The document discusses improving occupants' satisfaction with effective maintenance management of HVAC systems in office buildings. It identifies key maintenance characteristics that influence occupants' satisfaction, including the skill and knowledge of maintenance managers and laborers, the quality of spare parts and materials, and the level of response to failures and downtime. A study was conducted using questionnaires and interviews with maintenance personnel to understand the relationship between these maintenance characteristics and occupants' satisfaction. The findings revealed that characteristics like the skill of managers and laborers, quality of spare parts, and response level to issues have a significant correlation with higher occupants' satisfaction. An effective communication platform involving all participants in maintenance activities is needed to improve outcomes.
This document summarizes an article from the International Journal of Mechanical Engineering and Technology that implements Reliability Centered Maintenance (RCM) on an air compressor unit. It begins with an overview of RCM methodology and a literature review on previous RCM studies. It then details the 7 steps of RCM analysis conducted on the air compressor unit which includes failure mode analysis, criticality assessment, and development of a new preventative maintenance schedule. Cost analysis found the new RCM-based schedule reduces preventative maintenance costs by 15.57% annually. The conclusions state RCM provides an effective maintenance approach to minimize maintenance-induced failures and optimize preventative maintenance activities and costs.
This document discusses quality maintenance policies and objectives at universities. It begins with introductions to quality maintenance and definitions. It then discusses implementing quality maintenance in two phases: reactive and proactive. Seven quality tools are also mentioned. The document analyzes maintenance needs at Al-Najah University, identifying factors like doors, lighting, and computers. It proposes strategies for addressing each factor. Key performance indicators and a management system for quality maintenance are also proposed. The expected results are optimized organization and improved equipment management and accessibility.
1. The document discusses energy audits, which are tools used to identify areas of energy inefficiency and waste. Energy audits provide a systematic approach to measure energy use, identify losses, calculate actual consumption, and provide solutions to improve efficiency.
2. An energy audit involves verifying, monitoring, and analyzing energy use through measurement and analysis of consumption reports. The audit identifies opportunities for improved energy efficiency to provide benefits like cost savings, increased comfort, and equipment longevity.
3. Proper energy audits follow specific methodological steps including documentation review, facility inspection, staff interviews, utility analysis, evaluation of potential efficiency improvements, and reporting of findings and recommendations.
This document summarizes a case study analyzing the production processes at a steel factory in Jordan. It proposes implementing a SCADA system to improve process monitoring and control. It also reviews the factory's maintenance section to reduce costs from equipment failures. Key recommendations include purchasing a larger melting furnace, a scrap press, and restructuring maintenance management.
Process design synthesis, intensification, and integration of chemical processesUp Seven
This document discusses process design methodology for chemical processes. It introduces concepts of complexity and uncertainty in process design due to changing business environments. A holistic process design methodology is needed to efficiently handle uncertainty and complexity. The goal of process design is to create a blueprint that converts raw materials to products. Process design defines the process structure and parameters based on input of product quantity and quality goals. The document outlines the overall process from idea to plant, noting that process design plays a key role in selecting the best process technologies and structure to optimize profitability.
TPM the effective maintenance with Autonomous MaintenanceTimothy Wooi
This is a 2 days course on Total Productive Maintenance (TPM) that will guide you through to implement Autonomous Maintenance (AM) on your current Equipment and to plan the execution of your Preventive (PM) & Predictive Maintenance (PdM).TPM defines your Maintenance schedule and Goals. TPM helps you plan and develop the optimal program for your facility, resulting in increased efficiency and cost savings.
Day 1
TPM General Overview with Autonomous
Maintenance (AM) as the back bone of TPM
6 Steps to Autonomous Maintenance
Audit , Review & Externalize Inspection Activities
from Equipment Manual to (AM)
Executing Equipment Audit to start (AM) & (PM)
-TPM Board & AM Checklist with Visual
Management Implementation.
Industrial sickness of small and medium scale industries alphasct
This document discusses the causes and classification of industrial sickness, particularly for small and medium enterprises. It defines industrial sickness as when a unit continually incurs losses and has an imbalance in its financial structure. Small and medium enterprises are prone to sickness due to various internal factors like lack of financing and bad production policies, and external factors such as personnel constraints, marketing constraints, and production constraints. The document also classifies manufacturing and service enterprises based on investment size and defines micro, small, and medium enterprises.
Introduction to hvac system, types of efficient hvac system and how it works. design recommendation for installation of hvac. air handling unit concept. case study.
This document summarizes an article from the International Journal of Mechanical Engineering and Technology that implements Reliability Centered Maintenance (RCM) on an air compressor unit. It begins with an overview of RCM methodology and a literature review on previous RCM studies. It then details the 7 steps of RCM analysis conducted on the air compressor unit which includes failure mode analysis, criticality assessment, and development of a new preventative maintenance schedule. Cost analysis found the new RCM-based schedule reduces preventative maintenance costs by 15.57% annually. The conclusions state RCM provides an effective maintenance approach to minimize maintenance-induced failures and optimize preventative maintenance activities and costs.
This document discusses quality maintenance policies and objectives at universities. It begins with introductions to quality maintenance and definitions. It then discusses implementing quality maintenance in two phases: reactive and proactive. Seven quality tools are also mentioned. The document analyzes maintenance needs at Al-Najah University, identifying factors like doors, lighting, and computers. It proposes strategies for addressing each factor. Key performance indicators and a management system for quality maintenance are also proposed. The expected results are optimized organization and improved equipment management and accessibility.
1. The document discusses energy audits, which are tools used to identify areas of energy inefficiency and waste. Energy audits provide a systematic approach to measure energy use, identify losses, calculate actual consumption, and provide solutions to improve efficiency.
2. An energy audit involves verifying, monitoring, and analyzing energy use through measurement and analysis of consumption reports. The audit identifies opportunities for improved energy efficiency to provide benefits like cost savings, increased comfort, and equipment longevity.
3. Proper energy audits follow specific methodological steps including documentation review, facility inspection, staff interviews, utility analysis, evaluation of potential efficiency improvements, and reporting of findings and recommendations.
This document summarizes a case study analyzing the production processes at a steel factory in Jordan. It proposes implementing a SCADA system to improve process monitoring and control. It also reviews the factory's maintenance section to reduce costs from equipment failures. Key recommendations include purchasing a larger melting furnace, a scrap press, and restructuring maintenance management.
Process design synthesis, intensification, and integration of chemical processesUp Seven
This document discusses process design methodology for chemical processes. It introduces concepts of complexity and uncertainty in process design due to changing business environments. A holistic process design methodology is needed to efficiently handle uncertainty and complexity. The goal of process design is to create a blueprint that converts raw materials to products. Process design defines the process structure and parameters based on input of product quantity and quality goals. The document outlines the overall process from idea to plant, noting that process design plays a key role in selecting the best process technologies and structure to optimize profitability.
TPM the effective maintenance with Autonomous MaintenanceTimothy Wooi
This is a 2 days course on Total Productive Maintenance (TPM) that will guide you through to implement Autonomous Maintenance (AM) on your current Equipment and to plan the execution of your Preventive (PM) & Predictive Maintenance (PdM).TPM defines your Maintenance schedule and Goals. TPM helps you plan and develop the optimal program for your facility, resulting in increased efficiency and cost savings.
Day 1
TPM General Overview with Autonomous
Maintenance (AM) as the back bone of TPM
6 Steps to Autonomous Maintenance
Audit , Review & Externalize Inspection Activities
from Equipment Manual to (AM)
Executing Equipment Audit to start (AM) & (PM)
-TPM Board & AM Checklist with Visual
Management Implementation.
Industrial sickness of small and medium scale industries alphasct
This document discusses the causes and classification of industrial sickness, particularly for small and medium enterprises. It defines industrial sickness as when a unit continually incurs losses and has an imbalance in its financial structure. Small and medium enterprises are prone to sickness due to various internal factors like lack of financing and bad production policies, and external factors such as personnel constraints, marketing constraints, and production constraints. The document also classifies manufacturing and service enterprises based on investment size and defines micro, small, and medium enterprises.
Introduction to hvac system, types of efficient hvac system and how it works. design recommendation for installation of hvac. air handling unit concept. case study.
Building maintenance costs are increasing rapidly due to poor maintenance in the past. In this paper, attempts are made to identify the characteristics of scheduled maintenance. It has been established that the characteristics of scheduled maintenance always affect the cost performance. Therefore, this research aims to establish their relationships. Then, regression model is produced for maintenance prediction purposes. The triangulation approach that includes literature review, questionnaire survey, and interviews, has been adopted for data collection. Consequently, the regression model can be adopted by practitioners.
The document provides an introduction to building commissioning. It begins by comparing commissioning of buildings to commissioning of ships, where all systems are thoroughly tested before the ship enters service. It describes how commissioning aims to ensure buildings meet performance expectations and operate as intended through verification of system functionality and documentation. The document outlines different types of commissioning, including for new construction, retrocommissioning of existing buildings, recommissioning, and continuous commissioning. It emphasizes that commissioning is a quality control process that verifies performance meets design intent from early planning through post-occupancy.
IRJET - Review Paper on Air Conditioning System for Operation Theatre in Hosp...IRJET Journal
This document reviews computational fluid dynamics (CFD) simulations of air conditioning systems for operation theatres in hospitals. It summarizes several research papers on using CFD to model airflow, temperature distribution, and contaminant transport in operating rooms. The review finds that CFD can accurately predict airflow velocity and temperature patterns inside operating rooms when compared to experimental data. Parametric studies using CFD indicate that ceiling inlets and outlets often provide the best airflow and temperature uniformity. Overall, the document concludes that CFD is a useful tool for designing efficient and effective air conditioning systems for hospital operating rooms.
Institutional smart buildings energy auditIJECEIAES
Smart buildings and Fuzzy based control systems used in Buildings Management System (BMS), Building Energy Management Systems (BEMS) and Building Automation Systems (BAS) are a point of interests among researcher and stake holders of buildings’ developing sector due to its ability to save energy and reduce greenhouse gas emissions. Therefore this paper will review, investigates define and evaluates the use of fuzzy logic controllers in smart buildings under subtropical Australia’s subtropical regions. In addition the paper also will define the latest development, design and proposed controlling strategies used in institutional buildings. Furthermore this paper will highlight and discuss the conceptual basis of these technologies including Fuzzy, Neural and Hybrid add-on technologies, its capabilities and its limitation.
Prediction Cost Maintenance Model of Office Building Based on Condition-Based...University of Malaya
Building maintenance costs are continuously increasing as a result of poor maintenance. Consequently, there is an urgent need to develop solutions to reduce the maintenance costs. Various studies demonstrated that the characteristics of condition-based maintenance are directly related to the cost performance. Thus, this paper seeks to establish the relationships between the characteristics of condition-based maintenance and the cost performance. The researcher then developed a regression model for maintenance planning and prediction. The study adopted a mix method approach that includes questionnaire survey, interview, and case study. The findings highlighted the reliability of maintenance data and information as the most significant characteristic of condition-based maintenance. Consequently, the study concluded that the planning and the application of the condition-based maintenance strategy should consider its significant characteristics and make reference to the resulting prediction model. Furthermore, the study recommended measures to improve the significant characteristics and the cost performance in practice.
This project report analyzes the building services systems in an elderly center, including the mechanical ventilation, air conditioning, fire protection, and mechanical transportation systems. A literature review is provided on the components and functioning of each system. The report aims to gain an understanding of how the various service components integrate and operate within the building to provide safety, comfort and accessibility. The analysis is presented through diagrams and images supported by research on industry standards and requirements.
Pervasive Computing Based Intelligent Energy Conservation SystemEswar Publications
Most of the HVAC system in home is running based on static control algorithm; based on fixed work schedules. In that old system energy became waste when home contains low or no people occupancy. In this paper we presented new dynamic approach of HVAC system control, by combined with pervasive computing. Pervasive computing can be defined as availability of centralized system and information anywhere and anytime. We achieved our target by using occupancy sensors for collecting home status. Initially our occupancy sensors collect human presence and current HVAC status details and stored in centralized system. Then based on our user defined threshold value the centralized system maintains the building's heating, cooling and air quality conditions by controlling HVAC devices. I.e. this system turned off HVAC systems when a home is unoccupied, or put the system into an energy saving sleep mode when persons are asleep.
This document provides an overview of key performance indicators (KPIs) for quality of service criteria in building monitoring and control. It discusses 5 KPIs: 1) human/occupant comfort, 2) environmental friendliness and energy efficiency, 3) cost effectiveness of operations and maintenance, 4) safety and security, and 5) sustainability of other KPIs over time. Each KPI is defined and its importance is explained, such as how improved air quality, temperature control and ventilation can increase occupant productivity and cognitive performance. Tracking building data through smart monitoring systems is presented as an effective way for building operators to improve performance on all KPIs and achieve significant savings and benefits.
This document provides an abstract for a thesis submitted to fulfill the requirements for a Master's degree in Thermal Engineering. The thesis focuses on energy conservation in boilers. The study aims to reduce energy losses in a boiler and increase its efficiency. The boiler plant uses biomass fuel (rice husk). Efforts are focused on heat loss through the boiler furnace and major exergy destruction areas like the economizer and air preheater. The document provides literature on general energy conservation techniques in boilers, including for equipment like feedwater pumps. It discusses the methodology and calculations used for the energy audit and analysis, including instrumentation, formulas, and exergy analysis using the second law of thermodynamics. The energy savings estimation and
This document summarizes a case study on energy conservation and auditing for household applications. It discusses how energy audits are conducted to identify opportunities for energy conservation and efficiency improvements. A detailed energy audit involves multiple phases including documentation review, facility inspection, identifying and evaluating potential energy conservation measures (ECMs), and economic analysis of ECMs. The document recommends various ECMs that can save energy in homes and buildings, such as using efficient lighting like CFL bulbs, properly maintaining appliances like refrigerators and ACs, and replacing old, inefficient equipment.
This document proposes an indoor temperature preference setting control method (ITPSCM) for thermal comfort and energy saving based on reinforcement learning (RL). The method uses personal thermal comfort and energy savings as a reward function in Q-learning to obtain optimized room temperature settings. Comparative experiments show that compared to traditional temperature set point control, the ITPSCM can meet personal thermal comfort preferences earlier in HVAC operation. With just thermal comfort as a reward, it can save 22.34% daily energy; with both thermal comfort and energy savings as rewards, it can save 26.48% daily energy.
IRJET- Duct Designing in Air Conditioning System and its Impact on System Per...IRJET Journal
This document discusses duct design in air conditioning systems and its impact on system performance. It begins with an introduction explaining how duct systems are used to distribute cooled air from central air conditioning equipment to rooms when direct distribution is not possible. Improper duct design can lead to issues like increased friction loss, installation costs, noise, power consumption, and uneven cooling. The document then reviews several other studies that examined topics like air leakage from ducts, methods to minimize leakage and related energy losses, and different duct design optimization methods. It emphasizes the importance of proper duct design for minimizing costs and issues related to air distribution.
Operational discipline in practices - Build the safety cultureRonachai Fuangfoong
The document discusses various methods to improve operational discipline in chemical process industries, including conducting floor level meetings to identify risks, performing job cycle checks to ensure standard operating procedures are followed, conducting daily safety audits to identify hazards, and incorporating consequence analyses into work instructions to understand safe operating limits and emergency response. It provides examples of completed forms for a floor level meeting, job cycle check, risk assessment, daily safety audit, and consequence analysis to demonstrate how these methods can be implemented.
The document discusses principles and practices of maintenance planning. It covers topics like maintenance engineering, planning processes, objectives of planned maintenance, principles of maintenance systems, reliability measures like MTBF and MTTR, maintenance organization structures, and maintenance economics. The key aspects are ensuring smooth operations through planning, following principles to guide efficient maintenance work, benefits of sound maintenance systems for minimizing downtime and improving availability, and analyzing life cycle costs of equipment maintenance.
The document discusses principles and practices of maintenance planning in engineering systems. It describes key concepts like maintenance engineering, types of planning, objectives of planned maintenance, principles of maintenance systems, reliability measures like MTBF and MTTR, maintenance organization structures, and maintenance economics and costs. The overall goal of maintenance planning is to optimize equipment availability and performance at lowest cost through reliable maintenance strategies.
ABSTRACT In order to reduce the number and time of layups and to increase the...khasnaelvinurlita
This document discusses predictive maintenance of mechatronic systems to reduce downtime. It proposes performing predictive repairs on groups of components that have reached or exceeded their operating hours limit during a single stoppage. This approach allows repairs to be done in parallel, reducing system downtime and increasing production output. A mathematical model is presented showing the system states and transitions between states when components fail and the system is repaired.
Operations and maintenance of solar PV systems is important to maximize uptime over the system's 25+ year lifetime. Proper maintenance can increase performance by 10-30% and is needed to prevent downtime that negatively impacts return on investment. Effective O&M requires qualified personnel, preventative maintenance according to manufacturer recommendations, corrective maintenance to repair failures, and condition-based maintenance using monitoring data to anticipate issues. Incorporating weather monitoring, module-level monitoring, and SCADA systems allows more efficient O&M by monitoring system performance and identifying potential problems.
The document discusses quality of service (QoS) criteria for smart building operations using internet of things (IoT). It outlines five key performance indicators (KPIs) for measuring QoS: 1) occupants' comfort, 2) energy efficiency, 3) cost effectiveness, 4) safety and security, and 5) sustainability of other KPIs over time. Each KPI is defined in detail, outlining how it can be quantified and its impact on building performance and occupants. The document also discusses approaches for mathematical modeling and metrics to track the various QoS criteria to optimize building operations.
Null Bangalore | Pentesters Approach to AWS IAMDivyanshu
#Abstract:
- Learn more about the real-world methods for auditing AWS IAM (Identity and Access Management) as a pentester. So let us proceed with a brief discussion of IAM as well as some typical misconfigurations and their potential exploits in order to reinforce the understanding of IAM security best practices.
- Gain actionable insights into AWS IAM policies and roles, using hands on approach.
#Prerequisites:
- Basic understanding of AWS services and architecture
- Familiarity with cloud security concepts
- Experience using the AWS Management Console or AWS CLI.
- For hands on lab create account on [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
# Scenario Covered:
- Basics of IAM in AWS
- Implementing IAM Policies with Least Privilege to Manage S3 Bucket
- Objective: Create an S3 bucket with least privilege IAM policy and validate access.
- Steps:
- Create S3 bucket.
- Attach least privilege policy to IAM user.
- Validate access.
- Exploiting IAM PassRole Misconfiguration
-Allows a user to pass a specific IAM role to an AWS service (ec2), typically used for service access delegation. Then exploit PassRole Misconfiguration granting unauthorized access to sensitive resources.
- Objective: Demonstrate how a PassRole misconfiguration can grant unauthorized access.
- Steps:
- Allow user to pass IAM role to EC2.
- Exploit misconfiguration for unauthorized access.
- Access sensitive resources.
- Exploiting IAM AssumeRole Misconfiguration with Overly Permissive Role
- An overly permissive IAM role configuration can lead to privilege escalation by creating a role with administrative privileges and allow a user to assume this role.
- Objective: Show how overly permissive IAM roles can lead to privilege escalation.
- Steps:
- Create role with administrative privileges.
- Allow user to assume the role.
- Perform administrative actions.
- Differentiation between PassRole vs AssumeRole
Try at [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
Building maintenance costs are increasing rapidly due to poor maintenance in the past. In this paper, attempts are made to identify the characteristics of scheduled maintenance. It has been established that the characteristics of scheduled maintenance always affect the cost performance. Therefore, this research aims to establish their relationships. Then, regression model is produced for maintenance prediction purposes. The triangulation approach that includes literature review, questionnaire survey, and interviews, has been adopted for data collection. Consequently, the regression model can be adopted by practitioners.
The document provides an introduction to building commissioning. It begins by comparing commissioning of buildings to commissioning of ships, where all systems are thoroughly tested before the ship enters service. It describes how commissioning aims to ensure buildings meet performance expectations and operate as intended through verification of system functionality and documentation. The document outlines different types of commissioning, including for new construction, retrocommissioning of existing buildings, recommissioning, and continuous commissioning. It emphasizes that commissioning is a quality control process that verifies performance meets design intent from early planning through post-occupancy.
IRJET - Review Paper on Air Conditioning System for Operation Theatre in Hosp...IRJET Journal
This document reviews computational fluid dynamics (CFD) simulations of air conditioning systems for operation theatres in hospitals. It summarizes several research papers on using CFD to model airflow, temperature distribution, and contaminant transport in operating rooms. The review finds that CFD can accurately predict airflow velocity and temperature patterns inside operating rooms when compared to experimental data. Parametric studies using CFD indicate that ceiling inlets and outlets often provide the best airflow and temperature uniformity. Overall, the document concludes that CFD is a useful tool for designing efficient and effective air conditioning systems for hospital operating rooms.
Institutional smart buildings energy auditIJECEIAES
Smart buildings and Fuzzy based control systems used in Buildings Management System (BMS), Building Energy Management Systems (BEMS) and Building Automation Systems (BAS) are a point of interests among researcher and stake holders of buildings’ developing sector due to its ability to save energy and reduce greenhouse gas emissions. Therefore this paper will review, investigates define and evaluates the use of fuzzy logic controllers in smart buildings under subtropical Australia’s subtropical regions. In addition the paper also will define the latest development, design and proposed controlling strategies used in institutional buildings. Furthermore this paper will highlight and discuss the conceptual basis of these technologies including Fuzzy, Neural and Hybrid add-on technologies, its capabilities and its limitation.
Prediction Cost Maintenance Model of Office Building Based on Condition-Based...University of Malaya
Building maintenance costs are continuously increasing as a result of poor maintenance. Consequently, there is an urgent need to develop solutions to reduce the maintenance costs. Various studies demonstrated that the characteristics of condition-based maintenance are directly related to the cost performance. Thus, this paper seeks to establish the relationships between the characteristics of condition-based maintenance and the cost performance. The researcher then developed a regression model for maintenance planning and prediction. The study adopted a mix method approach that includes questionnaire survey, interview, and case study. The findings highlighted the reliability of maintenance data and information as the most significant characteristic of condition-based maintenance. Consequently, the study concluded that the planning and the application of the condition-based maintenance strategy should consider its significant characteristics and make reference to the resulting prediction model. Furthermore, the study recommended measures to improve the significant characteristics and the cost performance in practice.
This project report analyzes the building services systems in an elderly center, including the mechanical ventilation, air conditioning, fire protection, and mechanical transportation systems. A literature review is provided on the components and functioning of each system. The report aims to gain an understanding of how the various service components integrate and operate within the building to provide safety, comfort and accessibility. The analysis is presented through diagrams and images supported by research on industry standards and requirements.
Pervasive Computing Based Intelligent Energy Conservation SystemEswar Publications
Most of the HVAC system in home is running based on static control algorithm; based on fixed work schedules. In that old system energy became waste when home contains low or no people occupancy. In this paper we presented new dynamic approach of HVAC system control, by combined with pervasive computing. Pervasive computing can be defined as availability of centralized system and information anywhere and anytime. We achieved our target by using occupancy sensors for collecting home status. Initially our occupancy sensors collect human presence and current HVAC status details and stored in centralized system. Then based on our user defined threshold value the centralized system maintains the building's heating, cooling and air quality conditions by controlling HVAC devices. I.e. this system turned off HVAC systems when a home is unoccupied, or put the system into an energy saving sleep mode when persons are asleep.
This document provides an overview of key performance indicators (KPIs) for quality of service criteria in building monitoring and control. It discusses 5 KPIs: 1) human/occupant comfort, 2) environmental friendliness and energy efficiency, 3) cost effectiveness of operations and maintenance, 4) safety and security, and 5) sustainability of other KPIs over time. Each KPI is defined and its importance is explained, such as how improved air quality, temperature control and ventilation can increase occupant productivity and cognitive performance. Tracking building data through smart monitoring systems is presented as an effective way for building operators to improve performance on all KPIs and achieve significant savings and benefits.
This document provides an abstract for a thesis submitted to fulfill the requirements for a Master's degree in Thermal Engineering. The thesis focuses on energy conservation in boilers. The study aims to reduce energy losses in a boiler and increase its efficiency. The boiler plant uses biomass fuel (rice husk). Efforts are focused on heat loss through the boiler furnace and major exergy destruction areas like the economizer and air preheater. The document provides literature on general energy conservation techniques in boilers, including for equipment like feedwater pumps. It discusses the methodology and calculations used for the energy audit and analysis, including instrumentation, formulas, and exergy analysis using the second law of thermodynamics. The energy savings estimation and
This document summarizes a case study on energy conservation and auditing for household applications. It discusses how energy audits are conducted to identify opportunities for energy conservation and efficiency improvements. A detailed energy audit involves multiple phases including documentation review, facility inspection, identifying and evaluating potential energy conservation measures (ECMs), and economic analysis of ECMs. The document recommends various ECMs that can save energy in homes and buildings, such as using efficient lighting like CFL bulbs, properly maintaining appliances like refrigerators and ACs, and replacing old, inefficient equipment.
This document proposes an indoor temperature preference setting control method (ITPSCM) for thermal comfort and energy saving based on reinforcement learning (RL). The method uses personal thermal comfort and energy savings as a reward function in Q-learning to obtain optimized room temperature settings. Comparative experiments show that compared to traditional temperature set point control, the ITPSCM can meet personal thermal comfort preferences earlier in HVAC operation. With just thermal comfort as a reward, it can save 22.34% daily energy; with both thermal comfort and energy savings as rewards, it can save 26.48% daily energy.
IRJET- Duct Designing in Air Conditioning System and its Impact on System Per...IRJET Journal
This document discusses duct design in air conditioning systems and its impact on system performance. It begins with an introduction explaining how duct systems are used to distribute cooled air from central air conditioning equipment to rooms when direct distribution is not possible. Improper duct design can lead to issues like increased friction loss, installation costs, noise, power consumption, and uneven cooling. The document then reviews several other studies that examined topics like air leakage from ducts, methods to minimize leakage and related energy losses, and different duct design optimization methods. It emphasizes the importance of proper duct design for minimizing costs and issues related to air distribution.
Operational discipline in practices - Build the safety cultureRonachai Fuangfoong
The document discusses various methods to improve operational discipline in chemical process industries, including conducting floor level meetings to identify risks, performing job cycle checks to ensure standard operating procedures are followed, conducting daily safety audits to identify hazards, and incorporating consequence analyses into work instructions to understand safe operating limits and emergency response. It provides examples of completed forms for a floor level meeting, job cycle check, risk assessment, daily safety audit, and consequence analysis to demonstrate how these methods can be implemented.
The document discusses principles and practices of maintenance planning. It covers topics like maintenance engineering, planning processes, objectives of planned maintenance, principles of maintenance systems, reliability measures like MTBF and MTTR, maintenance organization structures, and maintenance economics. The key aspects are ensuring smooth operations through planning, following principles to guide efficient maintenance work, benefits of sound maintenance systems for minimizing downtime and improving availability, and analyzing life cycle costs of equipment maintenance.
The document discusses principles and practices of maintenance planning in engineering systems. It describes key concepts like maintenance engineering, types of planning, objectives of planned maintenance, principles of maintenance systems, reliability measures like MTBF and MTTR, maintenance organization structures, and maintenance economics and costs. The overall goal of maintenance planning is to optimize equipment availability and performance at lowest cost through reliable maintenance strategies.
ABSTRACT In order to reduce the number and time of layups and to increase the...khasnaelvinurlita
This document discusses predictive maintenance of mechatronic systems to reduce downtime. It proposes performing predictive repairs on groups of components that have reached or exceeded their operating hours limit during a single stoppage. This approach allows repairs to be done in parallel, reducing system downtime and increasing production output. A mathematical model is presented showing the system states and transitions between states when components fail and the system is repaired.
Operations and maintenance of solar PV systems is important to maximize uptime over the system's 25+ year lifetime. Proper maintenance can increase performance by 10-30% and is needed to prevent downtime that negatively impacts return on investment. Effective O&M requires qualified personnel, preventative maintenance according to manufacturer recommendations, corrective maintenance to repair failures, and condition-based maintenance using monitoring data to anticipate issues. Incorporating weather monitoring, module-level monitoring, and SCADA systems allows more efficient O&M by monitoring system performance and identifying potential problems.
The document discusses quality of service (QoS) criteria for smart building operations using internet of things (IoT). It outlines five key performance indicators (KPIs) for measuring QoS: 1) occupants' comfort, 2) energy efficiency, 3) cost effectiveness, 4) safety and security, and 5) sustainability of other KPIs over time. Each KPI is defined in detail, outlining how it can be quantified and its impact on building performance and occupants. The document also discusses approaches for mathematical modeling and metrics to track the various QoS criteria to optimize building operations.
Null Bangalore | Pentesters Approach to AWS IAMDivyanshu
#Abstract:
- Learn more about the real-world methods for auditing AWS IAM (Identity and Access Management) as a pentester. So let us proceed with a brief discussion of IAM as well as some typical misconfigurations and their potential exploits in order to reinforce the understanding of IAM security best practices.
- Gain actionable insights into AWS IAM policies and roles, using hands on approach.
#Prerequisites:
- Basic understanding of AWS services and architecture
- Familiarity with cloud security concepts
- Experience using the AWS Management Console or AWS CLI.
- For hands on lab create account on [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
# Scenario Covered:
- Basics of IAM in AWS
- Implementing IAM Policies with Least Privilege to Manage S3 Bucket
- Objective: Create an S3 bucket with least privilege IAM policy and validate access.
- Steps:
- Create S3 bucket.
- Attach least privilege policy to IAM user.
- Validate access.
- Exploiting IAM PassRole Misconfiguration
-Allows a user to pass a specific IAM role to an AWS service (ec2), typically used for service access delegation. Then exploit PassRole Misconfiguration granting unauthorized access to sensitive resources.
- Objective: Demonstrate how a PassRole misconfiguration can grant unauthorized access.
- Steps:
- Allow user to pass IAM role to EC2.
- Exploit misconfiguration for unauthorized access.
- Access sensitive resources.
- Exploiting IAM AssumeRole Misconfiguration with Overly Permissive Role
- An overly permissive IAM role configuration can lead to privilege escalation by creating a role with administrative privileges and allow a user to assume this role.
- Objective: Show how overly permissive IAM roles can lead to privilege escalation.
- Steps:
- Create role with administrative privileges.
- Allow user to assume the role.
- Perform administrative actions.
- Differentiation between PassRole vs AssumeRole
Try at [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
Build the Next Generation of Apps with the Einstein 1 Platform.
Rejoignez Philippe Ozil pour une session de workshops qui vous guidera à travers les détails de la plateforme Einstein 1, l'importance des données pour la création d'applications d'intelligence artificielle et les différents outils et technologies que Salesforce propose pour vous apporter tous les bénéfices de l'IA.
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...IJECEIAES
Climate change's impact on the planet forced the United Nations and governments to promote green energies and electric transportation. The deployments of photovoltaic (PV) and electric vehicle (EV) systems gained stronger momentum due to their numerous advantages over fossil fuel types. The advantages go beyond sustainability to reach financial support and stability. The work in this paper introduces the hybrid system between PV and EV to support industrial and commercial plants. This paper covers the theoretical framework of the proposed hybrid system including the required equation to complete the cost analysis when PV and EV are present. In addition, the proposed design diagram which sets the priorities and requirements of the system is presented. The proposed approach allows setup to advance their power stability, especially during power outages. The presented information supports researchers and plant owners to complete the necessary analysis while promoting the deployment of clean energy. The result of a case study that represents a dairy milk farmer supports the theoretical works and highlights its advanced benefits to existing plants. The short return on investment of the proposed approach supports the paper's novelty approach for the sustainable electrical system. In addition, the proposed system allows for an isolated power setup without the need for a transmission line which enhances the safety of the electrical network
Software Engineering and Project Management - Introduction, Modeling Concepts...Prakhyath Rai
Introduction, Modeling Concepts and Class Modeling: What is Object orientation? What is OO development? OO Themes; Evidence for usefulness of OO development; OO modeling history. Modeling
as Design technique: Modeling, abstraction, The Three models. Class Modeling: Object and Class Concept, Link and associations concepts, Generalization and Inheritance, A sample class model, Navigation of class models, and UML diagrams
Building the Analysis Models: Requirement Analysis, Analysis Model Approaches, Data modeling Concepts, Object Oriented Analysis, Scenario-Based Modeling, Flow-Oriented Modeling, class Based Modeling, Creating a Behavioral Model.
Software Engineering and Project Management - Software Testing + Agile Method...Prakhyath Rai
Software Testing: A Strategic Approach to Software Testing, Strategic Issues, Test Strategies for Conventional Software, Test Strategies for Object -Oriented Software, Validation Testing, System Testing, The Art of Debugging.
Agile Methodology: Before Agile – Waterfall, Agile Development.
Gas agency management system project report.pdfKamal Acharya
The project entitled "Gas Agency" is done to make the manual process easier by making it a computerized system for billing and maintaining stock. The Gas Agencies get the order request through phone calls or by personal from their customers and deliver the gas cylinders to their address based on their demand and previous delivery date. This process is made computerized and the customer's name, address and stock details are stored in a database. Based on this the billing for a customer is made simple and easier, since a customer order for gas can be accepted only after completing a certain period from the previous delivery. This can be calculated and billed easily through this. There are two types of delivery like domestic purpose use delivery and commercial purpose use delivery. The bill rate and capacity differs for both. This can be easily maintained and charged accordingly.
Rainfall intensity duration frequency curve statistical analysis and modeling...bijceesjournal
Using data from 41 years in Patna’ India’ the study’s goal is to analyze the trends of how often it rains on a weekly, seasonal, and annual basis (1981−2020). First, utilizing the intensity-duration-frequency (IDF) curve and the relationship by statistically analyzing rainfall’ the historical rainfall data set for Patna’ India’ during a 41 year period (1981−2020), was evaluated for its quality. Changes in the hydrologic cycle as a result of increased greenhouse gas emissions are expected to induce variations in the intensity, length, and frequency of precipitation events. One strategy to lessen vulnerability is to quantify probable changes and adapt to them. Techniques such as log-normal, normal, and Gumbel are used (EV-I). Distributions were created with durations of 1, 2, 3, 6, and 24 h and return times of 2, 5, 10, 25, and 100 years. There were also mathematical correlations discovered between rainfall and recurrence interval.
Findings: Based on findings, the Gumbel approach produced the highest intensity values, whereas the other approaches produced values that were close to each other. The data indicates that 461.9 mm of rain fell during the monsoon season’s 301st week. However, it was found that the 29th week had the greatest average rainfall, 92.6 mm. With 952.6 mm on average, the monsoon season saw the highest rainfall. Calculations revealed that the yearly rainfall averaged 1171.1 mm. Using Weibull’s method, the study was subsequently expanded to examine rainfall distribution at different recurrence intervals of 2, 5, 10, and 25 years. Rainfall and recurrence interval mathematical correlations were also developed. Further regression analysis revealed that short wave irrigation, wind direction, wind speed, pressure, relative humidity, and temperature all had a substantial influence on rainfall.
Originality and value: The results of the rainfall IDF curves can provide useful information to policymakers in making appropriate decisions in managing and minimizing floods in the study area.
Applications of artificial Intelligence in Mechanical Engineering.pdfAtif Razi
Historically, mechanical engineering has relied heavily on human expertise and empirical methods to solve complex problems. With the introduction of computer-aided design (CAD) and finite element analysis (FEA), the field took its first steps towards digitization. These tools allowed engineers to simulate and analyze mechanical systems with greater accuracy and efficiency. However, the sheer volume of data generated by modern engineering systems and the increasing complexity of these systems have necessitated more advanced analytical tools, paving the way for AI.
AI offers the capability to process vast amounts of data, identify patterns, and make predictions with a level of speed and accuracy unattainable by traditional methods. This has profound implications for mechanical engineering, enabling more efficient design processes, predictive maintenance strategies, and optimized manufacturing operations. AI-driven tools can learn from historical data, adapt to new information, and continuously improve their performance, making them invaluable in tackling the multifaceted challenges of modern mechanical engineering.
Discover the latest insights on Data Driven Maintenance with our comprehensive webinar presentation. Learn about traditional maintenance challenges, the right approach to utilizing data, and the benefits of adopting a Data Driven Maintenance strategy. Explore real-world examples, industry best practices, and innovative solutions like FMECA and the D3M model. This presentation, led by expert Jules Oudmans, is essential for asset owners looking to optimize their maintenance processes and leverage digital technologies for improved efficiency and performance. Download now to stay ahead in the evolving maintenance landscape.
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Sinan KOZAK
Sinan from the Delivery Hero mobile infrastructure engineering team shares a deep dive into performance acceleration with Gradle build cache optimizations. Sinan shares their journey into solving complex build-cache problems that affect Gradle builds. By understanding the challenges and solutions found in our journey, we aim to demonstrate the possibilities for faster builds. The case study reveals how overlapping outputs and cache misconfigurations led to significant increases in build times, especially as the project scaled up with numerous modules using Paparazzi tests. The journey from diagnosing to defeating cache issues offers invaluable lessons on maintaining cache integrity without sacrificing functionality.
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...PIMR BHOPAL
Variable frequency drive .A Variable Frequency Drive (VFD) is an electronic device used to control the speed and torque of an electric motor by varying the frequency and voltage of its power supply. VFDs are widely used in industrial applications for motor control, providing significant energy savings and precise motor operation.
Design and optimization of ion propulsion dronebjmsejournal
Electric propulsion technology is widely used in many kinds of vehicles in recent years, and aircrafts are no exception. Technically, UAVs are electrically propelled but tend to produce a significant amount of noise and vibrations. Ion propulsion technology for drones is a potential solution to this problem. Ion propulsion technology is proven to be feasible in the earth’s atmosphere. The study presented in this article shows the design of EHD thrusters and power supply for ion propulsion drones along with performance optimization of high-voltage power supply for endurance in earth’s atmosphere.
2. 2. Maintenance of HVAC system
Generally, the manufacturers recommend the maintenance require-
ments and the operating environment to the users. Wu et al. [8]
highlighted four types of maintenance programme for HVAC system
which includes:
(a) Test and inspection
(b) Scheduled maintenance
(c) Condition-based maintenance
(d) Corrective maintenance
In order to plan, organise and execute the maintenance programme
appropriately, it is vital to understand the components and functions of
a particular system. Chandrashekaran and Gopalakrishnan [9] demon-
strated that the most important HVAC components are the chillers,
cooling tower, air handling unit, compressor and pump. Thus, the main-
tenance of a HVAC system should focus on these essential components
to enhance the performance and the cost effectiveness of the system.
Since the HVAC system is centralised, it may affect the entire build-
ing when a failure occurs in any of its component. For example, the
cooling of condensed water cannot be done if the chillers break down
and hence the entire system cannot convert the hot air into cool air.
Furthermore, the maintenance of the central HVAC system is more com-
plicated and difficult because of the system's size and complexity. Hence,
to minimise the HVAC system downtime, corrective maintenance shall be
replaced with appropriate preventive maintenance strategies.
As argued by Wu et al. [8], most maintenance programmes of
building systems are developed based on the HVAC maintenance
programme. Thus, the HVAC system is selected as the scope of study
in this paper. In addition, Lavy [10] demonstrated that HVAC system is
the largest and most expensive component in a building. A high cost
of maintenance is required to retain the conditions of the HVAC system
without affecting maintenance performance.
3. Research design
This research adopted the mixed method approach that was
adopted by Ali [11] and Nik Mat [12] to study maintenance-related
topics. The approach comprises literature review, questionnaire survey,
semi-structured interview, and case study. This approach allows the re-
searchers to address more complicated research questions and achieve
higher reliability and validity of the research [13]. The research was di-
vided into stages and conducted sequentially (see Fig. 1).
Firstly, the features of the maintenance system of the HVAC system
were identified through literature reviews and preliminary survey. Sub-
sequently, close-ended questionnaires were drafted in five-point Likert
scale and multiple choices based on the findings of literature and pre-
liminary survey. The questionnaires were developed with reference to
the research of Ali [14]. It covered three sections, namely the
respondent's particular, maintenance characteristics of the HVAC sys-
tem, and occupants' satisfaction level (see Appendix).
Secondly, the simple random sampling method was adopted in the
questionnaire survey to identify the relevant respondents who have
been or are currently involved in the management of office building
maintenance. This method ensures the accuracy of the sample by
selecting the respondents at random and all elements in the population
are considered [15]. Population criteria included building requirements,
which were high-rise office buildings (7-storey and above) located in
Klang Valley, Malaysia and must be completed more than 2 years. Over-
all, 398 office buildings met the criteria and hence, the figure was deter-
mined as the research population. A set of the questionnaires was sent
out to each building from the research population and 120 sets of
valid questionnaires were returned, which gave a return rate of 30%.
The respondents were maintenance management personnel working
in different office buildings. 83% of the respondents were building man-
agers, building supervisors and executives specialising in the planning
and execution of maintenance management activities (see Fig. 2).
Meanwhile, 86% of the respondents had more than 5 years of working
experience in the maintenance management field (see Fig. 3). Hence,
the collected data was considerably reliable and accurate.
Literature Review & Preliminary Survey
To identify the research variables
Questionnaire Survey
To collect the research data
Correlation Analysis & Logistic Regression Analysis
To analyse the research data
Semi-Structured Interview
To validate the research result
Case Study
To test the applicability of research (regression) model practically
Practical implication
Fig. 1. Overall research flow.
47%
36%
10%
7%
Respondents' Profile (N = 120)
Building Manager
Building Executive/
Supervisor
Building Technician
Others
Fig. 2. Respondents' profile.
14%
52%
18%
16%
Respondents' Working Experience (N = 120)
< 6 years
6 - 10 years
11 - 15 years
> 15 years
Fig. 3. Respondents' working experience.
32 C.P. Au-Yong et al. / Automation in Construction 43 (2014) 31–37
3. Reliability analysis was conducted for the variable of maintenance
characteristic to enhance the reliability of the data. The purpose of this
analysis was to check the consistency of the scale of data [16]. The
Cronbach's alpha coefficient test shows that the coefficient for the main-
tenance characteristics was 0.755. A coefficient of more than 0.70 indi-
cates good reliability.
A correlation test was used to measure the relationship between the
maintenance characteristics and occupants' satisfaction through Statis-
tical Package for Social Science (SPSS) [17]. The Spearman rank-order
correlation was employed for analysis. It is suitable to analyse that
either or both variables are ordinal [18].
Subsequently, this study used the binary logistic regression to pro-
duce the prediction model for occupants' satisfaction. Whereby, the
probability of an eventcan be measured by using logistic regression [19].
Basically, logistic regression function is as follow:
Z¼β0þβ1X1þβ2X2þ ::::::þβkXkþε
Where,
Z latent variable
X1, X2, ...... , Xk independent variables
β0 constant
β1, β2, ...... , βk change in Y for a change of one unit in X1, X2, ...... , Xk
respectively
ε error term
Z value is transformed by using a link function to obtain the probabil-
ity of the event occurring. In this research, the link function to obtain the
probability of occupants' satisfaction is stated below:
P occupants’ satisfaction½ Š ¼ e
z
=1 þ e
z
; the value is between 0 and 1:
In order to validate the questionnaire results, building managers with
more than 5 years of experiences in office building maintenance were
interviewed. The interviewees were selected from the questionnaire re-
spondents who fulfil the requirements. Semi-structured interviews
were conducted to obtain further details and understandings about the
maintenance characteristics toward occupants' satisfaction. For example,
one of the interview questions was “Does the level of labourer skill and
knowledge significantly influence the occupants' satisfaction? How it influ-
ences the occupants' satisfaction?” The interview allows the researcher to
explore and uncover the respondents' views in detail [20].
76 respondents were identified as meeting the interviewee's re-
quirement, however, only 15 of them agreed to participate in the inter-
view session. The answers provided by the participants reached a
saturation after twelve (12) of them were interviewed, where the
answers given by the participants were similar and predictable without
new information [11]. Nevertheless, the interview session was carried
on until all fifteen (15) participants were interviewed. Unlike the ques-
tionnaire survey, the interviewees were required to answer the inter-
view questions and provide further explanation of maintenance
characteristics toward occupants' satisfaction.
A case study was carried out on a 27-storey office building located in
Kuala Lumpur. The building is 13 years old, with a total floor area of
324,000 square feet, privately owned and managed under the in-
house maintenance and management team. The building is accommo-
dated with centralised air-conditioning system. The purpose of the
case study was to test the applicability of the developed regression
model. Relevant information about the significant predictors was col-
lected. The data was applied into the regression model for calculation
of the probability of occupants' satisfaction. Consequently, the probabil-
ity was compared to the exact scenario of the office building.
4. Findings and discussion
Eight main maintenance characteristics of the HVAC system were
identified through the literature review and preliminary survey. They
are [21]:
(a) Skilled labourer [22–27]
(b) Spare parts and materials [22,28–32]
(c) Predetermined maintenance interval [27,30,33–36]
(d) Failure and maintenance downtime [7,9,37–40]
(e) Skilled manager [23,25,41]
(f) Maintenance equipment and technique [23,42–45]
(g) Maintenance data and information [34,38,46–49]
(h) Monitoring and inspection [2,34,46,50–52]
The eleven independent variables were extended from the mainte-
nance characteristics and analysed by using correlation analysis as
shown in Table 1. Indeed, higher concern towards the maintenance
characteristics is likely to raise the occupants' satisfaction. Therefore,
positive correlation between the maintenance characteristics and
occupants' satisfaction was expected in the outcome of the analysis.
Basically, a correlation coefficient of less than 0.3 points to a weak
relationship; a coefficient of 0.3 to 0.5 denotes a moderate relationship;
and a correlation coefficient of 0.5 or more points to a strong relation-
ship between two variables [53,54]. However, SPSS determines signifi-
cantly correlated variables with the significance value of 0.05 or
below. Of the eleven independent variables, the following eight vari-
ables are significantly correlated to the occupants' satisfaction:
(a) Skill and knowledge of labourer
(b) Number of labourers
Table 1
Correlation between maintenance characteristics and occupants' satisfaction.
Maintenance characteristics Occupants' satisfaction
Correlation coefficient Significance value
Skill and knowledge of labourer .634** .000
Number of labourer .192* .035
Stock of spare parts and materials −.108 .239
Quality of spare parts and materials .608** .000
Length of predetermined maintenance interval .020 .830
Response towards failure and downtime .617** .000
Skill and knowledge of manager .697** .000
Availability of maintenance equipment and technique .152 .099
Capability to adopt maintenance equipment and technique .553** .000
Accuracy of maintenance data and information .589** .000
Frequency of monitoring and inspection .189* .039
**. Correlation is significant at the 0.01 level (2-tailed).
*. Correlation is significant at the 0.05 level (2-tailed).
33C.P. Au-Yong et al. / Automation in Construction 43 (2014) 31–37
4. (c) Quality of spare parts and materials
(d) Response towards failure and downtime
(e) Skill and knowledge of manager
(f) Capability to adopt maintenance equipment and technique
(g) Accuracy of maintenance data and information
(h) Frequency of monitoring and inspection
Building clients and users demand that the maintenance labourers
provide good quality of work at all time. Poor labourers' skill and knowl-
edge is one of the main barriers in executing an effective maintenance
management [25]. The result stated that the level of labourer skill and
knowledge is significantly correlated to the occupants' satisfaction.
When the maintenance labourers fail to maintain the HVAC systems
above the acceptable standard, the daily activities of building occupants
can be affected. Therefore, they will be complaining on the poorly
skilled labourers that lead to the occurrence of uncomfortable working
environment. In order to ensure that the maintenance labourers possess
relevant skill and knowledge, the qualification of potential labourers
must be identified upon employment [24]. One of the interviewees ac-
knowledged the importance of labourers' qualification and revealed
that:
“…we always require the minimum qualification and working expe-
rience when employing the building technicians.”
Then, the Spearman's rank correlation coefficient detected signif-
icant correlation between the number of labourers and occupants'
satisfaction. However, a large amount of budget allocation is
required for hiring greater number of labourers [23]. Ali et al. [22]
suggested employing minimum but optimum labourer with accept-
able qualification standard as one of the measures to minimise main-
tenance cost. The result of analysis did not match the literature
contents. In addition, it was denied by most of the respondents,
who argued that the number of labourers should be minimum but
sufficient to perform the maintenance tasks effectively. One inter-
viewee mentioned that:
“…due to budget restriction, the clients will not spend extra money
to hire extra workers.”
According to the correlation analysis result, the quality of spare parts
and materials is significantly correlated to the occupants' satisfaction.
Quality of spare parts and materials always has an impact towards
maintenance performance. Good quality spare parts and materials en-
sure the building systems to operate effectively without affecting the ac-
tivities of building users [22]. In contrast, poor quality spare parts and
materials will lead to more defects and increase the frequency of break-
down [32]. Hence, the quality of spare parts and materials must be con-
sidered to prolong the system lifespan and enhance its operation. An
example was quoted from one of the interviewees:
“…good quality parts may need to be replaced once in 2 years. On
the other hand, poor quality parts may need to be replaced every
6 months. So, good quality parts reduce maintenance need. They sa-
ve time and cost, as well as minimise possibilities of defect.”
Furthermore, the response towards failure and downtime was found
to be significantly correlated to the occupants' satisfaction. Failure and
downtime involve the time required for detection, repair or replace-
ment and restarting the system, thus the unavailability of services and
facilities [38]. Generally, most of the office buildings are solely depen-
dent on the HVAC system to provide air circulation and ventilation. Fail-
ure of the system will critically jeopardise the indoor air quality and
hence affect the working environment [7]. Therefore, the interviewees
expressed that immediate response to the failure and downtime of
HVAC system is always requested by the building users. One of the
interviewees extended further impact of HVAC system failure towards
the organisations in the building:
“…extensive downtime may affect the image or reputation of orga-
nisation. For example, the customers of the organisation will be frus-
trated when they visit to the office with poor working environment.”
The result further demonstrated that the level of managerial skill
and knowledge is significantly correlated to the occupants' satisfaction.
Ellis [41] demonstrated that the introduction of maintenance strategies
without a skilled manager is unlikely to achieve the result. For example,
a skilled manager should be capable in obtaining appropriate mainte-
nance data and analysis, as well as providing training to produce disci-
plined and knowledgeable maintenance staff. Therefore, the support
from skilled manager is highly required to plan, manage, organise, su-
pervise, and monitor the implementation of the maintenance strategies
in different aspects. Some interviewees validated that a skilful and expe-
rienced building manager is usually able to provide the service as
required by the clients and users, above satisfactory level. He ensures
that all the maintenance tasks run smoothly and accordingly to prevent
failure, additional expenditure and downtime. For instance, an inter-
viewee said that:
“…one of the most important aspects in maintenance management
is that a manager must be able to solve the complaints raised up
by the clients or users.”
In building maintenance, some specific equipments such as scanning
equipment, are required by experts to perform such technologies and
techniques. This might be complicated and costly for an organisation
[23]. Due to the increase in the technical complexity of the HVAC
systems and the level of sophistication of the tools, Veldman et al. [44]
argued that the need for training to use and operate the tools also
increases. This implied that the maintenance personnel should be able
to adapt to the new tools and technologies accordingly through proper
training. The correlation analysis result revealed that the capability to
adopt maintenance equipment and technique is significantly correlated
to the occupants' satisfaction. Most of the interviewees revealed that the
building clients and occupants expect proper maintenance works to be
performed by using appropriate tools and equipments. An interviewee
further explained that:
“…if we are not capable to utilise the equipment and technique,
it will just be a waste of money and time, yet it will affect the system
quality. We know how advanced and expensive is the infrared
camera, but when no one understands the way of using it, it is just
nothing.”
The documentation of maintenance data and information is
essential to ensure the accuracy and reliability of information about
the maintenance records, conditions and remaining lifetime of system
components. In order to obtain and maintain accurate information, ap-
propriate documentation is required [46]. Qingfeng et al. [48] explained
that effectiveness of planning and implementation of maintenance tasks
is highly dependent on the accuracy of maintenance data. The analysis
result showed that accuracy of maintenance data and information is
significantly correlated to the occupants' satisfaction. Accurate mainte-
nance data lead to precise identification of the maintenance task,
thus help to enhance the quality of system operation as well as optimise
the utilisation of time and resources. Few interviewees commented
that:
“…accurate and reliable maintenance data improves the process of
maintenance and its outcome, hence fulfilling the requirement of
clients and users. As such, they will not complain on the provided
maintenance service.”
34 C.P. Au-Yong et al. / Automation in Construction 43 (2014) 31–37
5. “…it is important to provide accurate data for implementation of a
specific maintenance task without any hidden threat or problem
that might cost more for additional remedial work.”
In addition, the frequency of monitoring and inspection was found to
be significantly correlated to the occupants' satisfaction. In fact, the
downtime of a system can be reduced by increasing maintenance per-
sonnel care in condition monitoring [52]. Lo and Choi [51] and Jardine
et al. [34] demonstrated that for optimum monitoring of HVAC system,
inspections should preferably be executed at regular intervals in order
to select the most cost-effective method for maintenance action and
to minimise the risk and hazards to the building users. Hameed et al.
[46] supported that planning of appropriate maintenance activities
prior to failure is greatly influenced by the ability to monitor and inspect
the condition of systems. All interviewees acknowledged that regular
inspection on the HVAC systems is one of the unavoidable tasks. Opti-
mal frequency of inspection allows the technicians to detect abnormal
system condition effectively. Defective parts can be replaced to prevent
further damage, and ensures that the system operates smoothly with-
out disruption from damage. One of the interviewees mentioned that:
“…inspection should be carried out as frequent as possible to detect
and rectify the defective component as soon as possible.”
One of the important criteria to improve maintenance performance
is proper management of spare parts and materials. Basically, manage-
ment of spare parts and materials includes the study of spare part
needs, efficiency of spare parts reordering, level of stocks of spare
parts, and storage of spare parts [24]. Although positive correlation
between the maintenance characteristics and the occupants' satisfac-
tion was expected in this study, the analysis result indicated a negative
correlation between the stock of spare parts and materials and the occu-
pants' satisfaction. Most of the interviewees clarified that there is limit-
ed or even no storage space provided for storage of spare parts and
materials. Thus, the stock-up of spare parts and materials is not prac-
tised by the management in office buildings. To address the issue of un-
availability of spare parts and materials, an interviewee commented
that:
“…we don't keep stock of spare parts and materials, but we always
have various panel suppliers to provide us the spare parts and mate-
rials in the shortest time with reasonable cost.”
4.1. Developing the regression model
In order to validate the correlation analysis result and to determine
the significant predictors of the occupants' satisfaction, logistic regres-
sion analysis was conducted by using the eleven independent variables
as the predictors. The analysis includes all the significant predictors
(with significant value of less than 0.05) in and excludes all the insignif-
icant predictors (with significant value of more than 0.05) from the
regression model. In the analysis, occupants' satisfaction was coded
with the value of 0 and 1. Whereby, “not satisfied” and “satisfied”
were labelled as 0 and 1 respectively.
By using forward stepwise method, SPSS produced four steps (see
Table 2) to include the predictors that significantly contributed to the
logistic regression model. Step 1 revealed the skill and knowledge of
manager significantly predicting the odds of occupants' satisfaction
with X2
= 71.00, p b .05. Then, Step 2 computed the skill and knowledge
of labour with X2
= 22.93, p b .05. After that, Step 3 indicated the quality
of spare parts and materials significantly predicting the probability
of occupants' satisfaction with X2
= 18.09, p b .05. Lastly, Step 4 figured
out the response towards failure and downtime with X2
= 8.84, p b .05.
Therefore, there are four independent variables significantly predicting
whether or not the occupants are satisfied with the maintenance man-
agement (X2
= 120.86, p b .05).
In this case, 85.0% of the variance in occupants' satisfaction could be
predicted from the skill and knowledge of manager (SKM), skill and
knowledge of labour (SKL), quality of spare parts and materials
(QSM), and response towards failure and downtime (RFD). Further-
more, the p-value for Hosmer–Lemeshow goodness of fit was 0.552,
which was more than 0.05. Thus, the model adequately fit the data.
Then, the logistic regression equation was produced as follows (see
Table 2):
Z ¼ −14:648 þ 0:887 SKM þ 1:444 SKL þ 1:254 QSM þ 1:048 RFD
The value of the predictors was quantified from 1 to 5 that
represented “very low degree of concern” to “very high degree of
concern” respectively. Then, the value could be inserted to the equation
in order to obtain the probability of occupants' satisfaction. Therefore,
the skill and knowledge of manager, the skill and knowledge of
labourer, quality of spare parts and materials, as well as the response
towards failure and downtime are the significant maintenance charac-
teristics influencing the probability of occupants' satisfaction. A high
level of concern towards these characteristics is likely to increase the
probability of occupants' satisfaction towards the HVAC system.
4.2. Testing the applicability of the regression model in practical
Case study on a selected office building was carried out to collect the
data about the four significant predictors. The criteria to be concerned
about these predictors were tabulated in Table 3. Level of concern
towards each predictor could be reflected by four criteria respectively.
Concern on four criteria would contribute to the score of 5; whilst
none would contribute to the score of 1.
The details of the criteria concerned by the organisation are tabulat-
ed in Table 4. The organisation considered three criteria to assess the
maintenance manager and so, scored 4 for the skill and knowledge of
the manager. The management also took into consideration three
criteria to assess the maintenance labourer, which scored 4 for the
skill and knowledge of the labourer. They concerned four of the criteria
to ensure the quality of spare parts and hence, scored 5 for the quality of
spare parts and materials. Lastly, they stressed on three criteria in
responding failure and downtime, which scored 4 for the response
towards failure and downtime. After getting all the scores of the predic-
tors, they were inserted into the regression model for calculation of the
probability as follow:
Z ¼ −14:648 þ 0:887 SKM þ 1:444 SKL þ 1:254 QSM þ 1:048 RFD
¼ −14:648 þ 0:887 4ð Þ þ 1:444 4ð Þ þ 1:254 5ð Þ þ 1:048 4ð Þ
¼ 5:138
Table 2
Variables in the equation.
B S.E. Wald df Sig. Exp(B)
Step 1a
ManagerSkill 1.628 .269 36.742 1 .000 5.095
Constant −5.114 .925 30.570 1 .000 .006
Step 2b
LabourerSkill 1.202 .293 16.877 1 .000 3.327
ManagerSkill 1.511 .316 22.926 1 .000 4.531
Constant −8.481 1.563 29.439 1 .000 .000
Step 3c
LabourerSkill 1.488 .390 14.548 1 .000 4.427
PartQuality 1.194 .327 13.343 1 .000 3.302
ManagerSkill 1.328 .344 14.916 1 .000 3.774
Constant −12.451 2.479 25.231 1 .000 .000
Step 4d
LabourerSkill 1.444 .422 11.705 1 .001 4.240
PartQuality 1.254 .368 11.587 1 .001 3.504
DowntimeResponse 1.048 .389 7.263 1 .007 2.852
ManagerSkill .887 .364 5.929 1 .015 2.428
Constant −14.648 3.031 23.348 1 .000 .000
a
Variable(s) entered on step 1: ManagerSkill.
b
Variable(s) entered on step 2: LabourerSkill.
c
Variable(s) entered on step 3: PartQuality.
d
Variable(s) entered on step 4: DowntimeResponse.
35C.P. Au-Yong et al. / Automation in Construction 43 (2014) 31–37
6. Then; P occupants’ satisfaction½ Š ¼ e
z
=1 þ e
z
¼ e
5:138
=1 þ e
5:138
¼ 0:994
The previous customer satisfaction survey report prepared by the
management of the building was obtained. With reference to the survey
report towards the HVAC system, 95% of the occupants satisfied with
the service of the HVAC system. The high level of satisfaction indicated
that no major breakdown occurred, and the negative feedbacks were
related to the thermal comfort issues. Good maintenance service
promoted the occupancy rate of the building, which was 96%. Thus,
the probability of occupants' satisfaction matched to the exact scenario
of the occupants' satisfaction towards the HVAC system. As a result, the
applicability of the regression model in practical was validated and
confirmed.
4.3. Recommendations
The study demonstrated that the involvement of key participants
such as the clients, maintenance personnel, and building occupants or
users in the maintenance management process is vitally important to
enhance the effectiveness of maintenance management and increase
the occupants' satisfaction. Recommendations to improve the effective-
ness of the maintenance management of a building were discussed
in the interview sessions. The interviewees suggested that providing
a communication platform to gather the opinions, comments, needs,
and issues of the key participants (clients or organisation, management,
tenants, and customers or users) can improve the planning of mainte-
nance strategies accordingly. For instance, it is recommended that
meeting between the management and clients should be conducted
on a weekly basis, whilst meeting between management, clients and
tenants be conducted on a monthly basis. In addition, an online feed-
back system was proposed as a platform for the customers or users to
provide feedback, opinion, or complaint about the services provided in
the building at anytime. The online feedback system requires minimal
cost whilst organising meeting requires no cost. Therefore, the commit-
ment and participation of the key participants are necessary in effective
maintenance management. Participation provides an opportunity to
tackle problems through engagement of the key participants, prioritising
their concerns and maximising mutual satisfaction [55]. Further study
about the participation of the key participants and the provision of
an effective communication platform in maintenance management is
recommended.
5. Conclusion
This paper emphasised the improvement of maintenance characteris-
tics to reach the desired the occupants' satisfaction level towards the
HVAC system. The findings highlighted eight significant characteristics
that are significantly correlated with the occupants' satisfaction. They
are skill and knowledge of labourer, number of labourer, quality of
spare parts and materials, response towards failure and downtime, skill
and knowledge of the manager, capability to adopt maintenance equip-
ment and technique, accuracy of maintenance data and information,
as well as frequency of monitoring and inspection. Then, a prediction
Table 3
Criteria of the significant predictors to be concerned.
Predictor Criteria
Skill and knowledge of manager • Qualification (diploma/degree in relevant field)
• Experience
• Attending seminar/workshop
• Member of professional body
Skill and knowledge of labourer • Qualification (category of competency: technician/chargeman)
• Experience
• Attending training/workshop
• Positive attitude
Quality of spare parts and materials • Panel supplier
• Tendering process
• Approval by client
• Warranty
Response towards failure and downtime • In-house technician
• Outsourced contractor/service provider
• Immediate response to failure
• Avoid maintenance downtime during office hour
Table 4
Details of criteria concerned by the organisation.
Predictor Criteria Score
Skill and knowledge of manager • Possess at least a Diploma in Architecture/Building/Civil Engineering/Building Engineering or
equivalent qualification
• Minimum 5 years working experience in relevant field
• Attends seminar/workshop related to facilities management
4
Skill and knowledge of labourer • Building technician – possess at least a Certificate in Mechanical/Electrical Engineering; building
executive/administrative staff – possess at least a Diploma in relevant field
• Minimum 1 and 3 years working experience in relevant field for building technician and building
executive/administrative staff respectively
• Good communication and interpersonal skills, willing to work extra hours
4
Quality of spare parts and materials • Have a list of panel suppliers/contractors
• Tender for the acquisition of spare parts/materials
• Acquisition of spare parts/materials is approved by the clients
• Select the spare parts/materials under warrantee
5
Response towards failure and downtime • Employ in-house technician to tackle maintenance issue
• Outsource specific maintenance project to contractor/service provider
• 24-h standby technician
4
36 C.P. Au-Yong et al. / Automation in Construction 43 (2014) 31–37
7. model generated through SPSS revealed that the skill and knowledge of
manager, skill and knowledge of labourer, quality of spare parts and
materials, as well as the response towards failure and downtime are
the significant predictors of the occupants' satisfaction. Therefore, the
significant maintenance characteristics must be considered in the main-
tenance of the HVAC system or even other building systems. In practice,
the regression model would help the management to predict the main-
tenance performance as proven through the case study. Furthermore,
the management would be able to plan and implement the mainte-
nance characteristics effectively in order to achieve occupants' satisfac-
tion. Finally, this paper recommended that the management should
develop an effective communication platform such as meeting and on-
line feedback system, involving all key participants with commitment
and contribution towards the maintenance activities. In the meeting,
the clients, tenants and management can discuss, decide and approve
the issues or requests about the qualification of manager or labourer,
as well as the quality of spare parts. For example, they may decide the
minimum qualification of manager and labourer upon employment,
or discuss about the working attitude of the existing maintenance per-
sonnel. Furthermore, the acquisition of spare parts will be approved by
the clients and tenants to ensure the acceptable quality and reasonable
cost. Additionally, the online feedback system allows the users to report
any failure or maintenance issue at anytime, so that the maintenance
personnel are able to respond to the failure without delay.
Appendix A. Supplementary data
Supplementary data to this article can be found online at http://dx.
doi.org/10.1016/j.autcon.2014.03.013.
References
[1] J.H. Buys, E.H. Mathews, Investigation into capital costs of HVAC systems, Build.
Environ. 40 (2005) 1153–1163.
[2] R.Y. Kwak, A. Takakusagi, J.Y. Sohn, S. Fujii, B.Y. Park, Development of an optimal
preventive maintenance model based on the reliability assessment for air-
conditioning facilities in office buildings, Build. Environ. 39 (2004) 1141–1156.
[3] R. Suttell, Preventive HVAC maintenance is a good investment, The Source for
Facilities Decision-Makers: Buildings, vol. July, UNICCO Integrated Facilities Services,
Newton, 2006.
[4] A. Norhidayah, C.K. Lee, M.K. Azhar, S. Nurulwahida, Indoor air quality and sick
building syndrome in three selected buildings, Procedia Eng. 53 (2013) 93–98.
[5] A. Smith, M. Pitt, Sustainable workplaces and building user comfort and satisfaction,
J. Corp. Real Estate 13 (3) (2011) 144–156.
[6] R. Rooley, Sick building syndrome — The real facts: what is known, what can be
done, Facilities 15 (1/2) (1997) 29–33.
[7] S. Wu, K. Neale, M. Williamson, M. Hornby, Research opportunities in maintenance
of office building services systems, J. Qual. Maint. Eng. 16 (1) (2010) 23–33.
[8] S. Wu, D. Clements-Croome, V. Fairey, B. Albany, J. Sidhu, D. Desmond, K. Neale,
Reliability in the whole life cycle of building systems, Eng. Constr. Archit. Manag.
13 (2) (2006) 136–153.
[9] A. Chandrashekaran, B. Gopalakrishnan, Maintenance risk reduction for effective
facilities management, J. Facil. Manag. 6 (1) (2008) 52–68.
[10] S. Lavy, Facility management practices in higher education buildings, J. Facil. Manag.
6 (4) (2008) 303–315.
[11] A.S. Ali, Integrative Mechanisms in the Design Process of Building Refurbishment
Projects, Unpublished Thesis, Universiti Teknologi MARA, 2008.
[12] N.E.M. Nik Mat, Performance Measurement of Office Buildings Maintenance
Management, Unpublished Dissertation, University of Malaya, 2009.
[13] R.K. Yin, Case Study Research: Design and Methods, 4th ed. SAGE Publication, Inc.,
California, 2009.
[14] A.S. Ali, Cost decision making in building maintenance practice in Malaysia, J. Facil.
Manag. 7 (4) (2009) 298–306.
[15] W.E. Saris, I.N. Gallhofer, Design, Evaluation, and Analysis of Questionnaires for
Survey Research, John Wiley & Sons Inc., New Jersey, 2007.
[16] N.L. Leech, K.C. Barrett, G.A. Morgan, IBM SPSS for Intermediate Statistics: Use and
Interpretation, 4th ed. Taylor and Francis Group, LLC, New York, 2011.
[17] I. Diamond, J. Jefferies, Beginning Statistics: An Introduction for Social Scientists,
SAGE Publications Ltd, London, 2006.
[18] A.M. Graziano, M.L. Raulin, Research Methods: A Process of Inquiry, 7th ed. Pearson
Education Inc., Boston, 2010.
[19] Y.P. Chua, Statistik Penyelidikan Lanjutan: Ujian Regresi, Analisa Faktor dan Analisis
SEM Buku 5, McGraw-Hill (Malaysia) Sdn. Bhd, Kuala Lumpur, 2009.
[20] C. Marshall, G.B. Rossman, Designing Qualitative Research, 4th ed. Sage Publication,
Inc., California, 2006.
[21] C.P. Au-Yong, A.S. Ali, F. Ahmad, Significant characteristics of scheduled and
condition-based maintenance in office building, J. Perform. Constr. Facil. 28 (2)
(2013) 257–263.
[22] A.S. Ali, S.N. Kamaruzzaman, R. Sulaiman, C.P.Au. Yong, Factors affecting housing
maintenance cost in Malaysia, J. Facil. Manag. 8 (4) (2010) 285–298.
[23] M.C. Carnero, An evaluation system of the setting up of predictive maintenance
programmes, Reliab. Eng. Syst. Saf. 91 (2006) 945–963.
[24] P.D. Groote, Maintenance performance analysis: a practical approach, J. Qual. Maint.
Eng. 1 (2) (1995) 4–24.
[25] J. Kangwa, F. Olubodun, An investigation into home owner maintenance awareness,
management and skill-knowledge enhancing attributes, Struct. Surv. 21 (2) (2003)
70–78.
[26] J. Lai, F. Yik, P. Jones, Expenditure on operation and maintenance service and rental
income of commercial buildings, Facilities 26 (5/6) (2008) 242–265.
[27] D. Pandey, M.S. Kulkarni, P. Vrat, A model for optimal maintenance interval incorporat-
ing the cost of rejections in manufacturing, J. Adv. Manag. Res. 7 (2) (2010) 219–232.
[28] N. De Silva, M. Ranasinghe, Maintainability risks of condominiums in Sri Lanka,
J. Financ. Manag. Prop. Constr. 15 (1) (2010) 41–60.
[29] A. Parida, U. Kumar, Maintenance Performance Measurement (MPM): issues and
challenges, J. Qual. Maint. Eng. 12 (3) (2006) 239–251.
[30] A.H.C. Tsang, Condition-based maintenance: tools and decision making, J. Qual.
Maint. Eng. 1 (3) (1995) 3–17.
[31] F.W.H. Yik, J.H.K. Lai, The trend of outsourcing for building services operation and
maintenance in Hong Kong, Facilities 23 (1/2) (2005) 63–72.
[32] A. Zuashkiani, H. Rahmandad, A.K.S. Jardine, Mapping the dynamics of overall equip-
ment effectiveness to enhance asset management practices, J. Qual. Maint. Eng. 17
(1) (2011) 74–92.
[33] D.-H. Chen, D.-F. Lin, H.-L. Luo, Effectiveness of preventative maintenance treatments
using fourteen SPS-3 sites in Texas, J. Perform. Constr. Facil. 17 (3) (2003) 136–143.
[34] A.K.S. Jardine, D. Lin, D. Banjevic, A review on machinery diagnostic and prognostics
implementing condition-based maintenance, Mech. Syst. Signal Process. 20 (2006)
1483–1510.
[35] J. Khalil, S.M. Saad, N. Gindy, An integrated cost optimisation maintenance model for
industrial equipment, J. Qual. Maint. Eng. 15 (1) (2009) 106–118.
[36] V. Narayan, Effective Maintenance Management: Risk and Reliability Strategies for
Optimizing Performance, Industrial Press Inc., New York, 2003.
[37] S. Batun, M. Azizoğlu, Single machine scheduling with preventive maintenances, Int.
J. Prod. Res. 47 (7) (2009) 1753–1771.
[38] M. Bevilacqua, M. Braglia, The analytic hierarchy process applied to maintenance
strategy selection, Reliab. Eng. Syst. Saf. 70 (2000) 71–83.
[39] A.C. Marquez, J.N.D. Gupta, Contemporary maintenance management: process,
framework and supporting pillars, Int. J. Manag. Sci. 34 (2006) 313–326.
[40] S.K. Yang, A condition-based preventive maintenance arrangement for thermal
power plants, Electr. Power Syst. Res. 72 (2004) 49–62.
[41] B.A. Ellis, Condition based maintenance, Jethro Proj. (2008) 1–5.
[42] D.J. Edward, G.D. Holt, F.C. Harris, Predictive maintenance techniques and their
relevance to construction plant, J. Qual. Maint. Eng. 4 (1) (1998) 25–37.
[43] L. Mann, A. Saxena, G.M. Knapp, Statistical-based or condition-based preventive
maintenance? J. Qual. Maint. Eng. 1 (1) (1995) 46–59.
[44] J. Veldman, W. Klingenberg, H. Wortmann, Managing condition-based maintenance
technology: a multiple case study in the process industry, J. Qual. Maint. Eng. 17 (1)
(2011) 40–62.
[45] B. Wood, Towards innovative building maintenance, Struct. Surv. 23 (4) (2005)
291–297.
[46] Z. Hameed, S.H. Ahn, Y.M. Cho, Practical aspects of a condition monitoring system
for a wind turbine with emphasis on its design, system architecture, testing and in-
stallation, Renew. Energy 35 (2010) 879–894.
[47] A.A. Irigaray, E. Gilabert, Ubiquitous computing for dynamic condition-based main-
tenance, J. Qual. Maint. Eng. 15 (2) (2009) 151–166.
[48] W. Qingfeng, L. Wenbin, Z. Xin, Y. Jianfeng, Y. Qingbin, Development and application
of equipment maintenance and safety integrity management system, J. Loss Prev.
Process Ind. 24 (2011) 321–332.
[49] A.H.C. Tsang, W.K. Yeung, A.K.S. Jardine, B.P.K. Leung, Data management for CBM
optimization, J. Qual. Maint. Eng. 12 (1) (2006) 37–51.
[50] A. Grall, C. Berenguer, L. Dieulle, A condition-based maintenance policy for stochas-
tically deteriorating systems, Reliab. Eng. Syst. Saf. 76 (2002) 167–180.
[51] T.Y. Lo, K.T.W. Choi, Building defects diagnosis by infrared thermography, Struct.
Surv. 22 (5) (2004) 259–263.
[52] D. Sherwin, A review of overall models for maintenance management, J. Qual. Maint.
Eng. 6 (3) (2000) 138–164.
[53] C.D. Gray, P.R. Kinnear, IBM SPSS Statistics 19 Made Simple, Pyschology Press, East
Sussex, 2012.
[54] M. Saunders, P. Lewis, A. Thornhill, Research Methods for Business Students, 5th ed.
Pearson Education Limited, Essex, 2009.
[55] T.H.Y. Li, S.T. Ng, M. Skitmore, Evaluating stakeholder satisfaction during public
participation in major infrastructure and construction projects: a fuzzy approach,
Autom. Constr. 29 (2013) 123–135.
37C.P. Au-Yong et al. / Automation in Construction 43 (2014) 31–37