1 hbasecon.com
HBase 2.0 and Beyond Panel
Moderator: Jonathan Hsieh
Panel: Matteo Bertozzi / Sean Busbey / Jingcheng Du / Lars Hofhansl /
/ Enis Soztutar / Jimmy Xiang
2 hbasecon.com
Who are we?
 Matteo Bertozzi – HBase PMC, Cloudera
 Sean Busbey – HBase PMC, Cloudera
 Jingcheng Du – Intel
 Lars Hofhansl – HBase PMC, 0.94.x RM,
Salesforce.com
 Jonathan Hsieh – HBase PMC
 Enis Soztutar – HBase PMC, 1.0.0 RM,
Hortonworks
 Jimmy Xiang – HBase PMC, Cloudera
3 hbasecon.com
Outline
 Storing Larger Objects efficiently
 Making DDL Operations fault tolerant
 Better Region Assignment
 Compatibility guarantees for our users
 Improving Availability
 Using all machine resources
 Q+A
4 hbasecon.com
Outline
 Storing Larger Objects efficiently
 Making DDL Operations fault tolerant
 Better Region Assignment
 Compatibility guarantees for our users
 Improving Availability
 Using all machine resources
 Q+A
5 hbasecon.com
Why Moderate Object Storage (MOB)?
 A growing demand for the ability to store moderateobjects (MOB) in HBase ( 100KB
up to 10MB).
 Write amplification created by compactions, the write performance degrades along
with the accumulation of massive MOBs in HBase.
 Too many store files -> Frequent region compactions -> Massive I/O -> Slow compactions ->
Flush delay -> High memory usage -> Blocking updates
8.098
10.159 10.700
0.000
2.000
4.000
6.000
8.000
10.000
12.000
125G 500G 1T
Latency(sec)
Data volume
Data Insertion Average Latency
(5MB/record, 32 pre-split regions)
0
5
10
15
20
25
1 2 3 4 5 6 7 8
Latency(sec)
Time (hour)
1T Data Insertion Average Latency
(5MB/record, 32 pre-split regions)
6 hbasecon.com
How MOB I/O works
HRegionServer
Client
HFIle
MOB cell
HLog
memstore
MOB cell
MOB HFile
Flush
MOB cell
Write Path
Ref cell
Client
Read Path HRegionServer
memstore
HFIle
MOB HFile
MOB cell
MOB cell
Ref cell
7 hbasecon.com
Benefits
 Move the MOBs out of the main I/O path to make the write amplification more predictable.
 The same APIs to read and write MOBs.
 Work with HBase export/copy table, bulk load, replication and snapshot features.
 Work with HBase security mechanism.
8.098
10.159
10.700
6.851 6.963 7.033
0.000
2.000
4.000
6.000
8.000
10.000
12.000
125G 500G 1T
Latency(sec)
Data volume
Data Insertion Average Latency
(5MB/record, 32 pre-split regions)
MOB Disabled
MOB Enabled
10.590
57.975
6.212
33.886
0.000
10.000
20.000
30.000
40.000
50.000
60.000
Data Insertion Data Random Get
Latency(sec)
Average Latency for R/W Mixed Workload
(5MB/record, 32 pre-split regions,
300G pre-load, 200G insertion)
MOB Disabled
MOB Enabled
0
2
4
6
8
10
12
14
16
18
10 20 30 40 50 60
Lantecy(sec)
Time (minute)
Data Insertion Average Latency MOB Enabled
MOB Disabled
0
10
20
30
40
50
60
70
80
90
100
10 20 30 40 50 60
Latency(minute)
Time (minute)
Data Random Get Average Latency
MOB Enabled
MOB Disabled
8 hbasecon.com
Outline
 Storing Larger Objects efficiently
 Making DDL Operations fault tolerant
 Better Region Assignment
 Compatibility guarantees for our users
 Improving Availability
 Using all machine resources
 Q+A
9 hbasecon.com
Problem – Multi-Steps ops & Failures
DDL & other operations consist of multiple steps
e.g.
Create Table
Handler
Create regions on FileSystem
Add regions to META
Assign
cpHost.postCreateTableHandler() -> (ACLs)
if we crash in between steps.
we end up with half state.
e.g. File-System present, META not present
hbck MAY be able to repair it
if we crash in the middle of a single step (e.g. create N regions on fs)
hbck has not enough information to rebuild a correct state.
Requires manual intervention to repair the state
10 hbasecon.com
Solution – Multi-Steps ops & Failures
Rewrite each operation to use a State-Machine
e.g.
Create Table
Handler
Create regions on FileSystem
Add regions to META
Assign
cpHost.postCreateTableHandler() -> (ACLs)
...each executed step is written to a store
if the machine goes down
we know what was pending
and what should be rolledback
or how to continue to complete the operation
11 hbasecon.com
Procedure-v2/Notification-Bus
 The Procedure v2/NotificationBus aims to provide a unified way to build:
 Synchronous calls, with the ability to see the state/result in case of failure.
 Multisteps procedure with a rollback/rollforward ability in case of failure (e.g.
create/delete table)
 Notifications across multiple machines (e.g. ACLs/Labels/Quota cache updates)
 Coordination of long-running/heavy procedures (e.g. compactions, splits, …)
 Procedures across multiple machines (e.g. Snapshots, Assignment)
 Replication for Master operations (e.g. grant/revoke)
12 hbasecon.com
Procedure-v2/Notification-Bus - Roadmap
 Apache HBase 1.1
 Fault tolerant Master Operations (e.g. create/delete/…)
 Sync Client (We are still wire compatible, both ways)
 Apache HBase 1.2
 Master WebUI
 Notification BUS, and at least Snapshot using it.
 Apache HBase 1.3+ or 2.0 (depending on how hard is to keep Master/RSs compatibility)
 Replace Cache Updates, Assignment Manager, Distributed Log Replay,…
 New Features: Coordinated compactions, Master ops Replication (e.g. grant/revoke)
13 hbasecon.com
Outline
 Storing Larger Objects efficiently
 Making DDL Operations fault tolerant
 Better Region Assignment
 Compatibility guarantees for our users
 Improving Availability
 Using all machine resources
 Q+A
14 hbasecon.com
ZK-based Region Assignment
 Region states could be inconsistent
 Assignment info stored in both meta table and ZooKeeper
 Both Master and RegionServer can update them
 Limited scalability and operations efficiency
 ZooKeeper events used for coordination
14
15 hbasecon.com
ZK-less Region Assignment
 RPC based
 Master, the true coordinator
 Only Master can update meta table
 All state changes are persisted
 Follow the state machine
 RegionServer does what told by Master
 Report status to Master
 Each step needs acknowledgement from Master
15
16 hbasecon.com
Current Status
 Off by default in 1.0
 Impact
 Master is in the critical path
 Meta should be co-located with Master
 Procedure V2 could solve it (future work)
 Deployment topology change
 Master is a RegionServer, serves small system tables
 Blog post has more info
 https://blogs.apache.org/hbase/entry/hbase_zk_less_region_assignment
16
17 hbasecon.com
Outline
 Storing Larger Objects efficiently
 Making DDL Operations fault tolerant
 Better Region Assignment
 Compatibility guarantees for our users
 Improving Availability
 Using all machine resources
 Q+A
18 hbasecon.com
HBase Semantic Versioning
The Return to Sanity
19 hbasecon.com
Client
Version?
Server
Version?
Hadoop
Version?
Binary
Compatibility?
HFile
Version?
ARRGGHHH.
Should be SIMPLE!
Protobufs
Client/Server
Compatibility?
20 hbasecon.com
Semantic Versioning Makes Things Simple
21 hbasecon.com
HBase <Major>.<Minor>.<Patch>
22 hbasecon.com
MAJOR version
when you make incompatible API changes
23 hbasecon.com
MINOR version
when you add backwards-compatible functionality
24 hbasecon.com
PATCH version
when you make backwards-compatible bug fixes
25 hbasecon.com
We are adoption this starting with HBase 1.0
26 hbasecon.com
Compatibility Dimensions
(the long version)
 Client-Server wire protocol compatibility
 Server-Server protocol compatibility
 File format compatibility
 Client API compatibility
 Client Binary compatibility
 Server-Side Limited API compatibility (taken from Hadoop)
 Dependency Compatibility
 Operational Compatibility
27 hbasecon.com
TL;DR:
 A patch upgrade is a drop-in replacement
 A minor upgrade requires no application or client code
modification
 A major upgrade allows us - the HBase community - to make
breaking changes.
28 hbasecon.com
Simple
29 hbasecon.com
Thanks
http://semver.org/
http://hbase.apache.org/book.html#hbase.versioning
30 hbasecon.com
Outline
 Storing Larger Objects efficiently
 Making DDL Operations fault tolerant
 Better Region Assignment
 Compatibility guarantees for our users
 Improving Availability
 Using all machine resources
 Q+A
31 hbasecon.com
Improving read availability
 HBase is CP
 When a node goes down, some regions are unavailable until
recovery
 Some class of applications want high availability (for reads)
 Region replicas
 TIMELINE consistency reads
32 hbasecon.com
Phase contents
 Phase 1
 Region replicas
 Stale data up to minutes (15 min)
 in 1.0
 Phase 2
 millisecond-latencies for staleness (WAL replication)
 Replicas for the meta table
 Region splits and merges with region replicas
 Scan support
 In 1.1
33 hbasecon.com
Region1
Region2
Region3
WAL
append
ReplicaReplication
RegionServer 1
tail
hfile hfile hfile
HDFS
Flush/Compaction
34 hbasecon.com
Region1
Region2
Region3
WAL
ReplicaReplication
RegionServer 1
tail
Region2 (replica)
RegionServer 15
replay
RegionServer 20
Region1 (replica)
replay
hfile hfile hfile
HDFS
Flush/Compaction
Read flush files
35 hbasecon.com
Pluggable WAL Replication
 Pluggable WAL replication endpoint
 You can write your own replicators!
 Similar to co-processors (runs in the same RS process)
hbase> add_peer ’my_peer',
ENDPOINT_CLASSNAME =>
'org.hbase.MyReplicationEndpoint',
DATA => { "key1" => 1 },
CONFIG => { "config1" => "value1", "config2"
=> "value2" }}
36 hbasecon.com
Outline
 Storing Larger Objects efficiently
 Making DDL Operations fault tolerant
 Better Region Assignment
 Compatibility guarantees for our users
 Improving Availability
 Using all machine resources
 Q+A
37 hbasecon.com
Workload Throughput
Distributed work will eventually be limited by one of
• CPU
• Disk IO
• Network IO
38 hbasecon.com
HBase Under (synthetic) Load Now
Not CPU Bound
39 hbasecon.com
HBase Under (synthetic) Load Now
Not Disk Bound
40 hbasecon.com
HBase Under (synthetic) Load Now
Not Network
Bound
41 hbasecon.com
Modest Gain: Multiple WALs
 All regions write to one Write
ahead log file. (WAL)
 Idea: Let’s have multiple write
ahead logs so that we can write
more in parallel.
 Follow-up work:
 To the limit if were on SSD we
could have one WAL per
region.
RS
1
2
3
DNDisksRS
1
2
3
DNDisks
IDLE
IDLE
42 hbasecon.com
Future Solutions
• Alternative WAL providers
• Read path optimizations based on profiling
• Better tuning
43 hbasecon.com
Outline
 Storing Larger Objects efficiently
 Making DDL Operations fault tolerant
 Better Region Assignment
 Compatibility guarantees for our users
 Improving Availability
 Using all machine resources
 Q+A
44 hbasecon.com
Thanks!

HBaseCon 2015: HBase 2.0 and Beyond Panel

  • 1.
    1 hbasecon.com HBase 2.0and Beyond Panel Moderator: Jonathan Hsieh Panel: Matteo Bertozzi / Sean Busbey / Jingcheng Du / Lars Hofhansl / / Enis Soztutar / Jimmy Xiang
  • 2.
    2 hbasecon.com Who arewe?  Matteo Bertozzi – HBase PMC, Cloudera  Sean Busbey – HBase PMC, Cloudera  Jingcheng Du – Intel  Lars Hofhansl – HBase PMC, 0.94.x RM, Salesforce.com  Jonathan Hsieh – HBase PMC  Enis Soztutar – HBase PMC, 1.0.0 RM, Hortonworks  Jimmy Xiang – HBase PMC, Cloudera
  • 3.
    3 hbasecon.com Outline  StoringLarger Objects efficiently  Making DDL Operations fault tolerant  Better Region Assignment  Compatibility guarantees for our users  Improving Availability  Using all machine resources  Q+A
  • 4.
    4 hbasecon.com Outline  StoringLarger Objects efficiently  Making DDL Operations fault tolerant  Better Region Assignment  Compatibility guarantees for our users  Improving Availability  Using all machine resources  Q+A
  • 5.
    5 hbasecon.com Why ModerateObject Storage (MOB)?  A growing demand for the ability to store moderateobjects (MOB) in HBase ( 100KB up to 10MB).  Write amplification created by compactions, the write performance degrades along with the accumulation of massive MOBs in HBase.  Too many store files -> Frequent region compactions -> Massive I/O -> Slow compactions -> Flush delay -> High memory usage -> Blocking updates 8.098 10.159 10.700 0.000 2.000 4.000 6.000 8.000 10.000 12.000 125G 500G 1T Latency(sec) Data volume Data Insertion Average Latency (5MB/record, 32 pre-split regions) 0 5 10 15 20 25 1 2 3 4 5 6 7 8 Latency(sec) Time (hour) 1T Data Insertion Average Latency (5MB/record, 32 pre-split regions)
  • 6.
    6 hbasecon.com How MOBI/O works HRegionServer Client HFIle MOB cell HLog memstore MOB cell MOB HFile Flush MOB cell Write Path Ref cell Client Read Path HRegionServer memstore HFIle MOB HFile MOB cell MOB cell Ref cell
  • 7.
    7 hbasecon.com Benefits  Movethe MOBs out of the main I/O path to make the write amplification more predictable.  The same APIs to read and write MOBs.  Work with HBase export/copy table, bulk load, replication and snapshot features.  Work with HBase security mechanism. 8.098 10.159 10.700 6.851 6.963 7.033 0.000 2.000 4.000 6.000 8.000 10.000 12.000 125G 500G 1T Latency(sec) Data volume Data Insertion Average Latency (5MB/record, 32 pre-split regions) MOB Disabled MOB Enabled 10.590 57.975 6.212 33.886 0.000 10.000 20.000 30.000 40.000 50.000 60.000 Data Insertion Data Random Get Latency(sec) Average Latency for R/W Mixed Workload (5MB/record, 32 pre-split regions, 300G pre-load, 200G insertion) MOB Disabled MOB Enabled 0 2 4 6 8 10 12 14 16 18 10 20 30 40 50 60 Lantecy(sec) Time (minute) Data Insertion Average Latency MOB Enabled MOB Disabled 0 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 Latency(minute) Time (minute) Data Random Get Average Latency MOB Enabled MOB Disabled
  • 8.
    8 hbasecon.com Outline  StoringLarger Objects efficiently  Making DDL Operations fault tolerant  Better Region Assignment  Compatibility guarantees for our users  Improving Availability  Using all machine resources  Q+A
  • 9.
    9 hbasecon.com Problem –Multi-Steps ops & Failures DDL & other operations consist of multiple steps e.g. Create Table Handler Create regions on FileSystem Add regions to META Assign cpHost.postCreateTableHandler() -> (ACLs) if we crash in between steps. we end up with half state. e.g. File-System present, META not present hbck MAY be able to repair it if we crash in the middle of a single step (e.g. create N regions on fs) hbck has not enough information to rebuild a correct state. Requires manual intervention to repair the state
  • 10.
    10 hbasecon.com Solution –Multi-Steps ops & Failures Rewrite each operation to use a State-Machine e.g. Create Table Handler Create regions on FileSystem Add regions to META Assign cpHost.postCreateTableHandler() -> (ACLs) ...each executed step is written to a store if the machine goes down we know what was pending and what should be rolledback or how to continue to complete the operation
  • 11.
    11 hbasecon.com Procedure-v2/Notification-Bus  TheProcedure v2/NotificationBus aims to provide a unified way to build:  Synchronous calls, with the ability to see the state/result in case of failure.  Multisteps procedure with a rollback/rollforward ability in case of failure (e.g. create/delete table)  Notifications across multiple machines (e.g. ACLs/Labels/Quota cache updates)  Coordination of long-running/heavy procedures (e.g. compactions, splits, …)  Procedures across multiple machines (e.g. Snapshots, Assignment)  Replication for Master operations (e.g. grant/revoke)
  • 12.
    12 hbasecon.com Procedure-v2/Notification-Bus -Roadmap  Apache HBase 1.1  Fault tolerant Master Operations (e.g. create/delete/…)  Sync Client (We are still wire compatible, both ways)  Apache HBase 1.2  Master WebUI  Notification BUS, and at least Snapshot using it.  Apache HBase 1.3+ or 2.0 (depending on how hard is to keep Master/RSs compatibility)  Replace Cache Updates, Assignment Manager, Distributed Log Replay,…  New Features: Coordinated compactions, Master ops Replication (e.g. grant/revoke)
  • 13.
    13 hbasecon.com Outline  StoringLarger Objects efficiently  Making DDL Operations fault tolerant  Better Region Assignment  Compatibility guarantees for our users  Improving Availability  Using all machine resources  Q+A
  • 14.
    14 hbasecon.com ZK-based RegionAssignment  Region states could be inconsistent  Assignment info stored in both meta table and ZooKeeper  Both Master and RegionServer can update them  Limited scalability and operations efficiency  ZooKeeper events used for coordination 14
  • 15.
    15 hbasecon.com ZK-less RegionAssignment  RPC based  Master, the true coordinator  Only Master can update meta table  All state changes are persisted  Follow the state machine  RegionServer does what told by Master  Report status to Master  Each step needs acknowledgement from Master 15
  • 16.
    16 hbasecon.com Current Status Off by default in 1.0  Impact  Master is in the critical path  Meta should be co-located with Master  Procedure V2 could solve it (future work)  Deployment topology change  Master is a RegionServer, serves small system tables  Blog post has more info  https://blogs.apache.org/hbase/entry/hbase_zk_less_region_assignment 16
  • 17.
    17 hbasecon.com Outline  StoringLarger Objects efficiently  Making DDL Operations fault tolerant  Better Region Assignment  Compatibility guarantees for our users  Improving Availability  Using all machine resources  Q+A
  • 18.
    18 hbasecon.com HBase SemanticVersioning The Return to Sanity
  • 19.
  • 20.
  • 21.
  • 22.
    22 hbasecon.com MAJOR version whenyou make incompatible API changes
  • 23.
    23 hbasecon.com MINOR version whenyou add backwards-compatible functionality
  • 24.
    24 hbasecon.com PATCH version whenyou make backwards-compatible bug fixes
  • 25.
    25 hbasecon.com We areadoption this starting with HBase 1.0
  • 26.
    26 hbasecon.com Compatibility Dimensions (thelong version)  Client-Server wire protocol compatibility  Server-Server protocol compatibility  File format compatibility  Client API compatibility  Client Binary compatibility  Server-Side Limited API compatibility (taken from Hadoop)  Dependency Compatibility  Operational Compatibility
  • 27.
    27 hbasecon.com TL;DR:  Apatch upgrade is a drop-in replacement  A minor upgrade requires no application or client code modification  A major upgrade allows us - the HBase community - to make breaking changes.
  • 28.
  • 29.
  • 30.
    30 hbasecon.com Outline  StoringLarger Objects efficiently  Making DDL Operations fault tolerant  Better Region Assignment  Compatibility guarantees for our users  Improving Availability  Using all machine resources  Q+A
  • 31.
    31 hbasecon.com Improving readavailability  HBase is CP  When a node goes down, some regions are unavailable until recovery  Some class of applications want high availability (for reads)  Region replicas  TIMELINE consistency reads
  • 32.
    32 hbasecon.com Phase contents Phase 1  Region replicas  Stale data up to minutes (15 min)  in 1.0  Phase 2  millisecond-latencies for staleness (WAL replication)  Replicas for the meta table  Region splits and merges with region replicas  Scan support  In 1.1
  • 33.
  • 34.
    34 hbasecon.com Region1 Region2 Region3 WAL ReplicaReplication RegionServer 1 tail Region2(replica) RegionServer 15 replay RegionServer 20 Region1 (replica) replay hfile hfile hfile HDFS Flush/Compaction Read flush files
  • 35.
    35 hbasecon.com Pluggable WALReplication  Pluggable WAL replication endpoint  You can write your own replicators!  Similar to co-processors (runs in the same RS process) hbase> add_peer ’my_peer', ENDPOINT_CLASSNAME => 'org.hbase.MyReplicationEndpoint', DATA => { "key1" => 1 }, CONFIG => { "config1" => "value1", "config2" => "value2" }}
  • 36.
    36 hbasecon.com Outline  StoringLarger Objects efficiently  Making DDL Operations fault tolerant  Better Region Assignment  Compatibility guarantees for our users  Improving Availability  Using all machine resources  Q+A
  • 37.
    37 hbasecon.com Workload Throughput Distributedwork will eventually be limited by one of • CPU • Disk IO • Network IO
  • 38.
    38 hbasecon.com HBase Under(synthetic) Load Now Not CPU Bound
  • 39.
    39 hbasecon.com HBase Under(synthetic) Load Now Not Disk Bound
  • 40.
    40 hbasecon.com HBase Under(synthetic) Load Now Not Network Bound
  • 41.
    41 hbasecon.com Modest Gain:Multiple WALs  All regions write to one Write ahead log file. (WAL)  Idea: Let’s have multiple write ahead logs so that we can write more in parallel.  Follow-up work:  To the limit if were on SSD we could have one WAL per region. RS 1 2 3 DNDisksRS 1 2 3 DNDisks IDLE IDLE
  • 42.
    42 hbasecon.com Future Solutions •Alternative WAL providers • Read path optimizations based on profiling • Better tuning
  • 43.
    43 hbasecon.com Outline  StoringLarger Objects efficiently  Making DDL Operations fault tolerant  Better Region Assignment  Compatibility guarantees for our users  Improving Availability  Using all machine resources  Q+A
  • 44.

Editor's Notes

  • #38 When working with a big mass of machines, your first optimization step has to be getting to the exhaustion of one of these three resources. The specifics will depend on your workload, but right now we have big room for improvement.
  • #39 This is a mixed write / update/ read workload after reaching a state where there are memstore flushes and compactions happening.. It’s mostly waiting on synchronization AFAICT
  • #40 This is a mixed write / update/ read workload after reaching a state where there are memstore flushes and compactions happening.. It’s mostly waiting on synchronization AFAICT
  • #41 This is a mixed write / update/ read workload after reaching a state where there are memstore flushes and compactions happening.. It’s mostly waiting on synchronization AFAICT
  • #42 Historically one of the long poles in the tent has been the WAL, since all the regions served by a regions server hit the same one. As of HBase 1.0, there are options to expand to multiple pipelines. But the gains are modest. As of HBase 1.1, we can make use of HDFS storage policies to keep just the WAL on SSD in mixed disk deployments. We need more testing and operational feedback from the community though.
  • #43 Longer term solutions that will start showing up in HBase 2.0 involve updates to both the read and write paths. For WAL limitations, we need to examine some base assumptions; HDFS is made for throughput of large blobs, not for many small writes. Custom DFSClient in HBase to show value, then push upstream Maybe it’s best to defer to a system made for these kinds of writes, e.g. Kafka Stack has recently done some excellent work profiling what happens in an HBase system under load and some optimizations to better work with the jit compiler have been landing as a result. Frankly, we have a huge number of tuning options now that can eat a lot of hardware, but they remain inaccessible. Documentation improvements and a round of updating defaults based on current machine specs.