Electrical/Electronic Aptitude. Test 2
1. How much is the resistance of a lightbulb if it draws 0.12 A from a 9-V battery?
a. 470
b. 75 
c. 9.12 
d. 1.08 
Fig.1
2. A node of a network is shown in Fig. 1 with currents flowing in the directions shown.
Determine the value of I
a. 21
b. -10
c. -5
d. 4
3. Two resistors of 20 ohms each are connected in parallel. What is the equivalent
resistance?
a. 40
b. 20
c. 10
d. 5
4. A 20  resistor is connected in parallel with 30  resistor and the combination in
series with an 8  resistor. The equivalent resistance of the circuit is___
a. 58
b. 30
c. 20
d. 6.8
5. Two capacitors of 40 F each are connected in parallel. The effective capacitance is
a. 80 F
b. 40 F
c. 20 F
d. 10 F
Electrical/Electronic Aptitude. Test 2
6. Two capacitors of 100 F each are connected in series. The effective capacitance is
a. 200 F
b. 100 F
c. 50 F
d. 25 F
7. A voltage of 240 V is applied across two resistors, 1R and 2R in series. If the voltage
across 2R equals 110 V, how much is the voltage across 1R ?
a. 350 V
b. 240 V
c. 130 V
d. 110 V
8. 120-V source is connected across three resistors 1R , 2R and 3R .The resistors are
connected in parallel. If 1R = 2R = 3R , what is the voltage across 2R ?
a. 240 V
b. 120 V
c. 60 V
d. 40 V
[Questions 8 and 9]
An electric iron is rated for 1000 W and is to be operated form a 220 V supply.
9. What is the resistance of the iron
a. 48.4 
b. 32 
c. 22 
d. 12 
10. What is the current drawn by the iron?
a. 10 A
b. 7.5 A
c. 5.2 A
d. 4.55 A
11. Two resistors of 10  and 15 , each respectively are connected in parallel. The
two are then connected in series with a 5- resistance. It is then connected across a
12-V battery. What are the current and power drawn
a. 1.5 A , 20.25 W
b. 1.2 A , 17.28 W
c. 1.09 A , 13.1 W
d. 0.06 A , 11.52 W
Electrical/Electronic Aptitude. Test 2
12. The equivalent star element of three element of three equal resistors each to R and
connected in delta is
a. R
b.
3
2
R
c.
3
R
d. 3R
13. If the line voltage LineV for a star connection is 440 V, then the phase voltage phV is
a. 440 V
b.
440
3
V
c.
440
3
V
d. 240 V
14. A 440 V/110 V transformer has 1000 turns on the primary winding. The number of
turns on the secondary is:
a. 4000
b. 550
c. 250
d. 25
15. A transformer is to supply a load of 32 A at 415 V. If the primary voltage is 3320 V,
find the primary current
a. 32 A
b. 16 A
c. 8 A
d. 4 A
16. The voltage across a component in an electrical circuit is calculated as 50V using
Ohm’s law. When measured, the actual voltage is 50.4V. Calculate the percentage
error in the calculation.
a. 99.2%
b. 0.8%
c. 0.79%
d. None of the above

More Related Content

What's hot

Lab report 2
Lab report 2Lab report 2
Lab report 2
Evandro Conceicao
 
Electrical hazards
Electrical hazardsElectrical hazards
Electrical hazards
Kashif Riaz
 
Epp 0317-4 08 solder less(2)
Epp 0317-4 08 solder less(2)Epp 0317-4 08 solder less(2)
Epp 0317-4 08 solder less(2)
AKBAR TRADING
 
Siemens MV GIS Switchgear
Siemens MV GIS SwitchgearSiemens MV GIS Switchgear
Siemens MV GIS Switchgear
michaeljmack
 
Iec 60364 4-442
Iec 60364 4-442Iec 60364 4-442
Iec 60364 4-442
Maria Jimenez
 
Earthing
EarthingEarthing
Earthing
Adityareader
 
SAG-TENSION CALCULATION METHODS FOR OVERHEAD LINES
SAG-TENSION CALCULATION METHODS FOR OVERHEAD LINESSAG-TENSION CALCULATION METHODS FOR OVERHEAD LINES
SAG-TENSION CALCULATION METHODS FOR OVERHEAD LINES
Power System Operation
 
Bluescope Aluminium Catalogue - Edition 1
Bluescope Aluminium Catalogue - Edition 1 Bluescope Aluminium Catalogue - Edition 1
Bluescope Aluminium Catalogue - Edition 1
Rick French
 
Chapter 1. dpv a. lal revised
Chapter 1. dpv a. lal revisedChapter 1. dpv a. lal revised
Chapter 1. dpv a. lal revised
Prashant Khandelwal
 
17th Edition Part 524 To 529
17th  Edition  Part 524 To 52917th  Edition  Part 524 To 529
17th Edition Part 524 To 529
Paul Holden
 
Calculo de-cables-subterraneos
Calculo de-cables-subterraneosCalculo de-cables-subterraneos
Calculo de-cables-subterraneos
universidadcarabobo
 
Pressure vessels
Pressure vesselsPressure vessels
Pressure vessels
Abdul Hannan
 
[Juan Martinez] Transient Analysis of Power Systems.pdf
[Juan Martinez] Transient Analysis of Power Systems.pdf[Juan Martinez] Transient Analysis of Power Systems.pdf
[Juan Martinez] Transient Analysis of Power Systems.pdf
TIRSOROJAS4
 
Electrical wiring
Electrical wiringElectrical wiring
Electrical wiring
Patel Mit
 

What's hot (14)

Lab report 2
Lab report 2Lab report 2
Lab report 2
 
Electrical hazards
Electrical hazardsElectrical hazards
Electrical hazards
 
Epp 0317-4 08 solder less(2)
Epp 0317-4 08 solder less(2)Epp 0317-4 08 solder less(2)
Epp 0317-4 08 solder less(2)
 
Siemens MV GIS Switchgear
Siemens MV GIS SwitchgearSiemens MV GIS Switchgear
Siemens MV GIS Switchgear
 
Iec 60364 4-442
Iec 60364 4-442Iec 60364 4-442
Iec 60364 4-442
 
Earthing
EarthingEarthing
Earthing
 
SAG-TENSION CALCULATION METHODS FOR OVERHEAD LINES
SAG-TENSION CALCULATION METHODS FOR OVERHEAD LINESSAG-TENSION CALCULATION METHODS FOR OVERHEAD LINES
SAG-TENSION CALCULATION METHODS FOR OVERHEAD LINES
 
Bluescope Aluminium Catalogue - Edition 1
Bluescope Aluminium Catalogue - Edition 1 Bluescope Aluminium Catalogue - Edition 1
Bluescope Aluminium Catalogue - Edition 1
 
Chapter 1. dpv a. lal revised
Chapter 1. dpv a. lal revisedChapter 1. dpv a. lal revised
Chapter 1. dpv a. lal revised
 
17th Edition Part 524 To 529
17th  Edition  Part 524 To 52917th  Edition  Part 524 To 529
17th Edition Part 524 To 529
 
Calculo de-cables-subterraneos
Calculo de-cables-subterraneosCalculo de-cables-subterraneos
Calculo de-cables-subterraneos
 
Pressure vessels
Pressure vesselsPressure vessels
Pressure vessels
 
[Juan Martinez] Transient Analysis of Power Systems.pdf
[Juan Martinez] Transient Analysis of Power Systems.pdf[Juan Martinez] Transient Analysis of Power Systems.pdf
[Juan Martinez] Transient Analysis of Power Systems.pdf
 
Electrical wiring
Electrical wiringElectrical wiring
Electrical wiring
 

Viewers also liked

Google Docs: Collaboration Made Easy
Google Docs: Collaboration Made Easy Google Docs: Collaboration Made Easy
Google Docs: Collaboration Made Easy
Rosalind Tedford
 
Letting Summon Happen at Wake Forest University
Letting Summon Happen at Wake Forest UniversityLetting Summon Happen at Wake Forest University
Letting Summon Happen at Wake Forest University
Rosalind Tedford
 
Etapas de un proyecto
Etapas de un proyectoEtapas de un proyecto
Etapas de un proyecto
spokoo
 
Climbing Capitol Hill: Basics of Congressional Research
Climbing Capitol Hill: Basics of Congressional Research Climbing Capitol Hill: Basics of Congressional Research
Climbing Capitol Hill: Basics of Congressional Research
Rosalind Tedford
 
DigitalDesignandDesktopPublishing1
DigitalDesignandDesktopPublishing1DigitalDesignandDesktopPublishing1
DigitalDesignandDesktopPublishing1Diana Hall
 
Distributed dispersed generation_J.B. Essuman
Distributed dispersed generation_J.B. EssumanDistributed dispersed generation_J.B. Essuman
Distributed dispersed generation_J.B. Essuman
Kj_ss
 
Greenhouse effect
Greenhouse effectGreenhouse effect
Greenhouse effect
bekhter
 
Presentation1
Presentation1Presentation1
Presentation1
Jaspar Q
 
Immigration Judge Pelletier Unaccompanied Children Asylum Claims
Immigration Judge Pelletier Unaccompanied Children Asylum ClaimsImmigration Judge Pelletier Unaccompanied Children Asylum Claims
Immigration Judge Pelletier Unaccompanied Children Asylum Claims
Bryan Johnson
 
Reasonable fear ij stats
Reasonable fear ij stats Reasonable fear ij stats
Reasonable fear ij stats
Bryan Johnson
 
Sociology Anthropology - Korowai Tribe - Lost in Papua
Sociology Anthropology - Korowai Tribe - Lost in Papua Sociology Anthropology - Korowai Tribe - Lost in Papua
Sociology Anthropology - Korowai Tribe - Lost in Papua
Mariske Myeke Tampi
 
Gfk Think Tank Berlin Next Generation Food
Gfk Think Tank Berlin Next Generation FoodGfk Think Tank Berlin Next Generation Food
Gfk Think Tank Berlin Next Generation Food
Dr. Robert Kecskes
 
San ignacio de antioquia padre apostolico ii parte patrologia
San ignacio de antioquia padre apostolico ii parte patrologiaSan ignacio de antioquia padre apostolico ii parte patrologia
San ignacio de antioquia padre apostolico ii parte patrologia
Gladysmorayma Creamer Berrios
 
Generation Y - Auf der Suche nach einem kohärenten Qualitätsversprechen
Generation Y - Auf der Suche nach einem kohärenten QualitätsversprechenGeneration Y - Auf der Suche nach einem kohärenten Qualitätsversprechen
Generation Y - Auf der Suche nach einem kohärenten Qualitätsversprechen
Dr. Robert Kecskes
 
Live Events and Content: The Perfect Pair
Live Events and Content: The Perfect PairLive Events and Content: The Perfect Pair
Live Events and Content: The Perfect Pair
DoubleDutch
 
Bachillerato lomce 4ºeso
Bachillerato lomce 4ºesoBachillerato lomce 4ºeso
Bachillerato lomce 4ºeso
Susana Mateos Sanchez
 
Periodo adaptacion ei
Periodo adaptacion eiPeriodo adaptacion ei
Periodo adaptacion ei
Susana Mateos Sanchez
 
Rotary CNWHK X PLK STEM Workshops Project for Youth Development
Rotary CNWHK X PLK STEM Workshops Project for Youth DevelopmentRotary CNWHK X PLK STEM Workshops Project for Youth Development
Rotary CNWHK X PLK STEM Workshops Project for Youth Development
Simon M.K Leung DipGAI, RegAI, MInstAI
 

Viewers also liked (19)

Google Docs: Collaboration Made Easy
Google Docs: Collaboration Made Easy Google Docs: Collaboration Made Easy
Google Docs: Collaboration Made Easy
 
Letting Summon Happen at Wake Forest University
Letting Summon Happen at Wake Forest UniversityLetting Summon Happen at Wake Forest University
Letting Summon Happen at Wake Forest University
 
Etapas de un proyecto
Etapas de un proyectoEtapas de un proyecto
Etapas de un proyecto
 
Climbing Capitol Hill: Basics of Congressional Research
Climbing Capitol Hill: Basics of Congressional Research Climbing Capitol Hill: Basics of Congressional Research
Climbing Capitol Hill: Basics of Congressional Research
 
DigitalDesignandDesktopPublishing1
DigitalDesignandDesktopPublishing1DigitalDesignandDesktopPublishing1
DigitalDesignandDesktopPublishing1
 
Hearth 2012 Chan
Hearth 2012 ChanHearth 2012 Chan
Hearth 2012 Chan
 
Distributed dispersed generation_J.B. Essuman
Distributed dispersed generation_J.B. EssumanDistributed dispersed generation_J.B. Essuman
Distributed dispersed generation_J.B. Essuman
 
Greenhouse effect
Greenhouse effectGreenhouse effect
Greenhouse effect
 
Presentation1
Presentation1Presentation1
Presentation1
 
Immigration Judge Pelletier Unaccompanied Children Asylum Claims
Immigration Judge Pelletier Unaccompanied Children Asylum ClaimsImmigration Judge Pelletier Unaccompanied Children Asylum Claims
Immigration Judge Pelletier Unaccompanied Children Asylum Claims
 
Reasonable fear ij stats
Reasonable fear ij stats Reasonable fear ij stats
Reasonable fear ij stats
 
Sociology Anthropology - Korowai Tribe - Lost in Papua
Sociology Anthropology - Korowai Tribe - Lost in Papua Sociology Anthropology - Korowai Tribe - Lost in Papua
Sociology Anthropology - Korowai Tribe - Lost in Papua
 
Gfk Think Tank Berlin Next Generation Food
Gfk Think Tank Berlin Next Generation FoodGfk Think Tank Berlin Next Generation Food
Gfk Think Tank Berlin Next Generation Food
 
San ignacio de antioquia padre apostolico ii parte patrologia
San ignacio de antioquia padre apostolico ii parte patrologiaSan ignacio de antioquia padre apostolico ii parte patrologia
San ignacio de antioquia padre apostolico ii parte patrologia
 
Generation Y - Auf der Suche nach einem kohärenten Qualitätsversprechen
Generation Y - Auf der Suche nach einem kohärenten QualitätsversprechenGeneration Y - Auf der Suche nach einem kohärenten Qualitätsversprechen
Generation Y - Auf der Suche nach einem kohärenten Qualitätsversprechen
 
Live Events and Content: The Perfect Pair
Live Events and Content: The Perfect PairLive Events and Content: The Perfect Pair
Live Events and Content: The Perfect Pair
 
Bachillerato lomce 4ºeso
Bachillerato lomce 4ºesoBachillerato lomce 4ºeso
Bachillerato lomce 4ºeso
 
Periodo adaptacion ei
Periodo adaptacion eiPeriodo adaptacion ei
Periodo adaptacion ei
 
Rotary CNWHK X PLK STEM Workshops Project for Youth Development
Rotary CNWHK X PLK STEM Workshops Project for Youth DevelopmentRotary CNWHK X PLK STEM Workshops Project for Youth Development
Rotary CNWHK X PLK STEM Workshops Project for Youth Development
 

Similar to Electrical electronic aptitude test 2

AP Physics - Chapter 20 Powerpoint
AP Physics - Chapter 20 PowerpointAP Physics - Chapter 20 Powerpoint
AP Physics - Chapter 20 Powerpoint
Mrreynon
 
Dc Circuits Exam
Dc Circuits ExamDc Circuits Exam
Dc Circuits Exam
Maria Romina Angustia
 
D.C. Circuits
D.C. CircuitsD.C. Circuits
D.C. Circuits
Shafie Sofian
 
Electricity.Electronics Ch20
Electricity.Electronics Ch20Electricity.Electronics Ch20
Electricity.Electronics Ch20
Nisa Sho
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
Sumit Gupta
 
Chapter20 powerpoint 090223020055-phpapp01
Chapter20 powerpoint 090223020055-phpapp01Chapter20 powerpoint 090223020055-phpapp01
Chapter20 powerpoint 090223020055-phpapp01
Cleophas Rwemera
 
Sumario 653 659
Sumario 653 659Sumario 653 659
Fist periodical exam 2011 elec
Fist periodical exam 2011 elecFist periodical exam 2011 elec
Fist periodical exam 2011 elec
Ever Bellote
 
Unit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothariUnit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothari
Abha Tripathi
 
MOST IMPORTANT QUESTIONS FOR CURRENT ELECTRICITY CBSE XII BY ATC
MOST IMPORTANT QUESTIONS FOR CURRENT ELECTRICITY CBSE XII BY ATCMOST IMPORTANT QUESTIONS FOR CURRENT ELECTRICITY CBSE XII BY ATC
MOST IMPORTANT QUESTIONS FOR CURRENT ELECTRICITY CBSE XII BY ATC
Deepankur Rastogi
 
Ohmslawweb
OhmslawwebOhmslawweb
Ohmslawweb
MlokotiSikhulule
 
Electricity PPT.pptx
Electricity PPT.pptxElectricity PPT.pptx
Electricity PPT.pptx
SonuJain71
 
Ch 20 Electric Circuits
Ch 20 Electric CircuitsCh 20 Electric Circuits
Ch 20 Electric Circuits
Scott Thomas
 
Electricity
ElectricityElectricity
Electricity
John Paul Intano
 
Ch 18 student_201516
Ch 18 student_201516Ch 18 student_201516
Ch 18 student_201516
Rohit Mohd
 
EEE 1
EEE 1EEE 1
Current Electricity (NA)
Current Electricity (NA)Current Electricity (NA)
Current Electricity (NA)
guest5e66ab3
 
11671 physicspaper1
11671 physicspaper111671 physicspaper1
11671 physicspaper1
Abhishek Kumar
 
11671 physicspaper1 by_abhishek
11671 physicspaper1 by_abhishek11671 physicspaper1 by_abhishek
11671 physicspaper1 by_abhishek
Abhishek Kumar
 
IGCSE-CL10-CH 18-ELEC QTTIES.pptx
IGCSE-CL10-CH 18-ELEC QTTIES.pptxIGCSE-CL10-CH 18-ELEC QTTIES.pptx
IGCSE-CL10-CH 18-ELEC QTTIES.pptx
RachnaRishi2
 

Similar to Electrical electronic aptitude test 2 (20)

AP Physics - Chapter 20 Powerpoint
AP Physics - Chapter 20 PowerpointAP Physics - Chapter 20 Powerpoint
AP Physics - Chapter 20 Powerpoint
 
Dc Circuits Exam
Dc Circuits ExamDc Circuits Exam
Dc Circuits Exam
 
D.C. Circuits
D.C. CircuitsD.C. Circuits
D.C. Circuits
 
Electricity.Electronics Ch20
Electricity.Electronics Ch20Electricity.Electronics Ch20
Electricity.Electronics Ch20
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
 
Chapter20 powerpoint 090223020055-phpapp01
Chapter20 powerpoint 090223020055-phpapp01Chapter20 powerpoint 090223020055-phpapp01
Chapter20 powerpoint 090223020055-phpapp01
 
Sumario 653 659
Sumario 653 659Sumario 653 659
Sumario 653 659
 
Fist periodical exam 2011 elec
Fist periodical exam 2011 elecFist periodical exam 2011 elec
Fist periodical exam 2011 elec
 
Unit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothariUnit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothari
 
MOST IMPORTANT QUESTIONS FOR CURRENT ELECTRICITY CBSE XII BY ATC
MOST IMPORTANT QUESTIONS FOR CURRENT ELECTRICITY CBSE XII BY ATCMOST IMPORTANT QUESTIONS FOR CURRENT ELECTRICITY CBSE XII BY ATC
MOST IMPORTANT QUESTIONS FOR CURRENT ELECTRICITY CBSE XII BY ATC
 
Ohmslawweb
OhmslawwebOhmslawweb
Ohmslawweb
 
Electricity PPT.pptx
Electricity PPT.pptxElectricity PPT.pptx
Electricity PPT.pptx
 
Ch 20 Electric Circuits
Ch 20 Electric CircuitsCh 20 Electric Circuits
Ch 20 Electric Circuits
 
Electricity
ElectricityElectricity
Electricity
 
Ch 18 student_201516
Ch 18 student_201516Ch 18 student_201516
Ch 18 student_201516
 
EEE 1
EEE 1EEE 1
EEE 1
 
Current Electricity (NA)
Current Electricity (NA)Current Electricity (NA)
Current Electricity (NA)
 
11671 physicspaper1
11671 physicspaper111671 physicspaper1
11671 physicspaper1
 
11671 physicspaper1 by_abhishek
11671 physicspaper1 by_abhishek11671 physicspaper1 by_abhishek
11671 physicspaper1 by_abhishek
 
IGCSE-CL10-CH 18-ELEC QTTIES.pptx
IGCSE-CL10-CH 18-ELEC QTTIES.pptxIGCSE-CL10-CH 18-ELEC QTTIES.pptx
IGCSE-CL10-CH 18-ELEC QTTIES.pptx
 

Recently uploaded

Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 

Recently uploaded (20)

Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 

Electrical electronic aptitude test 2

  • 1. Electrical/Electronic Aptitude. Test 2 1. How much is the resistance of a lightbulb if it draws 0.12 A from a 9-V battery? a. 470 b. 75  c. 9.12  d. 1.08  Fig.1 2. A node of a network is shown in Fig. 1 with currents flowing in the directions shown. Determine the value of I a. 21 b. -10 c. -5 d. 4 3. Two resistors of 20 ohms each are connected in parallel. What is the equivalent resistance? a. 40 b. 20 c. 10 d. 5 4. A 20  resistor is connected in parallel with 30  resistor and the combination in series with an 8  resistor. The equivalent resistance of the circuit is___ a. 58 b. 30 c. 20 d. 6.8 5. Two capacitors of 40 F each are connected in parallel. The effective capacitance is a. 80 F b. 40 F c. 20 F d. 10 F
  • 2. Electrical/Electronic Aptitude. Test 2 6. Two capacitors of 100 F each are connected in series. The effective capacitance is a. 200 F b. 100 F c. 50 F d. 25 F 7. A voltage of 240 V is applied across two resistors, 1R and 2R in series. If the voltage across 2R equals 110 V, how much is the voltage across 1R ? a. 350 V b. 240 V c. 130 V d. 110 V 8. 120-V source is connected across three resistors 1R , 2R and 3R .The resistors are connected in parallel. If 1R = 2R = 3R , what is the voltage across 2R ? a. 240 V b. 120 V c. 60 V d. 40 V [Questions 8 and 9] An electric iron is rated for 1000 W and is to be operated form a 220 V supply. 9. What is the resistance of the iron a. 48.4  b. 32  c. 22  d. 12  10. What is the current drawn by the iron? a. 10 A b. 7.5 A c. 5.2 A d. 4.55 A 11. Two resistors of 10  and 15 , each respectively are connected in parallel. The two are then connected in series with a 5- resistance. It is then connected across a 12-V battery. What are the current and power drawn a. 1.5 A , 20.25 W b. 1.2 A , 17.28 W c. 1.09 A , 13.1 W d. 0.06 A , 11.52 W
  • 3. Electrical/Electronic Aptitude. Test 2 12. The equivalent star element of three element of three equal resistors each to R and connected in delta is a. R b. 3 2 R c. 3 R d. 3R 13. If the line voltage LineV for a star connection is 440 V, then the phase voltage phV is a. 440 V b. 440 3 V c. 440 3 V d. 240 V 14. A 440 V/110 V transformer has 1000 turns on the primary winding. The number of turns on the secondary is: a. 4000 b. 550 c. 250 d. 25 15. A transformer is to supply a load of 32 A at 415 V. If the primary voltage is 3320 V, find the primary current a. 32 A b. 16 A c. 8 A d. 4 A 16. The voltage across a component in an electrical circuit is calculated as 50V using Ohm’s law. When measured, the actual voltage is 50.4V. Calculate the percentage error in the calculation. a. 99.2% b. 0.8% c. 0.79% d. None of the above