HP Mission Critical Converged Infrastructure

Expanding with Project
Odyssey




 Speaker Name -
 Title -




 © 2011 Hewlett-Packard Development Company, L.P.
 1      © Copyright 2011 Hewlett-Packard Development Company, L.P.
 The information contained herein is subject to change without notice.
HP’S STRATEGY
Only HP Can Deliver



Infrastructure – the core
World’s largest provider of IT infrastructure

Software – extend the core
Best-in-class software to expand, optimize, and
manage the core


Services – add value to the core
Services that add value to the core


Solutions – make it work
Customer-centric solutions that make it all work


2
2   © Copyright 2011 Hewlett-Packard Development Company, L.P.
HP’S PORTFOLIO
Only HP Can Deliver



                                                           Healthcare       Energy &       Comm. Media      Public                    Financial
                                                                                                                      Manufacturing
                                                          Life sciences    Distribution    Entertainment    Sector                    Services


          Make it Work                                     Application             Converged          Enterprise     Information      Hybrid




                                                                                                                                                  FINANCIAL SERVICES - CAPITAL OPTIMIZATION
          Instant-On Solutions                           Transformation           Infrastructure       Security      Optimization     Delivery




                                                                                                                                                      SOLUTIONS: ASSET MGMT & LEASING
      Add Value to the core                                                               Application and Business            Technology
                                                                  ITO Services
      Services                                                                                    Services                     Services



    Expand the core                                     Applications & Infrastructure              Information             Security & Risk
    Software                                                   Management                          Management               Management



The core                                                                                       Enterprise Servers,
                                                              Personal Systems                                              Imaging & Printing
Infrastructure                                                                                Storage & Networking




3
3    © Copyright 2011 Hewlett-Packard Development Company, L.P.
        © 2010 Hewlett-Packard Development Company
Customer Are Migrating Toward Cloud                                          (APJ customer survey)




 Private Cloud is the preferred choice
     for large orgs across all countries
     (58%)                                                                  Unsure Public
      • Private Cloud is accepted by most of                                 6%     9%
        customers
      • Public cloud has less acceptance                             Both
                •     Concern with service level                     27%
                •     Concern with data security
      • Significant number of hybrid cloud
                                                                                       Private
                •     Mission critical application/data will still
                      be deployed in private cloud                                      58%


 Few customer has no cloud strategy



 4
 4   © Copyright 2011 Hewlett-Packard Development Company, L.P.
             Source: Springboard Research, 10/2010
Converged Infrastructure Maturity Model
HP Cloud strategy is to assess current state based on standardized metrics of Converged
Infra and , to set up migration plan and to provide a strategy to the customers


                                                                                       Domains
                                      Technology &                  Management tools            Culture & staff     Demand, supply
                                       architecture                   & processes               (IT personnel)      & IT governance
                Stage 5:              Adaptive, Pooled,
                                        Automated
                                                                    Policy-Based, End-To-End,
                                                                           Management
                                                                                                    Business
                                                                                                Process Focused
                                                                                                                         Real Time
                                                                                                                        Alignment of     Customer
                Adaptive,              Infrastructure                                                                    Supply to
                  shared                                            IT Processes Automated &
                                                                                                                          Demand
                                                                                                                                          Desired
                                                                     Integrated with Business
              infrastructure                                                Processes
                                                                                                                                           state
               Stage 4:                SOA- Compliant                     Service-Based          Service Focused      Supply Driven by
                                        Infrastructure                    Management.                                 Service Demand
                Service                    Services                      Service Centric,                                Forecast
                Oriented                                                   Integrated IT
                                                                             Processes
                                        Consolidated,                  Integrated, Tools &       Cross Functional       Centralized
               Stage 3:                  Virtualized,                       Information           Expert Teams          Governance       Personal
                                            Shared                           Collection                                                  roadmap
              Optimized                 Infrastructure                    Consolidated,
                                                                                                                                         based on
                                                                         Rationalized, IT
                                                                             Processes                                                   priorities

               Stage 2:                  Standardized                     Standardized           Departmental/Te        Centralized
                                          Technology                     Tools Standard               ams             Policies, Supply
            Standardized                                                  IT Processes,                                Constrained

                                                                                                                                         Current
                                                                               ITIL
    Stage




               Stage 1:                  Dedicated,                      Project-Based             Technology           Manage to
                                                                                                                                          state
                                        Project-Based                 Management Tools &            Focused              Project
              Compart-                                                    Information                                  Resources &
              mentalized                                              Ad Hoc IT Processes                                Budget

5      © Copyright 2011 Hewlett-Packard Development Company, L.P.
HP: COMPLETE SOLUTIONS FOR HYBRID DELIVERY
 Foundational Solutions

                   CLOUD SERVICE AUTOMATION
                   CLOUD MANAGEMENT AND SECURITY SOLUTIONS


                     MANAGE AND SECURE
                     Cloud and existing IT services


                     BUILD                            CONSUME
                     Cloud Solutions                  Flexible       ENTERPRISE CLOUD
                     for Private &                    cloud
                     Public Clouds         Burst      services       SERVICES (COMPUTE &
                                                                     SECURITY)
CLOUDSYSTEM
                                                                     HP CLOUD SERVICES
                     TRANSFORM                                       (COMPUTE & OBJECT STORAGE)
                     Infrastructure and applications for the Cloud



                    CLOUD DISCOVERY WORKSHOP
                    APPLICATION TRANSFORMATION TO CLOUD

 6
THE NEXT GENERATION DATA CENTER
SHIFTING FROM DISCRETE/DISTRIBUTED TO VIRTUALIZED AND
ORCHESTRATED
                                                                                  HP Converged Infrastructure
              Today’s Datacenter                                                          Data Center of the Future


                                                     Hierarchical
                                                     Network
                                                                                                               Logical Switch

            Discrete                                                                                     Flat Network
            Switches
                                                                 1-1 Cabling                       Server Pool
                                                                                Virtual                                   Orchestrated
                                                                               Resource                                    Automated
                                                 One-off
                                                                                 Pool                                     Provisioning
                                               Provisioning
                                                                                                    Storage Pool


                                                                                                                   Integrated Service
                                                                                                                   Management and
                                                                                                                        Security
                Discrete Distributed Resources


                    Poorly Integrated Power                                                    Optimized Power

                      Cooling Infrastructure                                                 Cooling Infrastructure
7   © Copyright 2011 Hewlett-Packard Development Company, L.P.
MODELING CI’S EVOLUTION

    Physical Data Center                                             Virtualized Data Center                                     CI Data Center
    •             Servers: 1000                                      •             Servers: 250 (x4)                             •             Servers: <250
    •             Ports: >10k                                        •             Ports: >3k                                    •             Ports: >1k
    •             Switches: 32                                       •             Switches: 16                                  •             Switches: 6
    •             Cables: 9000                                       •             Cables: 3000                                  •             Cables: 600
    •             NIC/HCA: 8000                                      •             NIC/HCA: 2000                                 •             NIC/HCA: 500
    •             Power: $0.12/kwh                                   •             Power: $0.12/kwh                              •             Power: $0.12/kwh
        Power/Cooling




                                                                         Power/Cooling




                                                                                                                                     Power/Cooling
                                            Complexity
                                Resources




                                                                                                             Complexity
                                                                                                 Resources




                                                                                                                                                                         Complexity
                                                                                                                                                             Resources
                        Space




                                                                                         Space




                                                                                                                                                     Space
                                                         Cost




                                                                                                                          Cost




                                                                                                                                                                                      Cost
8       © Copyright 2011 Hewlett-Packard Development Company, L.P.                                                                                                                           8
AUTOMATION BENEFITS CLOUD
Proven customer success                                             Manual            Automated        Improvement

Deploy security patch                                                 2 days            3 minutes         >99%


Discover network vulnerability                                       2 weeks            2 minutes         >99%


Automate compliance                                                 32 weeks             2 days           >99%


Provision new storage                                               4-8 hours          15 minutes         90%

                                                                                         > 65%
Manage incidents                                                 High alert volume                     $4M savings
                                                                                       automation

Deploy application updates to                                        2 weeks           20 minutes         99%
2600 servers
Provision and configure 600                                         3-4 months          2 weeks           85%
Windows servers
                                                                     80+ sev1
Automatic health check                                                               1 incident/week      99%
                                                                  incidents/week


9   © Copyright 2011 Hewlett-Packard Development Company, L.P.
Odyssey Project Benefit
 Customer Invest protection
  - Capable of developing and operating Itanium HP-UX /x86 Windows,
 Linux Business apps in a Single Platform – Almost all applications in a
 Single Platform!!
  - A simplicity of system management
  - Saving floor cost ( no need to buy any separate heterogeneous System)




 Free from Vendor Lock-In
  - Open Architecture + ISV
  - No issue of SLR(S/W License Review)– SLR issue occurs when migrating
 a Platform and S/W of one vendor to another vendors.
  - Can leverage total price by adding service price after proposing lower
 initial purchase price
ONLY HP IS PAVING A PATH TO THE FUTURE



                                                                  MISSION-CRITICAL YOUR WAY
           The most mission-critical applications
             where downtime is not an option




               Compelled to trade off always-on
               resiliency for price performance
                                                                       Best of both worlds
                                                                        with no trade-offs




11   © Copyright 2011 Hewlett-Packard Development Company, L.P.
1
Only HP is Modernizing Mission-Critical Computing
            CONVENTIONAL IT                           CONVERGED IT



                     Multiple Infrastructures


                                                         NonStop
                    Mainframe Architecture

                   Legacy RISC Architecture

                       x86 Architecture



                      Locked-in cost            Liberated to innovate and drive
                   prohibitive legacy IT         down data center economics


 HP Confidential
TECTONIC SHIFT IN CUSTOMER EXPECTATION FOR
MISSION-CRITICAL


                                                                                 MISSION-
                                                                                 CRITICAL
                    MISSION-                              x86
                    CRITICAL

       MAIN-
      FRAME
                                                                                               x86
                                                                             EPIC/RISC
                         EPIC/RISC

                                                                                     MAIN-
                                                                                    FRAME




            INDUSTRY STANDARD                                       GREATER                  EXCEED
              MISSION-CRITICAL                                     FLEXIBILITY                SLAs




 13   © Copyright 2011 Hewlett-Packard Development Company, L.P.
 1
INTEGRITY IS THE DESIGN CENTER FOR
MISSION-CRITICAL




                                           ISV Ecosystem                 Innovation



     Itanium Roadmap                                                                  Support Life




                                                        VIBRANT CUSTOMER BASE



14    © Copyright 2011 Hewlett-Packard Development Company, L.P.
1
ADVANCING MISSION-CRITICAL INTEGRITY/HP-UX
EXPERIENCE


                                                                                         HP VIRTUALSYSTEM
           32 SOCKET                                                                     FOR SUPERDOME 2/HP-UX
        SUPERDOME 2



                                                                                    HP CLOUDSYSTEM
                  HP VIRTUAL                                                        MATRIX WITH HP-UX
                PARTITIONS v6
                                                                                    HP CLOUD MAPS

                                                                  HP SERVICEGUARD




15   © Copyright 2011 Hewlett-Packard Development Company, L.P.
1
HP’s strategy for mission-critical computing




                      Continued innovations in traditional mission-critical
     NonStop



                            Making mission-critical x86 a reality



          Extending HP’s Mission Critical Converged Infrastructure Strategy


16
Bringing Integrity/HP-UX Technology to x86



                                 HP Mission-Critical Infrastructure Software


                                       HP Mission-Critical
          Cascading
          Innovations
                                    HP Mission-Critical System Software


                                        HP Mission-Critical Servers

                                         HP Mission-Critical Services
       SUPERIOR                                                  ECONOMIC
        SCALING   BREAKTHROUGH                                  EFFICIENCIES
                                   INTELLIGENT     ULTIMATE
                    RESILIENCY     MANAGEMENT     FLEXIBILITY




17
Only HP will enable the
 full x86 mission-critical experience

                                                                    DRAGONHAWK



                       Serviceguard                  System
                         for Linux      nPars       Software
     HYDRALYNX


                                                         x86 in
                                      Crossbar
                 Analysis Engine                      Superdome 2
                                       Fabric
                                                       Enclosure



          SUPERIOR                                                   ECONOMIC
           SCALING   BREAKTHROUGH                                   EFFICIENCIES
                                      INTELLIGENT     ULTIMATE
                       RESILIENCY     MANAGEMENT     FLEXIBILITY




18
Completing mission-critical x86 experience
 with Services

      SERVER                                                  STORAGE


                      PROVEN MISSION-CRITICAL SERVICES

                                         Focus on
                                    Customer Experience


                        SERVICES INVESTMENT IN x86

                    Mission-Critical                Mission-Critical
                 Services for Windows              Services for Linux



      SERVICES                                            NETWORKING




19
Smart Path to Mission-Critical

       NonStop                                        • NonStop OS H06.24 and J06.13

                                          • NS2200
   NonStop                                • BladeSystem (Quad-Core)




                 • Extending mission-critical reach      • Flexible workload solutions      • Mission-critical integration


   Integrity                         32s Superdome 2


                 • v8.4 Update                                                                        • v8.x



                                                            Serviceguard for
   Building mission-                                             Linux
                                                                                                     • DragonHawk
   Critical x86                                                                                      • HydraLynx
                              DL980

                                          • SQL Optimizer • Error analysis & recovery, online patching • Dynamic utility computing



                              2011                               2012                                    Future
2020
“Intel’s continued innovation with a
                                                                  multi-generation Itanium processor
                                                                  roadmap, combined with existing and
                                                                  future mission-critical capabilities of
                                                                  Intel Xeon processors, allows HP and
                                                                  Intel to provide customers with greater
                                                                  flexibility and choice. Together with HP
                                                                  we will be able to give customers the
                                                                  ability to do mission critical computing
                                                                  on their terms, with a broad range of
                                                                  operating systems and applications.”

                                                                  Kirk Skaugen,
                                                                  Vice President and GM
                                                                  Datacenter and Connected Systems Group
                                                                  Intel




21   © Copyright 2011 Hewlett-Packard Development Company, L.P.
Market Praise for HP’s Project Odyssey



                                                                  “All in all, my take is that this a smart move on
                                                                  HP’s part… and a positive for both current HP-UX
                                                                  customers as well as anyone looking for future
                                                                  high-end Linux or Windows platforms.”

                                                                  HP-UX users on Integrity should “wait” if possible

                                                                  “HP's Odyssey program promises even greater
                                                                  gains in the future for HP customers.”   1




22   © Copyright 2011 Hewlett-Packard Development Company, L.P.
THANK YOU

Expanding mission critical ci

  • 1.
    HP Mission CriticalConverged Infrastructure Expanding with Project Odyssey Speaker Name - Title - © 2011 Hewlett-Packard Development Company, L.P. 1 © Copyright 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
  • 2.
    HP’S STRATEGY Only HPCan Deliver Infrastructure – the core World’s largest provider of IT infrastructure Software – extend the core Best-in-class software to expand, optimize, and manage the core Services – add value to the core Services that add value to the core Solutions – make it work Customer-centric solutions that make it all work 2 2 © Copyright 2011 Hewlett-Packard Development Company, L.P.
  • 3.
    HP’S PORTFOLIO Only HPCan Deliver Healthcare Energy & Comm. Media Public Financial Manufacturing Life sciences Distribution Entertainment Sector Services Make it Work Application Converged Enterprise Information Hybrid FINANCIAL SERVICES - CAPITAL OPTIMIZATION Instant-On Solutions Transformation Infrastructure Security Optimization Delivery SOLUTIONS: ASSET MGMT & LEASING Add Value to the core Application and Business Technology ITO Services Services Services Services Expand the core Applications & Infrastructure Information Security & Risk Software Management Management Management The core Enterprise Servers, Personal Systems Imaging & Printing Infrastructure Storage & Networking 3 3 © Copyright 2011 Hewlett-Packard Development Company, L.P. © 2010 Hewlett-Packard Development Company
  • 4.
    Customer Are MigratingToward Cloud (APJ customer survey)  Private Cloud is the preferred choice for large orgs across all countries (58%) Unsure Public • Private Cloud is accepted by most of 6% 9% customers • Public cloud has less acceptance Both • Concern with service level 27% • Concern with data security • Significant number of hybrid cloud Private • Mission critical application/data will still be deployed in private cloud 58%  Few customer has no cloud strategy 4 4 © Copyright 2011 Hewlett-Packard Development Company, L.P. Source: Springboard Research, 10/2010
  • 5.
    Converged Infrastructure MaturityModel HP Cloud strategy is to assess current state based on standardized metrics of Converged Infra and , to set up migration plan and to provide a strategy to the customers Domains Technology & Management tools Culture & staff Demand, supply architecture & processes (IT personnel) & IT governance Stage 5: Adaptive, Pooled, Automated Policy-Based, End-To-End, Management Business Process Focused Real Time Alignment of Customer Adaptive, Infrastructure Supply to shared IT Processes Automated & Demand Desired Integrated with Business infrastructure Processes state Stage 4: SOA- Compliant Service-Based Service Focused Supply Driven by Infrastructure Management. Service Demand Service Services Service Centric, Forecast Oriented Integrated IT Processes Consolidated, Integrated, Tools & Cross Functional Centralized Stage 3: Virtualized, Information Expert Teams Governance Personal Shared Collection roadmap Optimized Infrastructure Consolidated, based on Rationalized, IT Processes priorities Stage 2: Standardized Standardized Departmental/Te Centralized Technology Tools Standard ams Policies, Supply Standardized IT Processes, Constrained Current ITIL Stage Stage 1: Dedicated, Project-Based Technology Manage to state Project-Based Management Tools & Focused Project Compart- Information Resources & mentalized Ad Hoc IT Processes Budget 5 © Copyright 2011 Hewlett-Packard Development Company, L.P.
  • 6.
    HP: COMPLETE SOLUTIONSFOR HYBRID DELIVERY Foundational Solutions CLOUD SERVICE AUTOMATION CLOUD MANAGEMENT AND SECURITY SOLUTIONS MANAGE AND SECURE Cloud and existing IT services BUILD CONSUME Cloud Solutions Flexible ENTERPRISE CLOUD for Private & cloud Public Clouds Burst services SERVICES (COMPUTE & SECURITY) CLOUDSYSTEM HP CLOUD SERVICES TRANSFORM (COMPUTE & OBJECT STORAGE) Infrastructure and applications for the Cloud CLOUD DISCOVERY WORKSHOP APPLICATION TRANSFORMATION TO CLOUD 6
  • 7.
    THE NEXT GENERATIONDATA CENTER SHIFTING FROM DISCRETE/DISTRIBUTED TO VIRTUALIZED AND ORCHESTRATED HP Converged Infrastructure Today’s Datacenter Data Center of the Future Hierarchical Network Logical Switch Discrete Flat Network Switches 1-1 Cabling Server Pool Virtual Orchestrated Resource Automated One-off Pool Provisioning Provisioning Storage Pool Integrated Service Management and Security Discrete Distributed Resources Poorly Integrated Power Optimized Power Cooling Infrastructure Cooling Infrastructure 7 © Copyright 2011 Hewlett-Packard Development Company, L.P.
  • 8.
    MODELING CI’S EVOLUTION Physical Data Center Virtualized Data Center CI Data Center • Servers: 1000 • Servers: 250 (x4) • Servers: <250 • Ports: >10k • Ports: >3k • Ports: >1k • Switches: 32 • Switches: 16 • Switches: 6 • Cables: 9000 • Cables: 3000 • Cables: 600 • NIC/HCA: 8000 • NIC/HCA: 2000 • NIC/HCA: 500 • Power: $0.12/kwh • Power: $0.12/kwh • Power: $0.12/kwh Power/Cooling Power/Cooling Power/Cooling Complexity Resources Complexity Resources Complexity Resources Space Space Space Cost Cost Cost 8 © Copyright 2011 Hewlett-Packard Development Company, L.P. 8
  • 9.
    AUTOMATION BENEFITS CLOUD Provencustomer success Manual Automated Improvement Deploy security patch 2 days 3 minutes >99% Discover network vulnerability 2 weeks 2 minutes >99% Automate compliance 32 weeks 2 days >99% Provision new storage 4-8 hours 15 minutes 90% > 65% Manage incidents High alert volume $4M savings automation Deploy application updates to 2 weeks 20 minutes 99% 2600 servers Provision and configure 600 3-4 months 2 weeks 85% Windows servers 80+ sev1 Automatic health check 1 incident/week 99% incidents/week 9 © Copyright 2011 Hewlett-Packard Development Company, L.P.
  • 10.
    Odyssey Project Benefit Customer Invest protection - Capable of developing and operating Itanium HP-UX /x86 Windows, Linux Business apps in a Single Platform – Almost all applications in a Single Platform!! - A simplicity of system management - Saving floor cost ( no need to buy any separate heterogeneous System) Free from Vendor Lock-In - Open Architecture + ISV - No issue of SLR(S/W License Review)– SLR issue occurs when migrating a Platform and S/W of one vendor to another vendors. - Can leverage total price by adding service price after proposing lower initial purchase price
  • 11.
    ONLY HP ISPAVING A PATH TO THE FUTURE MISSION-CRITICAL YOUR WAY The most mission-critical applications where downtime is not an option Compelled to trade off always-on resiliency for price performance Best of both worlds with no trade-offs 11 © Copyright 2011 Hewlett-Packard Development Company, L.P. 1
  • 12.
    Only HP isModernizing Mission-Critical Computing CONVENTIONAL IT CONVERGED IT Multiple Infrastructures NonStop Mainframe Architecture Legacy RISC Architecture x86 Architecture Locked-in cost Liberated to innovate and drive prohibitive legacy IT down data center economics HP Confidential
  • 13.
    TECTONIC SHIFT INCUSTOMER EXPECTATION FOR MISSION-CRITICAL MISSION- CRITICAL MISSION- x86 CRITICAL MAIN- FRAME x86 EPIC/RISC EPIC/RISC MAIN- FRAME INDUSTRY STANDARD GREATER EXCEED MISSION-CRITICAL FLEXIBILITY SLAs 13 © Copyright 2011 Hewlett-Packard Development Company, L.P. 1
  • 14.
    INTEGRITY IS THEDESIGN CENTER FOR MISSION-CRITICAL ISV Ecosystem Innovation Itanium Roadmap Support Life VIBRANT CUSTOMER BASE 14 © Copyright 2011 Hewlett-Packard Development Company, L.P. 1
  • 15.
    ADVANCING MISSION-CRITICAL INTEGRITY/HP-UX EXPERIENCE HP VIRTUALSYSTEM 32 SOCKET FOR SUPERDOME 2/HP-UX SUPERDOME 2 HP CLOUDSYSTEM HP VIRTUAL MATRIX WITH HP-UX PARTITIONS v6 HP CLOUD MAPS HP SERVICEGUARD 15 © Copyright 2011 Hewlett-Packard Development Company, L.P. 1
  • 16.
    HP’s strategy formission-critical computing Continued innovations in traditional mission-critical NonStop Making mission-critical x86 a reality Extending HP’s Mission Critical Converged Infrastructure Strategy 16
  • 17.
    Bringing Integrity/HP-UX Technologyto x86 HP Mission-Critical Infrastructure Software HP Mission-Critical Cascading Innovations HP Mission-Critical System Software HP Mission-Critical Servers HP Mission-Critical Services SUPERIOR ECONOMIC SCALING BREAKTHROUGH EFFICIENCIES INTELLIGENT ULTIMATE RESILIENCY MANAGEMENT FLEXIBILITY 17
  • 18.
    Only HP willenable the full x86 mission-critical experience DRAGONHAWK Serviceguard System for Linux nPars Software HYDRALYNX x86 in Crossbar Analysis Engine Superdome 2 Fabric Enclosure SUPERIOR ECONOMIC SCALING BREAKTHROUGH EFFICIENCIES INTELLIGENT ULTIMATE RESILIENCY MANAGEMENT FLEXIBILITY 18
  • 19.
    Completing mission-critical x86experience with Services SERVER STORAGE PROVEN MISSION-CRITICAL SERVICES Focus on Customer Experience SERVICES INVESTMENT IN x86 Mission-Critical Mission-Critical Services for Windows Services for Linux SERVICES NETWORKING 19
  • 20.
    Smart Path toMission-Critical NonStop • NonStop OS H06.24 and J06.13 • NS2200 NonStop • BladeSystem (Quad-Core) • Extending mission-critical reach • Flexible workload solutions • Mission-critical integration Integrity 32s Superdome 2 • v8.4 Update • v8.x Serviceguard for Building mission- Linux • DragonHawk Critical x86 • HydraLynx DL980 • SQL Optimizer • Error analysis & recovery, online patching • Dynamic utility computing 2011 2012 Future 2020
  • 21.
    “Intel’s continued innovationwith a multi-generation Itanium processor roadmap, combined with existing and future mission-critical capabilities of Intel Xeon processors, allows HP and Intel to provide customers with greater flexibility and choice. Together with HP we will be able to give customers the ability to do mission critical computing on their terms, with a broad range of operating systems and applications.” Kirk Skaugen, Vice President and GM Datacenter and Connected Systems Group Intel 21 © Copyright 2011 Hewlett-Packard Development Company, L.P.
  • 22.
    Market Praise forHP’s Project Odyssey “All in all, my take is that this a smart move on HP’s part… and a positive for both current HP-UX customers as well as anyone looking for future high-end Linux or Windows platforms.” HP-UX users on Integrity should “wait” if possible “HP's Odyssey program promises even greater gains in the future for HP customers.” 1 22 © Copyright 2011 Hewlett-Packard Development Company, L.P.
  • 23.