My Job Responsibilities in Maaden Aluminium Refinery – Engineering
Department
 Identify Projects – Based on Client requirement and Project list provided by
them my responsibility to review the list whether project is CAPEX, OPEX or
NODs. If Project comes under CAPEX category then forward to management
for approval.
 MOC preparation & Preparation of Business case – MOC and Business
case approval is important steps to get approval from Client to execute the
projects.
 FEED Preparation – FEED report preparation and review help to get
Feasibility Study of the project and help to prepare Project estimate cost (+_
30%)
 Fund Approval – To get fund approval from higher management
preparation of PDRB report is very essential practice followed by us which
covered feasibility report, Level 1 Schedule, Project Organization structure,
Man hours & fund required, Tentative major BOQ.
 FEL3– After getting fund approval Projects move to following steps:-
Detail Engineering - wherein RFQ to be float for Detail Engineering,
Review bids documents, prepare Technical review plan, contractor
finalization, KOM, man hours assign for each discipline, preparation of
document control sheet, Review each transmittal and attached
drawing & document provided by engineering contractor.
Procurement – Prepare list of detail BOQ, Planning, monitoring,
controlling spreadsheet, Progress monitoring spreadsheet, Reporting
formats, Level 2 & 3 schedule, RFQ for execution contractor, Technical
review of Bidders, follow up with buyers for contract award. Direct
/indirect project Material which are ti be bought by us to be indended
in Oracle and follow up with buyer to get delivered all materials on
site as per schedule.
Project Execution - KOM with contractor, prepare list of HSE
requirement as per nature of Projects and submit to contract to
comply the Maaden HSE requirement. Review Project execution plan,
construction matrices, SPA detail, review and stick with Level 4
schedule prepare by contractor following level 3 Schedule.
Reporting – Preparation of cumulative report of various projects and
submit to management daily, weekly and monthly basis. Dash board
report preparation for top management including RPRM presentation
monthly basis. Pivot table report is best tools for reporting and
submits to management for their review. Get information of projects
form construction engineers to update schedule and progress
monitoring sheet to calculate % Plan & Actual , S-Curve, Histogram
 Commissioning & Close out – Assist commissioning team to complete site
walk down, categories the Punch lists, schedule to attend Punch list by
contractor, pre commissioning & commissioning activities and final approval
from client . Prepare handing over documents and handover the projects to
end client and get sign off.
Current Capex Project Handling –
 Caustic Unloading Facility at Sea Port
 Natural Gas Debottlenecking
 Potable water line
 Bypass Sump Pump Discharge
 Caustic Storage
 Mud Divers Prototype Project (Clarification)
 Bauxite Truck Feeding facility
 Civil & Spill Control Project 2400
 Bauxite truck Cover removal platform
 Seed filtrate to Coarse Re-slurry
 Riser Tube for Bypass launder
 Flocculent dosing Project
 Checkered plate installation
 Fit strainers to back wash sprays
 Pedestrian machinery interface

More Related Content

What's hot

Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning Engineer
MD TAUSIF ASLAM
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
Peter White
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
Brian Nicholls
 
C V
C VC V
Daniel Andrescavage
Daniel AndrescavageDaniel Andrescavage
Daniel Andrescavage
Dan Andrescavage
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
Peter White
 
Guidelines for the monitoring officers
Guidelines for the monitoring officersGuidelines for the monitoring officers
Guidelines for the monitoring officers
hayat alishah
 
Resume_Sannikov Detailed
Resume_Sannikov DetailedResume_Sannikov Detailed
Resume_Sannikov Detailed
Andrei Sannikov
 
Resume
ResumeResume
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
Roberto Guevara
 
Updated CV
Updated CVUpdated CV
Updated CV
Ian Street
 
Lou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin's Document Control Procedure and DOC Experience SummaryLou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
Rajiva Gupta
 
RESUME-M. WILLIAMS
RESUME-M. WILLIAMSRESUME-M. WILLIAMS
RESUME-M. WILLIAMS
Mark E Williams
 
Woody 2000 project
Woody 2000 projectWoody 2000 project
Woody 2000 project
Wust53
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
Siddique Pasha
 
Steward Suffolk Team Partnership RN CH SRC 072612
Steward Suffolk Team Partnership RN CH SRC 072612Steward Suffolk Team Partnership RN CH SRC 072612
Steward Suffolk Team Partnership RN CH SRC 072612
Robert Roy Nichols
 
ESantavicca Resume March-2016
ESantavicca Resume March-2016ESantavicca Resume March-2016
ESantavicca Resume March-2016
Ed Santavicca
 
Methodologies of Project Progress Measurement
Methodologies of Project Progress MeasurementMethodologies of Project Progress Measurement
Methodologies of Project Progress Measurement
Amit Kumar Senapati, PMP®
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016
Mohamed Gamal
 

What's hot (20)

Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning Engineer
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
 
C V
C VC V
C V
 
Daniel Andrescavage
Daniel AndrescavageDaniel Andrescavage
Daniel Andrescavage
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
Guidelines for the monitoring officers
Guidelines for the monitoring officersGuidelines for the monitoring officers
Guidelines for the monitoring officers
 
Resume_Sannikov Detailed
Resume_Sannikov DetailedResume_Sannikov Detailed
Resume_Sannikov Detailed
 
Resume
ResumeResume
Resume
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Lou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin's Document Control Procedure and DOC Experience SummaryLou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin's Document Control Procedure and DOC Experience Summary
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
 
RESUME-M. WILLIAMS
RESUME-M. WILLIAMSRESUME-M. WILLIAMS
RESUME-M. WILLIAMS
 
Woody 2000 project
Woody 2000 projectWoody 2000 project
Woody 2000 project
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
 
Steward Suffolk Team Partnership RN CH SRC 072612
Steward Suffolk Team Partnership RN CH SRC 072612Steward Suffolk Team Partnership RN CH SRC 072612
Steward Suffolk Team Partnership RN CH SRC 072612
 
ESantavicca Resume March-2016
ESantavicca Resume March-2016ESantavicca Resume March-2016
ESantavicca Resume March-2016
 
Methodologies of Project Progress Measurement
Methodologies of Project Progress MeasurementMethodologies of Project Progress Measurement
Methodologies of Project Progress Measurement
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016
 

Similar to Maaden Exp.

CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
Sankar Sundaram PMP
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
ASHFAQ SYED MOHAMMED HUSSAIN
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
Ismail Shaikh
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATION
maheshvkat1972
 
Prashant Wani1
Prashant Wani1Prashant Wani1
Prashant Wani1
Prashant Wani, PMP®
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
Ayman Issa
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
Rushi Pru Dhvi
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
Rushi Pru Dhvi
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
Mostafa Sayed
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
Mohamed Sathiq
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy Kakollu
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
Majdi Abu Ali
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
Mohamed Aladly
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
Pradeep Singh
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
ravikant12002
 
EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015
Mohamad Khalid Nawawi
 
satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
Satheesh Menon
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
Abu Dhabi Oil Company (JAPAN)
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final Project
Allen Green
 

Similar to Maaden Exp. (20)

CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATION
 
Prashant Wani1
Prashant Wani1Prashant Wani1
Prashant Wani1
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015
 
satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final Project
 

Maaden Exp.

  • 1. My Job Responsibilities in Maaden Aluminium Refinery – Engineering Department  Identify Projects – Based on Client requirement and Project list provided by them my responsibility to review the list whether project is CAPEX, OPEX or NODs. If Project comes under CAPEX category then forward to management for approval.  MOC preparation & Preparation of Business case – MOC and Business case approval is important steps to get approval from Client to execute the projects.  FEED Preparation – FEED report preparation and review help to get Feasibility Study of the project and help to prepare Project estimate cost (+_ 30%)  Fund Approval – To get fund approval from higher management preparation of PDRB report is very essential practice followed by us which covered feasibility report, Level 1 Schedule, Project Organization structure, Man hours & fund required, Tentative major BOQ.  FEL3– After getting fund approval Projects move to following steps:- Detail Engineering - wherein RFQ to be float for Detail Engineering, Review bids documents, prepare Technical review plan, contractor finalization, KOM, man hours assign for each discipline, preparation of document control sheet, Review each transmittal and attached drawing & document provided by engineering contractor. Procurement – Prepare list of detail BOQ, Planning, monitoring, controlling spreadsheet, Progress monitoring spreadsheet, Reporting formats, Level 2 & 3 schedule, RFQ for execution contractor, Technical review of Bidders, follow up with buyers for contract award. Direct /indirect project Material which are ti be bought by us to be indended in Oracle and follow up with buyer to get delivered all materials on site as per schedule. Project Execution - KOM with contractor, prepare list of HSE requirement as per nature of Projects and submit to contract to comply the Maaden HSE requirement. Review Project execution plan, construction matrices, SPA detail, review and stick with Level 4 schedule prepare by contractor following level 3 Schedule. Reporting – Preparation of cumulative report of various projects and submit to management daily, weekly and monthly basis. Dash board
  • 2. report preparation for top management including RPRM presentation monthly basis. Pivot table report is best tools for reporting and submits to management for their review. Get information of projects form construction engineers to update schedule and progress monitoring sheet to calculate % Plan & Actual , S-Curve, Histogram  Commissioning & Close out – Assist commissioning team to complete site walk down, categories the Punch lists, schedule to attend Punch list by contractor, pre commissioning & commissioning activities and final approval from client . Prepare handing over documents and handover the projects to end client and get sign off. Current Capex Project Handling –  Caustic Unloading Facility at Sea Port  Natural Gas Debottlenecking  Potable water line  Bypass Sump Pump Discharge  Caustic Storage  Mud Divers Prototype Project (Clarification)  Bauxite Truck Feeding facility  Civil & Spill Control Project 2400  Bauxite truck Cover removal platform  Seed filtrate to Coarse Re-slurry  Riser Tube for Bypass launder  Flocculent dosing Project  Checkered plate installation  Fit strainers to back wash sprays  Pedestrian machinery interface