MANISH CHOURASIA – POWER PLANT PROFESSIONAL 
Mobile: 08806835961 E-Mail: mac195y@yahoo.com Skype: manishayochourasia 
Title 
BE Honors having 21 years of experience in erection, commissioning, project execution, maintenance of 
instrumentation systems at 660/250 MW thermal power plants/power project. Seeking career opportunity in C&I 
maintenance or project execution or project management. 
Overview 
1) 17 years as C&I erection, commissioning, O&M(Maintenance) at 2 X 250 MW Reliance Dahanu Power plant. 
2) 04 years and presently as AGM C&I Project at 5X660 MW Adani Supercritical Thermal power project, Tirora. 
3) 01 year technical & simulator training titled “Power plant familiarization” at NPTI Nagpur. 
Skills 
Technical: DCS - ABB Pro control P, Foxboro Invensys version 9.2, PLC GE – Rx3i,Versamax,Rockwell,Siemens CPU 
412-3H, ABB AC500,PM590-ETH, System networking, Auto control loops, Logic/Protection check, Logic modification 
Field Engineering, Simulation & cold trials, Field instrumentation, Hookup , I/O list , Loop check , Commissioning, 
Preventive maintenance, Shutdown jobs, Inventory, Calibration, Quality, Boiler, Turbine, Field quality 
improvements ,BOP. 
Managerial: Managing resources, Networking, Cost control, Material management , Teamwork, Mobilization, 
Bottleneck identification, Corrective measures, Lead from front, Decision making, Motivation, Schedules, Reports, 
Issues resolving ,MIS, Contractor & project management. 
Profile Summary 
Project execution, 4 years - 5X660 MW Adani Supercritical Thermal power project, Tirora : 
(1)Manage C&I Chinese inspections, damages & ensure replacements from China. Generated MIS which was 
monitored by the CEO. Achieved zero C&I material shortage.(2) Leading team & monitoring erection work of 
instrumentation packages.(3) Lead the boiler tray route major design changes. (4) Chaired contractor meetings to 
communicate time schedules, work progress, catchup plans, material status. (5) Timely material procurement. 
Power plant installation & maintenance, 17 years - 2X250 MW thermal power plant, PF boiler, Reliance Dahanu : 
(1) Took up ACW pump auto pickup logic modification as per operation requirement and completed successfully. (2) 
Generated the preventive maintenance schedule for various boiler auxiliaries. (3) E&C of boiler instruments with all 
FSSS logic checks.(4) Modified the logic of CPU for better monitoring. (5) Took up retrofitting of CW system PLC.(6) 
Identified alternate vendors(Turbine auxiliaries)of existing instruments for cost saving.(7)Reduced shutdown time. 
Career Scan 
Year: Organization 
Oct 1992 – Sep 1993, 01 year : “Power plant familiarization” training at NPTI, Nagpur BSES - Dahanu 
Oct 1993 - Sept 2010, 17 years : Senior Engineer to DGM C&I (Maintenance) BSES/Reliance - Dahanu 
Oct 2010 - Mar 2012, 1.6 years : DGM C&I (Project) Adani - Tirora 
Apr 2012 - Present, 2.7 years : AGM C&I (Project) Adani - Tirora 
Major Work responsibilities (BTG & BOP) at Adani 5X660 MW Thermal Power Station (China supply): 
1. Site preparation & contractor mobilization with basic facilities for proper mobilization & quick work start. 
2. Inspected the tools & tackles, identified the gaps for additional tool requirement, took up with contractor 
which were arranged shortly. 
3. Intimating contracting team members regarding work procedures & finalization of work formats. 
4. Leading & guiding team of engineers to supervise, monitor material & deliver quality work as per schedule. 
5. Daily supervision to check work progress & reporting to site head. 
6. Identification & procurement of project material, department monthly/ annual budgeting and cost control. 
7. Daily discussion with all team members to know issues, provide solutions, escalate if required.
8. Weekly inter department meetings with other functions for aligning work & fast execution. 
9. Contractor management – Tools, manpower, material, safety, measurement & billing, quality, reports, 
BOQs. 
10. Achieved synchronization of all 5 units from 2012 to 2014. 
11. Propagated the group vision & values amongst employees as a “Value champion”. 
12. Review of drawings with team: PIDs, I/O list, Interconnection, JB wiring, PLC/DCS wiring, instrument 
schedule, Hookup, cable tray layout, impulse piping, cable schedule, control philosophy, SAT. 
13. Arrange instrument calibration, installation, loop check of BTG C&I packages with reports. 
14. Guiding team for BOP area work like material check, cable laying, termination, loop check, commissioning. 
15. Installation & charging of Invensys Foxboro DCS panels, GE PLC, SIC, Emerson, Chinese instruments. 
16. Commissioning of SADC, FRS, HOTV, LOTV, Auma, Rotork, Fisher valves with reports. 
17. Erection & commissioning of turbovisary instruments TSI, DEH, MEH, ETS, METS of turbine proper. 
Major work responsibilities (O&M – BTG & BOP) at Reliance Energy, 2X250 MW Dahanu (BHEL supply): 
1. Erection & Commissioning of Boiler and auxiliaries C&I package, DCS panel (ABB Procontrol P13) charging, 
communication checking, FSSS commissioning, logic check, protection check, cold trial, HMI graphic checking. 
2. Valve commissioning, instrument commissioning, new signal configurations, software backup, CMC, 
combustion control, faultfinding, PG test, logic modification, joint protocol signoff. 
3. Checking of all DCS panel active/redundant processors program correctness during shutdown. 
4. Day to day maintenance of 250 MW KWU turbines & auxiliaries. 
5. Erection, site engineering, commissioning & maintenance of sea water FGD system Rockwell PLC & 
instruments. 
6. Maintenance of AHP,CHP, DM plant control system. 
7. Generate preventive maintenance (PM) schedule & ensure work completion at site for various equipment. 
8. Ensure attending of daily running defects, work orders along with team in minimum time. 
9. Working in coordination with operation team to quickly resolve defects. 
10. Procurement of material within time schedule, of desired quality, cost analysis and benchmarking. 
11. Root cause analysis of defect, best cost effective solution to avoid recurrence of defect, indentation of right 
quantity of spares based on material consumption analysis. 
12. Ensure availability of material, manpower, front clearance, coordination of activities with other cross 
function so as to consume minimum time, manpower and cost for successful completion of shutdown 
activities. 
13. Identifying area of obstruction/ breakdown and take steps to rectify the equipment & carryout necessary 
modification for prevention in future. 
14. Imparting technical training to new joinees. 
15. Group technical presentations on various topics. 
16. Retrofitting of CWPH relay based system with PLC based system for better efficiency. 
17. Planning / implementing technological changes to enhance efficiency. 
18. Logic building, implementation & testing of ACW pumps auto pickup scheme. 
19. Improved monitoring of FGD water parameters by installing new instruments. 
Trainings 
 1 year “Power plant familiarization” module at NPTI, Nagpur. 
 Simulator training at NTPC, Badarpur. 
 DCS training at BHEL EDN Bangalore. 
 Tube leakage detection system, BHEL, Mumbai. 
 15 days managerial training at Reliance training center, Mumbai. 
 Advanced managerial training at Adani, Tirora. 
Personal Snippets 
Date of Birth : 19th May, 1966. 
Current work location : Tirora, District : Gondia, Maharashtra. 
Current Address : House No B7, Ashirwad Colony, Near Fulchur Square, Gondia, Maharashtra 
Permanent address : B6/604, Saket, Kisan Koli Marg, Thane (W) Mumbai. 
Education : Bachelor of Engineering – Electronics (Honours) from University of Mumbai, 1991.

More Related Content

What's hot

khiva resume
khiva resumekhiva resume
khiva resume
JaSpReEt KhIvA
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
vasanth morais
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
kalpesh chauhan
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
Sandip Karmakar
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
Mark Crame
 
AbhijitSinha
AbhijitSinhaAbhijitSinha
AbhijitSinha
Abhijit Sinha
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
kami88
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
SURENDRA BABU
 
CV-ZTUFAIL2016
CV-ZTUFAIL2016CV-ZTUFAIL2016
CV-ZTUFAIL2016
Zahid Tufail
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
Pamela Bundros
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
Meer Azhar Ali Patel
 
Profile Krishnaraja
Profile KrishnarajaProfile Krishnaraja
Profile Krishnaraja
nkrrao
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
Ahmed Khalil
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
sasikumar A
 
Resume
ResumeResume
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
ashutosh nandan
 
New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume Ajay
Ajay kumar
 
CV - Chris Gibbins
CV - Chris GibbinsCV - Chris Gibbins
CV - Chris Gibbins
Chris Gibbins
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
Chandra Sekar
 
Resume-Subhakar
Resume-SubhakarResume-Subhakar
Resume-Subhakar
Subhakar Chaganti
 

What's hot (20)

khiva resume
khiva resumekhiva resume
khiva resume
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
 
AbhijitSinha
AbhijitSinhaAbhijitSinha
AbhijitSinha
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
CV-ZTUFAIL2016
CV-ZTUFAIL2016CV-ZTUFAIL2016
CV-ZTUFAIL2016
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
Profile Krishnaraja
Profile KrishnarajaProfile Krishnaraja
Profile Krishnaraja
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
 
Resume
ResumeResume
Resume
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
 
New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume Ajay
 
CV - Chris Gibbins
CV - Chris GibbinsCV - Chris Gibbins
CV - Chris Gibbins
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
Resume-Subhakar
Resume-SubhakarResume-Subhakar
Resume-Subhakar
 

Similar to MAC_Resume171214

Mrunal--CV Latest
Mrunal--CV LatestMrunal--CV Latest
Mrunal--CV Latest
Mrunal Kothari
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
sanjay yadav
 
Resume 25.09.15
Resume 25.09.15Resume 25.09.15
Resume 25.09.15
Gnanavel Thirumalaisamy
 
CV
CVCV
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
Chandramouli Tadepalli
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
Suresh Selvaraju
 
Resume
ResumeResume
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
Malikjan Nadaf
 
Acheivements pkk
Acheivements pkkAcheivements pkk
Acheivements pkk
PRASANNA KUMAR KULKARNI
 
Radhe_Resume
Radhe_ResumeRadhe_Resume
Radhe_Resume
Radhe Shyam Singh
 
Cv tapan kumar prusty updated
Cv tapan kumar prusty updatedCv tapan kumar prusty updated
Cv tapan kumar prusty updated
Tapan kumar prusty
 
Francis resume
Francis resumeFrancis resume
Francis resume
FRANCIS DCOSTA
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
Mohammad Naushad
 
Resume
ResumeResume
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
Venkatesh Naik
 
Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
Venkatesh N
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
Ajay Gautam
 
Resume-Chandra Mouli
Resume-Chandra MouliResume-Chandra Mouli
Resume-Chandra Mouli
CHANDRA MOULI
 
sreeram cv 2016
sreeram cv 2016sreeram cv 2016
sreeram cv 2016
Sreeram N
 
CV PMF - L1
CV PMF - L1CV PMF - L1
CV PMF - L1
Atul Modi
 

Similar to MAC_Resume171214 (20)

Mrunal--CV Latest
Mrunal--CV LatestMrunal--CV Latest
Mrunal--CV Latest
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
Resume 25.09.15
Resume 25.09.15Resume 25.09.15
Resume 25.09.15
 
CV
CVCV
CV
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
 
Resume
ResumeResume
Resume
 
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
 
Acheivements pkk
Acheivements pkkAcheivements pkk
Acheivements pkk
 
Radhe_Resume
Radhe_ResumeRadhe_Resume
Radhe_Resume
 
Cv tapan kumar prusty updated
Cv tapan kumar prusty updatedCv tapan kumar prusty updated
Cv tapan kumar prusty updated
 
Francis resume
Francis resumeFrancis resume
Francis resume
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
 
Resume
ResumeResume
Resume
 
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
 
Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
Resume-Chandra Mouli
Resume-Chandra MouliResume-Chandra Mouli
Resume-Chandra Mouli
 
sreeram cv 2016
sreeram cv 2016sreeram cv 2016
sreeram cv 2016
 
CV PMF - L1
CV PMF - L1CV PMF - L1
CV PMF - L1
 

MAC_Resume171214

  • 1. MANISH CHOURASIA – POWER PLANT PROFESSIONAL Mobile: 08806835961 E-Mail: mac195y@yahoo.com Skype: manishayochourasia Title BE Honors having 21 years of experience in erection, commissioning, project execution, maintenance of instrumentation systems at 660/250 MW thermal power plants/power project. Seeking career opportunity in C&I maintenance or project execution or project management. Overview 1) 17 years as C&I erection, commissioning, O&M(Maintenance) at 2 X 250 MW Reliance Dahanu Power plant. 2) 04 years and presently as AGM C&I Project at 5X660 MW Adani Supercritical Thermal power project, Tirora. 3) 01 year technical & simulator training titled “Power plant familiarization” at NPTI Nagpur. Skills Technical: DCS - ABB Pro control P, Foxboro Invensys version 9.2, PLC GE – Rx3i,Versamax,Rockwell,Siemens CPU 412-3H, ABB AC500,PM590-ETH, System networking, Auto control loops, Logic/Protection check, Logic modification Field Engineering, Simulation & cold trials, Field instrumentation, Hookup , I/O list , Loop check , Commissioning, Preventive maintenance, Shutdown jobs, Inventory, Calibration, Quality, Boiler, Turbine, Field quality improvements ,BOP. Managerial: Managing resources, Networking, Cost control, Material management , Teamwork, Mobilization, Bottleneck identification, Corrective measures, Lead from front, Decision making, Motivation, Schedules, Reports, Issues resolving ,MIS, Contractor & project management. Profile Summary Project execution, 4 years - 5X660 MW Adani Supercritical Thermal power project, Tirora : (1)Manage C&I Chinese inspections, damages & ensure replacements from China. Generated MIS which was monitored by the CEO. Achieved zero C&I material shortage.(2) Leading team & monitoring erection work of instrumentation packages.(3) Lead the boiler tray route major design changes. (4) Chaired contractor meetings to communicate time schedules, work progress, catchup plans, material status. (5) Timely material procurement. Power plant installation & maintenance, 17 years - 2X250 MW thermal power plant, PF boiler, Reliance Dahanu : (1) Took up ACW pump auto pickup logic modification as per operation requirement and completed successfully. (2) Generated the preventive maintenance schedule for various boiler auxiliaries. (3) E&C of boiler instruments with all FSSS logic checks.(4) Modified the logic of CPU for better monitoring. (5) Took up retrofitting of CW system PLC.(6) Identified alternate vendors(Turbine auxiliaries)of existing instruments for cost saving.(7)Reduced shutdown time. Career Scan Year: Organization Oct 1992 – Sep 1993, 01 year : “Power plant familiarization” training at NPTI, Nagpur BSES - Dahanu Oct 1993 - Sept 2010, 17 years : Senior Engineer to DGM C&I (Maintenance) BSES/Reliance - Dahanu Oct 2010 - Mar 2012, 1.6 years : DGM C&I (Project) Adani - Tirora Apr 2012 - Present, 2.7 years : AGM C&I (Project) Adani - Tirora Major Work responsibilities (BTG & BOP) at Adani 5X660 MW Thermal Power Station (China supply): 1. Site preparation & contractor mobilization with basic facilities for proper mobilization & quick work start. 2. Inspected the tools & tackles, identified the gaps for additional tool requirement, took up with contractor which were arranged shortly. 3. Intimating contracting team members regarding work procedures & finalization of work formats. 4. Leading & guiding team of engineers to supervise, monitor material & deliver quality work as per schedule. 5. Daily supervision to check work progress & reporting to site head. 6. Identification & procurement of project material, department monthly/ annual budgeting and cost control. 7. Daily discussion with all team members to know issues, provide solutions, escalate if required.
  • 2. 8. Weekly inter department meetings with other functions for aligning work & fast execution. 9. Contractor management – Tools, manpower, material, safety, measurement & billing, quality, reports, BOQs. 10. Achieved synchronization of all 5 units from 2012 to 2014. 11. Propagated the group vision & values amongst employees as a “Value champion”. 12. Review of drawings with team: PIDs, I/O list, Interconnection, JB wiring, PLC/DCS wiring, instrument schedule, Hookup, cable tray layout, impulse piping, cable schedule, control philosophy, SAT. 13. Arrange instrument calibration, installation, loop check of BTG C&I packages with reports. 14. Guiding team for BOP area work like material check, cable laying, termination, loop check, commissioning. 15. Installation & charging of Invensys Foxboro DCS panels, GE PLC, SIC, Emerson, Chinese instruments. 16. Commissioning of SADC, FRS, HOTV, LOTV, Auma, Rotork, Fisher valves with reports. 17. Erection & commissioning of turbovisary instruments TSI, DEH, MEH, ETS, METS of turbine proper. Major work responsibilities (O&M – BTG & BOP) at Reliance Energy, 2X250 MW Dahanu (BHEL supply): 1. Erection & Commissioning of Boiler and auxiliaries C&I package, DCS panel (ABB Procontrol P13) charging, communication checking, FSSS commissioning, logic check, protection check, cold trial, HMI graphic checking. 2. Valve commissioning, instrument commissioning, new signal configurations, software backup, CMC, combustion control, faultfinding, PG test, logic modification, joint protocol signoff. 3. Checking of all DCS panel active/redundant processors program correctness during shutdown. 4. Day to day maintenance of 250 MW KWU turbines & auxiliaries. 5. Erection, site engineering, commissioning & maintenance of sea water FGD system Rockwell PLC & instruments. 6. Maintenance of AHP,CHP, DM plant control system. 7. Generate preventive maintenance (PM) schedule & ensure work completion at site for various equipment. 8. Ensure attending of daily running defects, work orders along with team in minimum time. 9. Working in coordination with operation team to quickly resolve defects. 10. Procurement of material within time schedule, of desired quality, cost analysis and benchmarking. 11. Root cause analysis of defect, best cost effective solution to avoid recurrence of defect, indentation of right quantity of spares based on material consumption analysis. 12. Ensure availability of material, manpower, front clearance, coordination of activities with other cross function so as to consume minimum time, manpower and cost for successful completion of shutdown activities. 13. Identifying area of obstruction/ breakdown and take steps to rectify the equipment & carryout necessary modification for prevention in future. 14. Imparting technical training to new joinees. 15. Group technical presentations on various topics. 16. Retrofitting of CWPH relay based system with PLC based system for better efficiency. 17. Planning / implementing technological changes to enhance efficiency. 18. Logic building, implementation & testing of ACW pumps auto pickup scheme. 19. Improved monitoring of FGD water parameters by installing new instruments. Trainings  1 year “Power plant familiarization” module at NPTI, Nagpur.  Simulator training at NTPC, Badarpur.  DCS training at BHEL EDN Bangalore.  Tube leakage detection system, BHEL, Mumbai.  15 days managerial training at Reliance training center, Mumbai.  Advanced managerial training at Adani, Tirora. Personal Snippets Date of Birth : 19th May, 1966. Current work location : Tirora, District : Gondia, Maharashtra. Current Address : House No B7, Ashirwad Colony, Near Fulchur Square, Gondia, Maharashtra Permanent address : B6/604, Saket, Kisan Koli Marg, Thane (W) Mumbai. Education : Bachelor of Engineering – Electronics (Honours) from University of Mumbai, 1991.