This document analyzes the financial performance of the Chilime Hydropower Project located in Rasuwa District, Nepal. A group of 6 students conducted the analysis to calculate the variance, covariance, beta, and expected rate of return of the project. They collected market index and stock price data from July 2009 to June 2010 and used the capital asset pricing model formula in Excel. The results showed the project's beta was low at 0.08982, variance was positive, and expected returns were higher than the risk-free rate, indicating the investment was profitable. Therefore, the document concludes Chilime Hydropower is a good investment opportunity.