SlideShare a Scribd company logo
1 of 33
OREGON DOT BRIDGE SEMINAR
MAY 13-14, 2014
STATE OF THE ART DESIGN OF
LIGHT RAIL STRUCTURES
HART TRANSIT
Joe Krajewski, PE - HNTB
OUTLINE
1. Introduction
2. Green Line Extenstion, MBTA, Boston – Medford, MA
3. West Ohau – Farrington – Honolulu, HART, Hawaii
4. Summary
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
1. INTRODUCTION
Light Rail Aerial Structures are being planned for, designed and built all
around the country. Why?
 Current trend towards alleviating congestion in urban areas.
 There is a recognition that adding travel lanes to highways is
inadequate
More Lanes ≠ Less Congestion
 Reduction in greenhouse gases to combat global warming.
 Economic Development.
 Environmental Mitigation Method.
 Funding Source for larger Transportation Project.
 INTERMODAL APPROACH TO SOLVING ALL OF THE ABOVE
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
1. INTRODUCTION
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
1830 – Boston & Lowell Railroad. Steam Locomotives.
Green Line “D” Branch to Riverside still in use today.
1853 – Cambridge Railroad & Street Cars
Central Square to Harvard to the West End
1897 – First Subways in the Country
Tremont Street Subway precursor of the Green Line
Main Line Elevated precursor of the Orange Line
MBTA
Massachusetts Bay Transportation Authority
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
TODAY
- 5 Subway Lines – Green,
Orange, Red, Blue & Silver
- Connects 14 Cities & Towns
around Boston
- Commuter Rail (MBCR) that
services 145 Cities & Towns
from Rhode Island to New
Hampshire.
- Ferries
- Covers 1,000 square miles
- Services Millions
MBTA
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
- 4.5 Mile extension of the Green Line from Somerville to Medford (the campus of Tufts University)
- 7 New Stations
- 8 New Highway Bridges
- Vehicle Maintenance Facility
- 3000 foot long Emergency Egress/Pedestrian – Bikeway Viaduct
- 5 Miles of Retaining Walls
- Over 2 Miles of Light Rail Viaduct
All in a densely packed urban area
MBTA – GREEN LINE EXTENSION
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
Estimated Cost $1.5 Billion
Mandated by an Act of Congress as the Main Congestion/Air Pollution Mitigation &
Part Funding for the “Big Dig”.
Failure of Massachusetts to build the project within a specified time limit would result
in the Commonwealth being forced to pay back Billions in “Big Dig” funding.
Project Team
CM/GC Alternative Project Delivery Method (1st in the Northeast)
Design Engineers = HNTB/AECOM & 39 Sub Consultants
PM = HDR/Gilbane/Kleinfelder
OR = Hatch Mott MacDonald (Mandated by Commonwealth Law)
Contractor = J.F. White/Skanska/Kiewit
Project Schedule
Final Design Started Summer 2012
First Phase of Project Scheduled to go into Operation in 2018
Project Completion 2020
MBTA – GREEN LINE EXTENSION
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
7 Viaducts
Structural Steel Superstructure
Concrete Deck
Ballasted Track
CWR – Continuous Weld Rail
Concrete Piers
Drilled Shafts and Mini Piles
F’c = 4.3 ksi
Rebar = Grade 60
MBTA – GREEN LINE EXTENSION - VIADUCT
LECHMERE
MEDFORD BRANCH
YARD LEAD FLYOVER
UNION SQ EB
UNION SQ WB
UNION SQ YARD LEAD
EEV/COMMUNITY PATH
AASHTO 17th Edition LFD
AASHTO LRFD – EEV/Community Path Super.
Revenue Train – 4 Green Line Cars #7’s & #8’s
Future Revenue Train = #9’s with Level Boarding
Maintenance Train – Diesel Engine + 3 Ballast Cars
Overhead Catenary Electrical Power
Operating Speed = 50 MPH (Design 60 MPH)
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
5 Spans – Twin Trapezoidal Steel Boxes (FC)
6 Spans – 2 Single Trapezoidal Steel Boxes (FC)
3 Spans – Plate Girders Continuous & Integral
with Pier Caps
Grade 50 – Painted – Sea Foam Green
1,800 ft. long
The Lechmere Viaduct & Station are the Signature portion of the entire GLX
Aesthetic is everything for this Viaduct
MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
MBTA – GREEN LINE EXTENSION – VIADUCTS
For the remainder of the Viaducts Aesthetics is not important since the Viaducts span a Rail Road
Yard, Industrial Area and the backs of Parking Garages.
The Viaducts form an interchange between the Medford Main Line, the Union Square Branch and
the Railroad yard.
The EEV/Community Path Viaduct serves as an Emergency Egress off the tracks and a
connecting link between the Boston Bikeway System and the Community Path System to the
north.
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
MBTA – GREEN LINE EXTENSION – VIADUCTS
Plate Girders – Grade 50 Weathering Steel with painted ends
Tangent spans are simple spans except the EEV/Community path spans
Curved girder spans are 2 span continuous
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
MBTA – GREEN LINE EXTENSION – VIADUCTS
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
MBTA – GREEN LINE EXTENSION – VIADUCTS
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
November, 2010 – Voters Approved a Charter to create a semi-
autonomous public transit authority (HART).
July 1, 2011 – HART Began Operations – But no trains or rail in place.
2019 – Estimated Date of Start of actual train service.
HART
Honolulu Authority for Rapid Transit
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
Hawaii recognized that adding more lanes to their highways would not relieve traffic
congestion that is among the worst in the Country.
Traffic is Congested on the H-1 from 4:00 AM to 7:00 PM
Hawaii is going Intermodal by creating the Light Rail System in conjunction with
Rehabbing & Replacing portions of their highway system to improve the lives of all
citizens and sustain the natural beauty of the islands.
HART – Honolulu Rail Transit Project
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
HART – Honolulu Rail Transit Project
20 Miles of Elevated Guideway
21 New Stations
4 Park and Ride Garages
Vehicle Maintenance Facility
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
Estimated Cost $5 Billion
DB Alternative Delivery Method in Multiple Contracts
West Oha’u – Farrington Hwy & Kamehameha Hwy Contracts
Design Engineers = HNTB/FIGG/Shannon Wilson/URS
OR = CH2M Hill/PGHWong
Contractor = Kiewit
Project Schedule
Final Design Started Summer 2011
First Phase of Project Scheduled to go into Operation in 2019
Project Completion 2022
HART – Honolulu Rail Transit Project
- 20 Miles of Elevated Guideway (Viaduct)
- 21 New Stations
- 4 Park and Ride Garages
- Vehicle Maintenance Facility
All in a densely packed urban area
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
HART – Honolulu Rail Transit Project
Segmental Concrete Superstructure
Concrete Deck
Direct Fix Track for Level Boarding (ADA)
CWR – Continuous Weld Rail
Concrete Piers
CIP, Precast, Prestressed, Post-Tensioned
Drilled Shafts
F’c = 6.5 ksi
Rebar = Grade 75 & 80
AASHTO LRFD 2009
Revenue Train – 4 LMV Cars
Maintenance Train – 1 HMV Car
3rd Rail Electrical Power
Operating Speed = 55 MPH
(Design Speed = 66 MPH)
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
HART – Honolulu Rail Transit Project
AESTHETICS IS CLUSTERED AROUND EACH STATION & HIGH VISIBILITY LOCATIONS
8 FOOT DIAMETER COLUMN AESTHETIC DETAIL
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
HART – Honolulu Rail Transit Project
AESTHETICS IS CLUSTERED AROUND EACH STATION & HIGH VISIBILITY LOCATIONS
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
HART – Honolulu Rail Transit Project
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
HART – Honolulu Rail Transit Project
“L” PIER STATION PIER
Aesthetics Is Causing Structural Design Challenges
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
HART – Honolulu Rail Transit Project
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
HART – Honolulu Rail Transit Project
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
HART – Honolulu Rail Transit Project
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
SUMMARY
1. Light Rail Structures are more than just structures they are systems components.
2. They are Signature Structures because impact a Community Significantly.
3. They are part of an Intermodal Transportation System without being connected
or carried directly by Highway Bridges or even near Highways.
a) Note: GLX and HART were relied upon for funding Highways, but never were
connected to those Highways except as part of an overall strategy to:
1. Reduce Congestion
2. Reduce Air pollution
3. Provide Economic Development
4. Make the Communities they are in more livable.
b) Funding came from the FTA and FHWA
4. Design
a) AASHTO, but some AREMA
b) Stray Current, Terrorism, Hazards, . . . Part of the structural design process.
c) Aesthetics complicates the Structural Design so do Stations.
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
ODOT BRIDGE SEMINAR, MAY 13-14, 2014
STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES
SUMMARY
QUESTIONS ?????
HARTTRANSIT

More Related Content

What's hot

Purple line opening 2015
Purple line opening 2015Purple line opening 2015
Purple line opening 2015Jose Enriquez
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureMobility Lab
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationT.Y. Lin International
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearOHM Advisors
 
Bbp Presentation
Bbp PresentationBbp Presentation
Bbp Presentationlaluz914
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Josia Tannos, EIT
 
19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and Survey19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and SurveySFCTA
 
Oct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsOct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsCityofBoulder
 
Meriden on the Move
Meriden on the MoveMeriden on the Move
Meriden on the Movesneapa
 
Sindiong Project Examples
Sindiong Project ExamplesSindiong Project Examples
Sindiong Project ExamplesSteveSindiong
 

What's hot (20)

Purple line opening 2015
Purple line opening 2015Purple line opening 2015
Purple line opening 2015
 
TOD presentation
TOD presentationTOD presentation
TOD presentation
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation Future
 
041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the Year
 
Bbp Presentation
Bbp PresentationBbp Presentation
Bbp Presentation
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 
19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and Survey19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and Survey
 
APWA mid atlantic awards
APWA mid atlantic awardsAPWA mid atlantic awards
APWA mid atlantic awards
 
November 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual WorkshopNovember 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual Workshop
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
Senior Project PSR
Senior Project PSRSenior Project PSR
Senior Project PSR
 
Oct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsOct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House Boards
 
Meriden on the Move
Meriden on the MoveMeriden on the Move
Meriden on the Move
 
AAB #11 241 Somerville, MA:latest route around our rights
AAB #11 241 Somerville, MA:latest route around our rightsAAB #11 241 Somerville, MA:latest route around our rights
AAB #11 241 Somerville, MA:latest route around our rights
 
Sindiong Project Examples
Sindiong Project ExamplesSindiong Project Examples
Sindiong Project Examples
 
Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street  Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street
 

Similar to JKRAJEWSKI_ODOT2014_Light Rail Presentation

TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...South Fraser Blog
 
PPT Item # 12 - Midblock Pedestrian Crossing Improvement
PPT Item # 12 - Midblock Pedestrian Crossing ImprovementPPT Item # 12 - Midblock Pedestrian Crossing Improvement
PPT Item # 12 - Midblock Pedestrian Crossing Improvementahcitycouncil
 
Rick Hall: Place & Mobility
Rick Hall: Place & MobilityRick Hall: Place & Mobility
Rick Hall: Place & Mobilityguest7106fd
 
Overpass Solution
Overpass SolutionOverpass Solution
Overpass Solutionjgabateman
 
Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21jgabateman
 
South Fraser transit plan
South Fraser transit planSouth Fraser transit plan
South Fraser transit planjgabateman
 
Exposition Light Rail Transit Project 1
Exposition Light Rail Transit Project 1Exposition Light Rail Transit Project 1
Exposition Light Rail Transit Project 1Daryl Kellner
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014onthewight
 
Islington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgeIslington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgewilliam perrin
 
Harbor Ring Campaign
Harbor Ring CampaignHarbor Ring Campaign
Harbor Ring CampaignNY_Bicycling
 
Introduction to Transportation Engineering_1.ppt
Introduction to Transportation Engineering_1.pptIntroduction to Transportation Engineering_1.ppt
Introduction to Transportation Engineering_1.pptAlyzaCaszyUmayat
 
Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313peggydrouet
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxfordshireCC
 
Streetcar Report Final CP Front
Streetcar Report Final CP FrontStreetcar Report Final CP Front
Streetcar Report Final CP FrontLeumis Richardson
 
Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010Joe Zaccaria
 

Similar to JKRAJEWSKI_ODOT2014_Light Rail Presentation (20)

TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
PPT Item # 12 - Midblock Pedestrian Crossing Improvement
PPT Item # 12 - Midblock Pedestrian Crossing ImprovementPPT Item # 12 - Midblock Pedestrian Crossing Improvement
PPT Item # 12 - Midblock Pedestrian Crossing Improvement
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
Rick Hall: Place & Mobility
Rick Hall: Place & MobilityRick Hall: Place & Mobility
Rick Hall: Place & Mobility
 
Overpass Solution
Overpass SolutionOverpass Solution
Overpass Solution
 
Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21
 
South Fraser transit plan
South Fraser transit planSouth Fraser transit plan
South Fraser transit plan
 
Exposition Light Rail Transit Project 1
Exposition Light Rail Transit Project 1Exposition Light Rail Transit Project 1
Exposition Light Rail Transit Project 1
 
Space 134 - Potential for Transit Connections
Space 134 - Potential for Transit ConnectionsSpace 134 - Potential for Transit Connections
Space 134 - Potential for Transit Connections
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014
 
Islington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgeIslington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridge
 
Harbor Ring Campaign
Harbor Ring CampaignHarbor Ring Campaign
Harbor Ring Campaign
 
Introduction to Transportation Engineering_1.ppt
Introduction to Transportation Engineering_1.pptIntroduction to Transportation Engineering_1.ppt
Introduction to Transportation Engineering_1.ppt
 
Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313
 
CE460Final-2
CE460Final-2CE460Final-2
CE460Final-2
 
Theodor Nicolas Master
Theodor Nicolas MasterTheodor Nicolas Master
Theodor Nicolas Master
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
Streetcar Report Final CP Front
Streetcar Report Final CP FrontStreetcar Report Final CP Front
Streetcar Report Final CP Front
 
Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010
 

JKRAJEWSKI_ODOT2014_Light Rail Presentation

  • 1. OREGON DOT BRIDGE SEMINAR MAY 13-14, 2014 STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES HART TRANSIT Joe Krajewski, PE - HNTB
  • 2. OUTLINE 1. Introduction 2. Green Line Extenstion, MBTA, Boston – Medford, MA 3. West Ohau – Farrington – Honolulu, HART, Hawaii 4. Summary STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014
  • 3. 1. INTRODUCTION Light Rail Aerial Structures are being planned for, designed and built all around the country. Why?  Current trend towards alleviating congestion in urban areas.  There is a recognition that adding travel lanes to highways is inadequate More Lanes ≠ Less Congestion  Reduction in greenhouse gases to combat global warming.  Economic Development.  Environmental Mitigation Method.  Funding Source for larger Transportation Project.  INTERMODAL APPROACH TO SOLVING ALL OF THE ABOVE STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014
  • 4. 1. INTRODUCTION STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014
  • 5. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 1830 – Boston & Lowell Railroad. Steam Locomotives. Green Line “D” Branch to Riverside still in use today. 1853 – Cambridge Railroad & Street Cars Central Square to Harvard to the West End 1897 – First Subways in the Country Tremont Street Subway precursor of the Green Line Main Line Elevated precursor of the Orange Line MBTA Massachusetts Bay Transportation Authority
  • 6. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 TODAY - 5 Subway Lines – Green, Orange, Red, Blue & Silver - Connects 14 Cities & Towns around Boston - Commuter Rail (MBCR) that services 145 Cities & Towns from Rhode Island to New Hampshire. - Ferries - Covers 1,000 square miles - Services Millions MBTA
  • 7. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 - 4.5 Mile extension of the Green Line from Somerville to Medford (the campus of Tufts University) - 7 New Stations - 8 New Highway Bridges - Vehicle Maintenance Facility - 3000 foot long Emergency Egress/Pedestrian – Bikeway Viaduct - 5 Miles of Retaining Walls - Over 2 Miles of Light Rail Viaduct All in a densely packed urban area MBTA – GREEN LINE EXTENSION
  • 8. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 Estimated Cost $1.5 Billion Mandated by an Act of Congress as the Main Congestion/Air Pollution Mitigation & Part Funding for the “Big Dig”. Failure of Massachusetts to build the project within a specified time limit would result in the Commonwealth being forced to pay back Billions in “Big Dig” funding. Project Team CM/GC Alternative Project Delivery Method (1st in the Northeast) Design Engineers = HNTB/AECOM & 39 Sub Consultants PM = HDR/Gilbane/Kleinfelder OR = Hatch Mott MacDonald (Mandated by Commonwealth Law) Contractor = J.F. White/Skanska/Kiewit Project Schedule Final Design Started Summer 2012 First Phase of Project Scheduled to go into Operation in 2018 Project Completion 2020 MBTA – GREEN LINE EXTENSION
  • 9. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 7 Viaducts Structural Steel Superstructure Concrete Deck Ballasted Track CWR – Continuous Weld Rail Concrete Piers Drilled Shafts and Mini Piles F’c = 4.3 ksi Rebar = Grade 60 MBTA – GREEN LINE EXTENSION - VIADUCT LECHMERE MEDFORD BRANCH YARD LEAD FLYOVER UNION SQ EB UNION SQ WB UNION SQ YARD LEAD EEV/COMMUNITY PATH AASHTO 17th Edition LFD AASHTO LRFD – EEV/Community Path Super. Revenue Train – 4 Green Line Cars #7’s & #8’s Future Revenue Train = #9’s with Level Boarding Maintenance Train – Diesel Engine + 3 Ballast Cars Overhead Catenary Electrical Power Operating Speed = 50 MPH (Design 60 MPH)
  • 10. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 5 Spans – Twin Trapezoidal Steel Boxes (FC) 6 Spans – 2 Single Trapezoidal Steel Boxes (FC) 3 Spans – Plate Girders Continuous & Integral with Pier Caps Grade 50 – Painted – Sea Foam Green 1,800 ft. long The Lechmere Viaduct & Station are the Signature portion of the entire GLX Aesthetic is everything for this Viaduct MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
  • 11. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
  • 12. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
  • 13. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
  • 14. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
  • 15. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 MBTA – GREEN LINE EXTENSION – LECHMERE VIADUCT
  • 16. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 MBTA – GREEN LINE EXTENSION – VIADUCTS For the remainder of the Viaducts Aesthetics is not important since the Viaducts span a Rail Road Yard, Industrial Area and the backs of Parking Garages. The Viaducts form an interchange between the Medford Main Line, the Union Square Branch and the Railroad yard. The EEV/Community Path Viaduct serves as an Emergency Egress off the tracks and a connecting link between the Boston Bikeway System and the Community Path System to the north.
  • 17. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 MBTA – GREEN LINE EXTENSION – VIADUCTS Plate Girders – Grade 50 Weathering Steel with painted ends Tangent spans are simple spans except the EEV/Community path spans Curved girder spans are 2 span continuous
  • 18. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 MBTA – GREEN LINE EXTENSION – VIADUCTS
  • 19. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 MBTA – GREEN LINE EXTENSION – VIADUCTS
  • 20. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 November, 2010 – Voters Approved a Charter to create a semi- autonomous public transit authority (HART). July 1, 2011 – HART Began Operations – But no trains or rail in place. 2019 – Estimated Date of Start of actual train service. HART Honolulu Authority for Rapid Transit
  • 21. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 Hawaii recognized that adding more lanes to their highways would not relieve traffic congestion that is among the worst in the Country. Traffic is Congested on the H-1 from 4:00 AM to 7:00 PM Hawaii is going Intermodal by creating the Light Rail System in conjunction with Rehabbing & Replacing portions of their highway system to improve the lives of all citizens and sustain the natural beauty of the islands. HART – Honolulu Rail Transit Project
  • 22. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 HART – Honolulu Rail Transit Project 20 Miles of Elevated Guideway 21 New Stations 4 Park and Ride Garages Vehicle Maintenance Facility
  • 23. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 Estimated Cost $5 Billion DB Alternative Delivery Method in Multiple Contracts West Oha’u – Farrington Hwy & Kamehameha Hwy Contracts Design Engineers = HNTB/FIGG/Shannon Wilson/URS OR = CH2M Hill/PGHWong Contractor = Kiewit Project Schedule Final Design Started Summer 2011 First Phase of Project Scheduled to go into Operation in 2019 Project Completion 2022 HART – Honolulu Rail Transit Project - 20 Miles of Elevated Guideway (Viaduct) - 21 New Stations - 4 Park and Ride Garages - Vehicle Maintenance Facility All in a densely packed urban area
  • 24. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 HART – Honolulu Rail Transit Project Segmental Concrete Superstructure Concrete Deck Direct Fix Track for Level Boarding (ADA) CWR – Continuous Weld Rail Concrete Piers CIP, Precast, Prestressed, Post-Tensioned Drilled Shafts F’c = 6.5 ksi Rebar = Grade 75 & 80 AASHTO LRFD 2009 Revenue Train – 4 LMV Cars Maintenance Train – 1 HMV Car 3rd Rail Electrical Power Operating Speed = 55 MPH (Design Speed = 66 MPH)
  • 25. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 HART – Honolulu Rail Transit Project AESTHETICS IS CLUSTERED AROUND EACH STATION & HIGH VISIBILITY LOCATIONS 8 FOOT DIAMETER COLUMN AESTHETIC DETAIL
  • 26. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 HART – Honolulu Rail Transit Project AESTHETICS IS CLUSTERED AROUND EACH STATION & HIGH VISIBILITY LOCATIONS
  • 27. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 HART – Honolulu Rail Transit Project
  • 28. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 HART – Honolulu Rail Transit Project “L” PIER STATION PIER Aesthetics Is Causing Structural Design Challenges
  • 29. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 HART – Honolulu Rail Transit Project
  • 30. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 HART – Honolulu Rail Transit Project
  • 31. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 HART – Honolulu Rail Transit Project
  • 32. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES SUMMARY 1. Light Rail Structures are more than just structures they are systems components. 2. They are Signature Structures because impact a Community Significantly. 3. They are part of an Intermodal Transportation System without being connected or carried directly by Highway Bridges or even near Highways. a) Note: GLX and HART were relied upon for funding Highways, but never were connected to those Highways except as part of an overall strategy to: 1. Reduce Congestion 2. Reduce Air pollution 3. Provide Economic Development 4. Make the Communities they are in more livable. b) Funding came from the FTA and FHWA 4. Design a) AASHTO, but some AREMA b) Stray Current, Terrorism, Hazards, . . . Part of the structural design process. c) Aesthetics complicates the Structural Design so do Stations.
  • 33. STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES ODOT BRIDGE SEMINAR, MAY 13-14, 2014 STATE OF THE ART DESIGN OF LIGHT RAIL STRUCTURES SUMMARY QUESTIONS ????? HARTTRANSIT