SlideShare a Scribd company logo
Areas of Expertise:
 4M analysis Part 1 and Part 2
 QC Story approach
 Perform root cause analysis and other problem solving activities
 Engineering Notice (EN’s) coordination
 Conducting DCP, SPC, MSA, PPAP & SOP
 Human Error Prevention (HEP)
 5’s implementation in workplace
 Testing and inspection of products based on its drawing
 Check/review/generate QC Reports
 Interact with customers to identify opportunities to improve quality
 Manpower handling and work allotment
 Conducting Quick Concern Resolution Team (QCRT) for a severe quality concern in
Line, RFI & ANOVAC
 Poka-Yoke, KAIZENS implementation for quality improvement
Career Highlights:
 Closed 25 concerns through 4M analysis in the span of 5months
 Resolved two concerns through QC story approach.
 Special tool made and provided for Driver seat mounting nut tightening in new
model COMFY where there was least feasibility to perform that operation.
 External closure cap provided to the Transaxle oil container to reduce the prone of
water entry in to the container while oil filling into engine which reduced rework
cost per veh about Rs. 135/-
 Special tool made for checking the torque integrity on daily basis for a Specific joint
which turned non detectable into detectable.
 Provided torque value for joints and deployed torque wrenches with desired set
value for ensuring proper tightening of two specific joints on veh which eliminated
the concern of loose mounting.
 Active member in closure of “Rear grill unable to mount” through Mahindra Green
Belt (MGB) project
 Changed the hardware of Rear grill mountings while launching new models
CHAMP,COMFY to eliminate the concern of mounting bolts unable to tighten which
was also cost saving of Rs. 2/- per veh compared with the previous hardware
 Received appreciation from PU head for handling shifts effectively in the absence of
managers

More Related Content

What's hot

3. Asset Enablement and Calibration
3. Asset Enablement and Calibration3. Asset Enablement and Calibration
3. Asset Enablement and CalibrationRian van der Merwe
 
Strategic Elements for Successful Performance Testing
Strategic Elements for Successful Performance Testing Strategic Elements for Successful Performance Testing
Strategic Elements for Successful Performance Testing
Impetus Technologies
 
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
Viswajit Mani Kumar Koyada
 
Nagendra_01_Nov_2015
Nagendra_01_Nov_2015Nagendra_01_Nov_2015
Nagendra_01_Nov_2015Nagendra Urs
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitaeKiran Gp
 
Addressing Performance Testing Challenges in Agile- Impetus Webinar
Addressing Performance Testing Challenges in Agile- Impetus WebinarAddressing Performance Testing Challenges in Agile- Impetus Webinar
Addressing Performance Testing Challenges in Agile- Impetus Webinar
Impetus Technologies
 
Case study manual testing web application
Case study manual testing web applicationCase study manual testing web application
Case study manual testing web application
Krishna Gurjar
 
Ralph W pete Peters NFMT Session 031810
Ralph W pete Peters NFMT Session 031810Ralph W pete Peters NFMT Session 031810
Ralph W pete Peters NFMT Session 031810
Ralph W Peters
 
ERP
ERPERP
Performance Testing in the Agile Lifecycle
Performance Testing in the Agile LifecyclePerformance Testing in the Agile Lifecycle
Performance Testing in the Agile Lifecycle
Lee Barnes
 

What's hot (20)

dapski042116
dapski042116dapski042116
dapski042116
 
updated CV (2)
updated CV (2)updated CV (2)
updated CV (2)
 
Pradeep CV
Pradeep CV Pradeep CV
Pradeep CV
 
3. Asset Enablement and Calibration
3. Asset Enablement and Calibration3. Asset Enablement and Calibration
3. Asset Enablement and Calibration
 
Prashant Masali - profile
Prashant Masali - profilePrashant Masali - profile
Prashant Masali - profile
 
Strategic Elements for Successful Performance Testing
Strategic Elements for Successful Performance Testing Strategic Elements for Successful Performance Testing
Strategic Elements for Successful Performance Testing
 
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
 
Nagendra_01_Nov_2015
Nagendra_01_Nov_2015Nagendra_01_Nov_2015
Nagendra_01_Nov_2015
 
Vaibhav
VaibhavVaibhav
Vaibhav
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitae
 
Sagar Pagar-1
Sagar Pagar-1Sagar Pagar-1
Sagar Pagar-1
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
Addressing Performance Testing Challenges in Agile- Impetus Webinar
Addressing Performance Testing Challenges in Agile- Impetus WebinarAddressing Performance Testing Challenges in Agile- Impetus Webinar
Addressing Performance Testing Challenges in Agile- Impetus Webinar
 
Case study manual testing web application
Case study manual testing web applicationCase study manual testing web application
Case study manual testing web application
 
Ralph W pete Peters NFMT Session 031810
Ralph W pete Peters NFMT Session 031810Ralph W pete Peters NFMT Session 031810
Ralph W pete Peters NFMT Session 031810
 
ERP
ERPERP
ERP
 
Performance Testing in the Agile Lifecycle
Performance Testing in the Agile LifecyclePerformance Testing in the Agile Lifecycle
Performance Testing in the Agile Lifecycle
 
CV JAVED
CV JAVEDCV JAVED
CV JAVED
 
MUKESH G. CHAVAN-FD
MUKESH G. CHAVAN-FDMUKESH G. CHAVAN-FD
MUKESH G. CHAVAN-FD
 
Sumit Balhara QA
Sumit Balhara QASumit Balhara QA
Sumit Balhara QA
 

Viewers also liked

Crime And Police
Crime And Police
Crime And Police
Crime And Police
reflectivehuman65
 
final script fin
final script finfinal script fin
final script fin
jessowen98
 
Kukuruz
KukuruzKukuruz
Global Market Update
Global Market UpdateGlobal Market Update
Global Market Update
Agrud
 
Script final draft new
Script  final draft newScript  final draft new
Script final draft new
jessowen98
 
WEF_TC_acknowledgment_Report_2014-2
WEF_TC_acknowledgment_Report_2014-2WEF_TC_acknowledgment_Report_2014-2
WEF_TC_acknowledgment_Report_2014-2Mohamed Hosny
 
Правова освіта дошкільників в днз
Правова освіта дошкільників в днзПравова освіта дошкільників в днз
Правова освіта дошкільників в днз
Oksana Tutunik
 
Ευχές
ΕυχέςΕυχές
Ευχές
gvlachos
 
Wsr сх 1
Wsr сх 1Wsr сх 1
Wsr сх 1
labdua
 
Impacts of Hydrodynamic Disturbance on Sediment Resuspension, Phosphorus and ...
Impacts of Hydrodynamic Disturbance on Sediment Resuspension, Phosphorus and ...Impacts of Hydrodynamic Disturbance on Sediment Resuspension, Phosphorus and ...
Impacts of Hydrodynamic Disturbance on Sediment Resuspension, Phosphorus and ...Jian Huang
 

Viewers also liked (14)

Crime And Police
Crime And Police
Crime And Police
Crime And Police
 
final script fin
final script finfinal script fin
final script fin
 
Kukuruz
KukuruzKukuruz
Kukuruz
 
Comenzar
ComenzarComenzar
Comenzar
 
Bitácora 36
Bitácora 36Bitácora 36
Bitácora 36
 
Global Market Update
Global Market UpdateGlobal Market Update
Global Market Update
 
Script final draft new
Script  final draft newScript  final draft new
Script final draft new
 
WEF_TC_acknowledgment_Report_2014-2
WEF_TC_acknowledgment_Report_2014-2WEF_TC_acknowledgment_Report_2014-2
WEF_TC_acknowledgment_Report_2014-2
 
Educación preescolar
Educación preescolarEducación preescolar
Educación preescolar
 
Правова освіта дошкільників в днз
Правова освіта дошкільників в днзПравова освіта дошкільників в днз
Правова освіта дошкільників в днз
 
Ευχές
ΕυχέςΕυχές
Ευχές
 
Wsr сх 1
Wsr сх 1Wsr сх 1
Wsr сх 1
 
Tarea 3 francés
Tarea 3 francésTarea 3 francés
Tarea 3 francés
 
Impacts of Hydrodynamic Disturbance on Sediment Resuspension, Phosphorus and ...
Impacts of Hydrodynamic Disturbance on Sediment Resuspension, Phosphorus and ...Impacts of Hydrodynamic Disturbance on Sediment Resuspension, Phosphorus and ...
Impacts of Hydrodynamic Disturbance on Sediment Resuspension, Phosphorus and ...
 

Similar to Exp Mahindra

Bharath Kumar Resume
Bharath Kumar ResumeBharath Kumar Resume
Bharath Kumar ResumeBharath Kumar
 
Ajay_Training_Report[1]
Ajay_Training_Report[1]Ajay_Training_Report[1]
Ajay_Training_Report[1]AJAY KUMAR
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Managerjaymehta2
 
@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@Pravin Sadare
 
Six Sigma Final Outline
Six Sigma Final OutlineSix Sigma Final Outline
Six Sigma Final Outline
Stanley E. Mitchell, Sr.
 
Greenbelt Six Sigma Final Outline
Greenbelt Six Sigma Final OutlineGreenbelt Six Sigma Final Outline
Greenbelt Six Sigma Final Outline
guest098cf2fe
 
BE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in productionBE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in production
Jaga deesh
 
hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp Hemant Kadam
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTSUYASH TRIVEDI
 
Df Maint Tutorial
Df Maint TutorialDf Maint Tutorial
Df Maint Tutorial
ahmad bassiouny
 
Varun Kumar-Design Engineer_new
Varun Kumar-Design Engineer_newVarun Kumar-Design Engineer_new
Varun Kumar-Design Engineer_newVarun Singh
 
Six Sigma Final PPT - Revised
Six Sigma Final PPT - RevisedSix Sigma Final PPT - Revised
Six Sigma Final PPT - RevisedSomrita Ghatak
 
Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Kedar Borgaonkar
 
Pramod K Shukla Resume
Pramod K Shukla ResumePramod K Shukla Resume
Pramod K Shukla ResumePramod Shukla
 
Jgj cv 03.08.2018
Jgj cv 03.08.2018Jgj cv 03.08.2018
Jgj cv 03.08.2018
Jayant Joshi
 

Similar to Exp Mahindra (20)

Bharath Kumar Resume
Bharath Kumar ResumeBharath Kumar Resume
Bharath Kumar Resume
 
Ajay_Training_Report[1]
Ajay_Training_Report[1]Ajay_Training_Report[1]
Ajay_Training_Report[1]
 
Resume
ResumeResume
Resume
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Manager
 
@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Six Sigma Final Outline
Six Sigma Final OutlineSix Sigma Final Outline
Six Sigma Final Outline
 
Greenbelt Six Sigma Final Outline
Greenbelt Six Sigma Final OutlineGreenbelt Six Sigma Final Outline
Greenbelt Six Sigma Final Outline
 
BE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in productionBE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in production
 
hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Df Maint Tutorial
Df Maint TutorialDf Maint Tutorial
Df Maint Tutorial
 
Varun Kumar-Design Engineer_new
Varun Kumar-Design Engineer_newVarun Kumar-Design Engineer_new
Varun Kumar-Design Engineer_new
 
G28 dec8 ASR Resu
G28 dec8 ASR ResuG28 dec8 ASR Resu
G28 dec8 ASR Resu
 
Engels_Resume
Engels_ResumeEngels_Resume
Engels_Resume
 
Six Sigma Final PPT - Revised
Six Sigma Final PPT - RevisedSix Sigma Final PPT - Revised
Six Sigma Final PPT - Revised
 
Gauravcv
GauravcvGauravcv
Gauravcv
 
Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16
 
Pramod K Shukla Resume
Pramod K Shukla ResumePramod K Shukla Resume
Pramod K Shukla Resume
 
Jgj cv 03.08.2018
Jgj cv 03.08.2018Jgj cv 03.08.2018
Jgj cv 03.08.2018
 

Exp Mahindra

  • 1. Areas of Expertise:  4M analysis Part 1 and Part 2  QC Story approach  Perform root cause analysis and other problem solving activities  Engineering Notice (EN’s) coordination  Conducting DCP, SPC, MSA, PPAP & SOP  Human Error Prevention (HEP)  5’s implementation in workplace  Testing and inspection of products based on its drawing  Check/review/generate QC Reports  Interact with customers to identify opportunities to improve quality  Manpower handling and work allotment  Conducting Quick Concern Resolution Team (QCRT) for a severe quality concern in Line, RFI & ANOVAC  Poka-Yoke, KAIZENS implementation for quality improvement Career Highlights:  Closed 25 concerns through 4M analysis in the span of 5months  Resolved two concerns through QC story approach.  Special tool made and provided for Driver seat mounting nut tightening in new model COMFY where there was least feasibility to perform that operation.  External closure cap provided to the Transaxle oil container to reduce the prone of water entry in to the container while oil filling into engine which reduced rework cost per veh about Rs. 135/-  Special tool made for checking the torque integrity on daily basis for a Specific joint which turned non detectable into detectable.  Provided torque value for joints and deployed torque wrenches with desired set value for ensuring proper tightening of two specific joints on veh which eliminated the concern of loose mounting.
  • 2.  Active member in closure of “Rear grill unable to mount” through Mahindra Green Belt (MGB) project  Changed the hardware of Rear grill mountings while launching new models CHAMP,COMFY to eliminate the concern of mounting bolts unable to tighten which was also cost saving of Rs. 2/- per veh compared with the previous hardware  Received appreciation from PU head for handling shifts effectively in the absence of managers