This document is a PhD proposal submitted by Oghenevo Ogbewe to the University of Lagos examining developing a conceptual framework for integrating West Africa's regional energy systems using Model Based Systems Engineering (MBSE) methodologies. The proposal outlines the challenges facing energy integration in West Africa and argues that a multidisciplinary systems engineering approach is needed to develop solutions. The research aims to establish definitions and categorizations of components, model relationships between elements, and document system specifications to create a strategic planning tool that facilitates efficient energy integration in the region.