WHAT AM I DOING?




... proposing A strategy to improve socially vulnerable areas, by capturing the economic vitality of LUPs


                                                                         0                                                   1km




1. Palau de les Arts Reina Sofia       2. Sports venue - Veles e Vents       3. Formula 1 Grand Prix of Europe in Valencia
Why AM I DOING this?
                                                                                                 Francisco Camps /
                             Santiago Calatrava /
                                                                                                 Ex-president of the
                                     The Architect                                               Regional Government




                                                                                                 4. Opening of the Palau de les Arts Reina Sofia



Last 20 year strategy focused on promoting Large urban projects aimed at tourism, construction indsutry and the wealthy


  Juanito / A Local Bloke




                                                                                                  5. Street view of the Cabanyal neighbourhood
What are the Outputs?
          Strategy      Key Interventions                   Design proposal




                                            0         1km




                                        0       1km




                                    N
                                  MI
                             10
Problem Statement


       Increasing fragmentation and     BIg amount of public money      Lack of benefit distribution
            social vulnerability      spent on urban projects mostly   from large urban projects to
                                         favouring the wealthy and        local neighbourhoods
                                          construction companies




6. Railway separated neighbourhoods
Main Research questions
 - What are the strategic spatial interventions necessary to improve the
 condition of socially vulnerable areas in Valencia?
 - What are the existing possibilities of spatial planning to capture the
 benefits of LUPs for local communities?




7. The only pedestrian bridge linking two neighbourhoods
Problem            Problem Statement & Research Questions
           Statement
You Are
 Here
                             Site Description, Valencia’s Spatial & Strategic
            Context                 Planning, Theoretical Framework



                         Project Area Choice, LUPs, Spatial and Socio-economic
          Project Area              Analysis, Municipal Plan Aalysis




           Strategy       Strategy, Key Projects, Design Proposal, Conclusion
Context
VALENCIA
                                                                                              	Oldtown
                                                                                              Main Rods
                                                                                              Railway
                                                                                              Former River Bed
                                                                                              New River Bed




Municipality Population
810 000                               Barcelona 4h
                                                                Zaragoza
                                                                4,5h                                  Italy
                          Madrid                       Madrid                                         660 pax/year
Municipality Area:        4h                           1,5h                Barcelona 4h
134.65km²
                                                                                            Balearic islands
Density                   Malaga 6h      Alicante 2h      Alicante                          248 000 pax/year
                                                          2h
6 010/km²
Agriculture
  Period




                                                           Silk                      Rice               Citrus
Industrial
  period




                                                                   Ceramics   Furniture                 Metal
Service economy
     period




                  8. Transition in Valencian economy
                                                       Logistics              Construction   Service & Tourism
Recent Economic Chalanges
                                                                                                   9. Media headlines about
                                                                                                   socio-economic difficulties




  Highest unemployment in
  Eurozone

  Government Bankruptcy

  50% Youth Unemployment

  Valencia - The Greece of
  Spain


Economic recession is escalating the problems of social vulnerability, unemployment & development stagnation
  Student Protests

  Highest debt in Spain

  Corruption
Spatial Planning                                                                    National Government defines land use types:
                                                                                           Urban; Developable; Not Developable

          Local Government Delimits:	 	 - Land Use type					 - Spatial configuration, function
                                      Land use type
                                                                                                                       Function




10. Land use plan 2010                                11. General Plan of Valencia 2010




   Valencia’s planning act:              Additional planning -PLAN Parcial for developable areas
    Allows 3rd party to develop          documents:          -Programa de actuacion integrada for URBAN Areas
       land without owning it                                -Plan Especial for urban & not developable areas
Turia Garden	 1988
 City’s green backbone
                                  1                                 Strategic Planning
 Local citizen oriented
 Sports & leisure activities
 Increase in living quality


Central Park	 20??                      2
 Green heart of Valencia
 Redevelopment of rail infrastructure site

                                                            1
 Local citizen oriented
 Recreation & educative activities


 City of Arts And Science	                   `98-`11    3                       5
 Raise City’s identity & attract tourism and
 gentrification
 Culture, education, conference and sport activities
 Expensive construction & maintenance, loss making
 Limited accessibility & use
 Wealthy class and tourist oriented
                                                                2

F1 city Circuit	           2008            4
Redevelopment of deteriorating industrial area                              4
Limited periodical use of isolationist facilities                    3
Global sports event drawing publicity
Yearly franchise cost of ~35 million euros
Wealthy class and tourist oriented



 America’s Cup Port	                  2007          5
Redevelopment of industrial port and beach
Sports, tourism & recreation activities
Global event generating revenue
Promoting nautical high-tech industry
Luxury tourism and wealthy class oriented event
LUP Benefit orientation



                1988




                         1998-2011
                2014




Local Citizen
  oriented

 Tourism &
Wealthy class
  oriented

                                     12. Large Urban Project benefit orientation
Theoretical Framework
 & project area choice
Theoretical framework
                                                                            LUP integration

Confrontation of entrepreneurial and local needs in order to prevent isolationist projects
(Cuenya 2005)
Raising project integration by inclusion Of local participation (Lecroart 2007)


Locally painless project funding (Altshuler & Luberoff 2003)


Project flexibility and reversibility by multiple project operators (Lecroart 2007)


Mix of functions to ensure project vitality & Success (Lecroart 2007)


Local society favouring public space to increase project credibility (Lecroart 2007)
Urban VULNERABILITY 1991-2006
    Socially vulnerable areas in Valencia
                                 1991                                 2001                    2006




0      1      2km                                       0   1   2km          0   1   2km




Derived based on Housing condition, level of education, unemployment                  based on percentage of immigrants
13. Socially vulnerable neighbourhoods 1991/2001/2006
Criteria for project site
                                                                                                                                   URBAN REGENERATION
           PEOPLE LIVING IN BAD                                                                         VULNERABLE AREAS
                                                                                                                                     PROGRAM - RIVA
           CONDITION HOUSING                                                                                                       REHABILITACIÓN INTEGRAL DE VALENCIA




     39
                                    51

                                 54              14


                     16




                                                              414
                                                      14



                69
                            31     292



                                            33




0      1       2km                                                                       0       1      2km                0   1      2km




14. Areas of bad housing conditions / vulnerable neighbourhood / existing urban regeneration programs
Project Area




                                     City of Arts
                  Central Park       and Science




              Project Area


0   1   2km
              0      1       2km
Project ARea
  Analysis
City of Arts And Sciences




                                                                                                            Science Museum
                                                                                    Hemisféric
                                                                                                             -- 	Interactive science
                                                                                       -- Cinema hall
                                                                                                             exposition
                Palau de las Arts                                                      -- Souvenir shop
                Reina Sofia                                                                                  -- 	 Souvenir/book shop
                                                                                                             -- 	Restaurant
                   -- Operas
                   -- Ballets
                   -- Cinemas
                   -- Exhibitions
                   -- Conferences, etc.
                                                                                                                                       Oceanografic

                                                                                                                                        -- 	 Marine museum, aquarium
                                                                                                                                        -- 	Restaurants
                                                                                                                                        -- 	 Souvenir shops
                                Umbracle
                                                                                                                                        -- 	 Marine research
                                    -- 	Parking
                                    -- 	 Exhibition of flora and astronomy



                                                                             Agora

                                                                              -- 	 Sport / culture events
                                                                              -- 	Conferences
                                                                              -- 	 Show venue

15. City of Arts and Science
Central Park
                                   Vision




16. Central Park project
Central Park
                                      Existing Situation




17. Central Park existing sitation
Project Phasing

                                           Stage 1
                                           Stage 2
                                           Stage 3
18. Central Park plans and phasing
Project Area in 1946




19. Project area historic context
TURIA GARDEN                                                 19c                                   Spatial conditions
     (old river bed)


                                                     P                                       R    T     historic nUCLEUS   •	human scale, attractive streetscape

                                                  LU                                      PO
                                                                                                                           •	feeling of an old town
                                                                                                                           •	small property lots




                                    EXPAN DING
OLD T



                       NUCLE C
                             US
     OWN                                                                                                                   •	lack of greeneries and open spaces




                                         TION
                             RI
                                                             AL




                                       STAN
                       HISTO
                                                           U                                                               •	built environment requires refurbishing.
                                                         TR PE             ,
19th c                                                 UL CA         T ICS
                                                                  GIS TRY
                                                     C
       .                                           RI NDS


                                  FREE
EXPAN                                            AG LA          LO US                                   `70 block TYPE     •	Defined, human scale street level
      SION             -70`ie                                      D
                                                                                   RIA
                             s                                     IN                                                      •	border of unattractive railway
                       BLOCK
   PROJEC
                              TYPE
                                                                              R TU       MAIN
                                                                                                ROA
                                                                                                   DS
                                                                                                                           •	undeveloped properties blocks which


                                                             IVE
                 T AREA
                                                           R
                                                           (ne
                                                              w   rive
                                                                       r   bed
                                                                               )

                                                                                     0           1km
                                                                                                        free sTANDING      •	lots of green open space in between
                                                                                                                           •	Not developed groundfloor
                                                                                                                           •	Unapealing spaces for public activity




  Pre 1944 Nucleus




  Block type 1970 expansion




   Free Standing 1970 expansion
Abandoned & EmpTY Property




               EMPTY LAND LOT
               ABANDONED PROPERTY

         0                      1km
Older >64 living alone                                     Unemployment
                                                                                                                                          Socio-economic
                                                                                                                                              Conditions
                250
                250




                                                                                                                                                                  SERVICE, COMMERCE & SALES MANUFACTURE
                                                                                                                                                                                                          production of metal products
                                                                                                                                                                                                          production of office materials and computes
                                                                                                                                                                                                          production of other electronic poducts
                                                                                                                                                                                                          production of precision and optical machinery
                                                                                                                                                                                                          food and drink industries
                200
                200                                                                                                                                                                                       footware clothes and textile
                                                                                                                                                                                                          wood cork and furniture
                                                                                                                                                                                                          paper, printing and publishing
                                                                                                                                                                                                          Other 1
                                                                                                                                                                                                          Other 2
                                                                                                                                                                                                          Wholesale
                150
                150
                                                                                                                                                                                                          Groceries and Tabaco
                                                                                                                                                                                                          Non Groceries and Tabaco


Youth 16-30 unemployment                                   Immigrants
                                                                                                                                                                                                          Cafe, Restaurant
                                                                                                                                                                                                          Repairs of cars
                                                                                                                                                                                                          Automobiles
                                                                                                                                                                                                          Insurance and Real Estate
                100
                100
                                                                                                                                                                                                          Service for Business
                                                                                                                                                                                                          Rental, Real Estate
                                                                                                                                                                                                          Personal Service
                                                                                                                                                                                                          Other
                                                                                                                                                                                                          Architects and Civil Engineers
                                                                                                                                                                                                          Construction Engineers
                 50
                 50
                                                                                                                                                                                                          Brokers, Salesman
                                                                                                                                                                                                          HoReCa
                                                                                                                                                                                                          Insurance
                                                                                                                                                                                                          Managers
                                                                                                                                                                                                          Other Professionals
                                                                                                                                                                                                          Rent, Insurance and Law
                  0
                  0
                                                                                                                                                                                                          Teaching
                                                                                                                                                                                                          Health
                       1. Mont-Olivet        2. En Corts    3. Malilla   4. Fonteta de Sant Lluís   5. Na Rovella   6. La Punta   7. Ciutat Arts i les Ciències                                           Other




Bad Housing Condition                                      Density


                                                                                                                                                                                                                           Museums/Theatres/ Cinemas
                                                                                                                                                                                                                           Municipal Organization
                                                                                                                                                                                                                           Education
                                                                                                                                                                                                                           Youth Centre
                                                                                                                                                                                                                           Sports
                                                                                                                                                                                                                           Social Centres
                                                                                                                                                                                                                           Health
                                                                                                                                                                                                                           Libraries

                                                                                                                                                                                                                           Absence of Facilities



20. Project area socio-economic conditions
Traffic Intensity                   Bus connectivity                                      Connectivity




                                                   Bus lines running through the project site

                    Traffic intensity              Other Bus lines

                    Bridges and tunnels            Lack of direct accessibility




      Rail Public Transport               Subjective local transportation evaluation




                  Tram/Metro line
                  Future Metro line
                  Train Station            	>45% Population
                                                 thinking they have
                  Cargo Train Station      	15% bad transport
                  Bus Station              	5%   availability


21. Project infrastructure analysis
Existing Situation




                                 0                  1km

22. Existing spatial condition
municipal development plans




                                           0              1km

23. Municipal development plans
Central Park project




                                               0               1km

24. Central park related development issues
Real Estate Market




                                                                  0                  1km

25. Real estate markekt related Malilla Nord development issues
AIM
AIM of the project




Improve socially vulnerable
 neighbourhoods in Valencia, in
the context of local development
stagnation and economy
     recession
Further aims




Better   the spatial conditions
     of vulnerable areas


Use the potential       of LUPs
to make the neighbouring areas
        more successul
Strategy
FLOWS To LUPs




26. Capturing the flows that lead to to LUPs of Valencia
Activation
 Strategy
Key projects

                                              STARTUPS CENTRE
                           New Market




                   Design 
                 workshop area




                                               Huerta Info
                                                 Centre
Existing LUP Connections
New intervention Connections            0                1km
Strategy




Existing LUP connection   New Bridges                 Secondary Projects     Existing Greeneries

Existing LUP              New LUP connection          Secondary Connection   New Greeneries

Existing Bridges          Key intervention projects   New Bicycle Route      Future Metro
Redevelopment layer
                          Project / New Market




Older >64 living alone   Bad Housing Condition
                   0                       1km
Abandoned Property




27. Abandoned old historic neighbourhood
Redevelopment concept
Employment layer
    Project / workshop centre




               Empty Property
0                         1km
Empty property




28. Existing abandoned property
Opened up new green space
Employment layer
             Young Entrepreneur centre




         N
     MI
10




                      Unemployment
     0                             1km
Green layer
                                               Temporary parks &
                                               Huerta info centre




                                           0                1km

29. Existing huerta info centre location
Landscape info centre
Real Time
                            Tomate 1.2 €/Kg
                                                                        Agriculture
                                                                          Network
                            Jun 15 - Aug 30

                           Naranja 0.8 €/Kg
                           Apr 10 - Nov 20

                          Cereza 2.2 €/Kg
                          Jul 01 - Sep 15




                Parque Central
                                                               Merc@do
                     Collaboration             ...Tomates1.01 Naranjas1.22 Cerezas 2.03...
                     Publicity
                     Real Time Info
                     Feedback                                              New Market

                                                      Raise environmental awareness
                                                         Encourage local production /
                                                                         consumption
                                              Inform about product growth location,
                                                             status and seasonality
                                               Strengthen local agriculture network
Huerta Info Centre
                                               Promote typical Valencian landscape
secondary PROJECTS




                Intervention types
Temporary/Permanent


          New Green Spaces
          Under used property development
          Development promotion on empty
          property
Development promotion               New Green Spaces       Under used development




Bratislava / Green Square    Budapest / Urban Meadow
                                                           Magdeburg / Open Air Library




But Yam / Northern Gate

                             Dessau / Landscape Corridor   Vilnius / Litterateur’s Street




30. Reference projects


Philadelphia / Vacant Land   Brooklyn / Lent Space         Paris / Passage 56
Stakeholder
H   UERTA INFO
    CENTRE                                     P    RIVATE
                                                    ROPERTY
                                                                  Analysis


                                               P        €
                                                   RIVATE
                                                   INVESTORS




                 P   UBLIC
                     ROPERTY



P        €
    RIVATE
    INVESTORS



                                                               P   RIVATE
                                                                   ROPERTY




                                                               N    EW
                                                                    MARKET




                               P   RIVATE
                                   ROPERTIES
                                                   0                         1km
Project                 Stakeholder                                             Investment                                                       Gain                               New Land Owner
                                                       -- Partial investment into new market building                   -- New market
                      Public Land Owner                -- Development of mixed use buildings                            -- Improvement of under developed land
                        (Municipality)                 -- New public spaces                                             -- Increase in land value
                                                       -- Upgrade of adjacent living environment                        -- Stimulation of local economy
                          National Police              -                                                                -- Improved private space
                                                       -- Partial investment into new market building
                         Private Investors                                                                              -- Income from development
                                                       -- Mixed use buildings
                                                       -- Provision of greeneries                                       -- Publicity                                                       Muncipality
                    Parque Central Association
                                                       -- Investment into ‘Real Time Agriculture Network’               -- Collaboration with ‘Huerta Info Centre’
   New                                                                                                                                                                                   Private owners
                  Department of Employment and
  Market                                               -- Partial investment into new market building                   -- New job places
               Promotion of Entrepreneurial Projects
                                                       -- Participatory time & input for local needs                                                                                    Private investors
                                                                                                                        -- Current economy driven market design / working
                      Association of Markets
                                                       -- Investment into ‘Real Time Agriculture Network’               scheme
                                                                                                                        -- Improved surroundings
                    Neighbourhood Association          -- Participatory time & input for local needs                    -- Public / Private housing
                                                                                                                        -- New Public Facilities
                        Huerta Info Centre             -- Investment into ‘Real Time Agriculture Network’               -- Collaboration with the ‘New Market’
                                                                                                                        -- Publicity of local products
                      Association of Farmers           -- Investment into ‘Real Time Agriculture Network’
                                                                                                                        -- Increasing demand of work
                                                                                                                        -- Income for the sold land
                     Private Land Owner                -
                                                                                                                        -- Permission for higher development rights
                                                       -- Acquisition of private property
                            Municipality                                                                                -- Public use of under used area                                   Muncipality
                                                       -- Partial investment to Entrepreneur Centre
Entrepreneur             Private Investors             -- Partial investment to Entrepreneur Centre                     -- Strategically appealing location                               Private owner
   Centre         Department of Employment and
                                                       -- Partial investment to Entrepreneur Centre                     -- New job places for young population                          Private investors
               Promotion of Entrepreneurial Projects
                 Polytechnic University of Valencia    -- Architecture student design competition for the Centre        -- Tender for the winning project
                    Neighbourhood Associacion          -- Participatory time & input for local needs                    -- Facilities and public space according to local needs
               Multiple Private Land Owners            -                                                                -- Income from rented property
                            Municipality               -- 5 year rent of abandonded property                            -- Redevelopment of abandoned property                             Municipality
                                                                                                                                                                                  for 5 years with an availibility to
 Workshop         Department of Employment and         -- Inventory for the Workshop Area
                                                                                                                        -- New Job Places                                            extend the rental contract
  Area         Promotion of Entrepreneurial Projects   -- Necessary refurbishment works
                    Neighbourhood Association          -- Redevelopment of property                                     -- Built environment for public facility                         Private owners
                   Valencia’s Associacion of Arts      -- Workshops and lessons                                         -- Space for creativity and production
                     Private land owner                -                                                                -- Income for the sold land
                 Polytechnic University of Valencia    -- Architecture student design competition for the info centre   -- Tender for the winning project
                                                                                                                        -- Strengthening the regional strategy to promote local
                       Regional Government             -- Financing the project
Huerta Info                                                                                                             agricultural landscape
                                                                                                                                                                                           Municipality
                                                       -- Monitoring of the project
 Centre        Centre of Strategy and Development of                                                                    -- Strengthening the regional strategy to promote local
                               Valencia                -- Seek for private investors                                    agricultural landscape
                      Association of Markets           -- Investment into ‘Real Time Agriculture Network’               -- Collaboration with ‘Huerta info Centre’
                      Association of Farmers           -- Investment into ‘Real Time Agriculture Network’               -- Publicity of local products
Stakeholder Investments
            Farmer                                                                  €     Private Investors
          Association    €                 PROJECT NEW
                                             MARKET                                Land   National Police

           Market        €
                                              REAL TIME                               Dep. of Employment
          Associotion                        AGRICULTURE
                          i                                                            and Promotion of
                                              NETWORK                                   Entrepreneurial
                                                                                    €       Projects

          Huerta Info                        MIXED USE
                        Collab.
           Centre                                                                   €
                                              MARKET                                      Municipality
                                                                                   Land

           Parque       Collab.
                                            PUBLIC SPACE                                  Neighbourhood
           Central      Trees                                                        i     Association



Collab.    Collaboration of Projects   i    Ideas / Participation   Land   Provision of Land

Trees      Provision of Greeneries     €    Investment
Stakeholder Gains
                         Publicity                     Revenues                         Private Investors
  Farmer
Association        New job places      PROJECT NEW
                                         MARKET        Improved surroundings             National Police

 Market       New modern market           REAL TIME
                                                       New job places                  Dep. of Employment
Associotion   Customized structure       AGRICULTURE                                    and Promotion of
                                          NETWORK                                        Entrepreneurial
                                                       Land redevelopment                    Projects
                                                       Land value increase
Huerta Info                              MIXED USE     Local economy stimulation
              Project collaboration                                                     Municipality
 Centre                                   MARKET       Surounding improvement
                                                       New public/private housing
                           Publicity                   New facilities
 Parque                                                                                Neighbourhood
              Project collaboration     PUBLIC SPACE   New job places
 Central                                               New local market / centrality
                                                                                        Association
Project tradeoff study
Temporary High
Speed train station   Private investment tertiary
                      towers >25 floors (offices)


                      Redeveloped public historical
                      buildings. Administration,
                      education, cultural.



                      Private investment
                      residential towers <14 floors



                      Private investment
                      residential towers >25 floors




                                                      0       1km
Possible LUP tradeoffs
New pedestrian                   Neighbourhood
brige                            open air library




Upgrade of existing
pedestrian bridge
                      Community centre        Social Housing




New pedestrian
brige




                                                                  0               1km
Promotion of alternative LUP use




31. Alternative use of the City of Arts and Sciences
Design
New Links   / New Market / Startup Centre
10
             1                   Street Section Study
                     2




             3
                                      Main projects
                 4                    Street space boundary
                                      Greeneries

     1                       2

                         0           1km




         3                       4
Proposed ‘Calmed traffic’ areas




                    MARK
                        ET
                                                 TUPS
                                             STAR
    SCHO                               M
        OL



                                        T
                                    SPOR



WORK
    SHOPS
                                            Main projects
             PARK                           Street space boundary
                                            Metro Line
                                            Pedestrian / Bike connection
                                            Greeneries
                                            Calmed traffic zone
                                0                                1km
Design
New Links /   New Market / Startup Centre
Existing Situation




Abandoned / Empty property
Project Proposal




Proposed new Functions
entrance to the Market
established new links
NEW
MARKET
New Spatial Configuration




     NEW T
           E
      MARK
Established public
space connections
NEW MARKET DEVELOPMENT PHASING




Existing situation                      Phase 1- New Market & Public Space




Phase 2 - Adjacent Development          Phase 3 - Relocation & Demolishment



                                                                              M




Phase 4 - Development Completion        Proposed Spatial Configuration
Design
New Links / New Market /   Startup Centre
Entrepreneur Centre
Existing   Proposed
                                    Existing
                                    Buildings


                                    New
                                    Buildings


                                    Demolished
                                    Buildings


                                    Demolished
                                    Roads
Proposed Plan
Functions
Relation to the City of Arts and Science
conclusions
What are the strategic spatial interventions necessary to improve the position of socially vulnerable areas in Valencia?




What are the existing possibilities of spatial planning to improve the benefits of LUPs for local communities in Valencia?
New vocation of the site
                                  Green Heart of                           Young Startups & Hip
                                                   New Vital                   urban life
                                     Valencia      Centrality




                                                                                           Accessible daily activities
                                                                                                for the Citizens




 Social Centre, Skill learning,
Workshops & Self Employment                                     Local landscape and food
                                                                  production awareness
Strategy in the municipal context
Gracias




32. City of Arts and Science from the fields of huerta
Image Sources
Palau de les Arts Reina Sofia / www.flickr.com : Roberto Rocco2                      Central Park existing sitation /
Sports venue - Veles e Vents / www.flickr.com : Emilio!2                             Domantas Stukas, www.valenciaparquecentral.es24

Formula 1 Grand Prix of Europe in Valencia / www.f1-site.com2                        Central Park plans and phasing / www.valenciaparquecentral.es        25
Opening of the Palau de les Arts Reina Sofia / www.f1-site.com                  3    Project area historic context / www.urbanity.es26
Street view of the Cabanyal neighbourhood /                                           Project area socio-economic conditions /
www.maps.google.com3                                                                 Domantas Stukas based on www.ine.es                                  29
Railway separated neighbourhoods / Domantas Stukas5                                  Project infrastructure analysis /
                                                                                      Domantas Stukas based on www.valencia.es30
The only pedestrian bridge linking two neighbourhoods / Domantas
Stukas6                                                                              Existing spatial condition /
                                                                                      Domantas Stukas based on www.valencia.es31
Transition in Valencian economy /
www.flickr.com : DonaLG, Oselfa Faber, www.sabore.es, Brisky Fingers, Feria Habitat   Municipal development plans /
Valencia, Manyez, John Burke, Metro Centric; www.f1-site.com11                       Domantas Stukas based on www.valencia.es32

Media headlines about socio-economic difficulties /                                   Central park related development issues /
www.presseurop.eu, www.bbc.co.uk. www.elpais.com, www.cnn.com12                      Domantas Stukas based on www.valencia.es                             33
Land use plan 2010 / www.valencia.es13                                               Real estate markekt related Malilla Nord development issues /
General Plan of Valencia 2010 / www.valencia.es13                                    Domantas Stukas based on www.valencia.es, www.valenciaparquecentral.es34

Large Urban Project benefit orientation /                                             Capturing the flows that lead to to LUPs of Valencia /
Domantas Stukas based on www.valencia.es, Source: www.valenciaparquecentral.es,       Domantas Stukas based on www.valencia.es, www.maps.google.com39
www.vistasalegres.blogspot.no, www.f1-site.com, www.flickr.com : Rafa Cartagena,
                                                                                      Abandoned old historic neighbourhood / www.maps.google.com           44
jmhdezhdez                                                                     15
                                                                                      Existing abandoned property / www.maps.google.com47
Socially vulnerable neighbourhoods 1991/2001/2006 /
Domantas stukas based on www.siu.vivienda.es                                   18    Existing huerta info centre location / Domantas Stukas, www.gva.es   50
Areas of bad housing conditions / vulnerable neighbourhood /                          Reference projects / www.publicspace.org, www.72hoururbanaction.com54
existing urban regeneration programs /                                                Alternative use of the City of Arts and Sciences /
Domantas Stukas based on siu.vivienda.es, cartoweb.cma.gva.es19                      Domantas Stukas, www.cac.es                                          61
City of Arts and Science /                                                            City of Arts and Science from the fields of huerta /
www.maps.bing.com, www.flickr.com : Andifeelfine, fromhorta22                        www.flickr.com : ferelmafe                                           81
Central Park project / www.valenciaparquecentral.es23
MSc Urbanism Thesis Report
                                        June 2012




  A Project For Valencia
STRATEGY FOR REVITALIZING SOCIALLY VULNERABLE AREAS,
  CAPTURING THE BENEFITS OF LARGE URBAN PROJECTS




                                       DOMANTAS STUKAS
                                                       4116267




    Delft University of Technology, Department of Urbanism, Chair of Spatial Planning  Strategy, Studio Complex Cities

More Related Content

Similar to Domantas Stukas Master Thesis Presentation

Eura 2011: Cities without Limits
Eura 2011: Cities without LimitsEura 2011: Cities without Limits
Eura 2011: Cities without LimitsOtroHabitat
 
Naples: The Case of Scampia
Naples: The Case of ScampiaNaples: The Case of Scampia
Naples: The Case of ScampiaURBACT
 
THE URBAN GROWTH OF MEDIUM-SIZED TOWNS . THE CASE OF CASTILLA-LA MANCHA.
THE URBAN GROWTH OF MEDIUM-SIZED TOWNS . THE CASE OF CASTILLA-LA MANCHA. THE URBAN GROWTH OF MEDIUM-SIZED TOWNS . THE CASE OF CASTILLA-LA MANCHA.
THE URBAN GROWTH OF MEDIUM-SIZED TOWNS . THE CASE OF CASTILLA-LA MANCHA. Juan Antonio García González
 
Carmee gaul on regenation of barcelona's city centre
Carmee gaul  on  regenation of barcelona's city centreCarmee gaul  on  regenation of barcelona's city centre
Carmee gaul on regenation of barcelona's city centrewww.theurbanvision.com
 
Kavala Strategic Agenda 2030
Kavala Strategic Agenda 2030Kavala Strategic Agenda 2030
Kavala Strategic Agenda 2030URBASOFIA
 
P4 'A Project for Valencia'
P4 'A Project for Valencia'P4 'A Project for Valencia'
P4 'A Project for Valencia'Domantas Stukas
 
Presentation 22@Barcelona The Innovation District
Presentation 22@Barcelona The Innovation DistrictPresentation 22@Barcelona The Innovation District
Presentation 22@Barcelona The Innovation District22arrobabcn
 
KAVALA 2030 Strategic Agenda presentation
KAVALA 2030 Strategic Agenda presentationKAVALA 2030 Strategic Agenda presentation
KAVALA 2030 Strategic Agenda presentationURBASOFIA
 
090927 Curitiba Ecocity Final
090927 Curitiba Ecocity Final090927 Curitiba Ecocity Final
090927 Curitiba Ecocity Finalivanleung
 
Barcelona
BarcelonaBarcelona
BarcelonaClansky
 
Barcelona_Urban Planning.docx
Barcelona_Urban Planning.docxBarcelona_Urban Planning.docx
Barcelona_Urban Planning.docxIreneCastillo41
 
Alessia pulcini presentation urban design 1 - eu cities
Alessia pulcini   presentation urban design 1 - eu citiesAlessia pulcini   presentation urban design 1 - eu cities
Alessia pulcini presentation urban design 1 - eu citiesPulcini Alessia
 
Master thesis presentation 2011.12.21
Master thesis presentation  2011.12.21Master thesis presentation  2011.12.21
Master thesis presentation 2011.12.21ABDUXUKUR ZAYIT
 

Similar to Domantas Stukas Master Thesis Presentation (20)

Eura 2011: Cities without Limits
Eura 2011: Cities without LimitsEura 2011: Cities without Limits
Eura 2011: Cities without Limits
 
Producir conocimiento espacial - Sesión teórica 2
Producir conocimiento espacial - Sesión teórica 2Producir conocimiento espacial - Sesión teórica 2
Producir conocimiento espacial - Sesión teórica 2
 
Naples: The Case of Scampia
Naples: The Case of ScampiaNaples: The Case of Scampia
Naples: The Case of Scampia
 
THE URBAN GROWTH OF MEDIUM-SIZED TOWNS . THE CASE OF CASTILLA-LA MANCHA.
THE URBAN GROWTH OF MEDIUM-SIZED TOWNS . THE CASE OF CASTILLA-LA MANCHA. THE URBAN GROWTH OF MEDIUM-SIZED TOWNS . THE CASE OF CASTILLA-LA MANCHA.
THE URBAN GROWTH OF MEDIUM-SIZED TOWNS . THE CASE OF CASTILLA-LA MANCHA.
 
Carmee gaul on regenation of barcelona's city centre
Carmee gaul  on  regenation of barcelona's city centreCarmee gaul  on  regenation of barcelona's city centre
Carmee gaul on regenation of barcelona's city centre
 
Kavala Strategic Agenda 2030
Kavala Strategic Agenda 2030Kavala Strategic Agenda 2030
Kavala Strategic Agenda 2030
 
P4 'A Project for Valencia'
P4 'A Project for Valencia'P4 'A Project for Valencia'
P4 'A Project for Valencia'
 
Analysis Brussels Canal quarter
Analysis Brussels Canal quarterAnalysis Brussels Canal quarter
Analysis Brussels Canal quarter
 
Presentation 22@Barcelona The Innovation District
Presentation 22@Barcelona The Innovation DistrictPresentation 22@Barcelona The Innovation District
Presentation 22@Barcelona The Innovation District
 
KAVALA 2030 Strategic Agenda presentation
KAVALA 2030 Strategic Agenda presentationKAVALA 2030 Strategic Agenda presentation
KAVALA 2030 Strategic Agenda presentation
 
Book #1
Book #1Book #1
Book #1
 
Analysis Brussels Canal quarter
Analysis Brussels Canal quarterAnalysis Brussels Canal quarter
Analysis Brussels Canal quarter
 
090927 Curitiba Ecocity Final
090927 Curitiba Ecocity Final090927 Curitiba Ecocity Final
090927 Curitiba Ecocity Final
 
Barcelona
BarcelonaBarcelona
Barcelona
 
Barcelona
BarcelonaBarcelona
Barcelona
 
Barcelona_Urban Planning.docx
Barcelona_Urban Planning.docxBarcelona_Urban Planning.docx
Barcelona_Urban Planning.docx
 
1
11
1
 
1
11
1
 
Alessia pulcini presentation urban design 1 - eu cities
Alessia pulcini   presentation urban design 1 - eu citiesAlessia pulcini   presentation urban design 1 - eu cities
Alessia pulcini presentation urban design 1 - eu cities
 
Master thesis presentation 2011.12.21
Master thesis presentation  2011.12.21Master thesis presentation  2011.12.21
Master thesis presentation 2011.12.21
 

Recently uploaded

Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 

Recently uploaded (20)

Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 

Domantas Stukas Master Thesis Presentation

  • 1. TU Delft, MSc Urbanism - Final Graduation Presentation - June 2012 Domantas Stukas A Project for Valencia Strategy for revitalizing socially vulnerable areas, capturing the benefits of large urban projects domantas.stukas@yahoo.com
  • 2. WHAT AM I DOING? ... proposing A strategy to improve socially vulnerable areas, by capturing the economic vitality of LUPs 0 1km 1. Palau de les Arts Reina Sofia 2. Sports venue - Veles e Vents 3. Formula 1 Grand Prix of Europe in Valencia
  • 3. Why AM I DOING this? Francisco Camps / Santiago Calatrava / Ex-president of the The Architect Regional Government 4. Opening of the Palau de les Arts Reina Sofia Last 20 year strategy focused on promoting Large urban projects aimed at tourism, construction indsutry and the wealthy Juanito / A Local Bloke 5. Street view of the Cabanyal neighbourhood
  • 4. What are the Outputs? Strategy Key Interventions Design proposal 0 1km 0 1km N MI 10
  • 5. Problem Statement Increasing fragmentation and BIg amount of public money Lack of benefit distribution social vulnerability spent on urban projects mostly from large urban projects to favouring the wealthy and local neighbourhoods construction companies 6. Railway separated neighbourhoods
  • 6. Main Research questions - What are the strategic spatial interventions necessary to improve the condition of socially vulnerable areas in Valencia? - What are the existing possibilities of spatial planning to capture the benefits of LUPs for local communities? 7. The only pedestrian bridge linking two neighbourhoods
  • 7. Problem Problem Statement & Research Questions Statement You Are Here Site Description, Valencia’s Spatial & Strategic Context Planning, Theoretical Framework Project Area Choice, LUPs, Spatial and Socio-economic Project Area Analysis, Municipal Plan Aalysis Strategy Strategy, Key Projects, Design Proposal, Conclusion
  • 9. VALENCIA Oldtown Main Rods Railway Former River Bed New River Bed Municipality Population 810 000 Barcelona 4h Zaragoza 4,5h Italy Madrid Madrid 660 pax/year Municipality Area: 4h 1,5h Barcelona 4h 134.65km² Balearic islands Density Malaga 6h Alicante 2h Alicante 248 000 pax/year 2h 6 010/km²
  • 10.
  • 11. Agriculture Period Silk Rice Citrus Industrial period Ceramics Furniture Metal Service economy period 8. Transition in Valencian economy Logistics Construction Service & Tourism
  • 12. Recent Economic Chalanges 9. Media headlines about socio-economic difficulties Highest unemployment in Eurozone Government Bankruptcy 50% Youth Unemployment Valencia - The Greece of Spain Economic recession is escalating the problems of social vulnerability, unemployment & development stagnation Student Protests Highest debt in Spain Corruption
  • 13. Spatial Planning National Government defines land use types: Urban; Developable; Not Developable Local Government Delimits: - Land Use type - Spatial configuration, function Land use type Function 10. Land use plan 2010 11. General Plan of Valencia 2010 Valencia’s planning act: Additional planning -PLAN Parcial for developable areas Allows 3rd party to develop documents: -Programa de actuacion integrada for URBAN Areas land without owning it -Plan Especial for urban & not developable areas
  • 14. Turia Garden 1988 City’s green backbone 1 Strategic Planning Local citizen oriented Sports & leisure activities Increase in living quality Central Park 20?? 2 Green heart of Valencia Redevelopment of rail infrastructure site 1 Local citizen oriented Recreation & educative activities City of Arts And Science `98-`11 3 5 Raise City’s identity & attract tourism and gentrification Culture, education, conference and sport activities Expensive construction & maintenance, loss making Limited accessibility & use Wealthy class and tourist oriented 2 F1 city Circuit 2008 4 Redevelopment of deteriorating industrial area 4 Limited periodical use of isolationist facilities 3 Global sports event drawing publicity Yearly franchise cost of ~35 million euros Wealthy class and tourist oriented America’s Cup Port 2007 5 Redevelopment of industrial port and beach Sports, tourism & recreation activities Global event generating revenue Promoting nautical high-tech industry Luxury tourism and wealthy class oriented event
  • 15. LUP Benefit orientation 1988 1998-2011 2014 Local Citizen oriented Tourism & Wealthy class oriented 12. Large Urban Project benefit orientation
  • 16. Theoretical Framework & project area choice
  • 17. Theoretical framework LUP integration Confrontation of entrepreneurial and local needs in order to prevent isolationist projects (Cuenya 2005) Raising project integration by inclusion Of local participation (Lecroart 2007) Locally painless project funding (Altshuler & Luberoff 2003) Project flexibility and reversibility by multiple project operators (Lecroart 2007) Mix of functions to ensure project vitality & Success (Lecroart 2007) Local society favouring public space to increase project credibility (Lecroart 2007)
  • 18. Urban VULNERABILITY 1991-2006 Socially vulnerable areas in Valencia 1991 2001 2006 0 1 2km 0 1 2km 0 1 2km Derived based on Housing condition, level of education, unemployment based on percentage of immigrants 13. Socially vulnerable neighbourhoods 1991/2001/2006
  • 19. Criteria for project site URBAN REGENERATION PEOPLE LIVING IN BAD VULNERABLE AREAS PROGRAM - RIVA CONDITION HOUSING REHABILITACIÓN INTEGRAL DE VALENCIA 39 51 54 14 16 414 14 69 31 292 33 0 1 2km 0 1 2km 0 1 2km 14. Areas of bad housing conditions / vulnerable neighbourhood / existing urban regeneration programs
  • 20. Project Area City of Arts Central Park and Science Project Area 0 1 2km 0 1 2km
  • 21. Project ARea Analysis
  • 22. City of Arts And Sciences Science Museum Hemisféric -- Interactive science -- Cinema hall exposition Palau de las Arts -- Souvenir shop Reina Sofia -- Souvenir/book shop -- Restaurant -- Operas -- Ballets -- Cinemas -- Exhibitions -- Conferences, etc. Oceanografic -- Marine museum, aquarium -- Restaurants -- Souvenir shops Umbracle -- Marine research -- Parking -- Exhibition of flora and astronomy Agora -- Sport / culture events -- Conferences -- Show venue 15. City of Arts and Science
  • 23. Central Park Vision 16. Central Park project
  • 24. Central Park Existing Situation 17. Central Park existing sitation
  • 25. Project Phasing Stage 1 Stage 2 Stage 3 18. Central Park plans and phasing
  • 26. Project Area in 1946 19. Project area historic context
  • 27. TURIA GARDEN 19c Spatial conditions (old river bed) P R T historic nUCLEUS • human scale, attractive streetscape LU PO • feeling of an old town • small property lots EXPAN DING OLD T NUCLE C US OWN • lack of greeneries and open spaces TION RI AL STAN HISTO U • built environment requires refurbishing. TR PE , 19th c UL CA T ICS GIS TRY C . RI NDS FREE EXPAN AG LA LO US `70 block TYPE • Defined, human scale street level SION -70`ie D RIA s IN • border of unattractive railway BLOCK PROJEC TYPE R TU MAIN ROA DS • undeveloped properties blocks which IVE T AREA R (ne w rive r bed ) 0 1km free sTANDING • lots of green open space in between • Not developed groundfloor • Unapealing spaces for public activity Pre 1944 Nucleus Block type 1970 expansion Free Standing 1970 expansion
  • 28. Abandoned & EmpTY Property EMPTY LAND LOT ABANDONED PROPERTY 0 1km
  • 29. Older >64 living alone Unemployment Socio-economic Conditions 250 250 SERVICE, COMMERCE & SALES MANUFACTURE production of metal products production of office materials and computes production of other electronic poducts production of precision and optical machinery food and drink industries 200 200 footware clothes and textile wood cork and furniture paper, printing and publishing Other 1 Other 2 Wholesale 150 150 Groceries and Tabaco Non Groceries and Tabaco Youth 16-30 unemployment Immigrants Cafe, Restaurant Repairs of cars Automobiles Insurance and Real Estate 100 100 Service for Business Rental, Real Estate Personal Service Other Architects and Civil Engineers Construction Engineers 50 50 Brokers, Salesman HoReCa Insurance Managers Other Professionals Rent, Insurance and Law 0 0 Teaching Health 1. Mont-Olivet 2. En Corts 3. Malilla 4. Fonteta de Sant Lluís 5. Na Rovella 6. La Punta 7. Ciutat Arts i les Ciències Other Bad Housing Condition Density Museums/Theatres/ Cinemas Municipal Organization Education Youth Centre Sports Social Centres Health Libraries Absence of Facilities 20. Project area socio-economic conditions
  • 30. Traffic Intensity Bus connectivity Connectivity Bus lines running through the project site Traffic intensity Other Bus lines Bridges and tunnels Lack of direct accessibility Rail Public Transport Subjective local transportation evaluation Tram/Metro line Future Metro line Train Station >45% Population thinking they have Cargo Train Station 15% bad transport Bus Station 5% availability 21. Project infrastructure analysis
  • 31. Existing Situation 0 1km 22. Existing spatial condition
  • 32. municipal development plans 0 1km 23. Municipal development plans
  • 33. Central Park project 0 1km 24. Central park related development issues
  • 34. Real Estate Market 0 1km 25. Real estate markekt related Malilla Nord development issues
  • 35. AIM
  • 36. AIM of the project Improve socially vulnerable neighbourhoods in Valencia, in the context of local development stagnation and economy recession
  • 37. Further aims Better the spatial conditions of vulnerable areas Use the potential of LUPs to make the neighbouring areas more successul
  • 39. FLOWS To LUPs 26. Capturing the flows that lead to to LUPs of Valencia
  • 41. Key projects STARTUPS CENTRE New Market Design workshop area Huerta Info Centre Existing LUP Connections New intervention Connections 0 1km
  • 42. Strategy Existing LUP connection New Bridges Secondary Projects Existing Greeneries Existing LUP New LUP connection Secondary Connection New Greeneries Existing Bridges Key intervention projects New Bicycle Route Future Metro
  • 43. Redevelopment layer Project / New Market Older >64 living alone Bad Housing Condition 0 1km
  • 44. Abandoned Property 27. Abandoned old historic neighbourhood
  • 46. Employment layer Project / workshop centre Empty Property 0 1km
  • 47. Empty property 28. Existing abandoned property
  • 48. Opened up new green space
  • 49. Employment layer Young Entrepreneur centre N MI 10 Unemployment 0 1km
  • 50. Green layer Temporary parks & Huerta info centre 0 1km 29. Existing huerta info centre location
  • 52. Real Time Tomate 1.2 €/Kg Agriculture Network Jun 15 - Aug 30 Naranja 0.8 €/Kg Apr 10 - Nov 20 Cereza 2.2 €/Kg Jul 01 - Sep 15 Parque Central Merc@do Collaboration ...Tomates1.01 Naranjas1.22 Cerezas 2.03... Publicity Real Time Info Feedback New Market Raise environmental awareness Encourage local production / consumption Inform about product growth location, status and seasonality Strengthen local agriculture network Huerta Info Centre Promote typical Valencian landscape
  • 53. secondary PROJECTS Intervention types Temporary/Permanent New Green Spaces Under used property development Development promotion on empty property
  • 54. Development promotion New Green Spaces Under used development Bratislava / Green Square Budapest / Urban Meadow Magdeburg / Open Air Library But Yam / Northern Gate Dessau / Landscape Corridor Vilnius / Litterateur’s Street 30. Reference projects Philadelphia / Vacant Land Brooklyn / Lent Space Paris / Passage 56
  • 55. Stakeholder H UERTA INFO CENTRE P RIVATE ROPERTY Analysis P € RIVATE INVESTORS P UBLIC ROPERTY P € RIVATE INVESTORS P RIVATE ROPERTY N EW MARKET P RIVATE ROPERTIES 0 1km
  • 56. Project Stakeholder Investment Gain New Land Owner -- Partial investment into new market building -- New market Public Land Owner -- Development of mixed use buildings -- Improvement of under developed land (Municipality) -- New public spaces -- Increase in land value -- Upgrade of adjacent living environment -- Stimulation of local economy National Police - -- Improved private space -- Partial investment into new market building Private Investors -- Income from development -- Mixed use buildings -- Provision of greeneries -- Publicity Muncipality Parque Central Association -- Investment into ‘Real Time Agriculture Network’ -- Collaboration with ‘Huerta Info Centre’ New Private owners Department of Employment and Market -- Partial investment into new market building -- New job places Promotion of Entrepreneurial Projects -- Participatory time & input for local needs Private investors -- Current economy driven market design / working Association of Markets -- Investment into ‘Real Time Agriculture Network’ scheme -- Improved surroundings Neighbourhood Association -- Participatory time & input for local needs -- Public / Private housing -- New Public Facilities Huerta Info Centre -- Investment into ‘Real Time Agriculture Network’ -- Collaboration with the ‘New Market’ -- Publicity of local products Association of Farmers -- Investment into ‘Real Time Agriculture Network’ -- Increasing demand of work -- Income for the sold land Private Land Owner - -- Permission for higher development rights -- Acquisition of private property Municipality -- Public use of under used area Muncipality -- Partial investment to Entrepreneur Centre Entrepreneur Private Investors -- Partial investment to Entrepreneur Centre -- Strategically appealing location Private owner Centre Department of Employment and -- Partial investment to Entrepreneur Centre -- New job places for young population Private investors Promotion of Entrepreneurial Projects Polytechnic University of Valencia -- Architecture student design competition for the Centre -- Tender for the winning project Neighbourhood Associacion -- Participatory time & input for local needs -- Facilities and public space according to local needs Multiple Private Land Owners - -- Income from rented property Municipality -- 5 year rent of abandonded property -- Redevelopment of abandoned property Municipality for 5 years with an availibility to Workshop Department of Employment and -- Inventory for the Workshop Area -- New Job Places extend the rental contract Area Promotion of Entrepreneurial Projects -- Necessary refurbishment works Neighbourhood Association -- Redevelopment of property -- Built environment for public facility Private owners Valencia’s Associacion of Arts -- Workshops and lessons -- Space for creativity and production Private land owner - -- Income for the sold land Polytechnic University of Valencia -- Architecture student design competition for the info centre -- Tender for the winning project -- Strengthening the regional strategy to promote local Regional Government -- Financing the project Huerta Info agricultural landscape Municipality -- Monitoring of the project Centre Centre of Strategy and Development of -- Strengthening the regional strategy to promote local Valencia -- Seek for private investors agricultural landscape Association of Markets -- Investment into ‘Real Time Agriculture Network’ -- Collaboration with ‘Huerta info Centre’ Association of Farmers -- Investment into ‘Real Time Agriculture Network’ -- Publicity of local products
  • 57. Stakeholder Investments Farmer € Private Investors Association € PROJECT NEW MARKET Land National Police Market € REAL TIME Dep. of Employment Associotion AGRICULTURE i and Promotion of NETWORK Entrepreneurial € Projects Huerta Info MIXED USE Collab. Centre € MARKET Municipality Land Parque Collab. PUBLIC SPACE Neighbourhood Central Trees i Association Collab. Collaboration of Projects i Ideas / Participation Land Provision of Land Trees Provision of Greeneries € Investment
  • 58. Stakeholder Gains Publicity Revenues Private Investors Farmer Association New job places PROJECT NEW MARKET Improved surroundings National Police Market New modern market REAL TIME New job places Dep. of Employment Associotion Customized structure AGRICULTURE and Promotion of NETWORK Entrepreneurial Land redevelopment Projects Land value increase Huerta Info MIXED USE Local economy stimulation Project collaboration Municipality Centre MARKET Surounding improvement New public/private housing Publicity New facilities Parque Neighbourhood Project collaboration PUBLIC SPACE New job places Central New local market / centrality Association
  • 59. Project tradeoff study Temporary High Speed train station Private investment tertiary towers >25 floors (offices) Redeveloped public historical buildings. Administration, education, cultural. Private investment residential towers <14 floors Private investment residential towers >25 floors 0 1km
  • 60. Possible LUP tradeoffs New pedestrian Neighbourhood brige open air library Upgrade of existing pedestrian bridge Community centre Social Housing New pedestrian brige 0 1km
  • 61. Promotion of alternative LUP use 31. Alternative use of the City of Arts and Sciences
  • 62. Design New Links / New Market / Startup Centre
  • 63. 10 1 Street Section Study 2 3 Main projects 4 Street space boundary Greeneries 1 2 0 1km 3 4
  • 64. Proposed ‘Calmed traffic’ areas MARK ET TUPS STAR SCHO M OL T SPOR WORK SHOPS Main projects PARK Street space boundary Metro Line Pedestrian / Bike connection Greeneries Calmed traffic zone 0 1km
  • 65. Design New Links / New Market / Startup Centre
  • 67. Project Proposal Proposed new Functions entrance to the Market established new links
  • 71. NEW MARKET DEVELOPMENT PHASING Existing situation Phase 1- New Market & Public Space Phase 2 - Adjacent Development Phase 3 - Relocation & Demolishment M Phase 4 - Development Completion Proposed Spatial Configuration
  • 72. Design New Links / New Market / Startup Centre
  • 73. Entrepreneur Centre Existing Proposed Existing Buildings New Buildings Demolished Buildings Demolished Roads
  • 76. Relation to the City of Arts and Science
  • 78. What are the strategic spatial interventions necessary to improve the position of socially vulnerable areas in Valencia? What are the existing possibilities of spatial planning to improve the benefits of LUPs for local communities in Valencia?
  • 79. New vocation of the site Green Heart of Young Startups & Hip New Vital urban life Valencia Centrality Accessible daily activities for the Citizens Social Centre, Skill learning, Workshops & Self Employment Local landscape and food production awareness
  • 80. Strategy in the municipal context
  • 81. Gracias 32. City of Arts and Science from the fields of huerta
  • 82. Image Sources Palau de les Arts Reina Sofia / www.flickr.com : Roberto Rocco2 Central Park existing sitation / Sports venue - Veles e Vents / www.flickr.com : Emilio!2 Domantas Stukas, www.valenciaparquecentral.es24 Formula 1 Grand Prix of Europe in Valencia / www.f1-site.com2 Central Park plans and phasing / www.valenciaparquecentral.es 25 Opening of the Palau de les Arts Reina Sofia / www.f1-site.com 3 Project area historic context / www.urbanity.es26 Street view of the Cabanyal neighbourhood / Project area socio-economic conditions / www.maps.google.com3 Domantas Stukas based on www.ine.es 29 Railway separated neighbourhoods / Domantas Stukas5 Project infrastructure analysis / Domantas Stukas based on www.valencia.es30 The only pedestrian bridge linking two neighbourhoods / Domantas Stukas6 Existing spatial condition / Domantas Stukas based on www.valencia.es31 Transition in Valencian economy / www.flickr.com : DonaLG, Oselfa Faber, www.sabore.es, Brisky Fingers, Feria Habitat Municipal development plans / Valencia, Manyez, John Burke, Metro Centric; www.f1-site.com11 Domantas Stukas based on www.valencia.es32 Media headlines about socio-economic difficulties / Central park related development issues / www.presseurop.eu, www.bbc.co.uk. www.elpais.com, www.cnn.com12 Domantas Stukas based on www.valencia.es 33 Land use plan 2010 / www.valencia.es13 Real estate markekt related Malilla Nord development issues / General Plan of Valencia 2010 / www.valencia.es13 Domantas Stukas based on www.valencia.es, www.valenciaparquecentral.es34 Large Urban Project benefit orientation / Capturing the flows that lead to to LUPs of Valencia / Domantas Stukas based on www.valencia.es, Source: www.valenciaparquecentral.es, Domantas Stukas based on www.valencia.es, www.maps.google.com39 www.vistasalegres.blogspot.no, www.f1-site.com, www.flickr.com : Rafa Cartagena, Abandoned old historic neighbourhood / www.maps.google.com 44 jmhdezhdez 15 Existing abandoned property / www.maps.google.com47 Socially vulnerable neighbourhoods 1991/2001/2006 / Domantas stukas based on www.siu.vivienda.es 18 Existing huerta info centre location / Domantas Stukas, www.gva.es 50 Areas of bad housing conditions / vulnerable neighbourhood / Reference projects / www.publicspace.org, www.72hoururbanaction.com54 existing urban regeneration programs / Alternative use of the City of Arts and Sciences / Domantas Stukas based on siu.vivienda.es, cartoweb.cma.gva.es19 Domantas Stukas, www.cac.es 61 City of Arts and Science / City of Arts and Science from the fields of huerta / www.maps.bing.com, www.flickr.com : Andifeelfine, fromhorta22 www.flickr.com : ferelmafe 81 Central Park project / www.valenciaparquecentral.es23
  • 83. MSc Urbanism Thesis Report June 2012 A Project For Valencia STRATEGY FOR REVITALIZING SOCIALLY VULNERABLE AREAS, CAPTURING THE BENEFITS OF LARGE URBAN PROJECTS DOMANTAS STUKAS 4116267 Delft University of Technology, Department of Urbanism, Chair of Spatial Planning Strategy, Studio Complex Cities