After collecting data through work sampling, the team generated spaghetti diagrams to map the paths workers traveled throughout the production areas. The diagrams revealed significant unnecessary travel beyond individual workstations. Tables 7 and 8 then calculate the expected annual savings from reduced labor costs, improved space utilization, lower rework, and reduced inventory costs expected to total $99,300 through proposed changes.