SlideShare a Scribd company logo
1 of 6
1
CURRICULUM VITAE
PERSONNEL DETAILS
Name - AJITHKUMAR
Nationality - Indian
Date of Birth – 15.04.1983
Contact Detail - +968 94108481
E-mail ID - 83ajithkumar@gmail.com
Language Known - English, Hindi, Malayalam
Material status - Married
Driving license - Yes ( GCC )
Total Work Experience - 12 years (from 2004 July)
QUALIFICATION DETAILS
Education qualification – Pursuing Post Graduate diploma in Business Management from
Symbiosis- Pune ( Part time)
- B- TECH, Mechanical (2004, Calicut university) Full Time.(69%)
Computer skills and software used
- SAP – MM module
- MS office
- BAAN & Oracle
Key Experience – Procurement of process equipments and services for Water projects (EPC
project), MEP procurement/Sub Contract finalization and Plant/machinery hire & purchase
EMPLOYMENT HISTORY
Total Years of Work Experience - 12 years
1. Current Employer : Bahwan engineering Company LLC.
Current Project : Sohar Sea Water Reverse Osmosis Plant ( EPC Project)( From Jan
2016 to Till date)
This project is executed by Sohar SWRO construction LLC which is a joint venture between
Valoriza Aqua, one of the largest desalination company in the world and Bahwan Engineering
Company with an almost equal share.
EPC contract value 180 M USD
Plant Capacity 250 MLD
Job description :
 Procurement and material Management experience includes sourcing of materials and
equipment .
 Receiving and detailed review of RFQ from Engineering and float the same to different
suppliers
 Review of vendors offers from technical (preliminary) and detailed commercial point of view.
 Negotiations, order placement, expediting and positioning of goods and services as per project
schedule.
 Preparation of commercial comparison, recommendation of award and get the same approved
from both the managements.
 Preparation of letter of award and work orders.
2
 Procurement control list updation in coordination with Valoriza Aqua- Spain.
Major Packages Finalised
 DAF system.
 Sea water intake pumps, LP pumps,HP pumps and booster pumps
 Media filters
 Catridgefilters
 GRP Pipes and fittings
 Membranes.
 Couplings
 RO skids
 ERD skids
 Energy recovery device
 Chemical dosing systems
 Diesel generators
 HVAC package.
 Fire fighting package.
 33,KV, 11 KV and LV switch gears
 Oil immersed transformers
 Dry type transformers
 Thickener Mechanism
Achievement : Working as a BEC representative in procurement in the joint venture company with
close reporting to top management.
2 . Bahwan Engineering Co.LLC Oman ( 2014 - 2016)
Designation : Procurement Engineer
Project Handled : Oman convention and Exhibition centre
Scope – Execution of MEP works.
MEP Contract value : 85 M USD
Worked as Procurement Engineer assisted by two Executives, responsible for the MEP purchasing
activities related to HVAC, Plumbing, Fire fighting and Electrical finalization of various
equipments,accessories and subcontract works within the budget as per company policy.
The procurement activities of this project is handling independently assisted by two national
executives.
Job description :
 Procurement and material management experience includes sourcing of materials and
equipment .
 Receiving and detailed review of purchase requisition from Engineering and float the same to
different suppliers
 Review of vendors offers from technical (preliminary) and detailed commercial point of view.
 Negotiations, order placement, expediting and positioning of goods and services as per project
schedule.
3
 Preparing the commercial comparison and the get the internal approval approved from
management.
 Setting the ordering target and achieving the same in coordination with project director.
Major Items handled.
HVAC
Chillers, pumps, Cooling towers, Air seperators,Expansion tanks, Pressure independent control valves;
differential pressure control valves.FCUs , AHUs,Heat exchangers,CCUs,pipes, valves, VCDs, VAV
s,Sound attenuators,Fire rated ducts, and subcontracts for piping, ducting, insulation, testing and
commissioning, flushing and various equipment erection like chillers; aluminium cladding,grit blasting
and painting of piping etc
Plumbing
Fire pumps, Booster pumps,Solar system,Sanitary wares,Fuel oil system,FM-200 system,Foam deluge
system, Wet chemical fire suppression system;HDPE, UPVC and HPUPVC pipes and fittings, GI pipes;
Grooved fittings, GI threaded fitting , subcontract agreement like solar piping,fire fighting pipe
installation, erection of various solar tanks and pumps.
Electrical
HV and LV panels,Diesel generator,Bus duct,Transformers,Light fittings,Audio visual system, ICT
system, Security system,Lightning control system, and various subcontract like cable laying,
termination, panel erection, control cabling of BMS.
 Rich experience in Global sourcing, Negotiation, procurement & vendor development
 Proven skills in procurement spend reduction in operations & investments
 Worked in various industries – Manufacturing,HVAC contracting, MEP contracting.
 Knowledge of ERP(SAP/Oracle) based and technically sound in MS Office & excel
 Strong team management, interpersonal skills, communication skills under international
working culture
3 . Bahwan Engineering Co.LLC (Oman, from 2012- 2014)
Designation : Procurement Engineer
Nature of Business :- MEP contractor, EPC, Oil field & Electrical Substation jobs, Elevators.
Project Handled : Salalah International Airport Project
Scope of work : Supply, installation and testing and commissioning of HVAC system.
HVAC Package : 47 M USD
Job description :
 Procurement and material management experience includes sourcing of materials and
equipment .
 Receiving and detailed review of purchase requisition from Engineering and float the same to
different suppliers
4
 Review of vendors offers from technical (preliminary) and detailed commercial point of view.
 Negotiations, order placement, expediting and positioning of goods and services as per project
schedule.
 Preparing the commercial comparison and the get the internal approval approved from
management.
 Setting the ordering target and achieving the same in coordination with project director.
Major Items handled.
HVAC
Chillers, pumps, Cooling towers, Air seperators,Expansion tanks,Thermal energy storage tanks;
Pressure independent control valves; differential pressure control valves.FCUs , AHUs,Heat
exchangers,CCUs,pipes, valves, VCDs, VAV s,Sound attenuators,Fire rated ducts, and subcontracts for
piping, ducting, insulation, testing and commissioning, flushing and various equipment erection like
chillers; aluminium cladding,grit blasting and painting of piping etc
Plant & machinery - Hiring/Buying (Scissor lifts, Cherry picker, Forklift, Duct lifters, Crane,
Generators etc)
Job responsibility :-
 Purchase request verification & understand the requirement of end user
 In case of repeated request from end user insist end user/warehouse in charge to keep
minimum stock in order to avoid time delay in getting the materials at site & to do the better
price negotiation by showing good quantity with supplier (applicable for tools, consumables &
safety items).
 Preparation of enquiry format with BOQ, Specifications, required payments terms & other
commercial terms based on the our contract with client (applicable for the project specified
supply of material & sub contract cases)
 Study clients specification for the project specified material in order to fulfill clients
requirement.
 Floating the enquiry to minimum 3 suppliers/manufacture/Sub contractors with target date to
submit the offer
 Collecting techno commercial offers from suppliers, making price tabulation
 Handing over of Technical offers (technical compliance) to the Design/Engineering team to
check the technical suitability of the product.
 Based on feedback from the Design /Engineering team arrange techno commercial meetings
with supplier
 Final negotiation for the price, other commercial terms & getting internal management
approval
 Release of LOI
 Collection of Material Submittal documents from finalized supplier for the product & supplier
approval from Client nominated Engineer (Consultant)
 Release of firm order to the supplier against Purchase request from Design/Construction team
 Sending SOFT report every week to the consortium (Success, Opportunity, Failure & Threat)
 Sending monthly report of finalized suppliers & sub contractors list to the consortium
Achievements in Oman :-
Total savings of 1million RO in HVAC equipments sub contract finalization for MC5
project (period from 2012 to till date)
Successful handling purchasing activity in MC5 project under L&T Galfar consortium
procedures
Major Equipments and subcontract works of Oman convention project is finalized and
delivered.
5
BLUESTAR LTD, GURGAON
ASSISTANT MANAGER: 1st July 2010 to January 2012
 Responsibilities:
 Procurement of steel and other high value equipments for HVAC projects for entire Northern
Region.

 Ensuring project’s deliverables within estimated cost and stipulated time lines.

 Ensuring year on year improvements in project’s cost variance.

 Leading e-procurement initiatives like Reverse Auctions, etc.

 Procurement of import items

 Process Audits at Supplier end. Assessment, selection and development of new suppliers.
BLUESTAR LTD, GURGAON
SENIOR ENGINEER: Feb 2007 to June 2010
Responsibilities:
 Planning and procurement of local Material Component
 Planning and managing of just in time inventory levels.
 Procurement of project equipments.
 Negotiation with suppliers
 Preparation of purchase orders and supplier payments
Project handled :-
a. Jaipur airport (HVAC works) handled procurement activity of alll HVAC items)
b. Delhi Metro ( 7 stations project) successfully handled the water side accessories for this project
c. DAMEL project New Delhi, handled all MEP related procurement activities & finalizing various
types of sub contractors.
Software used :-Microsoft word, Excel & ERP system (SAP based system)
Job responsibility:-
 Verification & understanding of requested items in Purchase request from end user
 Sourcing vendors & floating enquiry to existing/new suppliers
 Follow up for quotation, analysis, comparison, negotiation, placing the order, follow up for the
deliveries & payment to the suppliers
 involving management for commercial negotiation in case of higher value (above 1,00,000Rs)
 Providing weekly report to the management for the procured materials
VIDEOCON INDUSTRIES LTD, NOIDA
QUALITY ENGINEER (AC): August 2004 to January 2007
Responsibilities:
 Planning ofacprod.and dispatchesofmaterialrelated plant ofVideocon accordingto the demand
and requirements.
6
 Vendor development, localisation projects supplier quality and capacity planning.
 Analyzing and improving the quality of vendor performance.
 Successfully handled the purchasing or dispatching plans at Noida plant.
 Working knowledge of my SAP in material management.
 Quality development.
 Motivation & discipline among department.
 Provide daily report to the manager.
Key Skills:
 Experience of working on SAP (supply, distribution and materials management) and ERP
platforms.
 Excellent knowledge of procurement processes.
 sound knowledge of technical & commercial terms.
 Good interpersonal and negotiation skills.
DECLARATION
I hereby declare thatall the above mentioned details given by me are true to the bestof my knowledge and belief.
Your Sincerely,
Ajithkumar.

More Related Content

What's hot (18)

Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CV
 
Procurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineeringProcurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineering
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
CV PTM ALNG Site Coordinator Giovanni KOOLMAN REV 1
CV PTM ALNG Site Coordinator Giovanni KOOLMAN REV 1CV PTM ALNG Site Coordinator Giovanni KOOLMAN REV 1
CV PTM ALNG Site Coordinator Giovanni KOOLMAN REV 1
 
RAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEERRAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEER
 
Resume of ECP
Resume of ECPResume of ECP
Resume of ECP
 
CV for linkedin
CV for linkedinCV for linkedin
CV for linkedin
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 
Skatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.docSkatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.doc
 
Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152
 
Cv ihsan ul haq
Cv ihsan ul haqCv ihsan ul haq
Cv ihsan ul haq
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Epc Vs Epcm
Epc Vs EpcmEpc Vs Epcm
Epc Vs Epcm
 
Jai Prakash sharma CV
Jai Prakash sharma CVJai Prakash sharma CV
Jai Prakash sharma CV
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designer
 

Similar to Procurement Expert with 12+ Years Experience in Water Projects

Similar to Procurement Expert with 12+ Years Experience in Water Projects (20)

Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
Resume
ResumeResume
Resume
 
Imran-Kazmi-Purchase- sourc CV- 16
Imran-Kazmi-Purchase- sourc CV-  16Imran-Kazmi-Purchase- sourc CV-  16
Imran-Kazmi-Purchase- sourc CV- 16
 
Robert cv
Robert cvRobert cv
Robert cv
 
CV
CVCV
CV
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
tamuthu
tamuthutamuthu
tamuthu
 
sre
sresre
sre
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Resume - Ajay Gupta (pdf)
Resume - Ajay Gupta (pdf)Resume - Ajay Gupta (pdf)
Resume - Ajay Gupta (pdf)
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy Gandhi
 
GOPINATH DEVANI
GOPINATH DEVANIGOPINATH DEVANI
GOPINATH DEVANI
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
EPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptxEPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptx
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
151213CS2426993.2 (1)
151213CS2426993.2 (1)151213CS2426993.2 (1)
151213CS2426993.2 (1)
 
vikram 5+ years Experience
vikram 5+ years Experiencevikram 5+ years Experience
vikram 5+ years Experience
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 

Procurement Expert with 12+ Years Experience in Water Projects

  • 1. 1 CURRICULUM VITAE PERSONNEL DETAILS Name - AJITHKUMAR Nationality - Indian Date of Birth – 15.04.1983 Contact Detail - +968 94108481 E-mail ID - 83ajithkumar@gmail.com Language Known - English, Hindi, Malayalam Material status - Married Driving license - Yes ( GCC ) Total Work Experience - 12 years (from 2004 July) QUALIFICATION DETAILS Education qualification – Pursuing Post Graduate diploma in Business Management from Symbiosis- Pune ( Part time) - B- TECH, Mechanical (2004, Calicut university) Full Time.(69%) Computer skills and software used - SAP – MM module - MS office - BAAN & Oracle Key Experience – Procurement of process equipments and services for Water projects (EPC project), MEP procurement/Sub Contract finalization and Plant/machinery hire & purchase EMPLOYMENT HISTORY Total Years of Work Experience - 12 years 1. Current Employer : Bahwan engineering Company LLC. Current Project : Sohar Sea Water Reverse Osmosis Plant ( EPC Project)( From Jan 2016 to Till date) This project is executed by Sohar SWRO construction LLC which is a joint venture between Valoriza Aqua, one of the largest desalination company in the world and Bahwan Engineering Company with an almost equal share. EPC contract value 180 M USD Plant Capacity 250 MLD Job description :  Procurement and material Management experience includes sourcing of materials and equipment .  Receiving and detailed review of RFQ from Engineering and float the same to different suppliers  Review of vendors offers from technical (preliminary) and detailed commercial point of view.  Negotiations, order placement, expediting and positioning of goods and services as per project schedule.  Preparation of commercial comparison, recommendation of award and get the same approved from both the managements.  Preparation of letter of award and work orders.
  • 2. 2  Procurement control list updation in coordination with Valoriza Aqua- Spain. Major Packages Finalised  DAF system.  Sea water intake pumps, LP pumps,HP pumps and booster pumps  Media filters  Catridgefilters  GRP Pipes and fittings  Membranes.  Couplings  RO skids  ERD skids  Energy recovery device  Chemical dosing systems  Diesel generators  HVAC package.  Fire fighting package.  33,KV, 11 KV and LV switch gears  Oil immersed transformers  Dry type transformers  Thickener Mechanism Achievement : Working as a BEC representative in procurement in the joint venture company with close reporting to top management. 2 . Bahwan Engineering Co.LLC Oman ( 2014 - 2016) Designation : Procurement Engineer Project Handled : Oman convention and Exhibition centre Scope – Execution of MEP works. MEP Contract value : 85 M USD Worked as Procurement Engineer assisted by two Executives, responsible for the MEP purchasing activities related to HVAC, Plumbing, Fire fighting and Electrical finalization of various equipments,accessories and subcontract works within the budget as per company policy. The procurement activities of this project is handling independently assisted by two national executives. Job description :  Procurement and material management experience includes sourcing of materials and equipment .  Receiving and detailed review of purchase requisition from Engineering and float the same to different suppliers  Review of vendors offers from technical (preliminary) and detailed commercial point of view.  Negotiations, order placement, expediting and positioning of goods and services as per project schedule.
  • 3. 3  Preparing the commercial comparison and the get the internal approval approved from management.  Setting the ordering target and achieving the same in coordination with project director. Major Items handled. HVAC Chillers, pumps, Cooling towers, Air seperators,Expansion tanks, Pressure independent control valves; differential pressure control valves.FCUs , AHUs,Heat exchangers,CCUs,pipes, valves, VCDs, VAV s,Sound attenuators,Fire rated ducts, and subcontracts for piping, ducting, insulation, testing and commissioning, flushing and various equipment erection like chillers; aluminium cladding,grit blasting and painting of piping etc Plumbing Fire pumps, Booster pumps,Solar system,Sanitary wares,Fuel oil system,FM-200 system,Foam deluge system, Wet chemical fire suppression system;HDPE, UPVC and HPUPVC pipes and fittings, GI pipes; Grooved fittings, GI threaded fitting , subcontract agreement like solar piping,fire fighting pipe installation, erection of various solar tanks and pumps. Electrical HV and LV panels,Diesel generator,Bus duct,Transformers,Light fittings,Audio visual system, ICT system, Security system,Lightning control system, and various subcontract like cable laying, termination, panel erection, control cabling of BMS.  Rich experience in Global sourcing, Negotiation, procurement & vendor development  Proven skills in procurement spend reduction in operations & investments  Worked in various industries – Manufacturing,HVAC contracting, MEP contracting.  Knowledge of ERP(SAP/Oracle) based and technically sound in MS Office & excel  Strong team management, interpersonal skills, communication skills under international working culture 3 . Bahwan Engineering Co.LLC (Oman, from 2012- 2014) Designation : Procurement Engineer Nature of Business :- MEP contractor, EPC, Oil field & Electrical Substation jobs, Elevators. Project Handled : Salalah International Airport Project Scope of work : Supply, installation and testing and commissioning of HVAC system. HVAC Package : 47 M USD Job description :  Procurement and material management experience includes sourcing of materials and equipment .  Receiving and detailed review of purchase requisition from Engineering and float the same to different suppliers
  • 4. 4  Review of vendors offers from technical (preliminary) and detailed commercial point of view.  Negotiations, order placement, expediting and positioning of goods and services as per project schedule.  Preparing the commercial comparison and the get the internal approval approved from management.  Setting the ordering target and achieving the same in coordination with project director. Major Items handled. HVAC Chillers, pumps, Cooling towers, Air seperators,Expansion tanks,Thermal energy storage tanks; Pressure independent control valves; differential pressure control valves.FCUs , AHUs,Heat exchangers,CCUs,pipes, valves, VCDs, VAV s,Sound attenuators,Fire rated ducts, and subcontracts for piping, ducting, insulation, testing and commissioning, flushing and various equipment erection like chillers; aluminium cladding,grit blasting and painting of piping etc Plant & machinery - Hiring/Buying (Scissor lifts, Cherry picker, Forklift, Duct lifters, Crane, Generators etc) Job responsibility :-  Purchase request verification & understand the requirement of end user  In case of repeated request from end user insist end user/warehouse in charge to keep minimum stock in order to avoid time delay in getting the materials at site & to do the better price negotiation by showing good quantity with supplier (applicable for tools, consumables & safety items).  Preparation of enquiry format with BOQ, Specifications, required payments terms & other commercial terms based on the our contract with client (applicable for the project specified supply of material & sub contract cases)  Study clients specification for the project specified material in order to fulfill clients requirement.  Floating the enquiry to minimum 3 suppliers/manufacture/Sub contractors with target date to submit the offer  Collecting techno commercial offers from suppliers, making price tabulation  Handing over of Technical offers (technical compliance) to the Design/Engineering team to check the technical suitability of the product.  Based on feedback from the Design /Engineering team arrange techno commercial meetings with supplier  Final negotiation for the price, other commercial terms & getting internal management approval  Release of LOI  Collection of Material Submittal documents from finalized supplier for the product & supplier approval from Client nominated Engineer (Consultant)  Release of firm order to the supplier against Purchase request from Design/Construction team  Sending SOFT report every week to the consortium (Success, Opportunity, Failure & Threat)  Sending monthly report of finalized suppliers & sub contractors list to the consortium Achievements in Oman :- Total savings of 1million RO in HVAC equipments sub contract finalization for MC5 project (period from 2012 to till date) Successful handling purchasing activity in MC5 project under L&T Galfar consortium procedures Major Equipments and subcontract works of Oman convention project is finalized and delivered.
  • 5. 5 BLUESTAR LTD, GURGAON ASSISTANT MANAGER: 1st July 2010 to January 2012  Responsibilities:  Procurement of steel and other high value equipments for HVAC projects for entire Northern Region.   Ensuring project’s deliverables within estimated cost and stipulated time lines.   Ensuring year on year improvements in project’s cost variance.   Leading e-procurement initiatives like Reverse Auctions, etc.   Procurement of import items   Process Audits at Supplier end. Assessment, selection and development of new suppliers. BLUESTAR LTD, GURGAON SENIOR ENGINEER: Feb 2007 to June 2010 Responsibilities:  Planning and procurement of local Material Component  Planning and managing of just in time inventory levels.  Procurement of project equipments.  Negotiation with suppliers  Preparation of purchase orders and supplier payments Project handled :- a. Jaipur airport (HVAC works) handled procurement activity of alll HVAC items) b. Delhi Metro ( 7 stations project) successfully handled the water side accessories for this project c. DAMEL project New Delhi, handled all MEP related procurement activities & finalizing various types of sub contractors. Software used :-Microsoft word, Excel & ERP system (SAP based system) Job responsibility:-  Verification & understanding of requested items in Purchase request from end user  Sourcing vendors & floating enquiry to existing/new suppliers  Follow up for quotation, analysis, comparison, negotiation, placing the order, follow up for the deliveries & payment to the suppliers  involving management for commercial negotiation in case of higher value (above 1,00,000Rs)  Providing weekly report to the management for the procured materials VIDEOCON INDUSTRIES LTD, NOIDA QUALITY ENGINEER (AC): August 2004 to January 2007 Responsibilities:  Planning ofacprod.and dispatchesofmaterialrelated plant ofVideocon accordingto the demand and requirements.
  • 6. 6  Vendor development, localisation projects supplier quality and capacity planning.  Analyzing and improving the quality of vendor performance.  Successfully handled the purchasing or dispatching plans at Noida plant.  Working knowledge of my SAP in material management.  Quality development.  Motivation & discipline among department.  Provide daily report to the manager. Key Skills:  Experience of working on SAP (supply, distribution and materials management) and ERP platforms.  Excellent knowledge of procurement processes.  sound knowledge of technical & commercial terms.  Good interpersonal and negotiation skills. DECLARATION I hereby declare thatall the above mentioned details given by me are true to the bestof my knowledge and belief. Your Sincerely, Ajithkumar.