The document summarizes phases 1 and 2 of the Expo Line Transit Project. Phase 1 is an 8.6 mile light rail line from Downtown Los Angeles to Culver City opening in 2011-2012. Phase 2 will extend the line 6.6 miles from Culver City to Santa Monica, opening in 2015. It will include 7 new stations and is estimated to cost $1.5 billion. The project is undergoing preliminary engineering and environmental review to refine elements and select a design-build contractor to complete final design and construction.