SlideShare a Scribd company logo
1 of 32
Download to read offline
Mufi Hannemann, Mayor



Discovering Honolulu Data
        Ken Schmidt, Administrator
        Honolulu Land Information System
        Department of Planning and Permiting
Information is a Critical Asset
A Critical Business Process
Mr. Know-It-All
Strategic Plan
       Linking the Goals and Tactical objectives to the Individual Projects with
       ability to define performance measures.




Increase Productivity


           Easier Work Processes


                          Eliminate Time
                          Consuming Data Entry


                                           Enhance Internet Permit
                                           Application Program
                                                                       IBPA Update
                                                                       Phase 1 to 3
Information Business Components

                             Products and Services
       Data

                     $




                 Financial




                                           `
     Personnel
                             Hardware/Software
GeoSpatial Data
Geometric and Cartographic Features


                                                  107’
                                                  107’
                              Vectors
       Topology                               Dimensions

                                    Surveys
                                                    ABC

  Networks
                Images                          Annotation
                                    CAD
                                  Drawings
                27 Main St.




3D Objects                                   Attributes
             Addresses
                                Terrain
Geo-Spatial Data
Everything is located
somewhere!
GIS is a visualization of
information at a location.
Holis FY07
          Product and Services Statistics
New Parcel Geo-database (new data delivered and installed)
    2,800 plat maps converted + 310 insets
    180,095 lots
    649,381 parcel dimension annotation
    46,638 easement
    15,501 land title lines
Storm Drain Update
    32,864 new features added
Maps Produced
    802 maps – 56.6% increase
Batch data update processing
    4000 property owner updates a month
Aerial Imagery – 500 GB of digital aerial and satellite imagery installed
    NGA
    USI-Hawaii
    Other – Ikonos, Digital Globe
New GIS Interfaces
    City View Professional (ArcMap 9)
         200 GIS Users throughout the City
    CityView Web - beta
Holis FY07
     Product and Services Statistics
POSSE Jobs Created     POSSE Data Created
  68,328 – FY06          3.390 M – FY06
  62,770 – FY05          3.115 M – FY05
  66,139 - FY04          3.282 M – FY04
  67,910- FY03           3.370 M – FY03
  55,675 – FY02          2.762 M – FY02
  50,485 – FY01          2.505 M – FY01
Total = 371,307 jobs   Total = 18,426,803 records
Honolulu Geo-Spatial Data
Geographic Categories, Themes, and Layers
Subdivision/Cadastral Base Maps
Tax Assessment Designations & Values
Land Ownership
Building Facilities and Addresses
Master Planning Designations
Regulatory Land Use Designations
Land Use & Activities
Socio-Economic & Demographic Data
Infrastructure & Utilities
Public Recreational Facilities
Health and Human Service Facilities
Topographic contours
Surface terrain models
Transportation Corridors/Address
Ranges
Flood and Natural Hazards
Natural and Environmental Resources
Honolulu Geo-Spatial Data
Key New Features
 Parcel Views
 Parcel History
 Building Structures
 Easements
 Storm Drains
 Hi-Resolution Imagery
 NAD83 HARN
Business Products and Services
OMB - GeoSpatial technologies is Line of Business (LOB)
Geo-Data Maintenance and Updates

Reengineering Base Map maintenance operations.
Base Map needed for all City agencies and operations.
Critical Business Processes
Map Production
Essential to policy decision making.
Report, Presentation, Location maps.
Visualization of geographic information.
Business Products and Services
Geo-Project Development and Support
  Geospatial Analysis
    Spatial Analysis and Model Building
    Geo-Statistics
    Vital for good policy formulation and issue analysis
Project Plan
                                                    Federal and
                                                     State Data
                                                      Sharing             Utility and
                               Private and
                                                                        Infrastructure
                                  Public
                                                                        Cooperatives
                              Partnerships


                        City GIS                                                  Aerial Imagery
                        Steering                  GIS Coordination                and Elevation
                                                                                                 Flood
                       Committee                                                       Data
         Enterprise                                                                              Zones
                                                                                                          Parcel and
        Architecture                                                                                      Basemap
         Integration                                                                                     Maintenance
                                                                                                          Regulatory and
   ArcGIS                                                                                                   Land Use
Upgrades and             Technology                                       GeoData Management
                        Infrastructure                                      and Maintenance                    Street
  Installs
                                                                                                             Addressing
                                                                                                           Public Safety
                                                                                                            and Critical
      GIS Server                                                                                             Facilites
     Upgrades and
                                                                                                   Storm Drain
       System
                                                                                                     Updates
     Administration
                                             GeoProducts and Services          Tax Plat  Building and
                              E911
                                                                              Automation Facility Data
                         Emergency                                              Map
                         Response                                            Production
                          Interface

                                                                     CityView 9
                                     CIP ArcIMS
                                                   City GIS Web
                                      interface
                                                        Site
Holis FY08
           Product and Services Statistics
POSSE Products
   HonLINE
       18% of Building Permits issued on-line (over                                                 Number of On-Line Building
       200)                                                                                          Permits Issued by Month

       $21,767 revenue/month                               300
       147 manhours saved in 1 month
   Web Site Enhancements                                   250

       1.8 M hits per month
       ALL of Building Permit applications submitted       200

       on-line



                                               #of OBP's
Over $16M revenues from permits.                           150
                                                                                                                                                                       S


GISWRs
                                                           100
   Work Requests - 450
   Data Maintenance – 341 Completed                        50

   Map Production - 802
   Other Projects Completed                                  0
                                                                 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07   Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08
Tao of Pooh


 Plans Change.
 Things work out in the end.
 Small efforts working together make
 large contributions.
 Realize sometimes you make mistakes.
 Wu Wei
Geospatial Data Availability
 Go to http://gis.hicentral.com
 Various data freely available for download
 Nightly updates for parcel, zoning, streets,
 and sewer data files.
 Key layers have been converted to NAD83
 HARN (finally!)
Face Page

              Interactive
              Display



            Data
            Downloads
Face Page

              Interactive
              Display



            Data
            Downloads
readme contents
Cadastral Data Tables
              Updated Weekly
Asmtgis – Land/building assessed value and
exemption (summary)
Asmtpitt - Land/Building assessed value and
exemption (sub-totaled by land use classification
‘splits’)
Ownmlt – Ownership records (multiple)
Owndat – Ownership records
Legdat – Parcel legal area and unit number
Siteaddress – situs address assigned at time of
permit
Table Details
ASMTGIS
   This table downloaded from BFS Real Property Assessment on a weekly schedule.
   Real Property Assessment Value/Exemption Table. This table contains the total (summary)
   values for assessment and exemption.
ASMTPITT
   Real Property Assessment Tax Class (Pitt) Code Table. May contain more than 1 record on
   a parcel where a parcel has 2 or more distinct Tax class codes. In this case, the assessed
   values and areas will not be the total value but a sub value determined for that particular tax
   code area.
   See ASMTGIS for total (summary) values for assessment and area on a parcel.
OWNDAT
   This table downloaded from BFS weekly. It contains the first recorded owner on the parcel.
   There should be one record for every parid. See ownmlt table for other owners.
OWNMLT
   This table downloaded from BFS Real Property Assessment on a weekly schedule. It
   contains additional owners where more than one is listed in
   the deed for the parcel. Does not contain first recorded owner. See OWNDAT for first
   recorded owner.
LEGDAT
   This table downloaded from BFS Real Property Assessment on a weekly schedule.
   Legal Data Table. This table contains the unit number and total legal area for the Parcel.
SITEADDRESS
   This table is composed of building addresses maintained by CCH DPP. It is downloaded
   from the Posse Permit system on a weekly schedule.
It takes people to create knowledge

More Related Content

What's hot

Transmission Distribution World September 2010 - Spatial Data Accuracy
Transmission  Distribution World September 2010 - Spatial Data AccuracyTransmission  Distribution World September 2010 - Spatial Data Accuracy
Transmission Distribution World September 2010 - Spatial Data AccuracyJustin Eldridge
 
Enhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing UtilityEnhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing UtilityCenter for Sustainable Energy
 
All Possible Worlds iab mx_public
All Possible Worlds  iab mx_publicAll Possible Worlds  iab mx_public
All Possible Worlds iab mx_publicIAB México
 
VGI - More Than Points On A Map
VGI - More Than Points On A MapVGI - More Than Points On A Map
VGI - More Than Points On A MapScot McQueen
 
Digital Ortho Image Creation of Hall County Aerial Photos Paper
Digital Ortho Image Creation of Hall County Aerial Photos PaperDigital Ortho Image Creation of Hall County Aerial Photos Paper
Digital Ortho Image Creation of Hall County Aerial Photos Papermpadams77
 
Transforming Cook County: Changing the Game with Shared Services and Open Gov...
Transforming Cook County: Changing the Game with Shared Services and Open Gov...Transforming Cook County: Changing the Game with Shared Services and Open Gov...
Transforming Cook County: Changing the Game with Shared Services and Open Gov...Greg Wass
 

What's hot (9)

Transmission Distribution World September 2010 - Spatial Data Accuracy
Transmission  Distribution World September 2010 - Spatial Data AccuracyTransmission  Distribution World September 2010 - Spatial Data Accuracy
Transmission Distribution World September 2010 - Spatial Data Accuracy
 
Enhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing UtilityEnhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing Utility
 
All Possible Worlds iab mx_public
All Possible Worlds  iab mx_publicAll Possible Worlds  iab mx_public
All Possible Worlds iab mx_public
 
VGI - More Than Points On A Map
VGI - More Than Points On A MapVGI - More Than Points On A Map
VGI - More Than Points On A Map
 
Kylie Dunn
Kylie DunnKylie Dunn
Kylie Dunn
 
On the Path to a Smarter World
On the Path to a Smarter WorldOn the Path to a Smarter World
On the Path to a Smarter World
 
Mining flyer
Mining flyerMining flyer
Mining flyer
 
Digital Ortho Image Creation of Hall County Aerial Photos Paper
Digital Ortho Image Creation of Hall County Aerial Photos PaperDigital Ortho Image Creation of Hall County Aerial Photos Paper
Digital Ortho Image Creation of Hall County Aerial Photos Paper
 
Transforming Cook County: Changing the Game with Shared Services and Open Gov...
Transforming Cook County: Changing the Game with Shared Services and Open Gov...Transforming Cook County: Changing the Game with Shared Services and Open Gov...
Transforming Cook County: Changing the Game with Shared Services and Open Gov...
 

Viewers also liked

Honolulu land use ordinance amendment
Honolulu land use ordinance amendmentHonolulu land use ordinance amendment
Honolulu land use ordinance amendmentHonolulu Civil Beat
 
Honolulu Rail Transit - Budget
Honolulu Rail Transit - BudgetHonolulu Rail Transit - Budget
Honolulu Rail Transit - BudgetRyan Ozawa
 
Hawaii Executive Budget In Brief FY 16-17
Hawaii Executive Budget In Brief FY 16-17Hawaii Executive Budget In Brief FY 16-17
Hawaii Executive Budget In Brief FY 16-17Honolulu Civil Beat
 
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...Jesse Souki
 
Honolulu Rail: Land Use and Transit-Oriented Development (TOD)
Honolulu Rail: Land Use and Transit-Oriented Development (TOD)Honolulu Rail: Land Use and Transit-Oriented Development (TOD)
Honolulu Rail: Land Use and Transit-Oriented Development (TOD)Jesse Souki
 
Honolulu Police Department FY2013 Presentation
Honolulu Police Department FY2013 PresentationHonolulu Police Department FY2013 Presentation
Honolulu Police Department FY2013 PresentationHonolulu Civil Beat
 
Paris Las Vegas
Paris Las VegasParis Las Vegas
Paris Las VegasLee Chain
 
Seattle Central Library
Seattle Central LibrarySeattle Central Library
Seattle Central LibraryLee Chain
 
The Getty, Los Angeles, California
The Getty, Los Angeles, CaliforniaThe Getty, Los Angeles, California
The Getty, Los Angeles, CaliforniaLee Chain
 
Guggenheim Museum, Bilbao, Spain
Guggenheim Museum, Bilbao, SpainGuggenheim Museum, Bilbao, Spain
Guggenheim Museum, Bilbao, SpainLee Chain
 

Viewers also liked (11)

Honolulu land use ordinance amendment
Honolulu land use ordinance amendmentHonolulu land use ordinance amendment
Honolulu land use ordinance amendment
 
Honolulu Rail Transit - Budget
Honolulu Rail Transit - BudgetHonolulu Rail Transit - Budget
Honolulu Rail Transit - Budget
 
Honolulu gis higicc june 2011
Honolulu gis higicc june 2011Honolulu gis higicc june 2011
Honolulu gis higicc june 2011
 
Hawaii Executive Budget In Brief FY 16-17
Hawaii Executive Budget In Brief FY 16-17Hawaii Executive Budget In Brief FY 16-17
Hawaii Executive Budget In Brief FY 16-17
 
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
 
Honolulu Rail: Land Use and Transit-Oriented Development (TOD)
Honolulu Rail: Land Use and Transit-Oriented Development (TOD)Honolulu Rail: Land Use and Transit-Oriented Development (TOD)
Honolulu Rail: Land Use and Transit-Oriented Development (TOD)
 
Honolulu Police Department FY2013 Presentation
Honolulu Police Department FY2013 PresentationHonolulu Police Department FY2013 Presentation
Honolulu Police Department FY2013 Presentation
 
Paris Las Vegas
Paris Las VegasParis Las Vegas
Paris Las Vegas
 
Seattle Central Library
Seattle Central LibrarySeattle Central Library
Seattle Central Library
 
The Getty, Los Angeles, California
The Getty, Los Angeles, CaliforniaThe Getty, Los Angeles, California
The Getty, Los Angeles, California
 
Guggenheim Museum, Bilbao, Spain
Guggenheim Museum, Bilbao, SpainGuggenheim Museum, Bilbao, Spain
Guggenheim Museum, Bilbao, Spain
 

Similar to Discovering Honolulu Data

Db graph a_tool_for_development_of_database_systems_based
Db graph a_tool_for_development_of_database_systems_basedDb graph a_tool_for_development_of_database_systems_based
Db graph a_tool_for_development_of_database_systems_basedAmbar Abdul
 
Connecting UP Australia 2011 - Unlocking the Front Counter
Connecting UP Australia 2011 - Unlocking the Front CounterConnecting UP Australia 2011 - Unlocking the Front Counter
Connecting UP Australia 2011 - Unlocking the Front CounterGary Maguire
 
GIS Needs Assessment & Planning for Community & Human Services
GIS Needs Assessment & Planning for Community & Human ServicesGIS Needs Assessment & Planning for Community & Human Services
GIS Needs Assessment & Planning for Community & Human ServicesGreg Babinski
 
Integrating GIS to financial data
Integrating GIS to financial dataIntegrating GIS to financial data
Integrating GIS to financial dataeventspat
 
TELUS Case Study: GIS for Telecommunications
TELUS Case Study: GIS for TelecommunicationsTELUS Case Study: GIS for Telecommunications
TELUS Case Study: GIS for Telecommunicationseventspat
 
TELUS Case Study: iVAULT implementation improved corporate intelligence
TELUS Case Study: iVAULT implementation improved corporate intelligence TELUS Case Study: iVAULT implementation improved corporate intelligence
TELUS Case Study: iVAULT implementation improved corporate intelligence eventspat
 
GIS Solutions for Highway and Roadway Management
GIS Solutions for Highway and Roadway ManagementGIS Solutions for Highway and Roadway Management
GIS Solutions for Highway and Roadway ManagementEsri
 
MEAUC Nov 2011 Presentation
MEAUC Nov 2011 PresentationMEAUC Nov 2011 Presentation
MEAUC Nov 2011 PresentationNishant Arora
 
NASA Facilities GIS
NASA Facilities GISNASA Facilities GIS
NASA Facilities GISrjinterr
 
World Pipelines - Better Together - SCADA and GIS
World Pipelines - Better Together - SCADA and GISWorld Pipelines - Better Together - SCADA and GIS
World Pipelines - Better Together - SCADA and GISsmrobb
 
GIS Progress Presentation
GIS Progress PresentationGIS Progress Presentation
GIS Progress PresentationZachary Collins
 
GIS for Transportation Infrastructure Management
GIS for Transportation Infrastructure ManagementGIS for Transportation Infrastructure Management
GIS for Transportation Infrastructure ManagementEsri
 
One map supermap natural resources management--darijav
One map   supermap natural resources management--darijavOne map   supermap natural resources management--darijav
One map supermap natural resources management--darijavGeoMedeelel
 
pune muncipal corporation project report
pune muncipal corporation project reportpune muncipal corporation project report
pune muncipal corporation project reportyochoudhary
 
GIS platforms: the power of interoperability
GIS platforms: the power of interoperabilityGIS platforms: the power of interoperability
GIS platforms: the power of interoperabilityglobal
 
Eurogeographics´Geospatial Contribution to the Digital Agenda for Europe
Eurogeographics´Geospatial Contribution to the Digital Agenda for EuropeEurogeographics´Geospatial Contribution to the Digital Agenda for Europe
Eurogeographics´Geospatial Contribution to the Digital Agenda for EuropeEsri
 

Similar to Discovering Honolulu Data (20)

Enterprise GIS Planning and Framework
Enterprise GIS Planning and FrameworkEnterprise GIS Planning and Framework
Enterprise GIS Planning and Framework
 
Db graph a_tool_for_development_of_database_systems_based
Db graph a_tool_for_development_of_database_systems_basedDb graph a_tool_for_development_of_database_systems_based
Db graph a_tool_for_development_of_database_systems_based
 
Connecting UP Australia 2011 - Unlocking the Front Counter
Connecting UP Australia 2011 - Unlocking the Front CounterConnecting UP Australia 2011 - Unlocking the Front Counter
Connecting UP Australia 2011 - Unlocking the Front Counter
 
ESRI - Metrics Based Study
ESRI - Metrics Based StudyESRI - Metrics Based Study
ESRI - Metrics Based Study
 
GIS Needs Assessment & Planning for Community & Human Services
GIS Needs Assessment & Planning for Community & Human ServicesGIS Needs Assessment & Planning for Community & Human Services
GIS Needs Assessment & Planning for Community & Human Services
 
Integrating GIS to financial data
Integrating GIS to financial dataIntegrating GIS to financial data
Integrating GIS to financial data
 
TELUS Case Study: GIS for Telecommunications
TELUS Case Study: GIS for TelecommunicationsTELUS Case Study: GIS for Telecommunications
TELUS Case Study: GIS for Telecommunications
 
TELUS Case Study: iVAULT implementation improved corporate intelligence
TELUS Case Study: iVAULT implementation improved corporate intelligence TELUS Case Study: iVAULT implementation improved corporate intelligence
TELUS Case Study: iVAULT implementation improved corporate intelligence
 
GIS Solutions for Highway and Roadway Management
GIS Solutions for Highway and Roadway ManagementGIS Solutions for Highway and Roadway Management
GIS Solutions for Highway and Roadway Management
 
MEAUC Nov 2011 Presentation
MEAUC Nov 2011 PresentationMEAUC Nov 2011 Presentation
MEAUC Nov 2011 Presentation
 
NASA Facilities GIS
NASA Facilities GISNASA Facilities GIS
NASA Facilities GIS
 
World Pipelines - Better Together - SCADA and GIS
World Pipelines - Better Together - SCADA and GISWorld Pipelines - Better Together - SCADA and GIS
World Pipelines - Better Together - SCADA and GIS
 
FINAL 31,12,10
FINAL 31,12,10FINAL 31,12,10
FINAL 31,12,10
 
GIS Progress Presentation
GIS Progress PresentationGIS Progress Presentation
GIS Progress Presentation
 
GIS for Transportation Infrastructure Management
GIS for Transportation Infrastructure ManagementGIS for Transportation Infrastructure Management
GIS for Transportation Infrastructure Management
 
One map supermap natural resources management--darijav
One map   supermap natural resources management--darijavOne map   supermap natural resources management--darijav
One map supermap natural resources management--darijav
 
pune muncipal corporation project report
pune muncipal corporation project reportpune muncipal corporation project report
pune muncipal corporation project report
 
GIS platforms: the power of interoperability
GIS platforms: the power of interoperabilityGIS platforms: the power of interoperability
GIS platforms: the power of interoperability
 
Eurogeographics´Geospatial Contribution to the Digital Agenda for Europe
Eurogeographics´Geospatial Contribution to the Digital Agenda for EuropeEurogeographics´Geospatial Contribution to the Digital Agenda for Europe
Eurogeographics´Geospatial Contribution to the Digital Agenda for Europe
 
Connected vehicle highway network applications
Connected vehicle highway network applicationsConnected vehicle highway network applications
Connected vehicle highway network applications
 

More from Hawaii Geographic Information Coordinating Council

More from Hawaii Geographic Information Coordinating Council (20)

Taking 3D to the next Level with 3D Streaming Maps
Taking 3D to the next Level with 3D Streaming MapsTaking 3D to the next Level with 3D Streaming Maps
Taking 3D to the next Level with 3D Streaming Maps
 
US Army Real Estate Holdings in Hawaii
US Army Real Estate Holdings in HawaiiUS Army Real Estate Holdings in Hawaii
US Army Real Estate Holdings in Hawaii
 
NOAA's Coastal Change Analysis Program
NOAA's Coastal Change Analysis ProgramNOAA's Coastal Change Analysis Program
NOAA's Coastal Change Analysis Program
 
Hawaii and US Pacific Basin Orthoimagery Update
Hawaii and US Pacific Basin Orthoimagery UpdateHawaii and US Pacific Basin Orthoimagery Update
Hawaii and US Pacific Basin Orthoimagery Update
 
The ArcGIS Platform: Appyling Geography Everywhere
The ArcGIS Platform: Appyling Geography EverywhereThe ArcGIS Platform: Appyling Geography Everywhere
The ArcGIS Platform: Appyling Geography Everywhere
 
Web based Data and Tools for Coastal Management
Web based Data and Tools for Coastal ManagementWeb based Data and Tools for Coastal Management
Web based Data and Tools for Coastal Management
 
Ecosystem Vulnerability and Cumulative Impacts on th eOceans of hawaii
Ecosystem Vulnerability and Cumulative Impacts on th eOceans of hawaiiEcosystem Vulnerability and Cumulative Impacts on th eOceans of hawaii
Ecosystem Vulnerability and Cumulative Impacts on th eOceans of hawaii
 
Using GIS to Connect Communities
Using GIS to Connect CommunitiesUsing GIS to Connect Communities
Using GIS to Connect Communities
 
Assessing Reef Health Using a Low Altitude Sensing Platform
Assessing Reef Health Using a Low Altitude Sensing PlatformAssessing Reef Health Using a Low Altitude Sensing Platform
Assessing Reef Health Using a Low Altitude Sensing Platform
 
Hawaii DOT Monitoring Stations Versus National Performance Measurement Resear...
Hawaii DOT Monitoring Stations Versus National Performance Measurement Resear...Hawaii DOT Monitoring Stations Versus National Performance Measurement Resear...
Hawaii DOT Monitoring Stations Versus National Performance Measurement Resear...
 
Use of GIS Technology to Inform Planning Efforts Through Visualization of Com...
Use of GIS Technology to Inform Planning Efforts Through Visualization of Com...Use of GIS Technology to Inform Planning Efforts Through Visualization of Com...
Use of GIS Technology to Inform Planning Efforts Through Visualization of Com...
 
Expanding GIS Access to Technical and Non-Technical Users to Enhance Project ...
Expanding GIS Access to Technical and Non-Technical Users to Enhance Project ...Expanding GIS Access to Technical and Non-Technical Users to Enhance Project ...
Expanding GIS Access to Technical and Non-Technical Users to Enhance Project ...
 
STEMworks: K12 Education in Hawaii in Science Technology Engineering and Math
STEMworks: K12 Education in Hawaii in Science Technology Engineering and MathSTEMworks: K12 Education in Hawaii in Science Technology Engineering and Math
STEMworks: K12 Education in Hawaii in Science Technology Engineering and Math
 
Planning for Technological Change
Planning for Technological ChangePlanning for Technological Change
Planning for Technological Change
 
Now & the Future of geodesy in Hawaii for the GIS Users
Now & the Future of geodesy in Hawaii for the GIS UsersNow & the Future of geodesy in Hawaii for the GIS Users
Now & the Future of geodesy in Hawaii for the GIS Users
 
314 woods- uav mapping history
314   woods- uav mapping history314   woods- uav mapping history
314 woods- uav mapping history
 
314 smith 2015 higicc-final
314  smith 2015 higicc-final314  smith 2015 higicc-final
314 smith 2015 higicc-final
 
Real Time Corrections for GNSS Receivers
Real Time Corrections for GNSS ReceiversReal Time Corrections for GNSS Receivers
Real Time Corrections for GNSS Receivers
 
Honolulu Board of Water Supply: Enterprise GIS
Honolulu Board of Water Supply: Enterprise GISHonolulu Board of Water Supply: Enterprise GIS
Honolulu Board of Water Supply: Enterprise GIS
 
State of Hawaii Digital Leveling Project
State of Hawaii Digital Leveling ProjectState of Hawaii Digital Leveling Project
State of Hawaii Digital Leveling Project
 

Recently uploaded

Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 

Recently uploaded (20)

Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 

Discovering Honolulu Data

  • 1. Mufi Hannemann, Mayor Discovering Honolulu Data Ken Schmidt, Administrator Honolulu Land Information System Department of Planning and Permiting
  • 2. Information is a Critical Asset
  • 5.
  • 6. Strategic Plan Linking the Goals and Tactical objectives to the Individual Projects with ability to define performance measures. Increase Productivity Easier Work Processes Eliminate Time Consuming Data Entry Enhance Internet Permit Application Program IBPA Update Phase 1 to 3
  • 7. Information Business Components Products and Services Data $ Financial ` Personnel Hardware/Software
  • 8. GeoSpatial Data Geometric and Cartographic Features 107’ 107’ Vectors Topology Dimensions Surveys ABC Networks Images Annotation CAD Drawings 27 Main St. 3D Objects Attributes Addresses Terrain
  • 9. Geo-Spatial Data Everything is located somewhere! GIS is a visualization of information at a location.
  • 10. Holis FY07 Product and Services Statistics New Parcel Geo-database (new data delivered and installed) 2,800 plat maps converted + 310 insets 180,095 lots 649,381 parcel dimension annotation 46,638 easement 15,501 land title lines Storm Drain Update 32,864 new features added Maps Produced 802 maps – 56.6% increase Batch data update processing 4000 property owner updates a month Aerial Imagery – 500 GB of digital aerial and satellite imagery installed NGA USI-Hawaii Other – Ikonos, Digital Globe New GIS Interfaces City View Professional (ArcMap 9) 200 GIS Users throughout the City CityView Web - beta
  • 11. Holis FY07 Product and Services Statistics POSSE Jobs Created POSSE Data Created 68,328 – FY06 3.390 M – FY06 62,770 – FY05 3.115 M – FY05 66,139 - FY04 3.282 M – FY04 67,910- FY03 3.370 M – FY03 55,675 – FY02 2.762 M – FY02 50,485 – FY01 2.505 M – FY01 Total = 371,307 jobs Total = 18,426,803 records
  • 12. Honolulu Geo-Spatial Data Geographic Categories, Themes, and Layers Subdivision/Cadastral Base Maps Tax Assessment Designations & Values Land Ownership Building Facilities and Addresses Master Planning Designations Regulatory Land Use Designations Land Use & Activities Socio-Economic & Demographic Data Infrastructure & Utilities Public Recreational Facilities Health and Human Service Facilities Topographic contours Surface terrain models Transportation Corridors/Address Ranges Flood and Natural Hazards Natural and Environmental Resources
  • 13. Honolulu Geo-Spatial Data Key New Features Parcel Views Parcel History Building Structures Easements Storm Drains Hi-Resolution Imagery NAD83 HARN
  • 14.
  • 15. Business Products and Services OMB - GeoSpatial technologies is Line of Business (LOB)
  • 16. Geo-Data Maintenance and Updates Reengineering Base Map maintenance operations. Base Map needed for all City agencies and operations.
  • 17. Critical Business Processes Map Production Essential to policy decision making. Report, Presentation, Location maps. Visualization of geographic information.
  • 18. Business Products and Services Geo-Project Development and Support Geospatial Analysis Spatial Analysis and Model Building Geo-Statistics Vital for good policy formulation and issue analysis
  • 19. Project Plan Federal and State Data Sharing Utility and Private and Infrastructure Public Cooperatives Partnerships City GIS Aerial Imagery Steering GIS Coordination and Elevation Flood Committee Data Enterprise Zones Parcel and Architecture Basemap Integration Maintenance Regulatory and ArcGIS Land Use Upgrades and Technology GeoData Management Infrastructure and Maintenance Street Installs Addressing Public Safety and Critical GIS Server Facilites Upgrades and Storm Drain System Updates Administration GeoProducts and Services Tax Plat Building and E911 Automation Facility Data Emergency Map Response Production Interface CityView 9 CIP ArcIMS City GIS Web interface Site
  • 20. Holis FY08 Product and Services Statistics POSSE Products HonLINE 18% of Building Permits issued on-line (over Number of On-Line Building 200) Permits Issued by Month $21,767 revenue/month 300 147 manhours saved in 1 month Web Site Enhancements 250 1.8 M hits per month ALL of Building Permit applications submitted 200 on-line #of OBP's Over $16M revenues from permits. 150 S GISWRs 100 Work Requests - 450 Data Maintenance – 341 Completed 50 Map Production - 802 Other Projects Completed 0 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08
  • 21. Tao of Pooh Plans Change. Things work out in the end. Small efforts working together make large contributions. Realize sometimes you make mistakes. Wu Wei
  • 22. Geospatial Data Availability Go to http://gis.hicentral.com Various data freely available for download Nightly updates for parcel, zoning, streets, and sewer data files. Key layers have been converted to NAD83 HARN (finally!)
  • 23. Face Page Interactive Display Data Downloads
  • 24.
  • 25. Face Page Interactive Display Data Downloads
  • 26.
  • 28. Cadastral Data Tables Updated Weekly Asmtgis – Land/building assessed value and exemption (summary) Asmtpitt - Land/Building assessed value and exemption (sub-totaled by land use classification ‘splits’) Ownmlt – Ownership records (multiple) Owndat – Ownership records Legdat – Parcel legal area and unit number Siteaddress – situs address assigned at time of permit
  • 29. Table Details ASMTGIS This table downloaded from BFS Real Property Assessment on a weekly schedule. Real Property Assessment Value/Exemption Table. This table contains the total (summary) values for assessment and exemption. ASMTPITT Real Property Assessment Tax Class (Pitt) Code Table. May contain more than 1 record on a parcel where a parcel has 2 or more distinct Tax class codes. In this case, the assessed values and areas will not be the total value but a sub value determined for that particular tax code area. See ASMTGIS for total (summary) values for assessment and area on a parcel. OWNDAT This table downloaded from BFS weekly. It contains the first recorded owner on the parcel. There should be one record for every parid. See ownmlt table for other owners. OWNMLT This table downloaded from BFS Real Property Assessment on a weekly schedule. It contains additional owners where more than one is listed in the deed for the parcel. Does not contain first recorded owner. See OWNDAT for first recorded owner. LEGDAT This table downloaded from BFS Real Property Assessment on a weekly schedule. Legal Data Table. This table contains the unit number and total legal area for the Parcel. SITEADDRESS This table is composed of building addresses maintained by CCH DPP. It is downloaded from the Posse Permit system on a weekly schedule.
  • 30.
  • 31.
  • 32. It takes people to create knowledge