CO1 Describe objectives and the basic principles in maintenance
CO2 Explain Maintenance Policies and Preventive Maintenance
CO3 Illustrate the various processes involved in condition monitoring
CO4 Explain the influence of failure analysis in basic machine elements
CO5 Explain the role of Repair Methods for Material.
• Basic Principles of maintenance planning
• Objectives and principles of planned maintenance
activity
• Importance and benefits of sound Maintenance
systems
• Reliability and Machine availability
• MTBF, MTTR and MWT
• Factors of availability
• Maintenance organization
• Maintenance economics.
Maintenance engineering : Maintenance engineering is
the activity of applying engineering concepts to the
optimization of equipment, procedure and departmental
budgets to achieve better maintainability, reliability and
availability of equipment.
Planning: Planning ensures the smooth operation of the
system. Planning defines what is to be done and how it is to
be done. It specifies the materials, tool, equipment and
skills required to perform the work.
Main classification of planning in engineering system are as follows,
1. Long range planning
2. Short range planning
3. Planning for immediate activity
1.Long Range planning : For a period of five years at least. Involves capital
budgeting, strategies and operational programmers.
2. Short range: up to one year. Made to achieve short term goals.
3. Immediate Activity Planning : it is done frequently whenever required.
Objectives of Planned Maintenance Activity
 To achieve minimum breakdown and to keep the plant in good working condition at the lowest
possible cost.
 To ensure the availability of machines and services in an optimum working condition.
 To keep machines and other facilities in a condition to be used to achieve the maximum profit without
any interruption.
 To keep the time schedule of delivery to customers.
 To meet the availability requirements for critical equipment.
 To keep the maintenance costs as low as possible for non-critical equipment.
 To control the effective and trained supervision.
 To meet the quality requirements of the product.
 To increase the profits of production systems.
Principles of Maintenance :They are followed in a system to guide the staff to
work efficiently and effectively to achieve the overall objectives of the
maintenance system,
Main areas of work governed by this principles are
Plant management in Maintenance work
Production and maintenance objectives
Establishment of work order and recording system
Information based Decision making
Adherence to planned maintenance strategy .
Manpower for Maintenance
Planning for maintenance functions
Role of Spare parts
Training.
SOUND MAINTENANCE SYSTEM
The following are the benefits of sound maintenance management system
 Minimization of down time
 Improvement in availability of system
 Extended life of equipment
 Safety and smooth operation of the process
 Providing adequate back up supply
 Minimization of normal expected wear and tear of equipment
 Safety of the personal involved in the organization
 Increasing the reliability of the system
 Providing a proper working environment
 Cost effective maintenance boosts the profit of the production system.
Reliability: Reliability is the probability that a component/system when
operating under given condition will perform its intended functions adequately
for a specified period of time.
RELIABILITY
Achievable Reliability
Its depends on maintenance and
operation of the equipment
Inherent Reliability
It is associated with the quality of the
material and design of machine parts
Equipment lifecycle: Reliability engineering is dependability in the life cycle management of
product. The failure pattern of equipment over its life cycle can be represented as bath-tub curve.
Mean Time To Failure(MTTF):Mean Time To Failure (MTTF) is a very basic measure of
reliability used for non-repairable systems. It represents the length of time that an item is expected to
last in operation until it fails.
Mean Time Between Failures(MTBF): The term MTBF is used for repairable systems, but it does not
take into account units that are shut down for routine scheduled maintenance
Mean Time To Repair (MTTR):It refers to the amount of time required to repair a system and
restore it to full functionality. The MTTR clock starts ticking when the repairs start and it goes on
until operations are restored. This includes repair time, testing period, and return to the normal
operating condition.
General Organization Structure of Maintenance Department
Maintenance economics: Life-cycle
cost analysis (LCCA) is a tool to
determine the most cost-effective
option among different competing
alternatives to purchase, own, operate,
maintain and, finally, dispose of an
object or process, when each is equally
appropriate to be implemented on
technical grounds
Estimation of economic life of
equipment: its depends on the
maintenance and repair cost, availability
and operational efficiency.
Reliability costs are the business
costs of unreliable systems.
Maintenance costs are the cost of
doing maintenance; be that reactive or
preventive maintenance.

More Related Content

What's hot

Office building maintenance cost prediction model
Office building maintenance cost prediction modelOffice building maintenance cost prediction model
Office building maintenance cost prediction modelUniversity of Malaya
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementAnupam Kumar
 
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENTREPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENTlaxtwinsme
 
Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015pyi kyaw lynn
 
Operations ManagementServices
Operations ManagementServicesOperations ManagementServices
Operations ManagementServicesahmad bassiouny
 
Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring MaintainabilityReliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring MaintainabilityAccendo Reliability
 
Ais Romney 2006 Slides 06 Control And Ais
Ais Romney 2006 Slides 06 Control And AisAis Romney 2006 Slides 06 Control And Ais
Ais Romney 2006 Slides 06 Control And AisSharing Slides Training
 
Spare Parts Management
Spare Parts ManagementSpare Parts Management
Spare Parts ManagementIEI GSC
 
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLCCBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLCCarl Byington
 
CHAPTER-1.pptx
CHAPTER-1.pptxCHAPTER-1.pptx
CHAPTER-1.pptxTafereAga
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity planWBDC of Florida
 
Procedures for managing workflow components, proper decision
Procedures for managing workflow components, proper decisionProcedures for managing workflow components, proper decision
Procedures for managing workflow components, proper decisioncarolyncollins
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET Journal
 

What's hot (20)

Office building maintenance cost prediction model
Office building maintenance cost prediction modelOffice building maintenance cost prediction model
Office building maintenance cost prediction model
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENTREPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
 
Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015
 
Maintainability engineering
Maintainability engineeringMaintainability engineering
Maintainability engineering
 
Unit 1
Unit 1Unit 1
Unit 1
 
Unit 2
Unit 2Unit 2
Unit 2
 
CIM unit-4
CIM  unit-4CIM  unit-4
CIM unit-4
 
Report on Engineering Services
Report on Engineering ServicesReport on Engineering Services
Report on Engineering Services
 
Operations ManagementServices
Operations ManagementServicesOperations ManagementServices
Operations ManagementServices
 
Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring MaintainabilityReliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
 
Ais Romney 2006 Slides 06 Control And Ais
Ais Romney 2006 Slides 06 Control And AisAis Romney 2006 Slides 06 Control And Ais
Ais Romney 2006 Slides 06 Control And Ais
 
Spare Parts Management
Spare Parts ManagementSpare Parts Management
Spare Parts Management
 
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLCCBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
 
CHAPTER-1.pptx
CHAPTER-1.pptxCHAPTER-1.pptx
CHAPTER-1.pptx
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity plan
 
Procedures for managing workflow components, proper decision
Procedures for managing workflow components, proper decisionProcedures for managing workflow components, proper decision
Procedures for managing workflow components, proper decision
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
 
Moc for lcl
Moc for lclMoc for lcl
Moc for lcl
 
Gupta2009
Gupta2009Gupta2009
Gupta2009
 

Similar to maintenance engineering

Maintenance management
Maintenance managementMaintenance management
Maintenance managementramduttkholia
 
Diagnostic Techniques Notes
Diagnostic Techniques NotesDiagnostic Techniques Notes
Diagnostic Techniques Notesrajimech06
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Sanjeev Deshmukh
 
MAINTENANCE MANAGEMENT.pptx
MAINTENANCE MANAGEMENT.pptxMAINTENANCE MANAGEMENT.pptx
MAINTENANCE MANAGEMENT.pptxmancangkul1
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceJames Fitzgerald
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenancevishakeb
 
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...IJERA Editor
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Dhanesh S
 
Maintenance Engineering, Principle of Maintenance
Maintenance Engineering, Principle of MaintenanceMaintenance Engineering, Principle of Maintenance
Maintenance Engineering, Principle of Maintenancerishikantmip22
 
Maintenance Lecture Notes for senior class
Maintenance Lecture Notes for senior classMaintenance Lecture Notes for senior class
Maintenance Lecture Notes for senior classNegash Alemu
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCEkifayat ullah
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCEkifayat ullah
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenancepradhyot05
 

Similar to maintenance engineering (20)

Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Diagnostic Techniques Notes
Diagnostic Techniques NotesDiagnostic Techniques Notes
Diagnostic Techniques Notes
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
MAINTENANCE MANAGEMENT.pptx
MAINTENANCE MANAGEMENT.pptxMAINTENANCE MANAGEMENT.pptx
MAINTENANCE MANAGEMENT.pptx
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
 
document (1).pdf
document (1).pdfdocument (1).pdf
document (1).pdf
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3
 
Maintenance Engineering, Principle of Maintenance
Maintenance Engineering, Principle of MaintenanceMaintenance Engineering, Principle of Maintenance
Maintenance Engineering, Principle of Maintenance
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Maintenance Lecture Notes for senior class
Maintenance Lecture Notes for senior classMaintenance Lecture Notes for senior class
Maintenance Lecture Notes for senior class
 
Maintenance and Asset Management
Maintenance and Asset ManagementMaintenance and Asset Management
Maintenance and Asset Management
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
 
Preventive maintenance
Preventive maintenance Preventive maintenance
Preventive maintenance
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenance
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 

Recently uploaded (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 

maintenance engineering

  • 2. CO1 Describe objectives and the basic principles in maintenance CO2 Explain Maintenance Policies and Preventive Maintenance CO3 Illustrate the various processes involved in condition monitoring CO4 Explain the influence of failure analysis in basic machine elements CO5 Explain the role of Repair Methods for Material.
  • 3. • Basic Principles of maintenance planning • Objectives and principles of planned maintenance activity • Importance and benefits of sound Maintenance systems • Reliability and Machine availability • MTBF, MTTR and MWT • Factors of availability • Maintenance organization • Maintenance economics.
  • 4. Maintenance engineering : Maintenance engineering is the activity of applying engineering concepts to the optimization of equipment, procedure and departmental budgets to achieve better maintainability, reliability and availability of equipment. Planning: Planning ensures the smooth operation of the system. Planning defines what is to be done and how it is to be done. It specifies the materials, tool, equipment and skills required to perform the work.
  • 5. Main classification of planning in engineering system are as follows, 1. Long range planning 2. Short range planning 3. Planning for immediate activity 1.Long Range planning : For a period of five years at least. Involves capital budgeting, strategies and operational programmers. 2. Short range: up to one year. Made to achieve short term goals. 3. Immediate Activity Planning : it is done frequently whenever required.
  • 6. Objectives of Planned Maintenance Activity  To achieve minimum breakdown and to keep the plant in good working condition at the lowest possible cost.  To ensure the availability of machines and services in an optimum working condition.  To keep machines and other facilities in a condition to be used to achieve the maximum profit without any interruption.  To keep the time schedule of delivery to customers.  To meet the availability requirements for critical equipment.  To keep the maintenance costs as low as possible for non-critical equipment.  To control the effective and trained supervision.  To meet the quality requirements of the product.  To increase the profits of production systems.
  • 7. Principles of Maintenance :They are followed in a system to guide the staff to work efficiently and effectively to achieve the overall objectives of the maintenance system, Main areas of work governed by this principles are Plant management in Maintenance work Production and maintenance objectives Establishment of work order and recording system Information based Decision making Adherence to planned maintenance strategy . Manpower for Maintenance Planning for maintenance functions Role of Spare parts Training.
  • 8. SOUND MAINTENANCE SYSTEM The following are the benefits of sound maintenance management system  Minimization of down time  Improvement in availability of system  Extended life of equipment  Safety and smooth operation of the process  Providing adequate back up supply  Minimization of normal expected wear and tear of equipment  Safety of the personal involved in the organization  Increasing the reliability of the system  Providing a proper working environment  Cost effective maintenance boosts the profit of the production system.
  • 9. Reliability: Reliability is the probability that a component/system when operating under given condition will perform its intended functions adequately for a specified period of time. RELIABILITY Achievable Reliability Its depends on maintenance and operation of the equipment Inherent Reliability It is associated with the quality of the material and design of machine parts
  • 10. Equipment lifecycle: Reliability engineering is dependability in the life cycle management of product. The failure pattern of equipment over its life cycle can be represented as bath-tub curve.
  • 11. Mean Time To Failure(MTTF):Mean Time To Failure (MTTF) is a very basic measure of reliability used for non-repairable systems. It represents the length of time that an item is expected to last in operation until it fails.
  • 12. Mean Time Between Failures(MTBF): The term MTBF is used for repairable systems, but it does not take into account units that are shut down for routine scheduled maintenance
  • 13. Mean Time To Repair (MTTR):It refers to the amount of time required to repair a system and restore it to full functionality. The MTTR clock starts ticking when the repairs start and it goes on until operations are restored. This includes repair time, testing period, and return to the normal operating condition.
  • 14. General Organization Structure of Maintenance Department
  • 15. Maintenance economics: Life-cycle cost analysis (LCCA) is a tool to determine the most cost-effective option among different competing alternatives to purchase, own, operate, maintain and, finally, dispose of an object or process, when each is equally appropriate to be implemented on technical grounds Estimation of economic life of equipment: its depends on the maintenance and repair cost, availability and operational efficiency.
  • 16. Reliability costs are the business costs of unreliable systems. Maintenance costs are the cost of doing maintenance; be that reactive or preventive maintenance.