SlideShare a Scribd company logo
Connecting Places, Connecting Lives
Connects Dwarka with the NH8, the Expressway
will bring Delhi and Gurgaon closer
Only 2 roads of connects Delhi and Gurgaon-MG
Road and the NH8 as of now…
Not sufficient to handle heavy daily traffic between
Delhi and Gurgaon
Connecting Places, Connecting Lives
With Dwarka Expressway, connectivity becomes
smoother, faster and so much easier!
IGI airport - a mere 2.5 kms away
Also bridges the gap between 16 new Residential
Sectors
That’s How Gurgaon Will Look After That
Agent of change and development
Planned around a world of opportunities and
development
Dwarka Expressway marks the beginning of a
golden era in real estate
Acts as a new channel of business and commerce
between Delhi and Gurgaon
World-class infrastructure and facilities to
transform lives of residents and investors
No more toll! No more delays!
No more toll for commuters between Delhi and
Gurgaon!
No more delays and traffic jams at the toll gate on
NH8!
All thanks to the toll plaza moving beyond
Manesar shortly
Power cuts are history
From power-shortage to power-surplus, Haryana’s
power supply improving massively
4 new power plants have been set up by the
Haryana Government
Power generation capacity of the state has
increased from 1587 MW to 5800 MW in the last 5
years
Exciting opportunities in Education
Reputed educational institutions flocking to areas
surrounding the Expressway
MatriKiran School under construction
Modern School opening a branch in Sector 91,
Gurgaon
Other well-known schools of Delhi are currently
looking to expand on this stretch
Boom in Healthcare
Nationally and internationally famous healthcare
organizations setting up branches around the
Dwarka Expressway
Reputed names in healthcare have/in process of
finalizing Dwarka Expressway as the location of
establishment
All this adds up to making the
Dwarka Expressway a new hub of
exciting developments in real estate
and the Golden Road!
The widest road in the NCR
18 kms long and 150 mtrs wide, with 60 mtrs of
greenery on both sides, the Dwarka Expressway
is 2x that of the NH8
14 kms out of the 18 kms is already constructed
Constructed means black-topped
and driveable

Dwarka
Expressw
ay

From
Haryan
a

From
Delhi

The double yellow
line indicates the
constructed
expressway
Gurgaon - Manesar Urban Complex
- 2025 AD
The Expressway today: The
remaining 4 kms
800 mtrs handed over to Indian Railways for
construction of Rail over-bridge, with HUDA paying
Railways Rs. 38 Crores in advance already (Expected
Completion Time: 16 months)
700 mtrs under various HUDA utilities such as HT
pillars and water works which HUDA is in the process
of shifting (Expected Completion Time: 6 months)
The balance 2.5 kms – has been resolved
The latest on the 2.5 kms under
stay order
On 30.9.2013, HUDA announced a rehabilitation
policy which was published in the Times of India
As Per Policy Published on
30.09.13
People with built up homes / structures are being
offered alternative plots in Sectors 110A and 37C
The plots on offer are of the same size as the
plots being taken over
HUDA has already acquired 145 acres in the
above 2 Sectors for this purpose
Only 15 acres required to re-settle all the
petitioners
As Per Policy Published on
30.09.13
Applicants had till 30.10.2013 to apply under
this policy
HUDA has received applications from 80% of
the residents on this stretch and is sorting them
out
All petitions expected to be resolved under this
process in the next 3-4 months
Actual availability of stretches
(As per Actual Site condition)
Chainage
S.No
. From

To

Length

Status
Clear
Constructed
Length
/ NOT

Remarks

Month of
Handing Over

Built up Area

End of Dec 11

1
2

0
468

468
750

468
282

282

Not Executed
Executed

3

750

765

15

15

Executed

May-13

4

765

900

135

135

Executed

Dec-11

5

900

960

60

60

Executed

May-13

6
7

960
2000

2000
2050

1040
50

1040
50

Executed
Executed

End April 11
End April 11

8

2050

2070

20

20

Executed

9

2070

2120

50

50

Clear

WMM II Completed

10

2120

2170

50

Not Executed

Stay on Land

11

2170

2260

90

90

Clear

WMM II Completed

12

2260

3350

1090

1090

Executed

Mid August 13

Mid August 13
End April 11
Chainage
S.No.

Length

Clear
Length

Status
Constructed/
NOT

Remarks

Month of
Handing Over

From

To

13

3350

3370

20

14

3370

3400

30

30

Executed

15

3400

3975

575

575

Executed

16

3975

4100

125

125

Executed

17

4100

4300

200

200

Executed

18

4300

4315

15

19

4315

4425

110

110

Executed

20

4425

4500

75

75

Executed

End April 11

21

4500

6620

2120

2120

Executed

End April 11

22

6620

7800

1180

23

7800

8285

485

24

8285

8345

60

25

8345

8750

405

HSIIDC drain
Jan-13
Reliance SEZ land

Jan-13
Feb 12

Pataudi Road

Not
Executed/ROB
485

Executed
Not Executed

405

ROB, Padmini Factory,
stay on land

Executed

Mid Sep 11
HUDA water sump house
Mid Sep 11
Chainage
S.No.

Length

From

To

26

8750

8800

50

27

8800

9820

1020

28

9820

9900

80

29

9900

10800

900

30

10800

11700

31

11700

32

1020

Status
Constructed/
NOT

Remarks

One side
executed

Clear
Length

RHS stay on land

Executed

Month of
Handing Over

Mid Oct 11

Not Executed

STP Channel

900

Executed

Water logged area
completed

900

900

Executed

end April 11

11760

60

60

Executed

Mid Oct 11

11760

12850

1090

1090

Executed

Mid Oct 11

33

12850

12900

50

50

Executed

Feb-13

34

12900

13000

100

35

13000

13060

60

60

Executed

Feb-13

36

13060

13400

340

340

Executed

Nov-11

37

13400

13520

120

120

Executed

Nov-11

38

13520

13650

130

130

Executed

Nov-11

39

13650

13700

50

50

Clear

Not Executed

Last week of Jan
13

Nipon Factory

Slab approach is to be
coming
Chainage
S.No.

From

To

Length

Clear
Length

Status
Constructed/
NOT

Remarks

Month of
Handing Over

Slab culvert
over sewer
Work is stopped from last
channel is in
2 month i.e on 6th Sep
progress by
2013
another
contractor

40

13700

13780

80

41

13780

14320

540

540

Executed

42

14320

14900

580

580

Clear

43

14900

15300

400

Not Executed New Palam Vihar – R&R

44

15300

15600

300

Not Executed New Palam Vihar – R&R

45

15600

16000

400

Not Executed New Palam Vihar – R&R

46

16000

16740

740

Not Executed New Palam Vihar – R&R

47

16740

18035

1295
18035

Clear Stretch

1295
14092

WMM 1st layer completed

Executed

01-Mar

14,092 mtrs.
Dwarka Expressway: The Delhi
update
Dwarka Expressway: The Delhi
update
Thanks to DDA’s efforts, all issues related to land
acquisition on Delhi side, resolved
Remaining stretch of less than a Km to be ready
within the next 6 months
All obstacles soon to vanish
All land issues on Delhi side resolved
All issues pertaining to 2.5 kms on Gurgaon side
soon to be resolved (Expected Timeline –
January’2014)
Soon, no more obstacles preventing investing in
the Golden Road!
Strike while hot!

(Average rate per sq ft)
Besides, the best developers are
building here
Some of the best and most trusted names in real
estate singling out the Dwarka Expressway as the
preferred location for various visionary projects
Residential or commercial, most of these projects
in full swing and nearing completion
Glimpses of the Expressway
Glimpses of the Expressway
The golden road beckons

Members of:

More Related Content

What's hot

Revitalization Strategy for Historic Core of Ahmedabad
Revitalization Strategy for Historic Core of AhmedabadRevitalization Strategy for Historic Core of Ahmedabad
Revitalization Strategy for Historic Core of Ahmedabad
IEREK Press
 
Pedestrian Guidelines 20 Nov09
Pedestrian Guidelines 20 Nov09Pedestrian Guidelines 20 Nov09
Pedestrian Guidelines 20 Nov09
uttipecDRAFT
 

What's hot (20)

Middle East Rail brochure
Middle East Rail brochureMiddle East Rail brochure
Middle East Rail brochure
 
MultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiMultiModal Transportation in New DElhi
MultiModal Transportation in New DElhi
 
Revitalization Strategy for Historic Core of Ahmedabad
Revitalization Strategy for Historic Core of AhmedabadRevitalization Strategy for Historic Core of Ahmedabad
Revitalization Strategy for Historic Core of Ahmedabad
 
Bhopal transport
Bhopal transportBhopal transport
Bhopal transport
 
Metro ppt - copy
Metro ppt - copyMetro ppt - copy
Metro ppt - copy
 
karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
 
Planning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaPlanning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at Rourkela
 
Bhubaneswar No 1 smart city proposal
Bhubaneswar No 1 smart city proposalBhubaneswar No 1 smart city proposal
Bhubaneswar No 1 smart city proposal
 
Chennai Mofussil Bus Terminal
Chennai Mofussil Bus TerminalChennai Mofussil Bus Terminal
Chennai Mofussil Bus Terminal
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
Land pooling mpd 2021 summary
Land pooling mpd 2021 summaryLand pooling mpd 2021 summary
Land pooling mpd 2021 summary
 
Mobility or Accessibility?
Mobility or Accessibility?Mobility or Accessibility?
Mobility or Accessibility?
 
AHMEDABAD CITY
AHMEDABAD CITYAHMEDABAD CITY
AHMEDABAD CITY
 
TOD in India
TOD in IndiaTOD in India
TOD in India
 
PANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESH
PANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESHPANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESH
PANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESH
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
 
Indian Travelogue-Ujjain
Indian Travelogue-Ujjain Indian Travelogue-Ujjain
Indian Travelogue-Ujjain
 
Pedestrian Guidelines 20 Nov09
Pedestrian Guidelines 20 Nov09Pedestrian Guidelines 20 Nov09
Pedestrian Guidelines 20 Nov09
 
Transportation planing problems in ahmedabad
Transportation planing problems in ahmedabadTransportation planing problems in ahmedabad
Transportation planing problems in ahmedabad
 
Geeta mandir bus port
Geeta mandir bus portGeeta mandir bus port
Geeta mandir bus port
 

Similar to Dwarka expressway: Road of Abundance and Opportunities

20 Things You Should Know About Dwarka Expressway
20 Things You Should Know About Dwarka Expressway20 Things You Should Know About Dwarka Expressway
20 Things You Should Know About Dwarka Expressway
Lee Group
 
20 things you should know about Dwarka Expressway
20 things you should know about Dwarka Expressway20 things you should know about Dwarka Expressway
20 things you should know about Dwarka Expressway
Square Yards
 
DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian Railways
Abeer Ray
 
M rly presentation_22.5.13
M rly presentation_22.5.13M rly presentation_22.5.13
M rly presentation_22.5.13
rdhyshym
 

Similar to Dwarka expressway: Road of Abundance and Opportunities (20)

Dwarka expressway road of opportunies and abundance
Dwarka expressway  road of opportunies and abundanceDwarka expressway  road of opportunies and abundance
Dwarka expressway road of opportunies and abundance
 
Dwarka expressway the golden road (1)
Dwarka expressway   the golden road (1)Dwarka expressway   the golden road (1)
Dwarka expressway the golden road (1)
 
20 things you should know about dwarka expressway
20 things you should know about dwarka expressway20 things you should know about dwarka expressway
20 things you should know about dwarka expressway
 
20 Things You Should Know About Dwarka Expressway
20 Things You Should Know About Dwarka Expressway20 Things You Should Know About Dwarka Expressway
20 Things You Should Know About Dwarka Expressway
 
20 things you should know about dwarka expressway
20 things you should know about dwarka expressway20 things you should know about dwarka expressway
20 things you should know about dwarka expressway
 
20 things you should know about Dwarka Expressway
20 things you should know about Dwarka Expressway20 things you should know about Dwarka Expressway
20 things you should know about Dwarka Expressway
 
Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...
Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...
Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...
 
Detailsh.pdf
Detailsh.pdfDetailsh.pdf
Detailsh.pdf
 
Narendra nagar flexible road pavement training report
Narendra nagar  flexible road pavement training reportNarendra nagar  flexible road pavement training report
Narendra nagar flexible road pavement training report
 
Union Budget 2022-23 : Ministry of Road Transport and Highway
Union Budget 2022-23 : Ministry of Road Transport and HighwayUnion Budget 2022-23 : Ministry of Road Transport and Highway
Union Budget 2022-23 : Ministry of Road Transport and Highway
 
DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian Railways
 
Demolition UKM HOSTEL.pptx
Demolition UKM HOSTEL.pptxDemolition UKM HOSTEL.pptx
Demolition UKM HOSTEL.pptx
 
NHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdfNHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdf
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800
 
Delhivaas presentation by samantaray
Delhivaas presentation by samantarayDelhivaas presentation by samantaray
Delhivaas presentation by samantaray
 
Delhivaas presentation by samantaray
Delhivaas presentation by samantarayDelhivaas presentation by samantaray
Delhivaas presentation by samantaray
 
Dilli Vaas
Dilli VaasDilli Vaas
Dilli Vaas
 
M rly presentation_22.5.13
M rly presentation_22.5.13M rly presentation_22.5.13
M rly presentation_22.5.13
 
The importance of broad gauge railways in north east india
The importance of broad gauge railways in north      east indiaThe importance of broad gauge railways in north      east india
The importance of broad gauge railways in north east india
 
Geography - Class 10 - Lifelines of National Economy- Inter disciplinary proj...
Geography - Class 10 - Lifelines of National Economy- Inter disciplinary proj...Geography - Class 10 - Lifelines of National Economy- Inter disciplinary proj...
Geography - Class 10 - Lifelines of National Economy- Inter disciplinary proj...
 

More from Mukul Bhartiya (7)

Statistical arbitrage
Statistical arbitrageStatistical arbitrage
Statistical arbitrage
 
Sales skill development
Sales skill developmentSales skill development
Sales skill development
 
Real estate manager
Real estate managerReal estate manager
Real estate manager
 
Picture1
Picture1Picture1
Picture1
 
Blog 11-answer
Blog 11-answerBlog 11-answer
Blog 11-answer
 
Dr. C.K. Prahalad
Dr. C.K. PrahaladDr. C.K. Prahalad
Dr. C.K. Prahalad
 
Retail Selling Techniques
Retail Selling TechniquesRetail Selling Techniques
Retail Selling Techniques
 

Recently uploaded

Property Forms PDF Guide for UK Residential Property
Property Forms PDF Guide for UK Residential PropertyProperty Forms PDF Guide for UK Residential Property
Property Forms PDF Guide for UK Residential Property
AskXX.com
 
Property Rental Cumbria Location and Price Guide
Property Rental Cumbria Location and Price GuideProperty Rental Cumbria Location and Price Guide
Property Rental Cumbria Location and Price Guide
AskXX.com
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
Listing Turkey
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
Listing Turkey
 
Property Rental Cumbria North West Guide
Property Rental Cumbria North West GuideProperty Rental Cumbria North West Guide
Property Rental Cumbria North West Guide
AskXX.com
 
UK Residential Property Sales Forms Guide
UK Residential Property Sales Forms GuideUK Residential Property Sales Forms Guide
UK Residential Property Sales Forms Guide
AskXX.com
 
Listing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey - Sinpaş Queen Bomonti KatalogListing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey
 

Recently uploaded (20)

Property Forms PDF Guide for UK Residential Property
Property Forms PDF Guide for UK Residential PropertyProperty Forms PDF Guide for UK Residential Property
Property Forms PDF Guide for UK Residential Property
 
Sefakoy Sinpas Boulevard Istanbul - Presentation
Sefakoy Sinpas Boulevard Istanbul - PresentationSefakoy Sinpas Boulevard Istanbul - Presentation
Sefakoy Sinpas Boulevard Istanbul - Presentation
 
Property Rental Cumbria Location and Price Guide
Property Rental Cumbria Location and Price GuideProperty Rental Cumbria Location and Price Guide
Property Rental Cumbria Location and Price Guide
 
How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!
 
Kohinoor Dhanori Apartments Pune Brochure
Kohinoor Dhanori Apartments Pune BrochureKohinoor Dhanori Apartments Pune Brochure
Kohinoor Dhanori Apartments Pune Brochure
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
 
Elegant Evergreen Homes - Timeless Luxury in Yelahanka, Bangalore
Elegant Evergreen Homes - Timeless Luxury in Yelahanka, BangaloreElegant Evergreen Homes - Timeless Luxury in Yelahanka, Bangalore
Elegant Evergreen Homes - Timeless Luxury in Yelahanka, Bangalore
 
Bozeman Real Estate Market Reports April/May 2024
Bozeman Real Estate Market Reports April/May 2024Bozeman Real Estate Market Reports April/May 2024
Bozeman Real Estate Market Reports April/May 2024
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
 
Sinpas Gokorman Presentation. - Listing Turkey
Sinpas Gokorman Presentation. - Listing TurkeySinpas Gokorman Presentation. - Listing Turkey
Sinpas Gokorman Presentation. - Listing Turkey
 
Avrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing TurkeyAvrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing Turkey
 
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
 
Salarpuria Sattva Lakeridge Neopolis Hyderabad.pdf.pdf
Salarpuria Sattva Lakeridge Neopolis Hyderabad.pdf.pdfSalarpuria Sattva Lakeridge Neopolis Hyderabad.pdf.pdf
Salarpuria Sattva Lakeridge Neopolis Hyderabad.pdf.pdf
 
Shapoorji Pallonji Plots Jadhavgadh Fort Pune.pdf
Shapoorji Pallonji Plots Jadhavgadh Fort Pune.pdfShapoorji Pallonji Plots Jadhavgadh Fort Pune.pdf
Shapoorji Pallonji Plots Jadhavgadh Fort Pune.pdf
 
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
 
Property Rental Cumbria North West Guide
Property Rental Cumbria North West GuideProperty Rental Cumbria North West Guide
Property Rental Cumbria North West Guide
 
UK Residential Property Sales Forms Guide
UK Residential Property Sales Forms GuideUK Residential Property Sales Forms Guide
UK Residential Property Sales Forms Guide
 
Redevelopment in Pune Challenges & Solutions (PPT).pdf
Redevelopment in Pune Challenges & Solutions (PPT).pdfRedevelopment in Pune Challenges & Solutions (PPT).pdf
Redevelopment in Pune Challenges & Solutions (PPT).pdf
 
MC Heights-Best Construction Company in jhang
MC Heights-Best Construction Company in jhangMC Heights-Best Construction Company in jhang
MC Heights-Best Construction Company in jhang
 
Listing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey - Sinpaş Queen Bomonti KatalogListing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey - Sinpaş Queen Bomonti Katalog
 

Dwarka expressway: Road of Abundance and Opportunities

  • 1.
  • 2. Connecting Places, Connecting Lives Connects Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer Only 2 roads of connects Delhi and Gurgaon-MG Road and the NH8 as of now… Not sufficient to handle heavy daily traffic between Delhi and Gurgaon
  • 3. Connecting Places, Connecting Lives With Dwarka Expressway, connectivity becomes smoother, faster and so much easier! IGI airport - a mere 2.5 kms away Also bridges the gap between 16 new Residential Sectors
  • 4. That’s How Gurgaon Will Look After That
  • 5. Agent of change and development Planned around a world of opportunities and development Dwarka Expressway marks the beginning of a golden era in real estate Acts as a new channel of business and commerce between Delhi and Gurgaon World-class infrastructure and facilities to transform lives of residents and investors
  • 6. No more toll! No more delays! No more toll for commuters between Delhi and Gurgaon! No more delays and traffic jams at the toll gate on NH8! All thanks to the toll plaza moving beyond Manesar shortly
  • 7. Power cuts are history From power-shortage to power-surplus, Haryana’s power supply improving massively 4 new power plants have been set up by the Haryana Government Power generation capacity of the state has increased from 1587 MW to 5800 MW in the last 5 years
  • 8. Exciting opportunities in Education Reputed educational institutions flocking to areas surrounding the Expressway MatriKiran School under construction Modern School opening a branch in Sector 91, Gurgaon Other well-known schools of Delhi are currently looking to expand on this stretch
  • 9. Boom in Healthcare Nationally and internationally famous healthcare organizations setting up branches around the Dwarka Expressway Reputed names in healthcare have/in process of finalizing Dwarka Expressway as the location of establishment
  • 10. All this adds up to making the Dwarka Expressway a new hub of exciting developments in real estate and the Golden Road!
  • 11. The widest road in the NCR 18 kms long and 150 mtrs wide, with 60 mtrs of greenery on both sides, the Dwarka Expressway is 2x that of the NH8 14 kms out of the 18 kms is already constructed
  • 12. Constructed means black-topped and driveable Dwarka Expressw ay From Haryan a From Delhi The double yellow line indicates the constructed expressway
  • 13. Gurgaon - Manesar Urban Complex - 2025 AD
  • 14. The Expressway today: The remaining 4 kms 800 mtrs handed over to Indian Railways for construction of Rail over-bridge, with HUDA paying Railways Rs. 38 Crores in advance already (Expected Completion Time: 16 months) 700 mtrs under various HUDA utilities such as HT pillars and water works which HUDA is in the process of shifting (Expected Completion Time: 6 months) The balance 2.5 kms – has been resolved
  • 15. The latest on the 2.5 kms under stay order On 30.9.2013, HUDA announced a rehabilitation policy which was published in the Times of India
  • 16. As Per Policy Published on 30.09.13 People with built up homes / structures are being offered alternative plots in Sectors 110A and 37C The plots on offer are of the same size as the plots being taken over HUDA has already acquired 145 acres in the above 2 Sectors for this purpose Only 15 acres required to re-settle all the petitioners
  • 17. As Per Policy Published on 30.09.13 Applicants had till 30.10.2013 to apply under this policy HUDA has received applications from 80% of the residents on this stretch and is sorting them out All petitions expected to be resolved under this process in the next 3-4 months
  • 18.
  • 19. Actual availability of stretches (As per Actual Site condition) Chainage S.No . From To Length Status Clear Constructed Length / NOT Remarks Month of Handing Over Built up Area End of Dec 11 1 2 0 468 468 750 468 282 282 Not Executed Executed 3 750 765 15 15 Executed May-13 4 765 900 135 135 Executed Dec-11 5 900 960 60 60 Executed May-13 6 7 960 2000 2000 2050 1040 50 1040 50 Executed Executed End April 11 End April 11 8 2050 2070 20 20 Executed 9 2070 2120 50 50 Clear WMM II Completed 10 2120 2170 50 Not Executed Stay on Land 11 2170 2260 90 90 Clear WMM II Completed 12 2260 3350 1090 1090 Executed Mid August 13 Mid August 13 End April 11
  • 20. Chainage S.No. Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over From To 13 3350 3370 20 14 3370 3400 30 30 Executed 15 3400 3975 575 575 Executed 16 3975 4100 125 125 Executed 17 4100 4300 200 200 Executed 18 4300 4315 15 19 4315 4425 110 110 Executed 20 4425 4500 75 75 Executed End April 11 21 4500 6620 2120 2120 Executed End April 11 22 6620 7800 1180 23 7800 8285 485 24 8285 8345 60 25 8345 8750 405 HSIIDC drain Jan-13 Reliance SEZ land Jan-13 Feb 12 Pataudi Road Not Executed/ROB 485 Executed Not Executed 405 ROB, Padmini Factory, stay on land Executed Mid Sep 11 HUDA water sump house Mid Sep 11
  • 21. Chainage S.No. Length From To 26 8750 8800 50 27 8800 9820 1020 28 9820 9900 80 29 9900 10800 900 30 10800 11700 31 11700 32 1020 Status Constructed/ NOT Remarks One side executed Clear Length RHS stay on land Executed Month of Handing Over Mid Oct 11 Not Executed STP Channel 900 Executed Water logged area completed 900 900 Executed end April 11 11760 60 60 Executed Mid Oct 11 11760 12850 1090 1090 Executed Mid Oct 11 33 12850 12900 50 50 Executed Feb-13 34 12900 13000 100 35 13000 13060 60 60 Executed Feb-13 36 13060 13400 340 340 Executed Nov-11 37 13400 13520 120 120 Executed Nov-11 38 13520 13650 130 130 Executed Nov-11 39 13650 13700 50 50 Clear Not Executed Last week of Jan 13 Nipon Factory Slab approach is to be coming
  • 22. Chainage S.No. From To Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over Slab culvert over sewer Work is stopped from last channel is in 2 month i.e on 6th Sep progress by 2013 another contractor 40 13700 13780 80 41 13780 14320 540 540 Executed 42 14320 14900 580 580 Clear 43 14900 15300 400 Not Executed New Palam Vihar – R&R 44 15300 15600 300 Not Executed New Palam Vihar – R&R 45 15600 16000 400 Not Executed New Palam Vihar – R&R 46 16000 16740 740 Not Executed New Palam Vihar – R&R 47 16740 18035 1295 18035 Clear Stretch 1295 14092 WMM 1st layer completed Executed 01-Mar 14,092 mtrs.
  • 23. Dwarka Expressway: The Delhi update
  • 24. Dwarka Expressway: The Delhi update Thanks to DDA’s efforts, all issues related to land acquisition on Delhi side, resolved Remaining stretch of less than a Km to be ready within the next 6 months
  • 25. All obstacles soon to vanish All land issues on Delhi side resolved All issues pertaining to 2.5 kms on Gurgaon side soon to be resolved (Expected Timeline – January’2014) Soon, no more obstacles preventing investing in the Golden Road!
  • 26. Strike while hot! (Average rate per sq ft)
  • 27. Besides, the best developers are building here Some of the best and most trusted names in real estate singling out the Dwarka Expressway as the preferred location for various visionary projects Residential or commercial, most of these projects in full swing and nearing completion
  • 28. Glimpses of the Expressway
  • 29. Glimpses of the Expressway
  • 30. The golden road beckons Members of: