Describe activities that the Engineer can perform throughout the project life cycle in support of the First canon (e.g. in Design Phase, Bid Package Preparation, and Construction Phase Services). You can summarize your list of activities/examples in a table, specifying for each activity which requirements/sub-section(s) a) through f) are addressed by such activity. Listing of activities addressing most sub-sections a through f is a plus. ( 30 points) Solution After first starting of a carrier the civil engineer is placed into the construction site for the execution of the design. With the experience he will appointed as a senior excecutive engineer.Later he will be placed in to the construction management department where he has to design the phase, tendering for the new projects, Estimation of the costs and the cost and time for the project , Designing of the structures etc.