Raja Bhoj CollegeofAgriculture,
Balaghat
Experiential Learning Programme
(ELP 2019-20)
Final Presentation
Commercial Horticulture Production
Presented to –
Dr. Sharad Bisen
Assistant Professor
Department of Horticulture
Presented by –
Shivkant Dangi
B.Sc. (Agriculture) Hons.
En. No. - 160301078
Dr. Hricha Singh
Asistant Professor
Department of Horticulture
“Horticultural remedy for
every nutritional malady.”
Dr. M.S. Swaminathan
Objectives of ELP
marketing
skills
Production
technology
Supervision
Risk management
Entrepreneurial
skills
Here, at Raja Bhoj College of Agriculture, Balaghat, it includes planning,
producing, budgeting, and marketing of horticultural crops,
Vermicompost and BGA.
Need and Scope of Project
Need based project
Meet the requirements in terms of vitamins and
minerals
Development of communication and transport
system create wide scope
Processing industries and employment
opportunities.
Horticulture Production Statics in India
U.P.
13% W.B.
10%
M.P.
9%
MH.
8%A.P.
8%
GJ.
7%KN.
7%
Bihar
7%
TN.
5%
Odisa
4%
others
22%
Horticulture Production Statewise
Mainly grown vegetables at Balaghat
Brinjal
336 ha
Tomato
85 ha
Beans
79 ha
Cauliflower
64.2 ha
Coriander
35 ha
Sweet potato
28 ha
Possibilities of Horticultural production at BALAGHAT
Vegetable production on less land
Possibility of growing different kind of
vegetable and fruit crops
Irrigation facilities are available.
Selecting horticultural crop for specific location
Schemes
Govt. Support
Govt. Restrictions
Local market
Remote market
Processing industry
Storage facility
Rainfall
Temperature
Evapotranspiration
Humidity
soil type
Availability of water
Electricity
Labor
Transport medium
Economical
support and policy
Market and
Processing
Industry
Climate and Agro
Climatic regions
In-situ Farm
Resources
Role of students in ELP
Unit management
Market research
Floor supervision
Schedule preparation
Other skilled and unskilled work
Project Planning
Project outline preparation
Resource management
Choice of right, high-yielding, certified seed of current/new
varieties suited for their area helps in better yield
Variety
01
Increased production.
Manures and Fertilizers
02
moisture conservation, temperature control, improvement
in soil structure and weed control
Mulch
03
prevent the fruit from beginning to rot
Staking Material
04
Drip irrigation and
Pesticides and Fungicides05
Required material, Resources,
Implements and Machinery for
Commercial Tomato Production
Nursery raising
Requirements and
Package of Practices
For Commercial Tomato Production
Climatic requirements Soil
Variety selection Mulching
Irrigation
Manures and Fertilizers
Staking
Plant protection Packaging
Marketing Value
Addition
Climatic
Requirements
Of Tomato
Day neutral plant
Optimum temperature requirement
21 - 24 °C
Susceptible towards water logging
Prohibited sowing in extreme low or high
temperature is an issue
Soil preference
pH – 6.5 – 7.5
Soil solarization
Sandy loam to medium black soil
Well drained soil
Deep profile
Variety Selection
High Yield
Maturity
Suited for area
Arka Abha, Shakhti
Bacterial Wilt
SL 102, NRT 8
Root Knot Nematode
CO 3, H 24
Blight
Criteria
Resistant
Sioux, CO 2, Punjan Chhuhara
Early – Hisar Arun, P. Early Dwarf
Pusa Ruby
Pusa Ruby, Punjab Chhuhara, Sonali,
Pusa Sheetal
Abhilash Variety
01
Higher Production
03
05
02
Days to First Harvest : 65-
70 days.
04
Good firmness & Shelf life
06
USP : Fruit size uniformity
over the picking;
Strong plant type
Average Fruit Weight :
80-85 gm
Nursery
Raising
01
Protected
Nursery
02
Open
Nursery
Add sieved FYM and fine sand
on the seedbed.
Raised beds are necessary to
avoid problem of water
logging in heavy soils.
To avoid mortality of seedlings
due to damping off, drench
the seed bed first with water
and then with Bavistin (15-20
g/10 litres of water).
Land Preparation
Ploughing
01
Manuring
02
Ridging
03
Organic Mulch & Inorganic Mulch
VS
Low cost
Increased organic matter in soil
Recycling
Bulky
Attack of insects
Less durability
Permanent
No insect attraction
Concise
Costly
Not recyclable
No such nutrient addition to soil
IRRIGATION
Tomato is very sensitive to water application.
Irrigation intervals should be according to soil type and rainfall, irrigation
should be given 7-8 days interval during kharif, during rabi 10-12 days and 5-
6 days during summer.
Flowering and fruit development are the critical stages of tomato
therefore; water stress should not be given during this period.
Spraying of Fungicides, Insecticides and Bio-agents
@COA Balaghat Unit
Date of Spray Commercial Name Dose
25-02-2020 Merivon 500 G/L SC
(BASF)
8 ml/pump
25-02-2020 Jump (Bayer) 2 ml/pump
05-03-2020 Infinito (Bayer) 30 ml/pump
Fertigation
1NPK
N-P-K in % : 19-19-19
2Urea
N-P-K in % : 46-0-0
3Ammonium Sulphate
N-P-K in % : 21-0-0
4Potassium Nitrate
13-0-46
5MAP
N-P-K in % : 13-61-0
6Potassium Chloride
N-P-K in % : 0-0-60
Micronutrients for fertigation
Copper Sulphate
25% Copper
Iron Sulphate
20% Iron
54%25% 20% 20%
Soluber
20% Boron
Am. Molybdenum
54% Molybdenum
Staking
Staking facilitates intercultural
operations and helps in maintaining the
quality of the fruits.
It is done 2-3 weeks after
transplanting.
Staking can be done either by wooden
stakes or laying overhead wires to which
individual plant is tied.
In case of indeterminate types, two or
three wires are stretched parallel to each
other along the row and plants are tied
to these wires.
www.hompageurl.com
Example Text Example Text Example Text
Example Text Example Text
/FACEBOOK
@TWITTER
B C
D E
IPM Practices
A
B
C
E
D
Seed treatment with Pseudomonas fluorescens @ 10g/kg of seeds.
Nursery application with Trichoderma viride and Pseudomonas
fluorescens and Selection of good and virus disease free
seedlings for planting.
Application of Neem cake @ 250kg/ha
Roguing out of virus infected plants upto 45 days of
transplanting Grow marigold as a border crop
.
Install yellow sticky traps. Spraying Neem
formulations (1%) / Neem seed kernel extract (5%)
IDM Practices
M
D
Tomato
I
Disease
•Removal and burning of diseased crop debris
•For viral diseases Vector control with dimethoate or methyl
demeton at 10 days interval.
•Maintain proper vigour of the plant
•Use of disease free seed.
•Intercropping of marigold with tomato reduces nematode
Integration of three summer ploughings or use of treated nursery
with spot application of carbofuran @1 kg a.i/ha
•All collateral hosts in the vicinity should be destroyed before
planting new crop.
•Soil solarization.
Weed
Control
Apply Pendimethalin 1.0 kg
a.i./ha or Fluchloralin 1.0 kg a.i /
ha as pre-emergence herbicide.
Follow it by hand weeding once
at 30 days after planting.
Harvesting
Fully
ripe
Such fruits
are used for
processing.
Breaker
stage
Such fruit
are less
prone to
damage
during
shipment
Reddish
pink
Fruits for
local sale are
harvested at
this stage.
Pink
stage
Pink colour
observed on
¾ part of the
fruit.
Fruits to be
shipped are
harvested at
this stage
Dark green
color
Processing and Value Addition
Tomato
Ketchup
Tomato
Sauce
Tomato
Soup
Tomato
Powder
Local Market, Waraseoni
Processing Industry
Value Addition
Marketing
Economics of Production per ha
Particulars Amount
Cost of production (in 2200 m2) 14,683 Rs
Yield of Tomato 25.5 q
Price per Quintal 1000 Rs./quintal
Gross income 25,570 Rs
Cost of Production per Quintal
Tomato
574.22 Rs/q
B:C Ratio 1.47
THANK YOU

Experiential Learning Programme

  • 1.
    Raja Bhoj CollegeofAgriculture, Balaghat ExperientialLearning Programme (ELP 2019-20) Final Presentation Commercial Horticulture Production Presented to – Dr. Sharad Bisen Assistant Professor Department of Horticulture Presented by – Shivkant Dangi B.Sc. (Agriculture) Hons. En. No. - 160301078 Dr. Hricha Singh Asistant Professor Department of Horticulture
  • 2.
    “Horticultural remedy for everynutritional malady.” Dr. M.S. Swaminathan
  • 3.
    Objectives of ELP marketing skills Production technology Supervision Riskmanagement Entrepreneurial skills Here, at Raja Bhoj College of Agriculture, Balaghat, it includes planning, producing, budgeting, and marketing of horticultural crops, Vermicompost and BGA.
  • 4.
    Need and Scopeof Project Need based project Meet the requirements in terms of vitamins and minerals Development of communication and transport system create wide scope Processing industries and employment opportunities.
  • 5.
    Horticulture Production Staticsin India U.P. 13% W.B. 10% M.P. 9% MH. 8%A.P. 8% GJ. 7%KN. 7% Bihar 7% TN. 5% Odisa 4% others 22% Horticulture Production Statewise
  • 6.
    Mainly grown vegetablesat Balaghat Brinjal 336 ha Tomato 85 ha Beans 79 ha Cauliflower 64.2 ha Coriander 35 ha Sweet potato 28 ha
  • 7.
    Possibilities of Horticulturalproduction at BALAGHAT Vegetable production on less land Possibility of growing different kind of vegetable and fruit crops Irrigation facilities are available.
  • 8.
    Selecting horticultural cropfor specific location Schemes Govt. Support Govt. Restrictions Local market Remote market Processing industry Storage facility Rainfall Temperature Evapotranspiration Humidity soil type Availability of water Electricity Labor Transport medium Economical support and policy Market and Processing Industry Climate and Agro Climatic regions In-situ Farm Resources
  • 9.
    Role of studentsin ELP Unit management Market research Floor supervision Schedule preparation Other skilled and unskilled work Project Planning Project outline preparation Resource management
  • 10.
    Choice of right,high-yielding, certified seed of current/new varieties suited for their area helps in better yield Variety 01 Increased production. Manures and Fertilizers 02 moisture conservation, temperature control, improvement in soil structure and weed control Mulch 03 prevent the fruit from beginning to rot Staking Material 04 Drip irrigation and Pesticides and Fungicides05 Required material, Resources, Implements and Machinery for Commercial Tomato Production
  • 11.
    Nursery raising Requirements and Packageof Practices For Commercial Tomato Production Climatic requirements Soil Variety selection Mulching Irrigation Manures and Fertilizers Staking Plant protection Packaging Marketing Value Addition
  • 12.
    Climatic Requirements Of Tomato Day neutralplant Optimum temperature requirement 21 - 24 °C Susceptible towards water logging Prohibited sowing in extreme low or high temperature is an issue
  • 13.
    Soil preference pH –6.5 – 7.5 Soil solarization Sandy loam to medium black soil Well drained soil Deep profile
  • 14.
    Variety Selection High Yield Maturity Suitedfor area Arka Abha, Shakhti Bacterial Wilt SL 102, NRT 8 Root Knot Nematode CO 3, H 24 Blight Criteria Resistant Sioux, CO 2, Punjan Chhuhara Early – Hisar Arun, P. Early Dwarf Pusa Ruby Pusa Ruby, Punjab Chhuhara, Sonali, Pusa Sheetal
  • 15.
    Abhilash Variety 01 Higher Production 03 05 02 Daysto First Harvest : 65- 70 days. 04 Good firmness & Shelf life 06 USP : Fruit size uniformity over the picking; Strong plant type Average Fruit Weight : 80-85 gm
  • 16.
    Nursery Raising 01 Protected Nursery 02 Open Nursery Add sieved FYMand fine sand on the seedbed. Raised beds are necessary to avoid problem of water logging in heavy soils. To avoid mortality of seedlings due to damping off, drench the seed bed first with water and then with Bavistin (15-20 g/10 litres of water).
  • 17.
  • 18.
    Organic Mulch &Inorganic Mulch VS Low cost Increased organic matter in soil Recycling Bulky Attack of insects Less durability Permanent No insect attraction Concise Costly Not recyclable No such nutrient addition to soil
  • 19.
    IRRIGATION Tomato is verysensitive to water application. Irrigation intervals should be according to soil type and rainfall, irrigation should be given 7-8 days interval during kharif, during rabi 10-12 days and 5- 6 days during summer. Flowering and fruit development are the critical stages of tomato therefore; water stress should not be given during this period.
  • 20.
    Spraying of Fungicides,Insecticides and Bio-agents @COA Balaghat Unit Date of Spray Commercial Name Dose 25-02-2020 Merivon 500 G/L SC (BASF) 8 ml/pump 25-02-2020 Jump (Bayer) 2 ml/pump 05-03-2020 Infinito (Bayer) 30 ml/pump
  • 21.
    Fertigation 1NPK N-P-K in %: 19-19-19 2Urea N-P-K in % : 46-0-0 3Ammonium Sulphate N-P-K in % : 21-0-0 4Potassium Nitrate 13-0-46 5MAP N-P-K in % : 13-61-0 6Potassium Chloride N-P-K in % : 0-0-60
  • 22.
    Micronutrients for fertigation CopperSulphate 25% Copper Iron Sulphate 20% Iron 54%25% 20% 20% Soluber 20% Boron Am. Molybdenum 54% Molybdenum
  • 23.
    Staking Staking facilitates intercultural operationsand helps in maintaining the quality of the fruits. It is done 2-3 weeks after transplanting. Staking can be done either by wooden stakes or laying overhead wires to which individual plant is tied. In case of indeterminate types, two or three wires are stretched parallel to each other along the row and plants are tied to these wires. www.hompageurl.com Example Text Example Text Example Text Example Text Example Text /FACEBOOK @TWITTER
  • 24.
    B C D E IPMPractices A B C E D Seed treatment with Pseudomonas fluorescens @ 10g/kg of seeds. Nursery application with Trichoderma viride and Pseudomonas fluorescens and Selection of good and virus disease free seedlings for planting. Application of Neem cake @ 250kg/ha Roguing out of virus infected plants upto 45 days of transplanting Grow marigold as a border crop . Install yellow sticky traps. Spraying Neem formulations (1%) / Neem seed kernel extract (5%)
  • 25.
    IDM Practices M D Tomato I Disease •Removal andburning of diseased crop debris •For viral diseases Vector control with dimethoate or methyl demeton at 10 days interval. •Maintain proper vigour of the plant •Use of disease free seed. •Intercropping of marigold with tomato reduces nematode Integration of three summer ploughings or use of treated nursery with spot application of carbofuran @1 kg a.i/ha •All collateral hosts in the vicinity should be destroyed before planting new crop. •Soil solarization.
  • 26.
    Weed Control Apply Pendimethalin 1.0kg a.i./ha or Fluchloralin 1.0 kg a.i / ha as pre-emergence herbicide. Follow it by hand weeding once at 30 days after planting.
  • 27.
    Harvesting Fully ripe Such fruits are usedfor processing. Breaker stage Such fruit are less prone to damage during shipment Reddish pink Fruits for local sale are harvested at this stage. Pink stage Pink colour observed on ¾ part of the fruit. Fruits to be shipped are harvested at this stage Dark green color
  • 28.
    Processing and ValueAddition Tomato Ketchup Tomato Sauce Tomato Soup Tomato Powder
  • 29.
    Local Market, Waraseoni ProcessingIndustry Value Addition Marketing
  • 30.
    Economics of Productionper ha Particulars Amount Cost of production (in 2200 m2) 14,683 Rs Yield of Tomato 25.5 q Price per Quintal 1000 Rs./quintal Gross income 25,570 Rs Cost of Production per Quintal Tomato 574.22 Rs/q B:C Ratio 1.47
  • 31.