Transportation For The Nation:Overview of Strategic Planning ProcessPresentation to NARC21 September 2010
Presentation Overview Concept & Project Activities Project Findings to Date Questions for the Discussion with NARC TFTN StrategicPlan Overview
Background & Impetus In 2008, an “Issues Brief” by the National States Geographic Information Council (NSGIC) called for creation of TFTN Office of Management and Budget (OMB) direction on “Geospatial Platform” calls for “geospatial data, services and applications contributed…by authoritative sources” OMB Circular A-16 identifies US-DOT as “lead” for “transportation” US-DOT is sponsoring the current project Kick-off in Early 2010 Final Report Due in Early 2011 We’re about half-way through the process Thanks in advance for participating in the process TFTN StrategicPlan Overview
The Concept“Creation and maintenance of high-quality, nationwide transportation data that is in the public domain” Characteristics: An initial focus on street centerlines, but eventually multi-modal Nationwidedata spanning all states and territories All roads, not just Federally funded roads Achieved by coordinated efforts from multiple levels of govt. Provides a common geometric baseline Data are in the public domain and readily shareable TFTN StrategicPlan Overview
Strategic Planning Effort Identify and engage the entire stakeholder community All levels of government Private Sector Non-profit and Citizens  ( OpenStreetMap, etc.) Define requirements, challenges and opportunities Document progress already made Existing data sets Bet practices New ideas Explore implementation issues Evaluate funding requirements and sources TFTN StrategicPlan Overview
Stakeholder OutreachPresentations & Workshops Coming Soon: Today: TFTN StrategicPlan Overview
Stakeholder Outreach Interviews ,[object Object]
Highway Performance Monitoring System
Intelligent Transportation Systems
Asset Management
Deputy Director of RITATFTN StrategicPlan Overview
Findings from Outreach Activities Very strong support for concept Identified many activities that would benefit from TFTN Road safety could be a key element “All roads outlook”needed for many US-DOT Safety Initiatives “All roads outlook”needed for emergency response Significant federal funding of safety initiatives “Think Regionally Act Locally” States and counties are looking beyond their borders States/counties as authoritative transportation data sources TFTN StrategicPlan Overview
A Potential Vision Emerges:Baseline Geometry with “Special Sauce” on top The specifics of what’s included in “baseline geometry” requires further definition Potential minimal components might be: Road naming Basic attributes (e.g. functional classification) Segment ID numbering ,[object Object],TFTN StrategicPlan Overview
Baseline Geometry “Special Sauce” content is added by individual stakeholders Nationwide Roads Inventory “HPMS roads” are a sub-set Bridges “special sauce” Accidents “special sauce”
“Special sauce” can be content and/or capabilities Additional potential components: ,[object Object]
Advanced attributes (e.g. width, lanes)
Full routability(e.g. speeds, turn restrictions, etc.)
Enhanced cartographic display (e.g. annotation, symbolization, etc.)
Linear Referencing Systems (LRS)
Integration with photo/imagery catalogsTFTN StrategicPlan Overview
A Potential Model for TFTNWith US-DOT leadership as prescribed by Circular A-16 Key take away from AASHTO GIS-T Symposium: Current FHWA “reporting requirements” for the Highway Performance Monitoring System (HPMS) could be expanded to include submission of a comprehensive statewide road inventory TFTN StrategicPlan Overview
How would an HPMS requirement work? “HPMS attributes” on a subsetof a statewide road inventory Annual HPMS reporting provides a data update mechanism US-DOT works with states to develop basic standards Enables states to utilize FHWA fundingfor creation and maintenance of inventory States develop their own plans and data management strategies US-DOT facilitates information exchange on state “best practices” TFTN StrategicPlan Overview
Challenges & Obstacles with the HPMS Model US-DOT/FHWA solely responsible for any changes to the HPMS reporting requirements (e.g. if all roads were to be included) Executive management wouldneed to be convinced, but seem willing No US-DOT resources currently available for aggregation, assembly and publication of nationwide data set HPMS has a state by state outlook But, other US-DOT program (e.g. Safety) could catalyze States are not required to work with neighbors for connectivity The level of quality, accuracy and readiness varies from State to State TFTN StrategicPlan Overview
Lessons LearnedStateBest Practicesfor creating Statewide Road Inventories Activate local government partners Provide funding and technical support State collects and aggregates into statewide data Involvement with emergency support community Examples include: AR and OH Public-Private partnership Contracting for creation & maintenance of statewide inventory Mechanism for posting update requests State obtains licensed data Examples include: NY and MA TFTN StrategicPlan Overview
Potential Benefits of TFTNDifferent benefits to different groups of stakeholders

More Related Content

What's hot

Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Koniag
 
Team overview gist april 2010
Team overview gist april 2010Team overview gist april 2010
Team overview gist april 2010KSI Koniag
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Koniag
 
Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014State of Georgia
 
NSGIC TFTN Workshop
NSGIC TFTN WorkshopNSGIC TFTN Workshop
NSGIC TFTN WorkshopKSI Koniag
 
Interfacing with the State and Local levels on transportation funding
Interfacing with the State and Local levels on transportation fundingInterfacing with the State and Local levels on transportation funding
Interfacing with the State and Local levels on transportation fundingChris Simmons
 
Artba p3 policy recommendations
Artba p3 policy recommendations Artba p3 policy recommendations
Artba p3 policy recommendations artba
 
A Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in FloridaA Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in Floridaguestd509af
 
Evolution of MPO Planning in Florida: 1997-2008
Evolution of MPO Planning in Florida: 1997-2008Evolution of MPO Planning in Florida: 1997-2008
Evolution of MPO Planning in Florida: 1997-2008alexbond68
 
20-year Transportation Funding Shortfall in Florida
20-year Transportation Funding Shortfall in Florida20-year Transportation Funding Shortfall in Florida
20-year Transportation Funding Shortfall in Floridaguestd509af
 
DPS and CPT eXplorer: connecting data & policy
DPS and CPT eXplorer: connecting data & policyDPS and CPT eXplorer: connecting data & policy
DPS and CPT eXplorer: connecting data & policycarloamati
 
State of Equity Policy Agenda FINAL tagged
State of Equity Policy Agenda FINAL taggedState of Equity Policy Agenda FINAL tagged
State of Equity Policy Agenda FINAL taggedJessie Grogan
 
Keynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road ProjectsKeynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road ProjectsCharlotte Chamber
 
Irfp 1819 07 dtx project delivery review services
Irfp 1819 07 dtx project delivery review servicesIrfp 1819 07 dtx project delivery review services
Irfp 1819 07 dtx project delivery review servicesAdina Levin
 

What's hot (16)

Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010
 
New York
New YorkNew York
New York
 
Team overview gist april 2010
Team overview gist april 2010Team overview gist april 2010
Team overview gist april 2010
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
 
Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014
 
NSGIC TFTN Workshop
NSGIC TFTN WorkshopNSGIC TFTN Workshop
NSGIC TFTN Workshop
 
Interfacing with the State and Local levels on transportation funding
Interfacing with the State and Local levels on transportation fundingInterfacing with the State and Local levels on transportation funding
Interfacing with the State and Local levels on transportation funding
 
Artba p3 policy recommendations
Artba p3 policy recommendations Artba p3 policy recommendations
Artba p3 policy recommendations
 
A Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in FloridaA Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in Florida
 
WV 3D Elevation Program (3DEP) / BAA Overview
WV 3D Elevation Program (3DEP) / BAA OverviewWV 3D Elevation Program (3DEP) / BAA Overview
WV 3D Elevation Program (3DEP) / BAA Overview
 
Evolution of MPO Planning in Florida: 1997-2008
Evolution of MPO Planning in Florida: 1997-2008Evolution of MPO Planning in Florida: 1997-2008
Evolution of MPO Planning in Florida: 1997-2008
 
20-year Transportation Funding Shortfall in Florida
20-year Transportation Funding Shortfall in Florida20-year Transportation Funding Shortfall in Florida
20-year Transportation Funding Shortfall in Florida
 
DPS and CPT eXplorer: connecting data & policy
DPS and CPT eXplorer: connecting data & policyDPS and CPT eXplorer: connecting data & policy
DPS and CPT eXplorer: connecting data & policy
 
State of Equity Policy Agenda FINAL tagged
State of Equity Policy Agenda FINAL taggedState of Equity Policy Agenda FINAL tagged
State of Equity Policy Agenda FINAL tagged
 
Keynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road ProjectsKeynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road Projects
 
Irfp 1819 07 dtx project delivery review services
Irfp 1819 07 dtx project delivery review servicesIrfp 1819 07 dtx project delivery review services
Irfp 1819 07 dtx project delivery review services
 

Similar to Narc tftn overview_v1

Nsgic annual status_briefing v0.2
Nsgic annual status_briefing v0.2Nsgic annual status_briefing v0.2
Nsgic annual status_briefing v0.2KSI Koniag
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dotKoniag
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dotKSI Koniag
 
Lewis tftn ngac_09232010
Lewis tftn ngac_09232010Lewis tftn ngac_09232010
Lewis tftn ngac_09232010KSI Koniag
 
Lewis TFTN FGDC
Lewis TFTN FGDCLewis TFTN FGDC
Lewis TFTN FGDCKSI Koniag
 
HIFLD Presentation
HIFLD PresentationHIFLD Presentation
HIFLD PresentationKSI Koniag
 
Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010KSI Koniag
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010KSI Koniag
 
Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Koniag
 
Tftn findings to date esri uc
Tftn findings to date esri ucTftn findings to date esri uc
Tftn findings to date esri ucKSI Koniag
 
Tftn findings to date esri uc
Tftn findings to date esri ucTftn findings to date esri uc
Tftn findings to date esri ucKSI Koniag
 
Tftn overview esri uc
Tftn overview esri ucTftn overview esri uc
Tftn overview esri ucKoniag
 
Tftn overview esri uc
Tftn overview esri ucTftn overview esri uc
Tftn overview esri ucKSI Koniag
 
Spatial igniteorlando tftn_in5min
Spatial igniteorlando tftn_in5minSpatial igniteorlando tftn_in5min
Spatial igniteorlando tftn_in5minKSI Koniag
 
Nsgic annual 2010 findings
Nsgic annual 2010 findingsNsgic annual 2010 findings
Nsgic annual 2010 findingsKSI Koniag
 
Nsgic annual 2010 findings
Nsgic annual 2010 findingsNsgic annual 2010 findings
Nsgic annual 2010 findingsKSI Koniag
 
NSGIC Mid-Year Meeting
NSGIC Mid-Year MeetingNSGIC Mid-Year Meeting
NSGIC Mid-Year MeetingKSI Koniag
 
fhwa_all_public_road_geospatial_representative_study
fhwa_all_public_road_geospatial_representative_studyfhwa_all_public_road_geospatial_representative_study
fhwa_all_public_road_geospatial_representative_studyJohn Formby
 
9/8 THUR 14:30 | TOD Toolbox :Regional & Statewide Coord. Efforts
9/8 THUR 14:30 | TOD Toolbox :Regional & Statewide Coord. Efforts9/8 THUR 14:30 | TOD Toolbox :Regional & Statewide Coord. Efforts
9/8 THUR 14:30 | TOD Toolbox :Regional & Statewide Coord. EffortsAPA Florida
 
1.4 widner panel presentation
1.4 widner panel presentation1.4 widner panel presentation
1.4 widner panel presentationKSI Koniag
 

Similar to Narc tftn overview_v1 (20)

Nsgic annual status_briefing v0.2
Nsgic annual status_briefing v0.2Nsgic annual status_briefing v0.2
Nsgic annual status_briefing v0.2
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dot
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dot
 
Lewis tftn ngac_09232010
Lewis tftn ngac_09232010Lewis tftn ngac_09232010
Lewis tftn ngac_09232010
 
Lewis TFTN FGDC
Lewis TFTN FGDCLewis TFTN FGDC
Lewis TFTN FGDC
 
HIFLD Presentation
HIFLD PresentationHIFLD Presentation
HIFLD Presentation
 
Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
 
Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Overview oftransportationforthenation v4
Overview oftransportationforthenation v4
 
Tftn findings to date esri uc
Tftn findings to date esri ucTftn findings to date esri uc
Tftn findings to date esri uc
 
Tftn findings to date esri uc
Tftn findings to date esri ucTftn findings to date esri uc
Tftn findings to date esri uc
 
Tftn overview esri uc
Tftn overview esri ucTftn overview esri uc
Tftn overview esri uc
 
Tftn overview esri uc
Tftn overview esri ucTftn overview esri uc
Tftn overview esri uc
 
Spatial igniteorlando tftn_in5min
Spatial igniteorlando tftn_in5minSpatial igniteorlando tftn_in5min
Spatial igniteorlando tftn_in5min
 
Nsgic annual 2010 findings
Nsgic annual 2010 findingsNsgic annual 2010 findings
Nsgic annual 2010 findings
 
Nsgic annual 2010 findings
Nsgic annual 2010 findingsNsgic annual 2010 findings
Nsgic annual 2010 findings
 
NSGIC Mid-Year Meeting
NSGIC Mid-Year MeetingNSGIC Mid-Year Meeting
NSGIC Mid-Year Meeting
 
fhwa_all_public_road_geospatial_representative_study
fhwa_all_public_road_geospatial_representative_studyfhwa_all_public_road_geospatial_representative_study
fhwa_all_public_road_geospatial_representative_study
 
9/8 THUR 14:30 | TOD Toolbox :Regional & Statewide Coord. Efforts
9/8 THUR 14:30 | TOD Toolbox :Regional & Statewide Coord. Efforts9/8 THUR 14:30 | TOD Toolbox :Regional & Statewide Coord. Efforts
9/8 THUR 14:30 | TOD Toolbox :Regional & Statewide Coord. Efforts
 
1.4 widner panel presentation
1.4 widner panel presentation1.4 widner panel presentation
1.4 widner panel presentation
 

Recently uploaded

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 

Recently uploaded (20)

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 

Narc tftn overview_v1

  • 1. Transportation For The Nation:Overview of Strategic Planning ProcessPresentation to NARC21 September 2010
  • 2. Presentation Overview Concept & Project Activities Project Findings to Date Questions for the Discussion with NARC TFTN StrategicPlan Overview
  • 3. Background & Impetus In 2008, an “Issues Brief” by the National States Geographic Information Council (NSGIC) called for creation of TFTN Office of Management and Budget (OMB) direction on “Geospatial Platform” calls for “geospatial data, services and applications contributed…by authoritative sources” OMB Circular A-16 identifies US-DOT as “lead” for “transportation” US-DOT is sponsoring the current project Kick-off in Early 2010 Final Report Due in Early 2011 We’re about half-way through the process Thanks in advance for participating in the process TFTN StrategicPlan Overview
  • 4. The Concept“Creation and maintenance of high-quality, nationwide transportation data that is in the public domain” Characteristics: An initial focus on street centerlines, but eventually multi-modal Nationwidedata spanning all states and territories All roads, not just Federally funded roads Achieved by coordinated efforts from multiple levels of govt. Provides a common geometric baseline Data are in the public domain and readily shareable TFTN StrategicPlan Overview
  • 5. Strategic Planning Effort Identify and engage the entire stakeholder community All levels of government Private Sector Non-profit and Citizens ( OpenStreetMap, etc.) Define requirements, challenges and opportunities Document progress already made Existing data sets Bet practices New ideas Explore implementation issues Evaluate funding requirements and sources TFTN StrategicPlan Overview
  • 6. Stakeholder OutreachPresentations & Workshops Coming Soon: Today: TFTN StrategicPlan Overview
  • 7.
  • 11. Deputy Director of RITATFTN StrategicPlan Overview
  • 12. Findings from Outreach Activities Very strong support for concept Identified many activities that would benefit from TFTN Road safety could be a key element “All roads outlook”needed for many US-DOT Safety Initiatives “All roads outlook”needed for emergency response Significant federal funding of safety initiatives “Think Regionally Act Locally” States and counties are looking beyond their borders States/counties as authoritative transportation data sources TFTN StrategicPlan Overview
  • 13.
  • 14. Baseline Geometry “Special Sauce” content is added by individual stakeholders Nationwide Roads Inventory “HPMS roads” are a sub-set Bridges “special sauce” Accidents “special sauce”
  • 15.
  • 17. Full routability(e.g. speeds, turn restrictions, etc.)
  • 18. Enhanced cartographic display (e.g. annotation, symbolization, etc.)
  • 20. Integration with photo/imagery catalogsTFTN StrategicPlan Overview
  • 21. A Potential Model for TFTNWith US-DOT leadership as prescribed by Circular A-16 Key take away from AASHTO GIS-T Symposium: Current FHWA “reporting requirements” for the Highway Performance Monitoring System (HPMS) could be expanded to include submission of a comprehensive statewide road inventory TFTN StrategicPlan Overview
  • 22. How would an HPMS requirement work? “HPMS attributes” on a subsetof a statewide road inventory Annual HPMS reporting provides a data update mechanism US-DOT works with states to develop basic standards Enables states to utilize FHWA fundingfor creation and maintenance of inventory States develop their own plans and data management strategies US-DOT facilitates information exchange on state “best practices” TFTN StrategicPlan Overview
  • 23. Challenges & Obstacles with the HPMS Model US-DOT/FHWA solely responsible for any changes to the HPMS reporting requirements (e.g. if all roads were to be included) Executive management wouldneed to be convinced, but seem willing No US-DOT resources currently available for aggregation, assembly and publication of nationwide data set HPMS has a state by state outlook But, other US-DOT program (e.g. Safety) could catalyze States are not required to work with neighbors for connectivity The level of quality, accuracy and readiness varies from State to State TFTN StrategicPlan Overview
  • 24. Lessons LearnedStateBest Practicesfor creating Statewide Road Inventories Activate local government partners Provide funding and technical support State collects and aggregates into statewide data Involvement with emergency support community Examples include: AR and OH Public-Private partnership Contracting for creation & maintenance of statewide inventory Mechanism for posting update requests State obtains licensed data Examples include: NY and MA TFTN StrategicPlan Overview
  • 25. Potential Benefits of TFTNDifferent benefits to different groups of stakeholders
  • 26. Potential Benefits of TFTNDifferent benefits to different groups of stakeholders Core business benefits to the US-DOT HPMS in the context of complete transportation data Highway Safety - nationwide accident mapping Bridge inventory efforts Benefits to “sister” federal agencies Reduces costs from redundant nationwide data sets Provides public domain data for sharing with partners Collaboration and synergy with other significant mapping programs at USGS and US Census TFTN StrategicPlan Overview
  • 27. Potential Benefits of TFTNDifferent benefits to different groups of stakeholders Benefits toState and Local Govt. Potentially opens up US-DOTresources for statewide road inventories Provides public domain data Facilitates sharing with partners Better data – particularly for rural areas – for GPS-based navigation Easier cross border/multi-jurisdiction coordination and collaboration Benefits to the General Public Consistent data across agencies to support citizen services Publicly accessible data for citizen and commercial innovation TFTN StrategicPlan Overview
  • 28. Examples of what have we heard so far… TFTN StrategicPlan Overview
  • 29. At the ESRI User Conference Short-term and long-term considerations Short term: don’t forget several nationwide datasets currently exist TIGER Commercial OpenStreetMap Longer term: design and build something new HPMS is not resourced to make a seamless nationwide data set Look at other “process models” too! Public/private partnership Build on TIGER Volunteered Geographic Information (VGI) Something “outside-the-box” that we have yet to imagine TFTN StrategicPlan Overview
  • 30. Census Bureau Interview Takeaways TIGER is a mature product Many users depend on it for a variety of applications National broadband mapping (for Census geometry) Significant improvements in latest TIGER files Positional accuracy improved (7.6 meter) Substantial input from local sources incorporated Research into potential for OpenStreetMap Planning for more frequent updates (depending on funding) TFTN StrategicPlan Overview
  • 31. USGS Interview Takeaways Requirement for nationwide roads in The National Map (TNM) TIGER did not meet TNM requirements Positional accuracy Depictions of interchanges and dual-carriageways Attributes Costs to retrofit TIGER were prohibitive Have currently replaced TIGER with TeleAtlas data Competitive price, but restricted use Looking at OpenStreetMap and other alternatives, long-term The National Hydrography Dataset (NHD) provides a positive example of Federal-State collaboration TFTN StrategicPlan Overview
  • 32. At the NSGIC Annual Conference Develop a matrix of common requirements and approaches – “what are the shared needs and commonalities?” Develop an inventory of what each state has for statewide street centerlines Develop several success stories as 1-2 page fact sheets, perhaps as “tiered” levels of success The Census Bureau considers itself to be a “Data Integrator,” not a Data Producer per se; boundaries are the “real issue” for Census Bureau, not roads; DOTs might need greater detail Next Generation 911 is and will be a big driver for GIS-based initiatives to build statewide street centerline data setsto support automated routing TFTN StrategicPlan Overview
  • 33. Questions for DiscussionWe want to hear from you! Benefits of TFTN to regional councils What would or should they be? What do you need? Relationship between regional councilsand state GIS coordination programs on transportation data sets Spectrum of cooperation and collaboration What’s working? What’s not? Best practices? NARC perspective on regional roles relative to stateagencies Who are producers? Who are consumers? What states work well with regional councils? TFTN StrategicPlan Overview