1) The document discusses the development and implementation of condition based maintenance for coal handling plants at thermal power stations. 2) It describes dividing the coal handling plant into five sections and monitoring physical parameters like vibration and temperature to detect problems. 3) The objectives of condition based maintenance are to establish alarm levels for early detection of failures in critical components and predict issues to improve safety, reliability and maintenance.
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)shyamies11
Availability Based Tariff was implemented in India in 2002-03. This presentation includes the chloronological sequence of events that led to the implementation of ABT . This also introduced a new concept of UI (Unscheduled Interchange) to rein in the wide excursion of grid frequency beyond the acceptable limits by imposition of fiscal disincentives for grid indiscipline by any regional or intra-regional entity
Tariff structure for Conventional and Non Conventional electricity generation sources, For tariff regulation of 2009-14 & 2014-19 and Renewable tariff order for 2015
Central Electricity Regulatory Commission implemented the Deviation Settlement Mechanism w.e.f 17.02.2014 throughout the country by bringing out the CERC (Deviation Settlement Regulations and other matters) Regulations, 2014. This regulation had a far-reaching consequences on any stakeholder like STUs, IPPs, ISGS for deviating from the injection/drawal Schedule in a time block beyond a certain prescribed limit by levying Deviation Charges including Additional Deviation Charges
The document covers the newly implemented regulation "Deviation settlement and mechanism" by CERC (central electricity regulatory commission.
This regulation has replaced the UI Regulation and mechanism.
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)shyamies11
Availability Based Tariff was implemented in India in 2002-03. This presentation includes the chloronological sequence of events that led to the implementation of ABT . This also introduced a new concept of UI (Unscheduled Interchange) to rein in the wide excursion of grid frequency beyond the acceptable limits by imposition of fiscal disincentives for grid indiscipline by any regional or intra-regional entity
Tariff structure for Conventional and Non Conventional electricity generation sources, For tariff regulation of 2009-14 & 2014-19 and Renewable tariff order for 2015
Central Electricity Regulatory Commission implemented the Deviation Settlement Mechanism w.e.f 17.02.2014 throughout the country by bringing out the CERC (Deviation Settlement Regulations and other matters) Regulations, 2014. This regulation had a far-reaching consequences on any stakeholder like STUs, IPPs, ISGS for deviating from the injection/drawal Schedule in a time block beyond a certain prescribed limit by levying Deviation Charges including Additional Deviation Charges
The document covers the newly implemented regulation "Deviation settlement and mechanism" by CERC (central electricity regulatory commission.
This regulation has replaced the UI Regulation and mechanism.
KK Wind Solutions presentation on Control System RetrofitRené Balle
KK Windsolutions presenting a strong retrofit case for Bonus, Siemens, Vestas and other turbines - showing significantly improved performance and short payback time.
This presentation was originally shown at the AWEA Wind Project O&M and Safety Seminar 2015 in San Diego.
For more information visit www.kkwindsolutions.com, nichr@kkwindsolutions.com or Phone: +4597221033
Ports-to-Plains Energy Summit
Omni Interlocken Resort
Broomfield, CO
April 7, 2011
The Ports-to-Plains Corridor runs through the middle of North America’s wind corridor. Learn about the issues affecting this growing industry throughout the region.
Presented by René Kamphuis, TNO NL and Matthias Stifter, AIT Energy Department, Austria at the IEA DSM workshop in Lucerne, Switzerland on 16 October 2013.
In its MYPD 3 Selective Reopener application hearing starting on June 23, Eskom’s acting CEO Brian Molefe will argue that an increase in tariffs will shorten load shedding and improve overall generation stability.
Mitsubishi ac servos melservo j4 solutions eco-friendly conveyors and product...Dien Ha The
Khoa Học - Kỹ Thuật & Giải Trí: http://phongvan.org
Tài Liệu Khoa Học Kỹ Thuật: http://tailieukythuat.info
Thiết bị Điện Công Nghiệp - Điện Hạ Thế: http://dienhathe.org
PI and LQR controllers for Frequency Regulation including Wind GenerationIJECEIAES
The increasing use of renewable technologies such as wind turbines in power systems may require the contribution of these new sources into grid ancillary services, such as Load Frequency Control. Hence, this work dealt with the performance comparison of two traditional control structures, PI and LQR, for secondary regulation of Load Frequency Control with the participation of variable-speed wind turbines. For this purpose, the doubly-fed induction generator wind turbine was modeled with additional control loops for emulation of the inertial response of conventional machines for frequency regulation tasks. Performance of proposed strategies was verified through simulation in a benchmark adapted from the WSCC 3 machines 9-bus test system. Results showed overall superior performance for LQR controller, although requiring more strenuous control effort from conventional units than PI control.
Tariff and Duty of Electricity supply in various State of India-A review by CEAAshish Verma
The Central Electricity Authority- a central autonomous technical planning and regulatory wing under Ministry of Power has released review report on tariff and duties of electricity supply by various distribution companies functioning at various states .
The Report is published for fulfilling the CEA's obligation under section 73(i) and (j) of electricty act 2003 .
KK Wind Solutions presentation on Control System RetrofitRené Balle
KK Windsolutions presenting a strong retrofit case for Bonus, Siemens, Vestas and other turbines - showing significantly improved performance and short payback time.
This presentation was originally shown at the AWEA Wind Project O&M and Safety Seminar 2015 in San Diego.
For more information visit www.kkwindsolutions.com, nichr@kkwindsolutions.com or Phone: +4597221033
Ports-to-Plains Energy Summit
Omni Interlocken Resort
Broomfield, CO
April 7, 2011
The Ports-to-Plains Corridor runs through the middle of North America’s wind corridor. Learn about the issues affecting this growing industry throughout the region.
Presented by René Kamphuis, TNO NL and Matthias Stifter, AIT Energy Department, Austria at the IEA DSM workshop in Lucerne, Switzerland on 16 October 2013.
In its MYPD 3 Selective Reopener application hearing starting on June 23, Eskom’s acting CEO Brian Molefe will argue that an increase in tariffs will shorten load shedding and improve overall generation stability.
Mitsubishi ac servos melservo j4 solutions eco-friendly conveyors and product...Dien Ha The
Khoa Học - Kỹ Thuật & Giải Trí: http://phongvan.org
Tài Liệu Khoa Học Kỹ Thuật: http://tailieukythuat.info
Thiết bị Điện Công Nghiệp - Điện Hạ Thế: http://dienhathe.org
PI and LQR controllers for Frequency Regulation including Wind GenerationIJECEIAES
The increasing use of renewable technologies such as wind turbines in power systems may require the contribution of these new sources into grid ancillary services, such as Load Frequency Control. Hence, this work dealt with the performance comparison of two traditional control structures, PI and LQR, for secondary regulation of Load Frequency Control with the participation of variable-speed wind turbines. For this purpose, the doubly-fed induction generator wind turbine was modeled with additional control loops for emulation of the inertial response of conventional machines for frequency regulation tasks. Performance of proposed strategies was verified through simulation in a benchmark adapted from the WSCC 3 machines 9-bus test system. Results showed overall superior performance for LQR controller, although requiring more strenuous control effort from conventional units than PI control.
Tariff and Duty of Electricity supply in various State of India-A review by CEAAshish Verma
The Central Electricity Authority- a central autonomous technical planning and regulatory wing under Ministry of Power has released review report on tariff and duties of electricity supply by various distribution companies functioning at various states .
The Report is published for fulfilling the CEA's obligation under section 73(i) and (j) of electricty act 2003 .
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...Premier Publishers
This paper describes the capacity enhancement of coal fired power plants through operational optimization, control techniques and better maintenance practices. The philosophy of “Prevention is Better than Cure” is dealt in detail to improve the Plant load factor (PLF) of plant. The energy conservation measures are also implemented in improving the plant performance and are enumerated in this paper. By adopting better maintenance practices for thermal power plants, enhance the capacity utilization of plants, thereby the present average PLF of 73.3 % of 210 and 250 MW units can be enhanced to about 95 % that will release an additional energy of about 1.2 lakh MU/year.
Transformer Asset Management is an activity in transmission department and a team of engineers maintaining transformers at site through condition monitoring and preventive maintenance to avoid failures at site during the revenue earning period and loss of revenue to the utility.
There are as many definitions of the maintenance as people offering it and yet maintenance costs as defined by plant accounting procedures, are a major portion of the total operating costs in most plants.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
3. • In the thermal power plants maximum requirement s of fuel is a coal. The handling of this fuel is a great
job. To handle the fuel i.e. coal, each power station is equipped with a coal handling plant.
• Maintenance
• current business environment, cost competitiveness, effective maintenance management has been accepted
as the key to corporate strategy for reduced costs.
• This has led to integration of maintenance management function with production and business problems, not
just equipment problems.
• Implementation of modern concept of Condition Based Maintenance can appreciably reduce maintenance
costs and enhance reliability of machine performance.
• Guidelines for implementation of CBM (condition based maintenance ) in
CHP (coal handling plant) are also discussed in this paper.
4. • The basic theory of condition monitoring is to know the deteriorating condition of a machine component,
well in advance of a breakdown.
• CBMS or Predictive Maintenance methods are an extension of preventive maintenance and have been proved
to minimize the cost of maintenance, improve operational safety and reduce the frequency and severity of in-
service machine failures.
• routine inspection
• The purpose of the inspection is to identify any degradation in the integrity of the systems during their
service life and to provide an early warning in order that remedial action can be taken before failure occurs.
• make decisions and to avoid unplanned outages.
5. • To maintain an efficiently operating unit and avoid failure of critical equipment, it is necessary to maintain the
critical parts of that equipment.
• The combination of corrective preventative and condition based maintenance will required to apply for
Critical Equipment's. This type of maintenance policy and strategy will improve performance of CHP through
availability of Critical Equipment.
6. The main objectives of CBM for CHP should be as follows
1. Establishing an alarm level based on the variations of a physical parameter like
vibration, power consumption, temperature etc.
2. Prediction of impending failures of critical plant components like Crusher Rotors, Conveyor Pulley Shafts,
in real time resulting in enhanced safety, operational reliability, availability, and maintainability.
8. 1. Divide Plant For Ease Of Maintenance
2. Detection Of Physical Parameters
3. In Service Examination By Using NDT
4. Analysis or Fault Diagnosis
5. Correction.
9. Coal handling plant should be divided into five [1] sections for ease of CBM.
• Unloading Units: Aerial ropeway , Railway , Road ways ,
• Feeding Units: Belt feeder , Rotary feeders , Screw feeders,
• Crushing and Screening Units : Impact , Attrition , Shear , Compression
• Stacking and Reclaiming Units :
• Bunkers
10. Detection Of Physical Parameters
1. Vibration , temperature monitoring.
2. Lube oil analysis including wear debris analysis .
3. Additionally, operational characteristics such as Coal flow rates; Conveyor speed and
so on can also be monitored to detect problems.
Analysis or Fault Diagnosis
Corrections
P-F Curves (potential failure curve)
14. Conclusions
• CBM it will allows planning shutdown before severe damage occurs and reduce reactive
maintenance practice.
• The transition to CBM for CHP will require a substantial investment. The return on this
investment will be dependent on the effectiveness of its implementation and the
commitment of all personnel.
• Cause of failure can be analyzed.
• Help for planning the requirement of long lead items.
• Effective use of CBM will offer benefits in plant availability, optimized use of resources, reduced downtime, which
reduce railway demurrage and further insure smooth and interrupt coal flow for boilers.
• The knowledge of machine condition and their time dependent behavior will be the basis of efficient condition
monitoring for CHP.
• CBM will successfully diagnoses and locates faulty operation conditions at an early stage in order to prevent
severe failures and w ill enable predictive and condition-oriented maintenance
15. REFERENCES
1. Technical paper on “Quality Assured Maintenance Management For Coal Handling Plant” by Makarand
Joshi, in M-News Edition 28 of Plant Maintenance Resource Center [Industrial Maintenance Portal] at web
site www.plantmaintenance.com/articles/Maintenance_Management_QA.pdf
2. Technical paper on “Development and Implementation of Reliability centered Maintenance using Vibration
Analysis: Experiences at Rourkela Steel Plant” by S.Parida, N.R.Kotu, M.M.Prasad Research & Development
Centre for Iron and Steel, Steel Authority of India Limited (SAIL), Rourkela Centre, Rourkela 769 011, India
S.Vanam, V.S.Vishwanath CMMS/CBMS Department, Rourkela Steel Plant, Steel Authority of India Limited
(SAIL), Rourkela - 769 011 India, published in 15thWorld Conference on NDT (15-21Oct ) in Rome.