/18/14)
26
Task 6
Technical Reference Manual
• Write and Deliver Final Technical Reference Manual
summarizing Tasks 1-5
• Quantitative Outcomes and Feasibility Assessment
• Draft: Completed within nine (9) months of award
(4/18/14)
• Final: Completed within eleven (11) months of award
(6/18/14)
• PowerPoint presentation about final Technical Reference
Manual
27
Questions
and
Discussion
28

More Related Content

What's hot

TPO FPC SMART Financial Plan Framework presentation
TPO FPC SMART Financial Plan Framework presentationTPO FPC SMART Financial Plan Framework presentation
TPO FPC SMART Financial Plan Framework presentation
Miami-Dade Transportation Planning Organization
 
Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014State of Georgia
 
Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final documentDonna Lum
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewMelissaARC
 
Draft FERC EIS for NEXUS Pipeline
Draft FERC EIS for NEXUS PipelineDraft FERC EIS for NEXUS Pipeline
Draft FERC EIS for NEXUS Pipeline
Marcellus Drilling News
 
Aug7_2012_and_what_is_ARNOLD
Aug7_2012_and_what_is_ARNOLDAug7_2012_and_what_is_ARNOLD
Aug7_2012_and_what_is_ARNOLDJohn Formby
 
FERC DEIS for Mountain Valley Project and Equitrans Expansion Project
FERC DEIS for Mountain Valley Project and Equitrans Expansion ProjectFERC DEIS for Mountain Valley Project and Equitrans Expansion Project
FERC DEIS for Mountain Valley Project and Equitrans Expansion Project
Marcellus Drilling News
 
Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...
Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...
Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...
RPO America
 
Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019
LSCOG
 
Kyova cert review_presentation
Kyova cert review_presentationKyova cert review_presentation
Kyova cert review_presentation
pyoungkyova
 
Georgia broadband deployment initiative overview
Georgia broadband deployment initiative overviewGeorgia broadband deployment initiative overview
Georgia broadband deployment initiative overview
State of Georgia
 
Lewis tftn ngac_09232010
Lewis tftn ngac_09232010Lewis tftn ngac_09232010
Lewis tftn ngac_09232010Koniag
 
FHWA Update
FHWA UpdateFHWA Update
FHWA Update
Jill Reeves
 
Ric mpo certification_review_presentation
Ric mpo certification_review_presentationRic mpo certification_review_presentation
Ric mpo certification_review_presentation
pyoungkyova
 
NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)
NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)
NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)
North Dakota GIS Hub
 
Mac Plan 2006
Mac Plan 2006Mac Plan 2006
Mac Plan 2006darciea
 
What's under the cover 20111019
What's under the cover   20111019What's under the cover   20111019
What's under the cover 20111019
NebraskaBroadband
 
Capital Improvement Saratoga 03 31-2021 council agenda packet
Capital Improvement Saratoga 03 31-2021 council agenda packetCapital Improvement Saratoga 03 31-2021 council agenda packet
Capital Improvement Saratoga 03 31-2021 council agenda packet
Rishi Kumar
 

What's hot (20)

TPO FPC SMART Financial Plan Framework presentation
TPO FPC SMART Financial Plan Framework presentationTPO FPC SMART Financial Plan Framework presentation
TPO FPC SMART Financial Plan Framework presentation
 
Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014
 
Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final document
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update Overview
 
Draft FERC EIS for NEXUS Pipeline
Draft FERC EIS for NEXUS PipelineDraft FERC EIS for NEXUS Pipeline
Draft FERC EIS for NEXUS Pipeline
 
Aug7_2012_and_what_is_ARNOLD
Aug7_2012_and_what_is_ARNOLDAug7_2012_and_what_is_ARNOLD
Aug7_2012_and_what_is_ARNOLD
 
FERC DEIS for Mountain Valley Project and Equitrans Expansion Project
FERC DEIS for Mountain Valley Project and Equitrans Expansion ProjectFERC DEIS for Mountain Valley Project and Equitrans Expansion Project
FERC DEIS for Mountain Valley Project and Equitrans Expansion Project
 
Legislative Redistricting
Legislative RedistrictingLegislative Redistricting
Legislative Redistricting
 
Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...
Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...
Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...
 
Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019
 
Kyova cert review_presentation
Kyova cert review_presentationKyova cert review_presentation
Kyova cert review_presentation
 
Georgia broadband deployment initiative overview
Georgia broadband deployment initiative overviewGeorgia broadband deployment initiative overview
Georgia broadband deployment initiative overview
 
Lewis tftn ngac_09232010
Lewis tftn ngac_09232010Lewis tftn ngac_09232010
Lewis tftn ngac_09232010
 
Final EIS Part 1
Final EIS Part 1Final EIS Part 1
Final EIS Part 1
 
FHWA Update
FHWA UpdateFHWA Update
FHWA Update
 
Ric mpo certification_review_presentation
Ric mpo certification_review_presentationRic mpo certification_review_presentation
Ric mpo certification_review_presentation
 
NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)
NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)
NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)
 
Mac Plan 2006
Mac Plan 2006Mac Plan 2006
Mac Plan 2006
 
What's under the cover 20111019
What's under the cover   20111019What's under the cover   20111019
What's under the cover 20111019
 
Capital Improvement Saratoga 03 31-2021 council agenda packet
Capital Improvement Saratoga 03 31-2021 council agenda packetCapital Improvement Saratoga 03 31-2021 council agenda packet
Capital Improvement Saratoga 03 31-2021 council agenda packet
 

Viewers also liked

Sam hill fmp schedule 21.01.13 word document
Sam hill fmp schedule 21.01.13 word documentSam hill fmp schedule 21.01.13 word document
Sam hill fmp schedule 21.01.13 word documentSamHill129
 
CV_Alen_Basa
CV_Alen_BasaCV_Alen_Basa
CV_Alen_BasaAlen Basa
 
280514 virginia woolf el trabajo
280514 virginia woolf   el trabajo280514 virginia woolf   el trabajo
280514 virginia woolf el trabajoPrhchile
 
Agua Con Il Divo
Agua Con Il DivoAgua Con Il Divo
Agua Con Il Divopilarandres
 
Imagenes de emos
Imagenes de emosImagenes de emos
Imagenes de emos
Jazmin Caiza
 
Feinschule English Academy
Feinschule English AcademyFeinschule English Academy
Feinschule English AcademyLompienkie
 
Entreprise Collaborative et Agile - Opportunités Business et Enjeux RH.
Entreprise Collaborative et Agile - Opportunités Business et Enjeux RH.Entreprise Collaborative et Agile - Opportunités Business et Enjeux RH.
Entreprise Collaborative et Agile - Opportunités Business et Enjeux RH.
Frédéric Williquet
 

Viewers also liked (10)

Sam hill fmp schedule 21.01.13 word document
Sam hill fmp schedule 21.01.13 word documentSam hill fmp schedule 21.01.13 word document
Sam hill fmp schedule 21.01.13 word document
 
CV_Alen_Basa
CV_Alen_BasaCV_Alen_Basa
CV_Alen_Basa
 
280514 virginia woolf el trabajo
280514 virginia woolf   el trabajo280514 virginia woolf   el trabajo
280514 virginia woolf el trabajo
 
KarenT
KarenTKarenT
KarenT
 
Zdgvgggggggggggg
ZdgvggggggggggggZdgvgggggggggggg
Zdgvgggggggggggg
 
Sistema de computo
Sistema de computoSistema de computo
Sistema de computo
 
Agua Con Il Divo
Agua Con Il DivoAgua Con Il Divo
Agua Con Il Divo
 
Imagenes de emos
Imagenes de emosImagenes de emos
Imagenes de emos
 
Feinschule English Academy
Feinschule English AcademyFeinschule English Academy
Feinschule English Academy
 
Entreprise Collaborative et Agile - Opportunités Business et Enjeux RH.
Entreprise Collaborative et Agile - Opportunités Business et Enjeux RH.Entreprise Collaborative et Agile - Opportunités Business et Enjeux RH.
Entreprise Collaborative et Agile - Opportunités Business et Enjeux RH.
 

Similar to fhwa_all_public_road_geospatial_representative_study

Team overview gist april 2010
Team overview gist april 2010Team overview gist april 2010
Team overview gist april 2010KSI Koniag
 
HIFLD Presentation
HIFLD PresentationHIFLD Presentation
HIFLD PresentationKSI Koniag
 
Narc tftn overview_v1
Narc tftn overview_v1Narc tftn overview_v1
Narc tftn overview_v1KSI Koniag
 
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
RPO America
 
November Committee at Large Meeting
November Committee at Large MeetingNovember Committee at Large Meeting
November Committee at Large MeetingKSI Koniag
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010KSI Koniag
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Koniag
 
April 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual WorkshopApril 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Koniag
 
Zlotchenko ncdot presentation
Zlotchenko ncdot presentationZlotchenko ncdot presentation
Zlotchenko ncdot presentationRPO America
 
GIS-T Notes Public
GIS-T Notes PublicGIS-T Notes Public
GIS-T Notes PublicKSI Koniag
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentationRPO America
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dotKSI Koniag
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dotKoniag
 
Lewis tftn ngac_09232010
Lewis tftn ngac_09232010Lewis tftn ngac_09232010
Lewis tftn ngac_09232010KSI Koniag
 
February 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual WorkshopFebruary 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
Kick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalKick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalpbcgov
 
Cleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National PerspectiveCleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National Perspective
Miami-Dade Transportation Planning Organization
 
Planning Partnerships in No. Arizona
Planning Partnerships in No. ArizonaPlanning Partnerships in No. Arizona
Planning Partnerships in No. Arizona
RPO America
 

Similar to fhwa_all_public_road_geospatial_representative_study (20)

Team overview gist april 2010
Team overview gist april 2010Team overview gist april 2010
Team overview gist april 2010
 
HIFLD Presentation
HIFLD PresentationHIFLD Presentation
HIFLD Presentation
 
Narc tftn overview_v1
Narc tftn overview_v1Narc tftn overview_v1
Narc tftn overview_v1
 
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
 
November Committee at Large Meeting
November Committee at Large MeetingNovember Committee at Large Meeting
November Committee at Large Meeting
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
 
April 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual WorkshopApril 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual Workshop
 
05-ARNOLD
05-ARNOLD05-ARNOLD
05-ARNOLD
 
Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Overview oftransportationforthenation v4
Overview oftransportationforthenation v4
 
Zlotchenko ncdot presentation
Zlotchenko ncdot presentationZlotchenko ncdot presentation
Zlotchenko ncdot presentation
 
GIS-T Notes Public
GIS-T Notes PublicGIS-T Notes Public
GIS-T Notes Public
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dot
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dot
 
Lewis tftn ngac_09232010
Lewis tftn ngac_09232010Lewis tftn ngac_09232010
Lewis tftn ngac_09232010
 
February 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual WorkshopFebruary 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual Workshop
 
Kick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalKick off meeting challenge grant revised final
Kick off meeting challenge grant revised final
 
Cleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National PerspectiveCleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National Perspective
 
Planning Partnerships in No. Arizona
Planning Partnerships in No. ArizonaPlanning Partnerships in No. Arizona
Planning Partnerships in No. Arizona
 

fhwa_all_public_road_geospatial_representative_study

  • 1. FEDERAL HIGHWAY ADMINISTRATION ALL PUBLIC ROAD GEOSPATIAL REPRESENTATIVE STUDY Project Overview
  • 2. Organizational Chart 2 Motor Fuel and Tax Evasion Ralph Davis Team Lead Highway System Performance Vacant Team Lead Highway Finance and Recovery Act Chris Allen Team Lead Travel Monitoring and Surveys Tianjia Tang, PE Team Lead Mike Slattery Clarissa Smith Monique Snow Ron Vaughn Maria Bonilla Tychelle Staten Paolo Angulo Chris Lehner Justin Clarke Ron Erickson Joe Hausman Tom Roff Rob Rozycki Ron Vaughn Mike Dougherty Bryant Gross Dawn Edwards Brad Gudzinas Danny Jenkins, PE Steven Jessberger David Jones Adella Santos Patrick Zhang, PE Danielle Gray
  • 3. Project Introduction • On August 7, 2012, FHWA announced that the HPMS is expanding the requirement for State DOTs to submit their LRS to include all public roads, and to provide facilities that are divided highways or dual carriageways (as independent features where applicable) • This requirement will be referred to as the All Road Network of Linear Referenced Data (ARNOLD) • Many states will be challenged by this requirement, but this project will produce guidance materials to help implement ARNOLD at the state level 3
  • 4. Project Team • US DOT • Joe Hausman (Project Manager) • Tom Roff (ARNOLD Lead) • Justin Clarke (Team Lead) • Contractors • Applied Geographics, Inc. (Prime Contractor) • David R. Fletcher (Subcontractor) • Michael Baker Jr., Inc. (Subcontractor) • Expert Panel • Mark Sarmiento – FHWA Planning • Mike Neathery – FHWA Planning • Robert Pollack – FHWA Safety • Stuart Thompson – FHWA Safety • Maria Chau – FHWA NY Division • Dave Blackstone – Ohio DOT • Frank Pisani – Utah DOT • Frank DeSendi – Pennsylvania DOT • Keith Dotson – Kentucky Transportation • Sharon Hawkins – Arkansas HDT • James Meyer – Arizona DOT • Michele Barnes – University of Michigan 4
  • 5. Project Overview • Task 1: Project Schedule, Risk Assessment and leverage the US DOT –GIO TFTN Strategic Plan • Task 2: Local Road LRS Development • Task 3: Statewide government and private LRS Best Practices • Task 4: LRS Temporal Maintenance • Task 5: LRS System Component Reference • Task 6: Technical Reference manual assembling information gathered from tasks 2-5 - in progress - in progress 5
  • 6. Overall Project Workplan 6 Task 1 Work Plan and Compliance Task 2 Local Road Collection Task 3 LRS Components and Best Practices Task 4 Examine LRS Temporal Maintenance Task 5 LRS System Component Reference Task 6 Technical Reference Manual All Tasks inform the final Reference Manual Information gathered builds on previous tasks
  • 7. Task 1 – Project Website 7
  • 8. Task 1 – Risk Assessment 8 1. State Compliance with ARNOLD requirements 3. Impact on Potential Consumers of ARNOLD 2. USDOT/FHWA’s ability to produce the nationwide ARNOLD Risks Considered
  • 9. Task 1 – RiskAssessment Risk 1: State Compliance Most frequently cited challenges • Limited resources • Data maintenance • Data collection • LRS technical issues • Understanding of methodology and requirements • Communicating benefits of program to stakeholders and leadership Based on review of State HPMS Plans 9 59% 10% 31% Likelihood of States Implementing ARNOLD by June 2014 Deadline High Med Low
  • 10. Task 1 – RiskAssessment Likelihood of States Implementing ARNOLD Based on review of State HPMS Plans 10 Green States are most likely to meet the June 2014 due date for having All Public Roads Linear Referenced
  • 11. Task 1 – RiskAssessment Risk 2: USDOT/FHWA’s Ability to Produce Nationwide ARNOLD FHWA needs to be able to build and maintain a complex integrated dataset, which requires: 11 ARNOLD FHWA Technology and Methods FHWA Staff and Expertise FHWA Policy Support and Leadership FHWA Budget
  • 12. Task 1 – Risk Assessment Risk3: Impacton PotentialConsumersof ARNOLD "build once, use many times" Certain systems and products are at risk if ARNOLD does not succeed Systems at Risk: Internal to USDOT • USDOT RITA/BTS: National Transportation Data Atlas • USDOT Office of Planning, Environment, and Realty: National Highway Planning Network 12
  • 13. Task 1 – Risk Assessment Risk3: Impacton PotentialConsumersof ARNOLD Systems at Risk: External to USDOT • The following provides an overview of non-USDOT systems that are at risk, or face higher costs if ARNOLD does not come into being: • National Spatial Data Infrastructure, the Geospatial Platform, and The National Map • US Census Bureau TIGER and LUCA data • FCC National Broadband Map (which currently uses TIGER data) • Open Street Map • Commercial Navigation Data Systems 13
  • 14. Task 1 – TFTN Alignment • The Study supports and is aligned with the following TFTN Next Steps: • Continue working with Stakeholders/advocates to sustain support for TFTN • Work with Stakeholders/advocates to gain support for TFTN implementation The Study is aimed at State DOT business and data processes to support HPMS reporting requirements, whereas the TFTN is a national initiative. Consequently while the Study may provide precedent data necessary for the TFTN, it is not directly concerned with the strategy or next steps laid out in the TFTN Strategic Plan. 14
  • 15. Task 1 – TFTN Alignment • Alignment occurs along several axes: • The overall Study goals are consistent with the TFTN Strategic Vision. • Technical tasks of the Study support the TFTN goal to establish LRS guidelines. • Technical tasks of the Study also support TFTN Phase 2 (statewide production of LRS data). • The Contractor for this Study was also involved with the development of the TFTN Strategic Plan, ensuring institutional continuity of the deep knowledge implicitly incorporated in the TFTN. 15
  • 16. Task 1 – TFTN Alignment TFTN Direct ARNOLD Alignment Indirect ARNOLD Alignment Development Strategy Catalyze development of TFTN via FHWA HPMS reporting requirements X Support States in developing statewide inventories X Aggregate state-level data into nationwide map and publish data to stakeholders. X Keep the TFTN current: data update and maintenance X Next Steps Continue working with Stakeholders/advocates to sustain support for TFTN X FHWA determination on whether to require states to provide complete, statewide road geometry X Assemble Internal USDOT TFTN Committee to establish inter-departmental cooperative agreements X Assemble funding necessary for Business Planning and prototyping X Development of Detailed Business & Implementation Plan X Formally engage US Census, and other potential partners, for inter-departmental agreements X Work with Stakeholders/advocates to gain support for TFTN implementation X Commence TFTN operational implementation X 16 Assessing alignment of various TFTN goals with ARNOLD goals
  • 17. Task 2 - Local Road Collection Currently in Progress • Interview FHWA approved entities on Business Processes and viability • DOT (5) • Local Government (2) • MPOs (2) • Develop Approach for States for All Public Roads LRS • Must include on-going maintenance of roadways • Write and Deliver Systematic Approach Report • Circa November 17
  • 18. Task 3 - LRS Components and Best Practices Currently in Progress • Literature Review • Document Best Overall Practices from Task 2 respondents + private industry • Write and Deliver Current Best Practices Assessment Report • Circa December 18
  • 19. Task 2 + 3 Best Practices Framework Assess States Supply Chain Patterns 1. Local governments supply geospatial road data to the DOT 2. A third party (non-DOT) creates statewide data and supplies it to the DOT 3. Hybrid approach whereas the state gathers as much as possible from a non-DOT entity (e.g regional agency or clearinghouse), and then gets the rest from locals 4. The DOT does it all 19
  • 20. Task 2 + 3 Supply Chain Pattern #1 20 State DOT County DOT City DOT MPO Federal Land Agency Private Land Owner Local governments supply geospatial road data to the DOT
  • 21. Task 2 + 3 Supply Chain Pattern #2 21 A third party (non-DOT) creates statewide data and supplies it to the DOT State DOT Geodata Supplier County DOT City DOT MPO Federal Land Agency Private Land Owner Volunteer Geographic Data (VGI)
  • 22. Task 2 + 3 Supply Chain Pattern #3 22 Hybrid approach Volunteer Geographic Data (VGI) Geodata Supplier County DOT City DOT MPO Federal Land Agency Private Land Owner State DOT County DOT City DOT
  • 23. Task 2 + 3 Supply Chain Pattern #4 23 The DOT does it all State DOT
  • 24. Task 2 + 3 Best Practices Framework Categorize Local Roads Level of Maturity using Common Baseline Network Requirements 24 Road Centerline Geometry All public and private highways, roads and streets Dual carriageway representation Updated/certified annually 1:24,000 scale Basic Road Centerline Attributes Persistent road ID number Road/street name Functional Class Year State Address Ranges Right side/left side address ranges Urban and rural addresses used for E911 LRS Control Linear precision: 0.001 miles Centerline Mileage Begin/ End accuracy: 0.001 miles Network/ Linear Topology Common topology for road network models (e.g. spatial analysis, buffering) (D R A F T)
  • 25. Task 4 Examine LRS Temporal Maintenance • Identify mechanisms (methods, tools, best practices) for ongoing data maintenance • Use NCHRP 2027 • Develop recommendations informed by tasks 2 and 3 • Consider existing cost/ benefit analysis • Write and Deliver Maintenance Plan Report Document • Completed six (6) months after award (1/18/14) 25
  • 26. Task 5 LRS System Components reference • Literature review of LRS business rules based on respondents from Task 2 • Federal • State (DOT) • Local Governments • MPO’s • Private Sector • Develop technical requirements for LRS systems • Research existing best practices and business rules • Synthesis and simplification of existing technical instruction manuals • Consider impact of enterprise business factors • Write and Deliver Technical Instructions Manual • Completed eight (8) months after award (3/18/14) 26
  • 27. Task 6 Technical Reference Manual • Write and Deliver Final Technical Reference Manual summarizing Tasks 1-5 • Quantitative Outcomes and Feasibility Assessment • Draft: Completed within nine (9) months of award (4/18/14) • Final: Completed within eleven (11) months of award (6/18/14) • PowerPoint presentation about final Technical Reference Manual 27