The document summarizes a feasibility study conducted by the US Army Corps of Engineers to develop renewable energy at a military training complex in Afghanistan. It assessed various renewable technologies including wind turbines, solar PV, solar hot water, and lighting retrofits. Due to logistical and maintenance challenges, larger wind turbines and solar arrays were deemed too difficult and smaller, distributed systems were recommended instead. Contractors in Kabul could install and maintain the proposed smaller systems. The study also considered energy efficiency upgrades and conducted site assessments to identify the best locations for wind turbines.
AC Transit engages with SunPower to save $5 million over the next 25 yearssunpower
AC (Alameda - Contra Costa) Transit District in California serves more than 215,000 commuters every day, and is dedicated to improving the quality of life and the health of the environment... http://us.sunpower.com/
Rural electrification by Lakshmi.Nidoni-Seminar report finallakshmi nidoni
ABSTRACT
In India, more than 200 million people live in rural areas without access to grid-connected power. A convenient & cost-effective solution would be hybrid power systems which can reduce dependency on grid supply, improve reliability. For a typical domestic load a solar –wind hybrid system is designed with charge controller to charge a conventional battery. To optimize system efficiency, a simple algorithm is developed for system sizing. Total cost of unit is calculated using life cycle cost analysis and payback period.
AC Transit engages with SunPower to save $5 million over the next 25 yearssunpower
AC (Alameda - Contra Costa) Transit District in California serves more than 215,000 commuters every day, and is dedicated to improving the quality of life and the health of the environment... http://us.sunpower.com/
Rural electrification by Lakshmi.Nidoni-Seminar report finallakshmi nidoni
ABSTRACT
In India, more than 200 million people live in rural areas without access to grid-connected power. A convenient & cost-effective solution would be hybrid power systems which can reduce dependency on grid supply, improve reliability. For a typical domestic load a solar –wind hybrid system is designed with charge controller to charge a conventional battery. To optimize system efficiency, a simple algorithm is developed for system sizing. Total cost of unit is calculated using life cycle cost analysis and payback period.
Smart Cities presentation at the Renewable Energy Conference at Eilat EilotHaim R. Branisteanu
My presentation of "Smart Cities" storage at Eilat- Eilot Renewable Energy Conference, of course there are many comments and explanations to add to each slide in this presentation, including recent LCOE report form Australia (see also Clarifications for Peer to Peer Networks in “Smart Cities” document.)
Rural electrification by Lakshmi.Nidoni-seminar pptlakshmi nidoni
ABSTRACT
In India, more than 200 million people live in rural areas without access to grid-connected power. A convenient & cost-effective solution would be hybrid power systems which can reduce dependency on grid supply, improve reliability. For a typical domestic load a solar –wind hybrid system is designed with charge controller to charge a conventional battery. To optimize system efficiency, a simple algorithm is developed for system sizing. Total cost of unit is calculated using life cycle cost analysis and payback period.
this is a presentation done to give awareness about power generation and generation using renewable energy sources to children s .In this presentation a new approach of using renewable is give that is "INTEGRATION OF RENEWABLE ENERGY RESOURCES"
GRAPHENE WILL BECOME THE GAME CHANGER - it is a thinnest and strongest material ever tested and high efficient capacity to overcome in all fields especially in biomedical and energy storage applications.
Solar energy is radiant light and heat from the Sun harnessed using a range of ever-evolving technologies such as solar heating, photovoltaics, solar thermal energy, solar architecture and artificial photosynthesis.
HYBRID POWER GENERATION SYSTEM From KMP CollegeHIGHVOLTEEE
Today, the world is progressing at quite a fast rate with the use of the conventional sources of energy. The two major demerits of using them are the environmental pollution created by its use and its limited quantity.
On the other hand the Non-conventional sources of energy are available in plenty, free of cost and pollution free.
Many types of clean and renewable energy sources can be used in the production of electrical energy.
The most vital way to take care of our lives is to take the responsibility of our own energy foot print.
Renewable energy plays an important role in the supply of energy. When renewable energy sources are used, the demand for fossil fuels is reduced. Unlike fossil fuels, non-biomass renewable sources of energy (photovoltaics, wind, hydropower, and geothermal) do not directly emit greenhouse gases.
Renewable energy is energy generated from natural resources such as : sunlight, wind, tides, and geothermal heat which are renewable (naturally replenished).
The use of renewable energy is not new. More than 150 years ago wood, which is one form of biomass, supplied up to 90 percent of the energy needs. e.
Now over half of renewable energy goes to producing electricity.
Greenway self park building is a green building.
Greenway Self Park building is an 11-storey building for parking with charging stations for vehicles and sharing vehicles with the use of wind energy in form of VAWT i.e. Helix wind turbines with a green roof top and also a rainwater harvesting system .
Smart Cities presentation at the Renewable Energy Conference at Eilat EilotHaim R. Branisteanu
My presentation of "Smart Cities" storage at Eilat- Eilot Renewable Energy Conference, of course there are many comments and explanations to add to each slide in this presentation, including recent LCOE report form Australia (see also Clarifications for Peer to Peer Networks in “Smart Cities” document.)
Rural electrification by Lakshmi.Nidoni-seminar pptlakshmi nidoni
ABSTRACT
In India, more than 200 million people live in rural areas without access to grid-connected power. A convenient & cost-effective solution would be hybrid power systems which can reduce dependency on grid supply, improve reliability. For a typical domestic load a solar –wind hybrid system is designed with charge controller to charge a conventional battery. To optimize system efficiency, a simple algorithm is developed for system sizing. Total cost of unit is calculated using life cycle cost analysis and payback period.
this is a presentation done to give awareness about power generation and generation using renewable energy sources to children s .In this presentation a new approach of using renewable is give that is "INTEGRATION OF RENEWABLE ENERGY RESOURCES"
GRAPHENE WILL BECOME THE GAME CHANGER - it is a thinnest and strongest material ever tested and high efficient capacity to overcome in all fields especially in biomedical and energy storage applications.
Solar energy is radiant light and heat from the Sun harnessed using a range of ever-evolving technologies such as solar heating, photovoltaics, solar thermal energy, solar architecture and artificial photosynthesis.
HYBRID POWER GENERATION SYSTEM From KMP CollegeHIGHVOLTEEE
Today, the world is progressing at quite a fast rate with the use of the conventional sources of energy. The two major demerits of using them are the environmental pollution created by its use and its limited quantity.
On the other hand the Non-conventional sources of energy are available in plenty, free of cost and pollution free.
Many types of clean and renewable energy sources can be used in the production of electrical energy.
The most vital way to take care of our lives is to take the responsibility of our own energy foot print.
Renewable energy plays an important role in the supply of energy. When renewable energy sources are used, the demand for fossil fuels is reduced. Unlike fossil fuels, non-biomass renewable sources of energy (photovoltaics, wind, hydropower, and geothermal) do not directly emit greenhouse gases.
Renewable energy is energy generated from natural resources such as : sunlight, wind, tides, and geothermal heat which are renewable (naturally replenished).
The use of renewable energy is not new. More than 150 years ago wood, which is one form of biomass, supplied up to 90 percent of the energy needs. e.
Now over half of renewable energy goes to producing electricity.
Greenway self park building is a green building.
Greenway Self Park building is an 11-storey building for parking with charging stations for vehicles and sharing vehicles with the use of wind energy in form of VAWT i.e. Helix wind turbines with a green roof top and also a rainwater harvesting system .
Energy Conservation, Energy in Afghanistan, Ways to Save energy, Sources Of Energy In Afghanistan
Engr.Ahmad Sameer Nawab
Kardan University Kabul, Afghanistan
A Praposal For Installation of 10 mw solar thermal power plant.Saurabh Biswas
A Business Praposal for goverment to install a 10 mw solar thermal power plant in dehradun ( hilly area) , our company PLUGS allow u to generate the power in a low budget...
OZ Assignment Help leading in Assignment services in Australia, ECE464 Power Electronics Assignment Solution discuss renewable energy source, energy facility
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable PowerClean Energy Canada
Navius Research Inc. and Steve Davis & Associates produced a conceptual design for powering the LNG terminal on the North Coast that would maximize renewables at its production facility and do so reliably, affordably and on schedule—using established commercial technologies. Further, doing so reduces that plant’s carbon pollution by 45 percent, its air emissions - nitrogen oxides - by 70 percent and increases local permanent jobs by 40 percent. The cost for all these benefits? A 1 percent increase in projected sales price of the LNG.
Presentation by Bushveld Energy at the African Solar Energy Forum in Accra, Ghana on 16 October 2019. The presentation covers four topics:
1) Overview of energy storage uses and technologies, including their current states of maturity;
2) Benefits to combining solar PV with storage, especially battery energy storage systems (BESS)
3) Examples from Bushveld’s experience in combining BESS with PV for commercial and industrial customers;
4) Introduction to Bushveld and its approach to BESS projects.
Nwtc seminar overview of the impact of turbulence on turbine dynamics, sept...ndkelley
Overview presentation on the impact of atmospheric turbulence on the dynamic response of wind turbines derived from 20 years of research at the National Renewable Energy Laboratory.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Renewable Energy Development for the Afghanistan National Security University by Bill Stein 31 jan 2012
1. US Army Corps of Engineers
BUILDING STRONG®
Renewable Energy Development for a
Military Training Complex in
Afghanistan
William Stein
Benjamin Barnes
US Army ERDC-CERL
Energy, Utility & Environment Conference
(EUEC 2012), Session K-3
Phoenix AZ USA
31 January 2012
Distribution Statement A - Approved for public
release; distribution is unlimited.
2. BUILDING STRONG®
Outline
• Information collected after feasibility study
• Results from discussion with SSA
• Assessment plan
• Wind
• Solar PV
• Solar Hot Water + Diesel/Propane Boilers
• Lighting retrofit
• Reflective roofs
• Window retrofit
• Waste water treatment potentials
• WTE
• Phases II and III
• Acknowledgements
2
3. BUILDING STRONG®
Information collected after feasibility study
The 3 X cost multiplier does not capture in sufficient detail the site conditions
• Logistical difficulties:
• 1 MW turbine requires a 300 ton crane
• Largest section to move by truck is 35m long
• Multiple contractors around Kabul verify that the
largest crane available is 125 tons.
• Theft and vandalism are issues.
• Lack of technical capacity available for
operation and maintenance.
• USAID failures in micro-hydro caused them to
recommend: “In the short-term, make every effort
to slow developments to match the capacity by
downsizing planned government and donor
programs … to accommodate sustainable
development.”
• Rough terrain, insufficient
roads.
Eastern ridge of ANSU site, typical terrain.
Photo credit: Ben Barnes, CERL
3
4. BUILDING STRONG®
Results From In-Brief with the Senior Science
Advisor (SSA) to the Commander
GO-AHEAD GIVEN TO:
• Reduce the size and increase
the number of wind turbines.
Five 10-12 kW units tentatively
approved; potential for more.
• Install 50 kW PV in multiple small
systems.
• Consider efficiency and low-tech
RE for RFP.
• Cancel complex WTE plant.
• Cancel complex anaerobic
digester.
EMPHASIS ON:
• Social value: demonstrating that
RE can work here, showing the
public that we’re trying things
that work.
• Five-year paybacks are preferred
• Waste and waste-water sludge
both still require trucking off the
installation, which presents a
security issue. If possible, SSA
would still like recommendations
on these items.
4
5. BUILDING STRONG®
Renewable Energy
• 10-12 kW wind turbines
• 50 kW PV in multiple small systems.
• Solar hot water (potentially with diesel or propane
boiler)
• Transpired solar walls on the few buildings with
makeup air
Energy Efficiency
• Lighting retrofit
• Window retrofit
• Reflective roof coatings
Assessment Plan
Technologies Considered
5
6. BUILDING STRONG®
• Met with Renewable Energy Enterprises (REE), an
Afghan-owned company with a permanent
presence in Kabul.
• Exchanged emails with and reviewed the work of
Sustainable Energy Services Afghanistan (SESA),
a company installing systems and training Afghan
technicians in Kabul.
• Concluded that qualified, local companies exist,
both with experience in the technologies we are
considering.
Assessment Plan
Verify Availability of Technology/Contractors
6
7. BUILDING STRONG®
Wind Power
Installing a 1MW wind turbine is impossible at worst, risky at best
The limitations mentioned above
make a 1 MW turbine risky at best.
Even if it could be installed and
maintained, it is an unrealistically
large investment for a site with no
detailed wind study.
Furthermore, multiple small
resources increases resiliency in a
difficult maintenance environment;
failed turbines represent a smaller
percentage of the overall capacity,
and can be cannibalized for parts if
necessary.
http://www.brighterenergy.org/wp-
content/uploads/2010/05/nordic.jpg
7
8. BUILDING STRONG®
Wind Power
Contractors in Kabul have the capacity to install and maintain small turbines
Panjshir Valley wind power
project, SES Afghanistan (using
10 kW Bergey)
http://sesa.af/projects/panjshir-valley/gallery/panjshir-windpower-
small-2/
22 Bunkers ERDC Partnership:
Wind and Solar Project by IHFD
(partner of REE).
WWW.IHFDLLC.COM
The expected payback period (very roughly estimated) of the
new, smaller wind turbines is 20 years, or about 2.5 times
that predicted for the larger turbine.
8
9. BUILDING STRONG®
Wind Power
Site Determination
Wind data from the
Kabul airport (~8 mi.
East) indicate a
predominantly N and NW
wind. Monthly data
suggest that this flow is
largely dependent on
immediate solar
radiation, as it decreases
substantially in the
Winter.
9
10. BUILDING STRONG®
Wind Power
Site Determination
LIDAR data from the Intelligence Fusion Cell assisted in
understanding large scale features likely to change the speed
and prevailing direction of the wind.
10
11. BUILDING STRONG®
Wind Power
Site Determination
Site observations on different days and times helped verify
assumptions on wind behavior and assess constructability.
GPS data and observations recorded for each potential site.
Observing wind walking from peak to saddle on
NW ridge. Photo credit: Ben Barnes, CERL
Bill Stein observing wind at NW peak at
ANSU site. Photo credit: Ben Barnes, CERL
11
16. BUILDING STRONG®
Wind Power
Future Potential
After two or more years, the
10 kW turbines will indicate
which wind sites are the
best, paving the way for
installation of a larger 275
kW Vergnet, which is the
largest tilt-up wind turbine
available. It can be installed
or maintained with a 20 ton
crane.
www.vergnet.com
16
17. BUILDING STRONG®
Photovoltaics
Installing a 2 MW PV array is risky and expensive. Senior Science Advisor requested
smaller and approved a total of 50 kW in smaller systems.
The technical limitations
mentioned above make a 2
MW solar array risky. Theft
and vandalism remain and
issue at ANSU, so smaller,
roof mounted systems are
preferred.
The same small inverter size
throughout will increase
system resiliency and is
more within the capacity of
the available contractors.http://www.industcards.com/nellis-pv.jpg
17
18. BUILDING STRONG®
Sayed Karam solar power
project, Sustainable Energy
Service Afghainstan
http://sesa.af/projects/sayed-karam-solar-pv-
project/gallery/
22 Bunkers ERDC Partnership:
Wind and Solar Project by IHFD
(partner of REE).
WWW.IHFDLLC.COM
The expected payback period (very roughly estimated) of the
new, smaller solar systems is 24 years, or about 1.6 times
that predicted for the ground-mounted 2-MW system.
Photovoltaics
Multiple contractors in Kabul have the capacity to install and maintain small,
grid-tied solar systems
18
19. BUILDING STRONG®
The expected payback period (very roughly estimated) of
the SHW systems is 9.4 years.
Solar Hot Water
Multiple contractors in Kabul have the capacity to install and maintain domestic SHW
systems, which have a better payback than other renewables considered.
An REE affiliate manufactures
solar thermal panels in Kabul.
They also import and install
systems.
WWW.IHFDLLC.COM
Sustainable Energy Services
Afghanistan installs evacuated
tube collectors.
http://img.diytrade.com/
19
20. BUILDING STRONG®
Solar Hot Water
Multiple contractors in Kabul have the capacity to install and maintain domestic
SHW systems, which have a better payback than other renewables considered.
• The current hot water scheme is many electric
resistance tanks in every building.
• The assessment identified buildings with heaters
in the same general location, making
supplementing with solar hot water more feasible.
• Diesel boilers also have the potential to reduce
diesel consumption per Btu of hot water by a
factor of 3 or 4. Propane is also an option, as it will
be supplied to the DFACs for cooking.
20
21. BUILDING STRONG®
Solar Hot Water
Comparing a low-solar-fraction electric backup SHW system to a ordinary
diesel boiler.
A low solar fraction
with electric backup
can consume more
diesel than a simple
diesel boiler.
The “break-even” solar
fraction when
comparing these two
systems, is 69%.
(assuming a genset efficiency of 25%
and a diesel boiler efficiency of 80%)
21
22. BUILDING STRONG®
Solar Hot Water
Four options
• Use a high solar fraction solar system (>80%)
with the existing electric water heaters as
backup.
• Accept the added complexity of SHW with a
diesel or propane backup.
• Implement diesel or propane boiler alone.
• Heat pump water heaters with or without solar
backup (this option likely unavailable)
22
23. BUILDING STRONG®
Lighting Retrofit
The lighting load can be cut in half in most places.
Magnetic ballasts were used in Phase I because electronic ballasts are
difficult to get in Kabul. ANSU is large enough to justify importing a large
order from Dubai, however, and the high reliability of programmable start
electronic ballasts suggests that 10-15% spares should be adequate for
the foreseeable future.
Typical two-
lamp fixture
from Building
229 on ANSU.
Photo credit:
Ben Barnes
23
24. BUILDING STRONG®
The spaces are also over-lit. 6500K lamps are more common in Afghanistan than
in the US, and the light they provide is used more efficiently by the human eye.
The US-based designers might not have taken this into account when designing
the lighting; one lamp-fixtures in most locations would give adequate lighting.
Replacing with one-lamp fixtures with electronic ballasts will have a (roughly
estimated) 4.4 year payback.
6500K lamps
excessively
illuminating a
barracks corridor
at ANSU. Photo
Credit: Ben
Barnes
Lighting Retrofit
The lighting load can be cut in half in most places.
24
25. BUILDING STRONG®
The expected payback period (very roughly estimated) of the reflective
roof coatings is 5 years. This does not include the small contribution to
PV and SHW systems from the higher reflectivity roof.
Reflective Roof
Reflective roofs have the potential to increase comfort in most buildings and
reduce cooling energy in the air conditioned buildings.
Bill Stein inspects new ‘TC Ceramic®’ coating on a roof in
Baghdad in 2004. Photo Credit: Richard Kelly
Coated Bagdad roof next to uncoated roof. Photo Credit:
Richard Kelly
25
26. BUILDING STRONG®
Other Technologies Assessed
• Window Retrofits.
• Waste water biogas digester.
• Solid waste to energy
incineration (briquette
machine or electricity plant).
26
AwningwindowinANSUsupport
area.Photocredit:BillStein
http://business.inquirer.net/money/topstories/view/20110
312-325042/Garbage-in-briquettes-out
TheBiogas/BiofertilizerBusinessHandbook.
PeaceCorpsInformationCollectionand
Exchange
27. BUILDING STRONG®
• Feasibility determined for several
demonstration scale retrofit technologies
for Phase I and II.
• Recommendations made for Phase III to
avoid unnecessary retrofit.
Conclusions
27
28. BUILDING STRONG®
Acknowledgements
• CSTC-A, for sponsorship
• AMEC, for providing food, lodging, hospitality and
security at their site, traveling around with us and
providing information and recommendations in a timely
manner.
• MACTEC, for meeting with us, and entertaining a long
discussion about design changes.
• REE, for meeting with us and discussing their
experiences in Afghanistan.
• SESA, for exchanging emails with us and discussing
their experiences in Afghanistan.
• TAD Intelligence Fusion Cell, for supporting the effort
by promptly responding to requests for GIS
information.
28
29. BUILDING STRONG®
Questions and contact information
Bill Stein
Office phone 520-456-1377
E-mail william.j.stein@usace.army.mil