What do we mean by
Residual Source Emissions?
• Emissions after accounting for the designed-in mitigation
• Evaluated for each operational activity, for each zone
• Emissions magnitude can be Small/Medium/Large
• Examples are provided for all seven activities (Refer to Section
6.2.1 of the Consultation Document)
• Not prescriptive; Decision is left to the professional judgement
2RSK Environment Ltd
Designed-in Mitigation
• Design Measures (Table 4, Section 7 of the
Consultation Draft)
• Operational Measures (Table 5, Section 7 of the
Consultation Draft)
3RSK Environment Ltd
Activity: Site Preparation/Restoration
4
Magnitude of Residual Source Emissions
Large Medium Small
Large working area (>10ha)

Small working area (<2.5ha)
High bunds (>8m) Low bunds (<4m)
High volume of material movement
(>100,000 m3)
Low volume of material movement
(<20,000m3)
High number of heavy plant (>10
numbers)
Low number of heavy plant (<5
numbers)
Bunds: Minimal seeding/sealing Bunds: Seeded/sealed immediately
Material of high dust potential (Fine
grained and friable material)
Material of low dust potential (high
moisture content material)
RSK Environment Ltd
5
Activity: Mineral Extraction
Magnitude of Residual Source Emissions
Large Medium Small
Large working area (>100ha)

Small working area (<20ha)
Drilling and blasting frequently used Low energy extraction methods (for
example, use of hydraulic
excavators)
Material of high dust potential
(Small particle and low moisture
content)
Material of low dust potential
(Coarse material and/or high
moisture content)
High extraction rate (>1 million
tonnes per annum)
Low extraction rate (<200,000
tonnes per annum)
RSK Environment Ltd
6
Activity: Material Handling
Magnitude of Residual Source Emissions
Large Medium Small
High number of heavy plant near to
the site boundary (>10 numbers of
loading plant)

Low number of heavy plant (<5
numbers of loading plant)
Unconsolidated/bare surface (dry,
poorly surfaced ground)
Clean hard standing surface
Activities close to the boundary
(within 50m of a site boundary)
Activities within the quarry void
(more than 100m of a site
boundary)
Material of high dust potential
and/or low moisture content
Material of low dust potential
and/or high moisture content
RSK Environment Ltd
7
Activity: On-site Transportation
Magnitude of Residual Source Emissions
Large Medium Small
Use of unconsolidated haul roads

Use of conveyors
Unpaved haul roads Paved haul roads
Road surface of high dust potential Road surface of low dust potential
High total length of haul roads Low total length of haul roads
High number of HDV movements
(>250 movements in a day)
Low number of HDV movements
(<100 movements in a day)
Uncontrolled vehicle speed Controlled low vehicle speed (a
maximum of 15 miles per hour)
RSK Environment Ltd
8
Activity: Mineral Processing
Magnitude of Residual Source Emissions
Large Medium Small
Mobile plant (mobile crusher and
screener with on-site concentre
batching plant)

Fixed plant
Raw material of high dust
potential, low moisture content
(for example, hard rock)
Raw material of low dust
potential, high moisture content
(for example, wet sand and gravel)
End product of high dust potential End product of low dust potential
Complex or combination of
processes
Single process (for example, fixed
screening process)
High volume of material processed
(> 1 million tonnes per annum)
Low volume of material processed
( <200,000 tonnes per annum)
RSK Environment Ltd
9
Activity: Stockpiles/Exposed Surfaces
Magnitude of Residual Source Emissions
Large Medium Small
Long-term stockpile (>12 months)

Short-term stockpile (<1 month)
Frequent material transfer (daily) Infrequent material transfer
(weekly)
Material of high dust potential Material of low dust potential
Ground surface unconsolidated/ un-
kept
Hard standing clean ground surface
Stockpiles close to the site boundary
(<50m)
Stockpiles well within quarry void
(>100m from a site boundary)
Large areas of exposed surfaces
(>10ha)
Small areas of exposed surfaces
(<2.5ha)
High wind speeds/low threshold for
dust
Low wind speeds/high dust
threshold
RSK Environment Ltd
10
Activity: Off-site Transportation
Magnitude of Residual Source Emissions
Large Medium Small
High number of HDV movements
(>200 movements)

Low number of HDV movements
(<25 movements)
Unconsolidated access road Paved access road
Small length of access road (<20m) Large length of access road (>50m)
No road sweeper available Employment of an effective road
sweeper
Limited/No vehicle cleaning
facilities
Extensive vehicle cleaning facilities
RSK Environment Ltd
11
Next steps
• The magnitude of Residual Source Emissions for each
operational activity, for each zone is summarised.
• S-P-R is established.
• Assessment is carried out to identify the potential dust
disamenity effects at specific receptor locations.
• Depending on the significance of dust effects, additional
mitigation measures are identified where necessary.
RSK Environment Ltd

More Related Content

Viewers also liked (6)

000200010270729384_CV
000200010270729384_CV000200010270729384_CV
000200010270729384_CV
 
Juan miguel-velasco-lopez-urda-seguridad-informatica-seguridad-informatica
Juan miguel-velasco-lopez-urda-seguridad-informatica-seguridad-informaticaJuan miguel-velasco-lopez-urda-seguridad-informatica-seguridad-informatica
Juan miguel-velasco-lopez-urda-seguridad-informatica-seguridad-informatica
 
лекц 16 так
лекц 16 таклекц 16 так
лекц 16 так
 
Chané Wonderboom Hoërskool prestasie erkenning 2014
Chané Wonderboom Hoërskool prestasie erkenning 2014Chané Wonderboom Hoërskool prestasie erkenning 2014
Chané Wonderboom Hoërskool prestasie erkenning 2014
 
Semiologia respiratorio
Semiologia respiratorioSemiologia respiratorio
Semiologia respiratorio
 
Perkembangan janin dalam rahim
Perkembangan janin dalam rahimPerkembangan janin dalam rahim
Perkembangan janin dalam rahim
 

Similar to Determining Residual Source Emissions - Dr Srinivas Srimath, RSK

EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docxEHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
jack60216
 
Greening the construction industry
Greening the construction industryGreening the construction industry
Greening the construction industry
Tim Lock
 
Advanced tailing separation process - Minewaste 2010 -
Advanced tailing separation process - Minewaste 2010 -Advanced tailing separation process - Minewaste 2010 -
Advanced tailing separation process - Minewaste 2010 -
Peter Godwin
 

Similar to Determining Residual Source Emissions - Dr Srinivas Srimath, RSK (20)

Landfilling
Landfilling Landfilling
Landfilling
 
Low Impact Development: Stormwater Management Design and Planning
Low Impact Development: Stormwater Management Design and PlanningLow Impact Development: Stormwater Management Design and Planning
Low Impact Development: Stormwater Management Design and Planning
 
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docxEHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
 
Filtration unit in water treatment plant
Filtration unit in water treatment plantFiltration unit in water treatment plant
Filtration unit in water treatment plant
 
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
 
Landfill - Basics
Landfill - BasicsLandfill - Basics
Landfill - Basics
 
EarthZyme 2013; SMART
EarthZyme 2013; SMARTEarthZyme 2013; SMART
EarthZyme 2013; SMART
 
Seminar on Solid Waste Management
Seminar on Solid Waste ManagementSeminar on Solid Waste Management
Seminar on Solid Waste Management
 
Textile sludge management
Textile sludge managementTextile sludge management
Textile sludge management
 
Greening the construction industry
Greening the construction industryGreening the construction industry
Greening the construction industry
 
Noosa sewage treatment plant (qld)
Noosa sewage treatment plant (qld)Noosa sewage treatment plant (qld)
Noosa sewage treatment plant (qld)
 
Noosa sewage treatment plant
Noosa sewage treatment plantNoosa sewage treatment plant
Noosa sewage treatment plant
 
Advanced tailing separation process - Minewaste 2010 -
Advanced tailing separation process - Minewaste 2010 -Advanced tailing separation process - Minewaste 2010 -
Advanced tailing separation process - Minewaste 2010 -
 
landfilling, planetary boundaries and planned obsolescence
landfilling, planetary boundaries and planned obsolescencelandfilling, planetary boundaries and planned obsolescence
landfilling, planetary boundaries and planned obsolescence
 
Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)
 
Tech link 3335
Tech link 3335Tech link 3335
Tech link 3335
 
Green buildings
Green buildingsGreen buildings
Green buildings
 
Filtartaion Techniques-final.ppt
Filtartaion Techniques-final.pptFiltartaion Techniques-final.ppt
Filtartaion Techniques-final.ppt
 
LAND FILL SITE AND DUMPING SITE
LAND FILL SITE AND DUMPING SITELAND FILL SITE AND DUMPING SITE
LAND FILL SITE AND DUMPING SITE
 
Solid Waste & Hazardous Waste
Solid Waste & Hazardous WasteSolid Waste & Hazardous Waste
Solid Waste & Hazardous Waste
 

Recently uploaded

Recently uploaded (20)

Elemental Analysis of Plants using ICP-OES(2023)
Elemental Analysis of Plants using ICP-OES(2023)Elemental Analysis of Plants using ICP-OES(2023)
Elemental Analysis of Plants using ICP-OES(2023)
 
NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...
NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...
NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...
 
CAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptx
CAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptxCAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptx
CAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptx
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnerships
 
Impacts of agriculture on the environment.
Impacts of agriculture on the environment.Impacts of agriculture on the environment.
Impacts of agriculture on the environment.
 
Laplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhhLaplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhh
 
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
 
Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.
 
Data analysis and findings
Data analysis and findingsData analysis and findings
Data analysis and findings
 
Peat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangPeat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG Londerang
 
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRYEFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
 
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
 
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
 
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
 
Production, dispersal, sedimentation and taphonomy of spores/pollen
Production, dispersal, sedimentation and taphonomy of spores/pollenProduction, dispersal, sedimentation and taphonomy of spores/pollen
Production, dispersal, sedimentation and taphonomy of spores/pollen
 
Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...
 
A Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with MangrovesA Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with Mangroves
 
Lab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjjLab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjj
 

Determining Residual Source Emissions - Dr Srinivas Srimath, RSK

  • 2. IAQM Guidance on Mineral Dust What do we mean by Residual Source Emissions? • Emissions after accounting for the designed-in mitigation • Evaluated for each operational activity, for each zone • Emissions magnitude can be Small/Medium/Large • Examples are provided for all seven activities (Refer to Section 6.2.1 of the Consultation Document) • Not prescriptive; Decision is left to the professional judgement 2RSK Environment Ltd
  • 3. Designed-in Mitigation • Design Measures (Table 4, Section 7 of the Consultation Draft) • Operational Measures (Table 5, Section 7 of the Consultation Draft) 3RSK Environment Ltd
  • 4. Activity: Site Preparation/Restoration 4 Magnitude of Residual Source Emissions Large Medium Small Large working area (>10ha)  Small working area (<2.5ha) High bunds (>8m) Low bunds (<4m) High volume of material movement (>100,000 m3) Low volume of material movement (<20,000m3) High number of heavy plant (>10 numbers) Low number of heavy plant (<5 numbers) Bunds: Minimal seeding/sealing Bunds: Seeded/sealed immediately Material of high dust potential (Fine grained and friable material) Material of low dust potential (high moisture content material) RSK Environment Ltd
  • 5. 5 Activity: Mineral Extraction Magnitude of Residual Source Emissions Large Medium Small Large working area (>100ha)  Small working area (<20ha) Drilling and blasting frequently used Low energy extraction methods (for example, use of hydraulic excavators) Material of high dust potential (Small particle and low moisture content) Material of low dust potential (Coarse material and/or high moisture content) High extraction rate (>1 million tonnes per annum) Low extraction rate (<200,000 tonnes per annum) RSK Environment Ltd
  • 6. 6 Activity: Material Handling Magnitude of Residual Source Emissions Large Medium Small High number of heavy plant near to the site boundary (>10 numbers of loading plant)  Low number of heavy plant (<5 numbers of loading plant) Unconsolidated/bare surface (dry, poorly surfaced ground) Clean hard standing surface Activities close to the boundary (within 50m of a site boundary) Activities within the quarry void (more than 100m of a site boundary) Material of high dust potential and/or low moisture content Material of low dust potential and/or high moisture content RSK Environment Ltd
  • 7. 7 Activity: On-site Transportation Magnitude of Residual Source Emissions Large Medium Small Use of unconsolidated haul roads  Use of conveyors Unpaved haul roads Paved haul roads Road surface of high dust potential Road surface of low dust potential High total length of haul roads Low total length of haul roads High number of HDV movements (>250 movements in a day) Low number of HDV movements (<100 movements in a day) Uncontrolled vehicle speed Controlled low vehicle speed (a maximum of 15 miles per hour) RSK Environment Ltd
  • 8. 8 Activity: Mineral Processing Magnitude of Residual Source Emissions Large Medium Small Mobile plant (mobile crusher and screener with on-site concentre batching plant)  Fixed plant Raw material of high dust potential, low moisture content (for example, hard rock) Raw material of low dust potential, high moisture content (for example, wet sand and gravel) End product of high dust potential End product of low dust potential Complex or combination of processes Single process (for example, fixed screening process) High volume of material processed (> 1 million tonnes per annum) Low volume of material processed ( <200,000 tonnes per annum) RSK Environment Ltd
  • 9. 9 Activity: Stockpiles/Exposed Surfaces Magnitude of Residual Source Emissions Large Medium Small Long-term stockpile (>12 months)  Short-term stockpile (<1 month) Frequent material transfer (daily) Infrequent material transfer (weekly) Material of high dust potential Material of low dust potential Ground surface unconsolidated/ un- kept Hard standing clean ground surface Stockpiles close to the site boundary (<50m) Stockpiles well within quarry void (>100m from a site boundary) Large areas of exposed surfaces (>10ha) Small areas of exposed surfaces (<2.5ha) High wind speeds/low threshold for dust Low wind speeds/high dust threshold RSK Environment Ltd
  • 10. 10 Activity: Off-site Transportation Magnitude of Residual Source Emissions Large Medium Small High number of HDV movements (>200 movements)  Low number of HDV movements (<25 movements) Unconsolidated access road Paved access road Small length of access road (<20m) Large length of access road (>50m) No road sweeper available Employment of an effective road sweeper Limited/No vehicle cleaning facilities Extensive vehicle cleaning facilities RSK Environment Ltd
  • 11. 11 Next steps • The magnitude of Residual Source Emissions for each operational activity, for each zone is summarised. • S-P-R is established. • Assessment is carried out to identify the potential dust disamenity effects at specific receptor locations. • Depending on the significance of dust effects, additional mitigation measures are identified where necessary. RSK Environment Ltd