SlideShare a Scribd company logo
1 of 2
DINESH BABU.V
Contact: 09994561817 ~E-Mail: dineshvaratharajan8@gmail.com
A result oriented & performance driven professional, in quest of assignments in Erection & Commissioning /
Instrumentation & Control with a leading organization of high repute
PROFILE SUMMARY
Qualified B.Tech. (Electronics & Instrumentation) with over 4 years of experience in:
Erection & Commissioning Instrumentation & Control Maintenance Management
Testing & Configuration Troubleshooting Safety Management
 Adept in looking after process measurement , instrumentation & control and services to monitor the operations
 Deft in performing Installation, Configuration, Functional Testing, Maintenance & Troubleshooting of Triconex
System, Logics in Honeywell PLC (ML200R Controller, MODBUS TCP/IP Protocol) for plant BOP System, etc.
 Well versed with various concepts of NFPA 72 Fire Alarm Code, NFPA 85 Boiler Hazardous & Combustion Code,
NFPA 70 National Electric Code, NFPA 2001 Clean Agent Fire Extinguishing System, ISA-84.01
 An effective communicator with strong leadership, decision making, analytical and problem solving skills
PROJECTS HANDLED
 Project: 1 x 600 MW METTUR THERMAL POWER PLANT
Location: Mettur, Tamil Nadu.
Client: TANGEDCO
 Project: 2 x 600 MW KALISINDH SUPER THERMAL POWER PROJECT
Location: KALISINDH, RAJASTHAN.
Client: RRVUNL
WORK EXPERIENCE
Since Aug’11 with BGR Energy Systems Limited, chennai as Engineer-Control & Instrumentation
Role:
 Performing installation & commissioning of equipment and conducting tests & inspections to improve operational
effectiveness of utilities
 Commissioning of field instruments and ensuring resource utilization to maximize the output
 Executing process measurement, control instrumentation & services to optimize processes; configuring and
programming various equipment
 Handling enquiry specification preparing and selecting instruments based on the type of applications
 Identifying several areas of obstruction / breakdown and taking steps to rectify equipment through applications of
troubleshooting tools
 Formulating contractor safety management guidelines to improve safety culture within organization
Highlights:
 Skilfully carried out erection & commissioning of the following:
o DCS, PLC, SCADA, HMI, Control Valves, Analyzer, etc.
o Study & review of Customer Specifications
o Designing of cables interconnection.
o Planning and Reviewing of daily work schedule at site and man power management.
o Modification in DCS logic for BTG systems as per control philosophy.
o Commissioning of BOP systems in automode with interlocks.
o Commissioning of CV, SOV & MOV in automode with interlocks.
o Familiar with P & I Diagrams, Control logic specifications, Instrument Index, Instrument Data Sheet, DCS I/O list,
Cable list.
TECHNICAL PURVIEW
 Development & modification of SCADA (Honeywell Experion PKS) for plant BOP System
 Third party integration with Foxboro I/A DCS through Modbus, Ethernet IP & OPC, SOE Configuration, etc.
 Fetching Plant Parameters from DCS with Management Information System (MIS) and Enterprise Resource Planning
System (ERP) for easy recognition of plant factors
 Erection, commissioning & maintenance of the following:
o Boiler & Turbine Field Instruments, Control Valve, Analyzers, Condition Monitoring System of various vendors like
ABB, Honeywell, Yokogawa, E&H, Magnetrol, Siemens, SMC, Emerson, Thermo Fisher and Rockwell
o Pressure, Level & Flow Transmitter, RTD, Thermocouples
o LIR for Field Instruments in feed water, condensate water and extraction steam systems.
o Field instruments in TDBFP, MDBFP, Seal Oil, Lube oil, Vacuum Pump, CCW, CEP
o Commissioning of Jack oil, EH oil Skid Panels
o Commissioning of field MOV’s such Auma, Shanghai, Rotork
 Installation & commissioning of the following:
o Fault Tolerant TRICONEX ESD System, Fault Diagnostics, Safety Monitoring
o Machine Monitoring system for rotating equipment like Turbine, Compressors, Fans, Pumps; implementation of
Performance Analysis & Diagnostic Optimization System (PADO) for parameters review of plant by using ETAPRO
 GE TMR for Emergency Shutdown System, GE Edward Systems Technology for Fire & Gas System and Tristation 1131
 Defining Fieldbus, Site Installation, Device Commissioning
 HART I/O Management system using PACTware
 Positioner calibration for all control valves.(ABB, SIEMENS, FIELVUE)
 Providing Process Control Engineering services and design documentation including: P&IDs and updates as design
progresses, Instrument Specifications, Control Panel Layouts, Conduit/Cable Tray Layouts, Instrument Location
Drawings, Network Architecture, Cable Schedules, Instrument Index/IO, Power Distribution
 Supervision in installation of impulse tubing for Pressure, Level, Flow and Control Valves
 Reviewing detailed engineering of Control Philosophy, P&IDs, Logic Diagram, SIS, DCS, PLC, etc
 Development & modification of SCADA (Honeywell Experion PKS) for plant BOP System
 Third party integration with Foxboro I/A DCS through Modbus, Profibus, SOE Configuration, etc
 Integration of:
o Plant floor with Enterprise using OPC Server
o DCS with PLC, HMI, SCADA and Package Control system using MODBUS
EDUCATION
2011 B.Tech. (Electronics & Instrumentation) from Kalasalingam University, srivilliputhur with 6.83 CGPA
IT SKILLS
 Well versed with PLC Software like Soft Master, Experion, Proficy Machine Edition and FOXBORO IACC
PERSONAL DETAILS
Date of Birth: 30th January, 1990
Address: No. 35, Thenvadal Puthu Theru, Sattur-626203, Tamil Nadu
Languages Known: Tamil ,English, Telugu
Passport: Available

More Related Content

What's hot

C V LAVERNE-LOUIS 2012 (1) (1)
C V LAVERNE-LOUIS 2012 (1) (1)C V LAVERNE-LOUIS 2012 (1) (1)
C V LAVERNE-LOUIS 2012 (1) (1)Louis Laverne
 
Using Wireless Measurements in Control Applications
Using Wireless Measurements in Control ApplicationsUsing Wireless Measurements in Control Applications
Using Wireless Measurements in Control ApplicationsEmerson Exchange
 
Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Emerson Exchange
 
Manu Mohan_resume
Manu Mohan_resumeManu Mohan_resume
Manu Mohan_resumeManu Mohan
 
Process Education on Demand
Process Education on Demand Process Education on Demand
Process Education on Demand Emerson Exchange
 
Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2Emerson Exchange
 
Case study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during executionCase study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during executionJohn Kingsley
 
Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)Stephanus Roux C Eng , IntPE(uk) , FIET
 
Calibration Excellence: Intelligent Application of Smart Technology is Just t...
Calibration Excellence: Intelligent Application of Smart Technology is Just t...Calibration Excellence: Intelligent Application of Smart Technology is Just t...
Calibration Excellence: Intelligent Application of Smart Technology is Just t...Emerson Exchange
 
Control using wireless measurements
Control using wireless measurementsControl using wireless measurements
Control using wireless measurementsEmerson Exchange
 
Wuderlich Malec Engineering - Modular Construction
Wuderlich Malec Engineering - Modular ConstructionWuderlich Malec Engineering - Modular Construction
Wuderlich Malec Engineering - Modular ConstructionJoel Gil
 
Andrew Kranak Resume 2016
Andrew Kranak Resume 2016Andrew Kranak Resume 2016
Andrew Kranak Resume 2016Andrew Kranak
 

What's hot (18)

Lijo_cv updated 27.04.2015
Lijo_cv updated 27.04.2015Lijo_cv updated 27.04.2015
Lijo_cv updated 27.04.2015
 
C V LAVERNE-LOUIS 2012 (1) (1)
C V LAVERNE-LOUIS 2012 (1) (1)C V LAVERNE-LOUIS 2012 (1) (1)
C V LAVERNE-LOUIS 2012 (1) (1)
 
Using Wireless Measurements in Control Applications
Using Wireless Measurements in Control ApplicationsUsing Wireless Measurements in Control Applications
Using Wireless Measurements in Control Applications
 
Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1
 
sairam_CV
sairam_CVsairam_CV
sairam_CV
 
Manu Mohan_resume
Manu Mohan_resumeManu Mohan_resume
Manu Mohan_resume
 
Process Control
Process ControlProcess Control
Process Control
 
Process Education on Demand
Process Education on Demand Process Education on Demand
Process Education on Demand
 
Robert Gerrish CV
Robert Gerrish CVRobert Gerrish CV
Robert Gerrish CV
 
updated_ashishmalhotra
updated_ashishmalhotraupdated_ashishmalhotra
updated_ashishmalhotra
 
Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2
 
Case study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during executionCase study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during execution
 
Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
 
Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)
 
Calibration Excellence: Intelligent Application of Smart Technology is Just t...
Calibration Excellence: Intelligent Application of Smart Technology is Just t...Calibration Excellence: Intelligent Application of Smart Technology is Just t...
Calibration Excellence: Intelligent Application of Smart Technology is Just t...
 
Control using wireless measurements
Control using wireless measurementsControl using wireless measurements
Control using wireless measurements
 
Wuderlich Malec Engineering - Modular Construction
Wuderlich Malec Engineering - Modular ConstructionWuderlich Malec Engineering - Modular Construction
Wuderlich Malec Engineering - Modular Construction
 
Andrew Kranak Resume 2016
Andrew Kranak Resume 2016Andrew Kranak Resume 2016
Andrew Kranak Resume 2016
 

Similar to dinesh. resume

Elv project engineer
Elv project engineerElv project engineer
Elv project engineerFahim Mohamed
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineerFahim Mohamed
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . BasrurAvinash B
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project EngineerFahim Mohamed
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer Parth Tailor
 
Minjie shen 201512
Minjie shen 201512Minjie shen 201512
Minjie shen 201512Minjie Shen
 
Thomas Yates Resume
Thomas Yates ResumeThomas Yates Resume
Thomas Yates ResumeThomas Yates
 
Instrumentation Construction Pre- CommnEngineer RESUME
Instrumentation Construction  Pre- CommnEngineer  RESUMEInstrumentation Construction  Pre- CommnEngineer  RESUME
Instrumentation Construction Pre- CommnEngineer RESUMEMohammed Y. Ahmed Nilangakar
 
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1Jalin Mehta
 
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsSanjeeth Thekkada
 

Similar to dinesh. resume (20)

AMIT (1)
AMIT (1)AMIT (1)
AMIT (1)
 
vinayak_Resume_18112014
vinayak_Resume_18112014vinayak_Resume_18112014
vinayak_Resume_18112014
 
Ram resume
Ram resumeRam resume
Ram resume
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer
 
MY_CV_1
MY_CV_1MY_CV_1
MY_CV_1
 
Minjie shen 201512
Minjie shen 201512Minjie shen 201512
Minjie shen 201512
 
Raja CV Instrument
Raja CV InstrumentRaja CV Instrument
Raja CV Instrument
 
Thomas Yates Resume
Thomas Yates ResumeThomas Yates Resume
Thomas Yates Resume
 
BHARATH KUMAR REDDY
BHARATH KUMAR REDDYBHARATH KUMAR REDDY
BHARATH KUMAR REDDY
 
Resume Imam
Resume ImamResume Imam
Resume Imam
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Instrumentation Construction Pre- CommnEngineer RESUME
Instrumentation Construction  Pre- CommnEngineer  RESUMEInstrumentation Construction  Pre- CommnEngineer  RESUME
Instrumentation Construction Pre- CommnEngineer RESUME
 
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
 
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 

dinesh. resume

  • 1. DINESH BABU.V Contact: 09994561817 ~E-Mail: dineshvaratharajan8@gmail.com A result oriented & performance driven professional, in quest of assignments in Erection & Commissioning / Instrumentation & Control with a leading organization of high repute PROFILE SUMMARY Qualified B.Tech. (Electronics & Instrumentation) with over 4 years of experience in: Erection & Commissioning Instrumentation & Control Maintenance Management Testing & Configuration Troubleshooting Safety Management  Adept in looking after process measurement , instrumentation & control and services to monitor the operations  Deft in performing Installation, Configuration, Functional Testing, Maintenance & Troubleshooting of Triconex System, Logics in Honeywell PLC (ML200R Controller, MODBUS TCP/IP Protocol) for plant BOP System, etc.  Well versed with various concepts of NFPA 72 Fire Alarm Code, NFPA 85 Boiler Hazardous & Combustion Code, NFPA 70 National Electric Code, NFPA 2001 Clean Agent Fire Extinguishing System, ISA-84.01  An effective communicator with strong leadership, decision making, analytical and problem solving skills PROJECTS HANDLED  Project: 1 x 600 MW METTUR THERMAL POWER PLANT Location: Mettur, Tamil Nadu. Client: TANGEDCO  Project: 2 x 600 MW KALISINDH SUPER THERMAL POWER PROJECT Location: KALISINDH, RAJASTHAN. Client: RRVUNL WORK EXPERIENCE Since Aug’11 with BGR Energy Systems Limited, chennai as Engineer-Control & Instrumentation Role:  Performing installation & commissioning of equipment and conducting tests & inspections to improve operational effectiveness of utilities  Commissioning of field instruments and ensuring resource utilization to maximize the output  Executing process measurement, control instrumentation & services to optimize processes; configuring and programming various equipment  Handling enquiry specification preparing and selecting instruments based on the type of applications  Identifying several areas of obstruction / breakdown and taking steps to rectify equipment through applications of troubleshooting tools  Formulating contractor safety management guidelines to improve safety culture within organization Highlights:  Skilfully carried out erection & commissioning of the following: o DCS, PLC, SCADA, HMI, Control Valves, Analyzer, etc. o Study & review of Customer Specifications o Designing of cables interconnection. o Planning and Reviewing of daily work schedule at site and man power management. o Modification in DCS logic for BTG systems as per control philosophy. o Commissioning of BOP systems in automode with interlocks. o Commissioning of CV, SOV & MOV in automode with interlocks. o Familiar with P & I Diagrams, Control logic specifications, Instrument Index, Instrument Data Sheet, DCS I/O list, Cable list. TECHNICAL PURVIEW  Development & modification of SCADA (Honeywell Experion PKS) for plant BOP System  Third party integration with Foxboro I/A DCS through Modbus, Ethernet IP & OPC, SOE Configuration, etc.  Fetching Plant Parameters from DCS with Management Information System (MIS) and Enterprise Resource Planning System (ERP) for easy recognition of plant factors  Erection, commissioning & maintenance of the following:
  • 2. o Boiler & Turbine Field Instruments, Control Valve, Analyzers, Condition Monitoring System of various vendors like ABB, Honeywell, Yokogawa, E&H, Magnetrol, Siemens, SMC, Emerson, Thermo Fisher and Rockwell o Pressure, Level & Flow Transmitter, RTD, Thermocouples o LIR for Field Instruments in feed water, condensate water and extraction steam systems. o Field instruments in TDBFP, MDBFP, Seal Oil, Lube oil, Vacuum Pump, CCW, CEP o Commissioning of Jack oil, EH oil Skid Panels o Commissioning of field MOV’s such Auma, Shanghai, Rotork  Installation & commissioning of the following: o Fault Tolerant TRICONEX ESD System, Fault Diagnostics, Safety Monitoring o Machine Monitoring system for rotating equipment like Turbine, Compressors, Fans, Pumps; implementation of Performance Analysis & Diagnostic Optimization System (PADO) for parameters review of plant by using ETAPRO  GE TMR for Emergency Shutdown System, GE Edward Systems Technology for Fire & Gas System and Tristation 1131  Defining Fieldbus, Site Installation, Device Commissioning  HART I/O Management system using PACTware  Positioner calibration for all control valves.(ABB, SIEMENS, FIELVUE)  Providing Process Control Engineering services and design documentation including: P&IDs and updates as design progresses, Instrument Specifications, Control Panel Layouts, Conduit/Cable Tray Layouts, Instrument Location Drawings, Network Architecture, Cable Schedules, Instrument Index/IO, Power Distribution  Supervision in installation of impulse tubing for Pressure, Level, Flow and Control Valves  Reviewing detailed engineering of Control Philosophy, P&IDs, Logic Diagram, SIS, DCS, PLC, etc  Development & modification of SCADA (Honeywell Experion PKS) for plant BOP System  Third party integration with Foxboro I/A DCS through Modbus, Profibus, SOE Configuration, etc  Integration of: o Plant floor with Enterprise using OPC Server o DCS with PLC, HMI, SCADA and Package Control system using MODBUS EDUCATION 2011 B.Tech. (Electronics & Instrumentation) from Kalasalingam University, srivilliputhur with 6.83 CGPA IT SKILLS  Well versed with PLC Software like Soft Master, Experion, Proficy Machine Edition and FOXBORO IACC PERSONAL DETAILS Date of Birth: 30th January, 1990 Address: No. 35, Thenvadal Puthu Theru, Sattur-626203, Tamil Nadu Languages Known: Tamil ,English, Telugu Passport: Available