Presented By:
 Karnataka has an industrial growth rate of 12%
per year.
 Factors for rapid growth
-Sustainable economic growth
-Government thrust on private participation
in development of infrastructure sector.
 Government of Karnataka identify different
projects for development of the state.
 Tadadi port in Karnataka is one among them.
Preliminary step:
 projects amenability for development under
public private partnership frame work.
 If the project is found feasible, detailed
report including detail technical studies
should be worked out for the same.
 Infrastructure Development Corporation
Limited was awarded the mandate for
undertaking the feasibility study.
1. Problem Diagnosis
2. Goal Articulation
3. Forecasting
4. Design of Alternatives
5. Testing
6. Evaluation
7. Implementation
 Un availability of major port
-No major ports in the range of < 300kms
 Transportation cost and travel time
- transporting production materials from
production place to the port increase travel
time and freight charges
- productivity of the region; more raw materials
like iron ore
 Less capacity of the minor ports to import
and export materials
- Karwar and Belekeri handles not more
than 9 million tones per year
 Bad connectivity of cargo movement from
the port to the hinterland
- no railway connectivity (nearest station
is 25km away)
- no direct high way access
 Reason for developing Tadadi port
- for easy cargo movement to the port,
connectivity to the hinterland is critical
factor
- to reduce the transportation cost and
travel time from production place to
the port
- to increase the cargo handling capacity
 Achievement after completion of the port
- Modernization; change in life style of
the local community
- Industrialization; more facilities more
the industries and production companies
- to stimulate private sector investment in
industrial and commercial area
- to ensure the availability of pool of labour
with range of skills to meet the needs of economic
activities in the area
 To predict the impacts of the natural
development of the project
 Increase in cargo i.e., Cargos forecasting
-Proposed govt. projects (hydropower, cement
factory etc)
-Widening of road
-Interest of private sector like JSW
-Expansion of near by major ports
 Industry growth potential- Employment growth
 Multinational manufacturers/ Small or Medium firms
 Population forecasting: City is in young category
 Increase in ships
 Requirement of storage
 Extra berth for increased cargo
 More cargo handling equipment
 Leads development in two phases
Phase1-With current infrastructure like rails,
roads, industries
Phase 2-With change in infrastructure like
widening of roads
 Alt. 1-Karwar port-
-Waterfront area-low
-Available depth-6.5m
-Type-All weather intermediate
 Alt. 2-Belekeri port
-Captive port
 Alt.3-Tadadi port
-Waterfront area-fair
- land development -govt. have 1854 acres
near to this
 Alt. 4-Development of available any of two
ports to meet demand
 Criteria for the selection
 Less impact on nearby property like
acquisition of residential property
 More water front area and depth
 Improve long term shipping operation and
safety
 Avoid impacts on adjacent property like near
beaches
 Improve traffic operation, condition and
safety
 Select Tadadi port according to the criteria;
tadadi port fulfill most of the requirement.
 Plans are tested to evaluate the degree to which
objectives are fulfilled and constraints are
violated.
o Objectives:
 Connectivity issues-Minimization of traffic
diversion
-During construction
-During operation-Roads and railway
• Roads:
• NH 63-NH17=18.06(current),38.25mtpa(Future)
In plain terrain mostly, forest section 78 km
Mostly two laned and 30% stretch is 4 laned
• NH 4-SH69-NH17=9.56mtpa/17mtpa
Forest section-11km, SH 69- intermediate(5.5-7m wide)
• Technical issues-Aghanashimi river prone to
silting
• Sectoral transfer-Mining->power/steel
 Investment, Production & Employment
growth
 Available water front area and depth
 Ship traffic operation and safety
 Constraints:
• Finance-Feasible for investment by private
bodies due to large industrial activity and its
growth potential
• Public relation-about 20-30% are involved in
fishery ,favors
• Land- acquired in past
6.1 Environmental Evaluation
Due to port location
 Effect on communities because of losing
agriculture and housing land
 Erosion and accretion
 Changes current patterns and littoral drifts
 Affects aquatic fauna and flora and also
contamination on bottom part of water
During port construction
 Infrastructure like roads, railways and water
ways
 Water supply drainage and electrical power
 Pile driving, deposition of rubble dredging
 Re-suspension of sediments and turbid water
 Dredging may causes changes current
patterns and flows
 Disposal of dredged material on land cause
leakage of harmful substance into ground
water
 Dredging disturb bottom sediments
 Dredging causes loss of fishery resource
 Dredging removes bottom biota
 Emission of dust and gases from equipment
 Noise and vibration because of equipment
 Disposal of dredged material causes
destruction of plants, loss of vegetation &
leakage of bad material
During port operation
 Ship traffic and discharges may cause
environmental concerns
 Water pollution; spills of soils, lubricants,
fuels and other oily liquids
 Accidental spills of toxic harmful materials
 Leakage of oils will affect fishery resource,
aquatic biota
 Noise and vibration during cargo handling
6.2 Socio and Political Evaluation
Due to port location
 Relocation of local community
 Damages fishing nets and navigation
 Change cultural traditions of local
community
During port operation
 Oil and oily wastes of ship spoil recreational
activities cause serious damage of to tourism
 Ship traffic may disturb boat cruising and
fishery boat operation
 Changes life style of local people
 Labor from outside may cause conflict with
local community
6.3 Economical Evaluation
During port construction
 More job opportunity
 Using local materials for construction
During port operation
 More production gives high economic
beneficial
 implementation of the Suvarna Karnataka
development corridor program for industrial
development
 Government of Karnataka propose to
develop 10 special industrial zones; direct
impact on trade, industry and economic of
the country
 Numerical contribution to the GDP and acts
an economic multiplier
 Project fund
-Project could be funded DEBT equity ratio with
2.33:1
-Interest for the loan is12.5%
 Environmental
-Further study will be done by concerned body
(environmental evaluation and impact
assessment)
 Political authorization
-After all the required study government office
will authorize whether to proceed with the
project.
 Recommendation for the next stage
Feasibility study report on development of tadadi port

More Related Content

What's hot

Coastal shipping scenario in india
Coastal shipping scenario in india Coastal shipping scenario in india
Coastal shipping scenario in india
Heisenberg26
 
SAGARMALA
SAGARMALASAGARMALA
Ports ppt
Ports pptPorts ppt
Ports ppt
Parth Desai
 
Rohan organiations study at cochin port trust
Rohan organiations study at cochin port trustRohan organiations study at cochin port trust
Rohan organiations study at cochin port trustLibu Thomas
 
Bharatmala project
Bharatmala projectBharatmala project
Bharatmala project
Col Mukteshwar Prasad
 
Sagarmala
SagarmalaSagarmala
Sagarmala
Sailish Cephas
 
Transport today
Transport todayTransport today
Transport today
abood491
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
ANIKETBAMBOLE1
 
Ports Sector Report - February 2017
Ports Sector Report - February 2017Ports Sector Report - February 2017
Ports Sector Report - February 2017
India Brand Equity Foundation
 
China cutting CO2 emissions related to shipbuilding and usage of vessels, Tea...
China cutting CO2 emissions related to shipbuilding and usage of vessels, Tea...China cutting CO2 emissions related to shipbuilding and usage of vessels, Tea...
China cutting CO2 emissions related to shipbuilding and usage of vessels, Tea...
Team Finland Future Watch
 
Sagarmala project
Sagarmala projectSagarmala project
Sagarmala project
GopalakrishnanThiaga
 
Mitigation of CO2 in China – shipbuilding and usage of vessels
Mitigation of CO2 in China – shipbuilding and usage of vesselsMitigation of CO2 in China – shipbuilding and usage of vessels
Mitigation of CO2 in China – shipbuilding and usage of vessels
Team Finland Future Watch
 
India :Ports Sector Report_August 2013
India :Ports Sector Report_August 2013India :Ports Sector Report_August 2013
India :Ports Sector Report_August 2013
India Brand Equity Foundation
 
A study on Sea Port Industry (An Empirical Research)
A study on Sea Port Industry (An Empirical Research)A study on Sea Port Industry (An Empirical Research)
A study on Sea Port Industry (An Empirical Research)
Dimpu Sarath Kumar
 
Inland Waterway Transportation (IWT) in INDIA
Inland Waterway Transportation (IWT) in INDIAInland Waterway Transportation (IWT) in INDIA
Inland Waterway Transportation (IWT) in INDIA
Machiraju Presentations Pvt. Ltd.
 
Ppt by mr paul antony cochin port
Ppt by mr paul antony cochin portPpt by mr paul antony cochin port
Ppt by mr paul antony cochin portmcci175
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)
irjes
 
Cpec(salman's group)
Cpec(salman's group)Cpec(salman's group)
Cpec(salman's group)
Salman H. Sindhoo
 

What's hot (20)

Coastal shipping scenario in india
Coastal shipping scenario in india Coastal shipping scenario in india
Coastal shipping scenario in india
 
SAGARMALA
SAGARMALASAGARMALA
SAGARMALA
 
Ports ppt
Ports pptPorts ppt
Ports ppt
 
Rohan organiations study at cochin port trust
Rohan organiations study at cochin port trustRohan organiations study at cochin port trust
Rohan organiations study at cochin port trust
 
Bharatmala project
Bharatmala projectBharatmala project
Bharatmala project
 
Sagarmala
SagarmalaSagarmala
Sagarmala
 
Transport today
Transport todayTransport today
Transport today
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
 
Ports Sector Report - February 2017
Ports Sector Report - February 2017Ports Sector Report - February 2017
Ports Sector Report - February 2017
 
China cutting CO2 emissions related to shipbuilding and usage of vessels, Tea...
China cutting CO2 emissions related to shipbuilding and usage of vessels, Tea...China cutting CO2 emissions related to shipbuilding and usage of vessels, Tea...
China cutting CO2 emissions related to shipbuilding and usage of vessels, Tea...
 
BRIEF_ON_LAPSSET
BRIEF_ON_LAPSSETBRIEF_ON_LAPSSET
BRIEF_ON_LAPSSET
 
Sagarmala project
Sagarmala projectSagarmala project
Sagarmala project
 
Mitigation of CO2 in China – shipbuilding and usage of vessels
Mitigation of CO2 in China – shipbuilding and usage of vesselsMitigation of CO2 in China – shipbuilding and usage of vessels
Mitigation of CO2 in China – shipbuilding and usage of vessels
 
India :Ports Sector Report_August 2013
India :Ports Sector Report_August 2013India :Ports Sector Report_August 2013
India :Ports Sector Report_August 2013
 
Ind ii fgd (1) npmp presentation 9 august 2011 final
Ind ii fgd (1)  npmp presentation 9 august 2011 finalInd ii fgd (1)  npmp presentation 9 august 2011 final
Ind ii fgd (1) npmp presentation 9 august 2011 final
 
A study on Sea Port Industry (An Empirical Research)
A study on Sea Port Industry (An Empirical Research)A study on Sea Port Industry (An Empirical Research)
A study on Sea Port Industry (An Empirical Research)
 
Inland Waterway Transportation (IWT) in INDIA
Inland Waterway Transportation (IWT) in INDIAInland Waterway Transportation (IWT) in INDIA
Inland Waterway Transportation (IWT) in INDIA
 
Ppt by mr paul antony cochin port
Ppt by mr paul antony cochin portPpt by mr paul antony cochin port
Ppt by mr paul antony cochin port
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)
 
Cpec(salman's group)
Cpec(salman's group)Cpec(salman's group)
Cpec(salman's group)
 

Viewers also liked

Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 
Dryportpresentation roso 135 (1)
Dryportpresentation roso 135 (1)Dryportpresentation roso 135 (1)
Dryportpresentation roso 135 (1)StudsPlanet.com
 
How to Prepare Innovative Feasibility Study in transitional economy
How to Prepare Innovative Feasibility Study in transitional economyHow to Prepare Innovative Feasibility Study in transitional economy
How to Prepare Innovative Feasibility Study in transitional economy
Consulting Group for Development, CGD
 
Feasibility Study Product Proposals
Feasibility Study Product ProposalsFeasibility Study Product Proposals
Feasibility Study Product Proposals
Bryan Agustin Oculam
 
Shipping industry in India
Shipping industry in IndiaShipping industry in India
Shipping industry in IndiaAadii Bhatia
 
Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)
Bryan Agustin Oculam
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 

Viewers also liked (9)

Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 
Dryportpresentation roso 135 (1)
Dryportpresentation roso 135 (1)Dryportpresentation roso 135 (1)
Dryportpresentation roso 135 (1)
 
KMOC ASIA Ltd.
KMOC ASIA Ltd.KMOC ASIA Ltd.
KMOC ASIA Ltd.
 
How to Prepare Innovative Feasibility Study in transitional economy
How to Prepare Innovative Feasibility Study in transitional economyHow to Prepare Innovative Feasibility Study in transitional economy
How to Prepare Innovative Feasibility Study in transitional economy
 
Feasibility Study Product Proposals
Feasibility Study Product ProposalsFeasibility Study Product Proposals
Feasibility Study Product Proposals
 
Feasibility Study
Feasibility StudyFeasibility Study
Feasibility Study
 
Shipping industry in India
Shipping industry in IndiaShipping industry in India
Shipping industry in India
 
Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 

Similar to Feasibility study report on development of tadadi port

7-sagarmala-overview (1).pdf
7-sagarmala-overview (1).pdf7-sagarmala-overview (1).pdf
7-sagarmala-overview (1).pdf
Nirav Shah
 
Seaport as an Infrastructure Project in india - PIF (from investor side)
Seaport as an Infrastructure Project in india - PIF (from investor side)Seaport as an Infrastructure Project in india - PIF (from investor side)
Seaport as an Infrastructure Project in india - PIF (from investor side)
Nishant Bangar
 
MedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader DarwishMedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader Darwish
ASCAME
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3
Parti Djibouti
 
Combine coal transshipment project report
Combine coal transshipment project reportCombine coal transshipment project report
Combine coal transshipment project report
shehri_cbe
 
E brochure &amp; corporate presentation 1027915746-2015-03-28_01-49-13
E brochure &amp; corporate presentation  1027915746-2015-03-28_01-49-13E brochure &amp; corporate presentation  1027915746-2015-03-28_01-49-13
E brochure &amp; corporate presentation 1027915746-2015-03-28_01-49-13
suyog pagade
 
CTA110 Anand Barate-Patil seminar.pptx
CTA110 Anand Barate-Patil seminar.pptxCTA110 Anand Barate-Patil seminar.pptx
CTA110 Anand Barate-Patil seminar.pptx
AnandBaratePatil
 
Market Assessment of The Port Sector In India
Market  Assessment of The Port Sector In IndiaMarket  Assessment of The Port Sector In India
Market Assessment of The Port Sector In India
Manisha Gupta
 
Project report on CC road
Project report on CC roadProject report on CC road
Project report on CC road
vikash mishra
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
gangadhar7907
 
Port characteristic and their elements , port capacity and types of carriers
Port characteristic and their elements , port capacity and types of carriersPort characteristic and their elements , port capacity and types of carriers
Port characteristic and their elements , port capacity and types of carriers
PANYALASAHITHREDDY
 
RDP Chapter 19
RDP Chapter 19RDP Chapter 19
Presentation vetria mineração creation
Presentation   vetria mineração creationPresentation   vetria mineração creation
Presentation vetria mineração creationTriunfoRi
 
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Micheal Le Havre
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahore
Ayesha Akhtar
 
Paul_Kelly.ppt
Paul_Kelly.pptPaul_Kelly.ppt
Paul_Kelly.ppt
EviAprianti4
 
Yash Pathak 54863 (Sagarmala Project).pptx
Yash Pathak 54863 (Sagarmala Project).pptxYash Pathak 54863 (Sagarmala Project).pptx
Yash Pathak 54863 (Sagarmala Project).pptx
yashpathak867040
 
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLift Events
 
Pipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineeringPipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineering
TauqueerAhmad17
 
ISMED PPD: Assessment Report
ISMED PPD: Assessment ReportISMED PPD: Assessment Report
ISMED PPD: Assessment Report
OECDGlobalRelations
 

Similar to Feasibility study report on development of tadadi port (20)

7-sagarmala-overview (1).pdf
7-sagarmala-overview (1).pdf7-sagarmala-overview (1).pdf
7-sagarmala-overview (1).pdf
 
Seaport as an Infrastructure Project in india - PIF (from investor side)
Seaport as an Infrastructure Project in india - PIF (from investor side)Seaport as an Infrastructure Project in india - PIF (from investor side)
Seaport as an Infrastructure Project in india - PIF (from investor side)
 
MedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader DarwishMedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader Darwish
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3
 
Combine coal transshipment project report
Combine coal transshipment project reportCombine coal transshipment project report
Combine coal transshipment project report
 
E brochure &amp; corporate presentation 1027915746-2015-03-28_01-49-13
E brochure &amp; corporate presentation  1027915746-2015-03-28_01-49-13E brochure &amp; corporate presentation  1027915746-2015-03-28_01-49-13
E brochure &amp; corporate presentation 1027915746-2015-03-28_01-49-13
 
CTA110 Anand Barate-Patil seminar.pptx
CTA110 Anand Barate-Patil seminar.pptxCTA110 Anand Barate-Patil seminar.pptx
CTA110 Anand Barate-Patil seminar.pptx
 
Market Assessment of The Port Sector In India
Market  Assessment of The Port Sector In IndiaMarket  Assessment of The Port Sector In India
Market Assessment of The Port Sector In India
 
Project report on CC road
Project report on CC roadProject report on CC road
Project report on CC road
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 
Port characteristic and their elements , port capacity and types of carriers
Port characteristic and their elements , port capacity and types of carriersPort characteristic and their elements , port capacity and types of carriers
Port characteristic and their elements , port capacity and types of carriers
 
RDP Chapter 19
RDP Chapter 19RDP Chapter 19
RDP Chapter 19
 
Presentation vetria mineração creation
Presentation   vetria mineração creationPresentation   vetria mineração creation
Presentation vetria mineração creation
 
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahore
 
Paul_Kelly.ppt
Paul_Kelly.pptPaul_Kelly.ppt
Paul_Kelly.ppt
 
Yash Pathak 54863 (Sagarmala Project).pptx
Yash Pathak 54863 (Sagarmala Project).pptxYash Pathak 54863 (Sagarmala Project).pptx
Yash Pathak 54863 (Sagarmala Project).pptx
 
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
 
Pipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineeringPipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineering
 
ISMED PPD: Assessment Report
ISMED PPD: Assessment ReportISMED PPD: Assessment Report
ISMED PPD: Assessment Report
 

Recently uploaded

road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
Nettur Technical Training Foundation
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 

Recently uploaded (20)

road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 

Feasibility study report on development of tadadi port

  • 1. IIT GUWAHATI 2015 Amit Kumar 154104077 Akash Bishal Das 154104079 Frezgi Assefa 154104100 Presented By:
  • 2.  Karnataka has an industrial growth rate of 12% per year.  Factors for rapid growth -Sustainable economic growth -Government thrust on private participation in development of infrastructure sector.  Government of Karnataka identify different projects for development of the state.  Tadadi port in Karnataka is one among them.
  • 3. Preliminary step:  projects amenability for development under public private partnership frame work.  If the project is found feasible, detailed report including detail technical studies should be worked out for the same.  Infrastructure Development Corporation Limited was awarded the mandate for undertaking the feasibility study.
  • 4. 1. Problem Diagnosis 2. Goal Articulation 3. Forecasting 4. Design of Alternatives 5. Testing 6. Evaluation 7. Implementation
  • 5.  Un availability of major port -No major ports in the range of < 300kms  Transportation cost and travel time - transporting production materials from production place to the port increase travel time and freight charges - productivity of the region; more raw materials like iron ore
  • 6.  Less capacity of the minor ports to import and export materials - Karwar and Belekeri handles not more than 9 million tones per year  Bad connectivity of cargo movement from the port to the hinterland - no railway connectivity (nearest station is 25km away) - no direct high way access
  • 7.  Reason for developing Tadadi port - for easy cargo movement to the port, connectivity to the hinterland is critical factor - to reduce the transportation cost and travel time from production place to the port - to increase the cargo handling capacity
  • 8.  Achievement after completion of the port - Modernization; change in life style of the local community - Industrialization; more facilities more the industries and production companies - to stimulate private sector investment in industrial and commercial area - to ensure the availability of pool of labour with range of skills to meet the needs of economic activities in the area
  • 9.  To predict the impacts of the natural development of the project  Increase in cargo i.e., Cargos forecasting -Proposed govt. projects (hydropower, cement factory etc) -Widening of road -Interest of private sector like JSW -Expansion of near by major ports  Industry growth potential- Employment growth  Multinational manufacturers/ Small or Medium firms  Population forecasting: City is in young category
  • 10.  Increase in ships  Requirement of storage  Extra berth for increased cargo  More cargo handling equipment  Leads development in two phases Phase1-With current infrastructure like rails, roads, industries Phase 2-With change in infrastructure like widening of roads
  • 11.  Alt. 1-Karwar port- -Waterfront area-low -Available depth-6.5m -Type-All weather intermediate  Alt. 2-Belekeri port -Captive port  Alt.3-Tadadi port -Waterfront area-fair - land development -govt. have 1854 acres near to this
  • 12.  Alt. 4-Development of available any of two ports to meet demand  Criteria for the selection  Less impact on nearby property like acquisition of residential property  More water front area and depth  Improve long term shipping operation and safety  Avoid impacts on adjacent property like near beaches
  • 13.  Improve traffic operation, condition and safety  Select Tadadi port according to the criteria; tadadi port fulfill most of the requirement.
  • 14.  Plans are tested to evaluate the degree to which objectives are fulfilled and constraints are violated. o Objectives:  Connectivity issues-Minimization of traffic diversion -During construction -During operation-Roads and railway • Roads: • NH 63-NH17=18.06(current),38.25mtpa(Future) In plain terrain mostly, forest section 78 km Mostly two laned and 30% stretch is 4 laned
  • 15. • NH 4-SH69-NH17=9.56mtpa/17mtpa Forest section-11km, SH 69- intermediate(5.5-7m wide) • Technical issues-Aghanashimi river prone to silting • Sectoral transfer-Mining->power/steel  Investment, Production & Employment growth  Available water front area and depth  Ship traffic operation and safety
  • 16.  Constraints: • Finance-Feasible for investment by private bodies due to large industrial activity and its growth potential • Public relation-about 20-30% are involved in fishery ,favors • Land- acquired in past
  • 17. 6.1 Environmental Evaluation Due to port location  Effect on communities because of losing agriculture and housing land  Erosion and accretion  Changes current patterns and littoral drifts  Affects aquatic fauna and flora and also contamination on bottom part of water
  • 18. During port construction  Infrastructure like roads, railways and water ways  Water supply drainage and electrical power  Pile driving, deposition of rubble dredging  Re-suspension of sediments and turbid water  Dredging may causes changes current patterns and flows
  • 19.  Disposal of dredged material on land cause leakage of harmful substance into ground water  Dredging disturb bottom sediments  Dredging causes loss of fishery resource  Dredging removes bottom biota  Emission of dust and gases from equipment
  • 20.  Noise and vibration because of equipment  Disposal of dredged material causes destruction of plants, loss of vegetation & leakage of bad material During port operation  Ship traffic and discharges may cause environmental concerns  Water pollution; spills of soils, lubricants, fuels and other oily liquids
  • 21.  Accidental spills of toxic harmful materials  Leakage of oils will affect fishery resource, aquatic biota  Noise and vibration during cargo handling 6.2 Socio and Political Evaluation Due to port location  Relocation of local community  Damages fishing nets and navigation  Change cultural traditions of local community
  • 22. During port operation  Oil and oily wastes of ship spoil recreational activities cause serious damage of to tourism  Ship traffic may disturb boat cruising and fishery boat operation  Changes life style of local people  Labor from outside may cause conflict with local community
  • 23. 6.3 Economical Evaluation During port construction  More job opportunity  Using local materials for construction During port operation  More production gives high economic beneficial  implementation of the Suvarna Karnataka development corridor program for industrial development
  • 24.  Government of Karnataka propose to develop 10 special industrial zones; direct impact on trade, industry and economic of the country  Numerical contribution to the GDP and acts an economic multiplier
  • 25.  Project fund -Project could be funded DEBT equity ratio with 2.33:1 -Interest for the loan is12.5%  Environmental -Further study will be done by concerned body (environmental evaluation and impact assessment)  Political authorization -After all the required study government office will authorize whether to proceed with the project.  Recommendation for the next stage