SlideShare a Scribd company logo
Development Plan 
Review Process 
1. Optional (Recommended) Conceptual Review with staff 
2. Preliminary Plan Submitted[1] 
3. Staff field inspections 
4. Technical Review Committee meeting 
5. Comments/Corrections sent to Engineer 
6. Submit revised plans[2] 
7. Staff reports available 
8. Planning Commission Workshop 
9. Planning Commission Meeting 
a. denial - return to Step 2 
b. postponement 
c. approval (w/conditions) - continue to Step 10 
10. Submit Final Development Plan including all construction plans (1 copy - no 
signatures) for review by Planning Commission Staff and City Engineer (if applicable - 
2 copies) 
11. Address any comments provided by Staff 
12. File Final Development Plan[3] (1 mylar and 8 paper with signatures + digital 
submittal)for final review and certification for approval 
13. Schedule and attend Pre-Construction Meeting with Engineering Staff 
14. Installation of erosion control/BMP measures 
15. Obtain Grading Permit 
16. Submit 1 paper copy plus all required materials to the Chief Building Official for a 
building permit 
17. Begin construction, including drainage and landscaping. Improvements must be 
installed/completed or a bond/letter of credit submitted to the Planning Commission 
prior to the issuance of a C.O. by the Chief Building Official. 
NOTE: Amendments to the Final Development Plan will be reviewed on an individual basis. Based on the degree of amendment/revision, a 
revised Preliminary Development Plan may be required for review and approval by the full Planning Commission (must be submitted by the 
application deadline). Final Development Plans that require full Planning Commission review must be submitted by the application deadline. See 
current Fee Schedule for all applicable fees. 
1. by standard deadline; this includes all preliminary development plans and resubmittals. 
2. If a Traffic Impact Study is required, the TIS must be submitted for review and approval at this stage. 
3. Final Plan does not require full Planning Commission approval unless requested at the time of Preliminary Plan approval.

More Related Content

What's hot

Firepumpdesignintent4.01
Firepumpdesignintent4.01Firepumpdesignintent4.01
Firepumpdesignintent4.01
ทศพร ฉัตรทอง
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
Rajiva Gupta
 
Project change management plan template
Project change management plan templateProject change management plan template
Project change management plan template
Vivek Srivastava
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3
Allan Leyte
 
Guidelines for the monitoring officers
Guidelines for the monitoring officersGuidelines for the monitoring officers
Guidelines for the monitoring officers
hayat alishah
 
1.wrong Hsu fitment on tractor .
1.wrong Hsu fitment on tractor .1.wrong Hsu fitment on tractor .
1.wrong Hsu fitment on tractor .
Prabhat Shukla
 
Revised Construction Drawing Flow Chart_2016_01_11
Revised Construction Drawing Flow Chart_2016_01_11Revised Construction Drawing Flow Chart_2016_01_11
Revised Construction Drawing Flow Chart_2016_01_11
Jack Tan Kiah Kee
 
Presentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah IghagbonPresentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah Ighagbon
AANUOLUWAPO D. IGHAGBON
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
Aditi Shah
 
Project management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plantProject management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plant
Samir Dave
 
Single Proprietorship JD
Single Proprietorship JDSingle Proprietorship JD
Single Proprietorship JD
Dean Apao
 
EPSC Module 3 Unit 1
EPSC Module 3 Unit 1EPSC Module 3 Unit 1
EPSC Module 3 Unit 1
ejve22
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
Peter White
 
Lou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin's Document Control Procedure and DOC Experience SummaryLou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin
 
Post job career
Post job careerPost job career
Post job career
nguyen thuy
 
Ecv
EcvEcv
CV-Baghzouz Nour New
CV-Baghzouz Nour NewCV-Baghzouz Nour New
CV-Baghzouz Nour New
Nour El Houda BAGHZOUZ
 
Updated CV
Updated CVUpdated CV
Updated CV
Ian Street
 
Methodologies of Project Progress Measurement
Methodologies of Project Progress MeasurementMethodologies of Project Progress Measurement
Methodologies of Project Progress Measurement
Amit Kumar Senapati, PMP®
 
Project Flow Chart-BO Major Projects FINAL (with Hyperlinks)
Project Flow Chart-BO Major Projects FINAL (with Hyperlinks)Project Flow Chart-BO Major Projects FINAL (with Hyperlinks)
Project Flow Chart-BO Major Projects FINAL (with Hyperlinks)
Vinod S Nair
 

What's hot (20)

Firepumpdesignintent4.01
Firepumpdesignintent4.01Firepumpdesignintent4.01
Firepumpdesignintent4.01
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
 
Project change management plan template
Project change management plan templateProject change management plan template
Project change management plan template
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3
 
Guidelines for the monitoring officers
Guidelines for the monitoring officersGuidelines for the monitoring officers
Guidelines for the monitoring officers
 
1.wrong Hsu fitment on tractor .
1.wrong Hsu fitment on tractor .1.wrong Hsu fitment on tractor .
1.wrong Hsu fitment on tractor .
 
Revised Construction Drawing Flow Chart_2016_01_11
Revised Construction Drawing Flow Chart_2016_01_11Revised Construction Drawing Flow Chart_2016_01_11
Revised Construction Drawing Flow Chart_2016_01_11
 
Presentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah IghagbonPresentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah Ighagbon
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Project management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plantProject management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plant
 
Single Proprietorship JD
Single Proprietorship JDSingle Proprietorship JD
Single Proprietorship JD
 
EPSC Module 3 Unit 1
EPSC Module 3 Unit 1EPSC Module 3 Unit 1
EPSC Module 3 Unit 1
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
Lou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin's Document Control Procedure and DOC Experience SummaryLou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin's Document Control Procedure and DOC Experience Summary
 
Post job career
Post job careerPost job career
Post job career
 
Ecv
EcvEcv
Ecv
 
CV-Baghzouz Nour New
CV-Baghzouz Nour NewCV-Baghzouz Nour New
CV-Baghzouz Nour New
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Methodologies of Project Progress Measurement
Methodologies of Project Progress MeasurementMethodologies of Project Progress Measurement
Methodologies of Project Progress Measurement
 
Project Flow Chart-BO Major Projects FINAL (with Hyperlinks)
Project Flow Chart-BO Major Projects FINAL (with Hyperlinks)Project Flow Chart-BO Major Projects FINAL (with Hyperlinks)
Project Flow Chart-BO Major Projects FINAL (with Hyperlinks)
 

Viewers also liked

Image
ImageImage
Image
AdamsBlog
 
Ellie part 1 final
Ellie part 1 finalEllie part 1 final
Ellie part 1 final
ellieevans
 
Valery....
Valery....Valery....
Valery....
valery1616
 
Uravnenie 5 klass
Uravnenie 5 klassUravnenie 5 klass
Uravnenie 5 klass
Иван Иванов
 
Vi atau VIM Editor Linux
Vi atau VIM Editor LinuxVi atau VIM Editor Linux
Vi atau VIM Editor Linux
Akbar Akbar
 
графи
графиграфи
графи
denyshi123
 
Different Forms of Television Adverts Final
Different Forms of Television Adverts FinalDifferent Forms of Television Adverts Final
Different Forms of Television Adverts Final
teddz22
 
Organic oils vs supermarket varieties
Organic oils vs supermarket varietiesOrganic oils vs supermarket varieties
Organic oils vs supermarket varieties
Pauline Ferguson
 
Asignación nº5
Asignación nº5Asignación nº5
Asignación nº5
Diana Pinto
 
Seleccionar la Realitat
Seleccionar la RealitatSeleccionar la Realitat
Seleccionar la Realitat
Jaume JG
 
Lifeisawesome ppt
Lifeisawesome pptLifeisawesome ppt
Lifeisawesome ppt
doprlayer
 
Tpf
TpfTpf
PROLIM sponsors "The Fifth IEOM 2015 Event" PROLIM
PROLIM sponsors "The Fifth IEOM 2015 Event" PROLIMPROLIM sponsors "The Fifth IEOM 2015 Event" PROLIM
PROLIM sponsors "The Fifth IEOM 2015 Event" PROLIM
PROLIM Global Corporation
 
MATEMATICASFormato de planificación del programa
MATEMATICASFormato de planificación del programaMATEMATICASFormato de planificación del programa
MATEMATICASFormato de planificación del programa
Romeo Eliezer Solis Ramirez
 

Viewers also liked (15)

Image
ImageImage
Image
 
Ellie part 1 final
Ellie part 1 finalEllie part 1 final
Ellie part 1 final
 
Valery....
Valery....Valery....
Valery....
 
Uravnenie 5 klass
Uravnenie 5 klassUravnenie 5 klass
Uravnenie 5 klass
 
Vi atau VIM Editor Linux
Vi atau VIM Editor LinuxVi atau VIM Editor Linux
Vi atau VIM Editor Linux
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
графи
графиграфи
графи
 
Different Forms of Television Adverts Final
Different Forms of Television Adverts FinalDifferent Forms of Television Adverts Final
Different Forms of Television Adverts Final
 
Organic oils vs supermarket varieties
Organic oils vs supermarket varietiesOrganic oils vs supermarket varieties
Organic oils vs supermarket varieties
 
Asignación nº5
Asignación nº5Asignación nº5
Asignación nº5
 
Seleccionar la Realitat
Seleccionar la RealitatSeleccionar la Realitat
Seleccionar la Realitat
 
Lifeisawesome ppt
Lifeisawesome pptLifeisawesome ppt
Lifeisawesome ppt
 
Tpf
TpfTpf
Tpf
 
PROLIM sponsors "The Fifth IEOM 2015 Event" PROLIM
PROLIM sponsors "The Fifth IEOM 2015 Event" PROLIMPROLIM sponsors "The Fifth IEOM 2015 Event" PROLIM
PROLIM sponsors "The Fifth IEOM 2015 Event" PROLIM
 
MATEMATICASFormato de planificación del programa
MATEMATICASFormato de planificación del programaMATEMATICASFormato de planificación del programa
MATEMATICASFormato de planificación del programa
 

Similar to Development Plan Review Process

03 flow chart - redevelopment of the building
03   flow chart -  redevelopment of the building03   flow chart -  redevelopment of the building
03 flow chart - redevelopment of the building
spandane
 
Hrc nmmc guidelines
Hrc nmmc guidelinesHrc nmmc guidelines
Hrc nmmc guidelines
Pradeep Methakar
 
Group proposal
Group proposalGroup proposal
Group proposal
Leon Lim
 
Group proposal
Group proposalGroup proposal
Group proposal
ChelleChelleeeee
 
Detailed Experiance - REV01
Detailed Experiance - REV01Detailed Experiance - REV01
Detailed Experiance - REV01
Abdelfattah Odeh, PMP, PE
 
10 flow chart - redevelopment decision - business to be transacted at 1st sgm
10   flow chart - redevelopment decision - business to be transacted at 1st sgm10   flow chart - redevelopment decision - business to be transacted at 1st sgm
10 flow chart - redevelopment decision - business to be transacted at 1st sgm
spandane
 
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafaPreventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Sakib Nizam
 
Pc iv-new
Pc iv-newPc iv-new
Pc iv-new
hayat alishah
 
Works programme
Works programmeWorks programme
Works programme
SrinivasaRao Guduru
 
Environmental clearance for construction projects optima
Environmental clearance for construction projects optimaEnvironmental clearance for construction projects optima
Environmental clearance for construction projects optima
Siddharth Choksi
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution Plan
James Zhang (Chi, Zhang)
 
Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned Developments
Brunswick County
 
RIBA Revit.pdf
RIBA Revit.pdfRIBA Revit.pdf
RIBA Revit.pdf
AmitSharma396539
 
VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2
Jerry Bauers
 
Kick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfKick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdf
MOHDFIRRDHAUSBINMOHD
 
Responses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptxResponses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptx
PANKITPATEL12
 
Item # 13 - Plan Review Process Revisions
Item # 13 - Plan Review Process RevisionsItem # 13 - Plan Review Process Revisions
Item # 13 - Plan Review Process Revisions
ahcitycouncil
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
Ayman Issa
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
Avinash Kumar Gupta
 
TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09
3MikeRyan
 

Similar to Development Plan Review Process (20)

03 flow chart - redevelopment of the building
03   flow chart -  redevelopment of the building03   flow chart -  redevelopment of the building
03 flow chart - redevelopment of the building
 
Hrc nmmc guidelines
Hrc nmmc guidelinesHrc nmmc guidelines
Hrc nmmc guidelines
 
Group proposal
Group proposalGroup proposal
Group proposal
 
Group proposal
Group proposalGroup proposal
Group proposal
 
Detailed Experiance - REV01
Detailed Experiance - REV01Detailed Experiance - REV01
Detailed Experiance - REV01
 
10 flow chart - redevelopment decision - business to be transacted at 1st sgm
10   flow chart - redevelopment decision - business to be transacted at 1st sgm10   flow chart - redevelopment decision - business to be transacted at 1st sgm
10 flow chart - redevelopment decision - business to be transacted at 1st sgm
 
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafaPreventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
 
Pc iv-new
Pc iv-newPc iv-new
Pc iv-new
 
Works programme
Works programmeWorks programme
Works programme
 
Environmental clearance for construction projects optima
Environmental clearance for construction projects optimaEnvironmental clearance for construction projects optima
Environmental clearance for construction projects optima
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution Plan
 
Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned Developments
 
RIBA Revit.pdf
RIBA Revit.pdfRIBA Revit.pdf
RIBA Revit.pdf
 
VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2
 
Kick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfKick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdf
 
Responses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptxResponses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptx
 
Item # 13 - Plan Review Process Revisions
Item # 13 - Plan Review Process RevisionsItem # 13 - Plan Review Process Revisions
Item # 13 - Plan Review Process Revisions
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
 
TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09
 

Recently uploaded

在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
3woawyyl
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
JuanFelipeHerrera4
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
Scalabrini Institute for Human Mobility in Africa
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
Cheong Man Keong
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
Congressional Budget Office
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
Bharat Mata
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
teeaszt
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
Energy for One World
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
Congressional Budget Office
 

Recently uploaded (20)

在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
 

Development Plan Review Process

  • 1. Development Plan Review Process 1. Optional (Recommended) Conceptual Review with staff 2. Preliminary Plan Submitted[1] 3. Staff field inspections 4. Technical Review Committee meeting 5. Comments/Corrections sent to Engineer 6. Submit revised plans[2] 7. Staff reports available 8. Planning Commission Workshop 9. Planning Commission Meeting a. denial - return to Step 2 b. postponement c. approval (w/conditions) - continue to Step 10 10. Submit Final Development Plan including all construction plans (1 copy - no signatures) for review by Planning Commission Staff and City Engineer (if applicable - 2 copies) 11. Address any comments provided by Staff 12. File Final Development Plan[3] (1 mylar and 8 paper with signatures + digital submittal)for final review and certification for approval 13. Schedule and attend Pre-Construction Meeting with Engineering Staff 14. Installation of erosion control/BMP measures 15. Obtain Grading Permit 16. Submit 1 paper copy plus all required materials to the Chief Building Official for a building permit 17. Begin construction, including drainage and landscaping. Improvements must be installed/completed or a bond/letter of credit submitted to the Planning Commission prior to the issuance of a C.O. by the Chief Building Official. NOTE: Amendments to the Final Development Plan will be reviewed on an individual basis. Based on the degree of amendment/revision, a revised Preliminary Development Plan may be required for review and approval by the full Planning Commission (must be submitted by the application deadline). Final Development Plans that require full Planning Commission review must be submitted by the application deadline. See current Fee Schedule for all applicable fees. 1. by standard deadline; this includes all preliminary development plans and resubmittals. 2. If a Traffic Impact Study is required, the TIS must be submitted for review and approval at this stage. 3. Final Plan does not require full Planning Commission approval unless requested at the time of Preliminary Plan approval.