Dwarka Expressway is not only the road of connectivity, but road of opportunity and abundance due to the development taking place surrounding it. If seeing is believing, then look at the presentation and see it yourself...
2. Connecting Places, Connecting Lives
Connects Dwarka with the NH8, the Expressway
will bring Delhi and Gurgaon closer
Only 2 roads of connects Delhi and Gurgaon-MG
Road and the NH8 as of now…
Not sufficient to handle heavy daily traffic between
Delhi and Gurgaon
3. Connecting Places, Connecting Lives
With Dwarka Expressway, connectivity becomes
smoother, faster and so much easier!
IGI airport - a mere 2.5 kms away
Also bridges the gap between 16 new Residential
Sectors
5. Agent of change and development
Planned around a world of opportunities and
development
Dwarka Expressway marks the beginning of a
golden era in real estate
Acts as a new channel of business and commerce
between Delhi and Gurgaon
World-class infrastructure and facilities to
transform lives of residents and investors
6. No more toll! No more delays!
No more toll for commuters between Delhi and
Gurgaon!
No more delays and traffic jams at the toll gate on
NH8!
All thanks to the toll plaza moving beyond
Manesar shortly
7. Power cuts are history
From power-shortage to power-surplus, Haryana’s
power supply improving massively
4 new power plants have been set up by the
Haryana Government
Power generation capacity of the state has
increased from 1587 MW to 5800 MW in the last 5
years
8. Exciting opportunities in Education
Reputed educational institutions flocking to areas
surrounding the Expressway
MatriKiran School under construction
Modern School opening a branch in Sector 91,
Gurgaon
Other well-known schools of Delhi are currently
looking to expand on this stretch
9. Boom in Healthcare
Nationally and internationally famous healthcare
organizations setting up branches around the
Dwarka Expressway
Reputed names in healthcare have/in process of
finalizing Dwarka Expressway as the location of
establishment
10. All this adds up to making the
Dwarka Expressway a new hub of
exciting developments in real estate
and the Golden Road!
11. The widest road in the NCR
18 kms long and 150 mtrs wide, with 60 mtrs of
greenery on both sides, the Dwarka Expressway
is 2x that of the NH8
14 kms out of the 18 kms is already constructed
12. Constructed means black-topped
and driveable
Dwarka
Expressw
ay
From
Haryan
a
From
Delhi
The double yellow
line indicates the
constructed
expressway
14. The Expressway today: The
remaining 4 kms
800 mtrs handed over to Indian Railways for
construction of Rail over-bridge, with HUDA paying
Railways Rs. 38 Crores in advance already (Expected
Completion Time: 16 months)
700 mtrs under various HUDA utilities such as HT
pillars and water works which HUDA is in the process
of shifting (Expected Completion Time: 6 months)
The balance 2.5 kms – has been resolved
15. The latest on the 2.5 kms under
stay order
On 30.9.2013, HUDA announced a rehabilitation
policy which was published in the Times of India
16. As Per Policy Published on
30.09.13
People with built up homes / structures are being
offered alternative plots in Sectors 110A and 37C
The plots on offer are of the same size as the
plots being taken over
HUDA has already acquired 145 acres in the
above 2 Sectors for this purpose
Only 15 acres required to re-settle all the
petitioners
17. As Per Policy Published on
30.09.13
Applicants had till 30.10.2013 to apply under
this policy
HUDA has received applications from 80% of
the residents on this stretch and is sorting them
out
All petitions expected to be resolved under this
process in the next 3-4 months
18.
19. Actual availability of stretches
(As per Actual Site condition)
S.No
.
Chainage
Length
Status
Clear
Constructed
Length
/ NOT
Remarks
Month of
Handing Over
From
To
1
2
0
468
468
750
468
282
282
Not Executed
Executed
3
750
765
15
15
Executed
May-13
4
765
900
135
135
Executed
Dec-11
5
900
960
60
60
Executed
May-13
6
7
960
2000
2000
2050
1040
50
1040
50
Executed
Executed
End April 11
End April 11
8
2050
2070
20
20
Executed
9
2070
2120
50
50
Clear
WMM II Completed
10
2120
2170
50
Not Executed
Stay on Land
11
2170
2260
90
90
Clear
WMM II Completed
12
2260
3350
1090
1090
Executed
Built up Area
End of Dec 11
Mid August 13
Mid August 13
End April 11
22. Chainage
S.No.
Length
From
To
Status
Constructed/
NOT
Remarks
Slab culvert
over sewer
channel is in
progress by
another
contractor
Clear
Length
Work is stopped from last
2 month i.e on 6th Sep
2013
40
13700
13780
80
41
13780
14320
540
540
Executed
42
14320
14900
580
580
Clear
WMM 1st layer completed
43
14900
15300
400
Not Executed
New Palam Vihar – R&R
44
15300
15600
300
Not Executed
New Palam Vihar – R&R
45
15600
16000
400
Not Executed
New Palam Vihar – R&R
46
16000
16740
740
Not Executed
New Palam Vihar – R&R
47
16740
18035
1295
18035
Month of
Handing Over
Clear Stretch
1295
14092
Executed
01-Mar
14,092 mtrs.
24. Dwarka Expressway: The Delhi
update
Thanks to DDA’s efforts, all issues related to land
acquisition on Delhi side, resolved
Remaining stretch of less than a Km to be ready
within the next 6 months
25. All obstacles soon to vanish
All land issues on Delhi side resolved
All issues pertaining to 2.5 kms on Gurgaon side
soon to be resolved (Expected Timeline –
January’2014)
Soon, no more obstacles preventing investing in
the Golden Road!
27. Besides, the best developers are
building here
Some of the best and most trusted names in real
estate singling out the Dwarka Expressway as the
preferred location for various visionary projects
Residential or commercial, most of these projects
in full swing and nearing completion