A whole new corridor of connectivity

Connecting Dwarka with the NH8, the Expressway
will bring Delhi and Gurgaon closer
Currently, only 2 roads of connectivity between
Delhi and Gurgaon-MG Road and the NH8
Not enough to tackle the heavily increasing traffic
of daily commuters between Delhi and Gurgaon
A whole new corridor of connectivity

With Dwarka Expressway, connectivity becomes
smoother, faster and so much easier!
IGI airport - a mere 2.5 kms away

Also bridges the gap between 16 new Residential
Sectors
The changing face of Gurgaon

And this is how Gurgaon will soon look, when the
Expressway opens up
A catalyst of change and
development
Planned around a world of opportunities and
development
Dwarka Expressway marks the beginning of a
golden era in real estate

Acts as a new channel of business and commerce
between Delhi and Gurgaon
World-class infrastructure and facilities to
transform lives of residents and investors
Years of thought and planning
A result of years of planning, research and
development by the best brains in real estate
Aided by experts and top professionals in the
Corporate and Government sector, a range of
exciting projects in the residential and commercial
space are already underway
No more toll! No more delays!
No more toll for commuters between Delhi and
Gurgaon!
No more delays and traffic jams at the toll gate on
NH8!

All thanks to the toll plaza moving beyond
Manesar shortly
Power cuts are history
From power-shortage to power-surplus, Haryana’s
power supply improving massively
4 new power plants have been set up by the
Haryana Government

Power generation capacity of the state has
increased from 1587 MW to 5800 MW in the last 5
years
Exciting opportunities in Education
Reputed educational institutions flocking to areas
surrounding the Expressway
MatriKiran School under construction
Modern School opening a branch in Sector 91,
Gurgaon
Other well-known schools of Delhi are currently
looking to expand on this stretch
Boom in Healthcare
Nationally and internationally famous healthcare
organizations setting up branches around the
Dwarka Expressway
Reputed names in healthcare have/in process of
finalizing Dwarka Expressway as the location of
establishment
All this adds up to making the
Dwarka Expressway a new hub of
exciting developments in real estate
and the Golden Road!
The widest road in the NCR
18 kms long and 150 mtrs wide, with 60 mtrs of
greenery on both sides, the Dwarka Expressway
is 2x that of the NH8
14 kms out of the 18 kms is already constructed
Constructed means black-topped
and driveable

From
Delhi

Dwarka
Expressway

From
Haryana

The double yellow
line indicates the
constructed
expressway
Gurgaon - Manesar Urban Complex
- 2031 AD
The Expressway today: The
remaining 4 kms
800 mtrs handed over to Indian Railways for
construction of Rail over-bridge, with HUDA paying
Railways Rs. 38 Crores in advance already (Expected
Completion Time: 16 months)
700 mtrs under various HUDA utilities such as HT
pillars and water works which HUDA is in the process
of shifting (Expected Completion Time: 6 months)
The balance 2.5 kms – has been resolved
The latest on the 2.5 kms under
stay order
On 30.9.2013, HUDA announced a rehabilitation
policy which was published in the Times of India
As Per Policy Published on
30.09.13
People with built up homes / structures are being
offered alternative plots in Sectors 110A and 37C
The plots on offer are of the same size as the
plots being taken over
HUDA has already acquired 145 acres in the
above 2 Sectors for this purpose
Only 15 acres required to re-settle all the
petitioners
As Per Policy Published on
30.09.13
Applicants had till 30.10.2013 to apply under
this policy
HUDA has received applications from 80% of
the residents on this stretch and is sorting them
out
All petitions expected to be resolved under this
process in the next 3-4 months
Actual availability of stretches
(As per Actual Site condition)
S.No
.

Chainage
Length

Status
Clear
Constructed
Length
/ NOT

Remarks

Month of
Handing Over

From

To

1
2

0
468

468
750

468
282

282

Not Executed
Executed

3

750

765

15

15

Executed

May-13

4

765

900

135

135

Executed

Dec-11

5

900

960

60

60

Executed

May-13

6
7

960
2000

2000
2050

1040
50

1040
50

Executed
Executed

End April 11
End April 11

8

2050

2070

20

20

Executed

9

2070

2120

50

50

Clear

WMM II Completed

10

2120

2170

50

Not Executed

Stay on Land

11

2170

2260

90

90

Clear

WMM II Completed

12

2260

3350

1090

1090

Executed

Built up Area

End of Dec 11

Mid August 13

Mid August 13
End April 11
Chainage

S.No.

Length

Clear
Length

Status
Constructed/
NOT

Remarks

Month of
Handing Over

From

To

13

3350

3370

20

14

3370

3400

30

30

Executed

15

3400

3975

575

575

Executed

16

3975

4100

125

125

Executed

17

4100

4300

200

200

Executed

18

4300

4315

15

19

4315

4425

110

110

Executed

20

4425

4500

75

75

Executed

End April 11

21

4500

6620

2120

2120

Executed

End April 11

22

6620

7800

1180

23

7800

8285

485

24

8285

8345

60

25

8345

8750

405

HSIIDC drain
Jan-13
Reliance SEZ land

Jan-13
Feb 12

Pataudi Road

Not
Executed/ROB
485

Executed
Not Executed

405

ROB, Padmini Factory,
stay on land

Executed

Mid Sep 11
HUDA water sump house
Mid Sep 11
Chainage

S.No.

Length
From

To

26

8750

8800

50

27

8800

9820

1020

28

9820

9900

80

29

9900

10800

900

30

10800

11700

31

11700

32

1020

Status
Constructed/
NOT

Remarks

One side
executed

Clear
Length

RHS stay on land

Executed

Month of
Handing Over

Mid Oct 11

Not Executed

STP Channel

900

Executed

Water logged area
completed

900

900

Executed

end April 11

11760

60

60

Executed

Mid Oct 11

11760

12850

1090

1090

Executed

Mid Oct 11

33

12850

12900

50

50

Executed

Feb-13

34

12900

13000

100

35

13000

13060

60

60

Executed

Feb-13

36

13060

13400

340

340

Executed

Nov-11

37

13400

13520

120

120

Executed

Nov-11

38

13520

13650

130

130

Executed

Nov-11

39

13650

13700

50

50

Clear

Not Executed

Last week of Jan
13

Nipon Factory

Slab approach is to be
coming
Chainage

S.No.

Length
From

To

Clear
Length

Status
Constructed/
NOT

Remarks

Month of
Handing Over

Slab culvert
over sewer
Work is stopped from last
channel is in
2 month i.e on 6th Sep
progress by
2013
another
contractor

40

13700

13780

80

41

13780

14320

540

540

Executed

42

14320

14900

580

580

Clear

WMM 1st layer completed

43

14900

15300

400

Not Executed

New Palam Vihar – R&R

44

15300

15600

300

Not Executed

New Palam Vihar – R&R

45

15600

16000

400

Not Executed

New Palam Vihar – R&R

46

16000

16740

740

Not Executed

New Palam Vihar – R&R

47

16740

18035

1295
18035

Clear Stretch

1295
14092

Executed

01-Mar

14,092 mtrs.
Dwarka Expressway: The Delhi
update
Dwarka Expressway: The Delhi
update
Thanks to DDA’s efforts, all issues related to land
acquisition on Delhi side, resolved
Remaining stretch of less than a Km to be ready
within the next 6 months
All obstacles soon to vanish
All land issues on Delhi side resolved
All issues pertaining to 2.5 kms on Gurgaon side
soon to be resolved (Expected Timeline –
January’2014)

Soon, no more obstacles preventing investing in
the Golden Road!
Strike while hot!

(Average rate per sq ft)
Besides, the best developers are
building here
Some of the best and most trusted names in real
estate singling out the Dwarka Expressway as the
preferred location for various visionary projects
Residential or commercial, most of these projects
in full swing and nearing completion
Glimpses of the Expressway
Glimpses of the Expressway
The golden road beckons

Abloom Realty Services Pvt Ltd
342, 3Rd Floor,
Vipul Trade Centre
Sohna Road,Sector-48
Gurgaon, Haryana-122001
Phone: 0124-2666077
M: +919891162311
+919911362311

More Related Content

Viewers also liked

20141311 MIS Introduction_en
20141311 MIS Introduction_en20141311 MIS Introduction_en
20141311 MIS Introduction_en
Nguyen Trieu Anh
 
Europa
EuropaEuropa
Europa
asefe33
 
Diferentes sistemas operativos y sus características
Diferentes sistemas operativos y sus característicasDiferentes sistemas operativos y sus características
Diferentes sistemas operativos y sus características
Jack8Guerrero
 
Response cards k12 qt ntx lt
Response cards k12 qt ntx ltResponse cards k12 qt ntx lt
Response cards k12 qt ntx lt
William McIntosh
 
MGrande_CoastalFellows2014
MGrande_CoastalFellows2014MGrande_CoastalFellows2014
MGrande_CoastalFellows2014
Mary Grande
 
Informatica web 2.0
Informatica web 2.0Informatica web 2.0
Informatica web 2.0
Xavier Ayala
 
Presentación video de informatica
Presentación video de informaticaPresentación video de informatica
Presentación video de informatica
gustavocusme
 
Eurofins prefmap2
Eurofins prefmap2Eurofins prefmap2
Eurofins prefmap2onibi29
 
Dueñas 3
Dueñas 3Dueñas 3
1 cualidades físicas y sus métodos de desarrollo
1 cualidades físicas y sus métodos de desarrollo1 cualidades físicas y sus métodos de desarrollo
1 cualidades físicas y sus métodos de desarrollo
susanavelasco123
 
HawthorneEffect_BC_BACK_Jodi_Akin
HawthorneEffect_BC_BACK_Jodi_AkinHawthorneEffect_BC_BACK_Jodi_Akin
HawthorneEffect_BC_BACK_Jodi_Akinjodi akin
 
Tourism development pilot jan 2016v5
Tourism development pilot jan 2016v5Tourism development pilot jan 2016v5
Tourism development pilot jan 2016v5
Jon Allison
 
Eurofins attributs sensoriels&marketing
Eurofins attributs sensoriels&marketingEurofins attributs sensoriels&marketing
Eurofins attributs sensoriels&marketingonibi29
 
Protocolo de la actividad
Protocolo de la actividadProtocolo de la actividad
Protocolo de la actividad
escuelaruralsantabarbara
 
Gamification
GamificationGamification
Gamification
Jean-Charles Pillet
 
Alicia aguero
Alicia agueroAlicia aguero
Alicia aguero
aliciaaguero65
 

Viewers also liked (17)

20141311 MIS Introduction_en
20141311 MIS Introduction_en20141311 MIS Introduction_en
20141311 MIS Introduction_en
 
Europa
EuropaEuropa
Europa
 
Diferentes sistemas operativos y sus características
Diferentes sistemas operativos y sus característicasDiferentes sistemas operativos y sus características
Diferentes sistemas operativos y sus características
 
Response cards k12 qt ntx lt
Response cards k12 qt ntx ltResponse cards k12 qt ntx lt
Response cards k12 qt ntx lt
 
MGrande_CoastalFellows2014
MGrande_CoastalFellows2014MGrande_CoastalFellows2014
MGrande_CoastalFellows2014
 
Informatica web 2.0
Informatica web 2.0Informatica web 2.0
Informatica web 2.0
 
Presentación video de informatica
Presentación video de informaticaPresentación video de informatica
Presentación video de informatica
 
Eurofins prefmap2
Eurofins prefmap2Eurofins prefmap2
Eurofins prefmap2
 
Dueñas 3
Dueñas 3Dueñas 3
Dueñas 3
 
1 cualidades físicas y sus métodos de desarrollo
1 cualidades físicas y sus métodos de desarrollo1 cualidades físicas y sus métodos de desarrollo
1 cualidades físicas y sus métodos de desarrollo
 
HawthorneEffect_BC_BACK_Jodi_Akin
HawthorneEffect_BC_BACK_Jodi_AkinHawthorneEffect_BC_BACK_Jodi_Akin
HawthorneEffect_BC_BACK_Jodi_Akin
 
Tourism development pilot jan 2016v5
Tourism development pilot jan 2016v5Tourism development pilot jan 2016v5
Tourism development pilot jan 2016v5
 
Ppt adm 2_slideshare
Ppt adm 2_slidesharePpt adm 2_slideshare
Ppt adm 2_slideshare
 
Eurofins attributs sensoriels&marketing
Eurofins attributs sensoriels&marketingEurofins attributs sensoriels&marketing
Eurofins attributs sensoriels&marketing
 
Protocolo de la actividad
Protocolo de la actividadProtocolo de la actividad
Protocolo de la actividad
 
Gamification
GamificationGamification
Gamification
 
Alicia aguero
Alicia agueroAlicia aguero
Alicia aguero
 

Similar to Dwarka expressway the golden road (1)

Dwarka expressway road of opportunies and abundance
Dwarka expressway  road of opportunies and abundanceDwarka expressway  road of opportunies and abundance
Dwarka expressway road of opportunies and abundance
Ethical Consulting
 
Dwarka expressway: Road of Abundance and Opportunities
Dwarka expressway: Road of Abundance and OpportunitiesDwarka expressway: Road of Abundance and Opportunities
Dwarka expressway: Road of Abundance and Opportunities
Mukul Bhartiya
 
20 things you should know about Dwarka Expressway
20 things you should know about Dwarka Expressway20 things you should know about Dwarka Expressway
20 things you should know about Dwarka Expressway
Square Yards
 
20 things you should know about dwarka expressway
20 things you should know about dwarka expressway20 things you should know about dwarka expressway
20 things you should know about dwarka expressway
Alok Mehta
 
20 Things You Should Know About Dwarka Expressway
20 Things You Should Know About Dwarka Expressway20 Things You Should Know About Dwarka Expressway
20 Things You Should Know About Dwarka Expressway
Lee Group
 
20 things you should know about dwarka expressway
20 things you should know about dwarka expressway20 things you should know about dwarka expressway
20 things you should know about dwarka expressway
Kiran Kaur
 
20 Things you should know about Dwarka Expressway Gurgaon
20 Things you should know about Dwarka Expressway Gurgaon20 Things you should know about Dwarka Expressway Gurgaon
20 Things you should know about Dwarka Expressway Gurgaon
Reias India
 
Making of mughal road..
Making of mughal road..Making of mughal road..
Making of mughal road..
humairab1
 
Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
Vivek Thakur
 
M rly presentation_22.5.13
M rly presentation_22.5.13M rly presentation_22.5.13
M rly presentation_22.5.13
rdhyshym
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
Rajesh Prasad
 
Cheap houses in Mullanpur new chandigarh
Cheap houses in Mullanpur new chandigarhCheap houses in Mullanpur new chandigarh
Cheap houses in Mullanpur new chandigarh
Luxottica
 
SCG Report on Himurja SHP Tender 2014
SCG Report on Himurja SHP Tender 2014SCG Report on Himurja SHP Tender 2014
SCG Report on Himurja SHP Tender 2014
Nikhil Jaipurkar
 
Interdepartmental Permissions -Yemmiganur.docx
Interdepartmental Permissions -Yemmiganur.docxInterdepartmental Permissions -Yemmiganur.docx
Interdepartmental Permissions -Yemmiganur.docx
AarveeYemmiganur
 
Usbrlp at a glance
Usbrlp at a glanceUsbrlp at a glance
Usbrlp at a glance
Lakhwant Singh Khalsa
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017
RJ Sajeeb
 
Presentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptxPresentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptx
MdAbiAbdullah1
 
Hrm raw ppt
Hrm raw pptHrm raw ppt
Hrm raw ppt
Shimanto Deb
 
Dwarka expressway a highway to value creation a report by PropTiger Data Labs
Dwarka expressway a highway to value creation a report by PropTiger Data LabsDwarka expressway a highway to value creation a report by PropTiger Data Labs
Dwarka expressway a highway to value creation a report by PropTiger Data Labs
PROPTIGER
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
Ajay Sankar
 

Similar to Dwarka expressway the golden road (1) (20)

Dwarka expressway road of opportunies and abundance
Dwarka expressway  road of opportunies and abundanceDwarka expressway  road of opportunies and abundance
Dwarka expressway road of opportunies and abundance
 
Dwarka expressway: Road of Abundance and Opportunities
Dwarka expressway: Road of Abundance and OpportunitiesDwarka expressway: Road of Abundance and Opportunities
Dwarka expressway: Road of Abundance and Opportunities
 
20 things you should know about Dwarka Expressway
20 things you should know about Dwarka Expressway20 things you should know about Dwarka Expressway
20 things you should know about Dwarka Expressway
 
20 things you should know about dwarka expressway
20 things you should know about dwarka expressway20 things you should know about dwarka expressway
20 things you should know about dwarka expressway
 
20 Things You Should Know About Dwarka Expressway
20 Things You Should Know About Dwarka Expressway20 Things You Should Know About Dwarka Expressway
20 Things You Should Know About Dwarka Expressway
 
20 things you should know about dwarka expressway
20 things you should know about dwarka expressway20 things you should know about dwarka expressway
20 things you should know about dwarka expressway
 
20 Things you should know about Dwarka Expressway Gurgaon
20 Things you should know about Dwarka Expressway Gurgaon20 Things you should know about Dwarka Expressway Gurgaon
20 Things you should know about Dwarka Expressway Gurgaon
 
Making of mughal road..
Making of mughal road..Making of mughal road..
Making of mughal road..
 
Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
 
M rly presentation_22.5.13
M rly presentation_22.5.13M rly presentation_22.5.13
M rly presentation_22.5.13
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
 
Cheap houses in Mullanpur new chandigarh
Cheap houses in Mullanpur new chandigarhCheap houses in Mullanpur new chandigarh
Cheap houses in Mullanpur new chandigarh
 
SCG Report on Himurja SHP Tender 2014
SCG Report on Himurja SHP Tender 2014SCG Report on Himurja SHP Tender 2014
SCG Report on Himurja SHP Tender 2014
 
Interdepartmental Permissions -Yemmiganur.docx
Interdepartmental Permissions -Yemmiganur.docxInterdepartmental Permissions -Yemmiganur.docx
Interdepartmental Permissions -Yemmiganur.docx
 
Usbrlp at a glance
Usbrlp at a glanceUsbrlp at a glance
Usbrlp at a glance
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017
 
Presentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptxPresentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptx
 
Hrm raw ppt
Hrm raw pptHrm raw ppt
Hrm raw ppt
 
Dwarka expressway a highway to value creation a report by PropTiger Data Labs
Dwarka expressway a highway to value creation a report by PropTiger Data LabsDwarka expressway a highway to value creation a report by PropTiger Data Labs
Dwarka expressway a highway to value creation a report by PropTiger Data Labs
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 

Recently uploaded

HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
VickyAulakh1
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
Farmland Bazaar
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
Tom Blefko
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
a7xjm8n4
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
z5h13yqc
 
Gurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdfGurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdf
jwhrsngh23
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
SVN International Corp.
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
VickyAulakh1
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
GVRenting
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
knox groups real estate
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
hawifitumaed
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
olgashriki
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
Listing Turkey
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
hawifitumaed
 

Recently uploaded (15)

HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
 
Gurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdfGurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdf
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
 

Dwarka expressway the golden road (1)

  • 1.
  • 2. A whole new corridor of connectivity Connecting Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer Currently, only 2 roads of connectivity between Delhi and Gurgaon-MG Road and the NH8 Not enough to tackle the heavily increasing traffic of daily commuters between Delhi and Gurgaon
  • 3. A whole new corridor of connectivity With Dwarka Expressway, connectivity becomes smoother, faster and so much easier! IGI airport - a mere 2.5 kms away Also bridges the gap between 16 new Residential Sectors
  • 4. The changing face of Gurgaon And this is how Gurgaon will soon look, when the Expressway opens up
  • 5.
  • 6. A catalyst of change and development Planned around a world of opportunities and development Dwarka Expressway marks the beginning of a golden era in real estate Acts as a new channel of business and commerce between Delhi and Gurgaon World-class infrastructure and facilities to transform lives of residents and investors
  • 7. Years of thought and planning A result of years of planning, research and development by the best brains in real estate Aided by experts and top professionals in the Corporate and Government sector, a range of exciting projects in the residential and commercial space are already underway
  • 8. No more toll! No more delays! No more toll for commuters between Delhi and Gurgaon! No more delays and traffic jams at the toll gate on NH8! All thanks to the toll plaza moving beyond Manesar shortly
  • 9. Power cuts are history From power-shortage to power-surplus, Haryana’s power supply improving massively 4 new power plants have been set up by the Haryana Government Power generation capacity of the state has increased from 1587 MW to 5800 MW in the last 5 years
  • 10. Exciting opportunities in Education Reputed educational institutions flocking to areas surrounding the Expressway MatriKiran School under construction Modern School opening a branch in Sector 91, Gurgaon Other well-known schools of Delhi are currently looking to expand on this stretch
  • 11. Boom in Healthcare Nationally and internationally famous healthcare organizations setting up branches around the Dwarka Expressway Reputed names in healthcare have/in process of finalizing Dwarka Expressway as the location of establishment
  • 12. All this adds up to making the Dwarka Expressway a new hub of exciting developments in real estate and the Golden Road!
  • 13. The widest road in the NCR 18 kms long and 150 mtrs wide, with 60 mtrs of greenery on both sides, the Dwarka Expressway is 2x that of the NH8 14 kms out of the 18 kms is already constructed
  • 14. Constructed means black-topped and driveable From Delhi Dwarka Expressway From Haryana The double yellow line indicates the constructed expressway
  • 15. Gurgaon - Manesar Urban Complex - 2031 AD
  • 16. The Expressway today: The remaining 4 kms 800 mtrs handed over to Indian Railways for construction of Rail over-bridge, with HUDA paying Railways Rs. 38 Crores in advance already (Expected Completion Time: 16 months) 700 mtrs under various HUDA utilities such as HT pillars and water works which HUDA is in the process of shifting (Expected Completion Time: 6 months) The balance 2.5 kms – has been resolved
  • 17. The latest on the 2.5 kms under stay order On 30.9.2013, HUDA announced a rehabilitation policy which was published in the Times of India
  • 18. As Per Policy Published on 30.09.13 People with built up homes / structures are being offered alternative plots in Sectors 110A and 37C The plots on offer are of the same size as the plots being taken over HUDA has already acquired 145 acres in the above 2 Sectors for this purpose Only 15 acres required to re-settle all the petitioners
  • 19. As Per Policy Published on 30.09.13 Applicants had till 30.10.2013 to apply under this policy HUDA has received applications from 80% of the residents on this stretch and is sorting them out All petitions expected to be resolved under this process in the next 3-4 months
  • 20.
  • 21. Actual availability of stretches (As per Actual Site condition) S.No . Chainage Length Status Clear Constructed Length / NOT Remarks Month of Handing Over From To 1 2 0 468 468 750 468 282 282 Not Executed Executed 3 750 765 15 15 Executed May-13 4 765 900 135 135 Executed Dec-11 5 900 960 60 60 Executed May-13 6 7 960 2000 2000 2050 1040 50 1040 50 Executed Executed End April 11 End April 11 8 2050 2070 20 20 Executed 9 2070 2120 50 50 Clear WMM II Completed 10 2120 2170 50 Not Executed Stay on Land 11 2170 2260 90 90 Clear WMM II Completed 12 2260 3350 1090 1090 Executed Built up Area End of Dec 11 Mid August 13 Mid August 13 End April 11
  • 22. Chainage S.No. Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over From To 13 3350 3370 20 14 3370 3400 30 30 Executed 15 3400 3975 575 575 Executed 16 3975 4100 125 125 Executed 17 4100 4300 200 200 Executed 18 4300 4315 15 19 4315 4425 110 110 Executed 20 4425 4500 75 75 Executed End April 11 21 4500 6620 2120 2120 Executed End April 11 22 6620 7800 1180 23 7800 8285 485 24 8285 8345 60 25 8345 8750 405 HSIIDC drain Jan-13 Reliance SEZ land Jan-13 Feb 12 Pataudi Road Not Executed/ROB 485 Executed Not Executed 405 ROB, Padmini Factory, stay on land Executed Mid Sep 11 HUDA water sump house Mid Sep 11
  • 23. Chainage S.No. Length From To 26 8750 8800 50 27 8800 9820 1020 28 9820 9900 80 29 9900 10800 900 30 10800 11700 31 11700 32 1020 Status Constructed/ NOT Remarks One side executed Clear Length RHS stay on land Executed Month of Handing Over Mid Oct 11 Not Executed STP Channel 900 Executed Water logged area completed 900 900 Executed end April 11 11760 60 60 Executed Mid Oct 11 11760 12850 1090 1090 Executed Mid Oct 11 33 12850 12900 50 50 Executed Feb-13 34 12900 13000 100 35 13000 13060 60 60 Executed Feb-13 36 13060 13400 340 340 Executed Nov-11 37 13400 13520 120 120 Executed Nov-11 38 13520 13650 130 130 Executed Nov-11 39 13650 13700 50 50 Clear Not Executed Last week of Jan 13 Nipon Factory Slab approach is to be coming
  • 24. Chainage S.No. Length From To Clear Length Status Constructed/ NOT Remarks Month of Handing Over Slab culvert over sewer Work is stopped from last channel is in 2 month i.e on 6th Sep progress by 2013 another contractor 40 13700 13780 80 41 13780 14320 540 540 Executed 42 14320 14900 580 580 Clear WMM 1st layer completed 43 14900 15300 400 Not Executed New Palam Vihar – R&R 44 15300 15600 300 Not Executed New Palam Vihar – R&R 45 15600 16000 400 Not Executed New Palam Vihar – R&R 46 16000 16740 740 Not Executed New Palam Vihar – R&R 47 16740 18035 1295 18035 Clear Stretch 1295 14092 Executed 01-Mar 14,092 mtrs.
  • 25. Dwarka Expressway: The Delhi update
  • 26. Dwarka Expressway: The Delhi update Thanks to DDA’s efforts, all issues related to land acquisition on Delhi side, resolved Remaining stretch of less than a Km to be ready within the next 6 months
  • 27. All obstacles soon to vanish All land issues on Delhi side resolved All issues pertaining to 2.5 kms on Gurgaon side soon to be resolved (Expected Timeline – January’2014) Soon, no more obstacles preventing investing in the Golden Road!
  • 28. Strike while hot! (Average rate per sq ft)
  • 29. Besides, the best developers are building here Some of the best and most trusted names in real estate singling out the Dwarka Expressway as the preferred location for various visionary projects Residential or commercial, most of these projects in full swing and nearing completion
  • 30. Glimpses of the Expressway
  • 31. Glimpses of the Expressway
  • 32. The golden road beckons Abloom Realty Services Pvt Ltd 342, 3Rd Floor, Vipul Trade Centre Sohna Road,Sector-48 Gurgaon, Haryana-122001 Phone: 0124-2666077 M: +919891162311 +919911362311