1. PADMANAPAN K Mail:padmanabhandinakaran@gmail.com
Chennai, India Contact Info: 09712913767/ 8754539004
OBJECTIVE:
To be an integral part of the progressive organization that provides me an environment of
continues learning to update my knowledge and skills in order to cope up with the emerging
technological development and needs.
EDUCATION:
B.Tech (Electrical Engineering) from KSO University
Diploma (ELECTRICAL and ELECTRONIC Engineering) from NPA Centenary Polytechnic
collage in Kotagiri with First class 79 % up to Sixth semester.
High 10th passed in First class, 72. 00% from Government Hr, Sec, School, Maharajapuram
in March 2000.
SOFTWARE EXPOSURE:
Operating System: Windows, 98, 2000&2003 XP
Programming Exposure: Auto CAD 2000 MS Office
Metasys Integration Software. M5 Graphics Workstation, M3 and M3i Graphics
TAC VISTA Software
OTHERS TOOLS:
AUTOCAD2004
MS Office, MS Access and Projects
Windows XP / Vista.
Designing of Microsoft Visio.
EXPERIENCE:
Profile: 5
WIPRO LTD (Wipro Infotech)
18/11/2013 to Till
DESIGNATION: Assistant Manager–IBMS & BMS Practice
1. Project management for the project on end to end
2. Doing the Site survey for All the system
3. Design coordination to arrive the BOQ with local and Import items
4. Study the bid documents and match with the BOQ and POs
5. Product Selection co-related with the Bid Documents
6. Get the approval from customer, PMC and Consultant for drawings, Technical submittals
7. Materials follow ups attend the daily site meeting with 3rd party vendors and MEP managers
for site work progress
8. Attend the weekly site meeting with customer and discussed for bullet points like Technical,
site, and commercials
9. Deep monitoring for Installation and commissioning all the stages.
10. Implement the Per commissioning checklist
11. Testing and commissioning the system
12. System Training to be provide to the customer, maintenance team
13. Project is transits to customer
14. Project to be handed over to ONM team with all Training.
2. Networking Experience:
OFC cable Installation and CAT-6 Cu cable installation
Placing of indoor/Outdoor rack
Installation of Cu Patch panel and LIU
Splicing & Testing of OFC cables, Installation of Switches and Servers
Installation of Workstations, all software and LCD/LED Display Units.
Using Ring topology network for OFC Infrastructure
EBABX Installation and commissioning of BPL, Accord and HCL
Telecom NOC Experience:
Profile: 4
CARRIERRACE TECHNOLOGIES PVT LTD
07/12/2012 to 14/11/2013
DESIGNATION: Assistant Project Manager- Hyderabad Area.
Job Profile:
1. Complete Project owner for IBMS-BMS Installation, Per-commissioning, Testing,
Commissioning, Training, and Smooth Hander over to customer, Clearing of Finance Dues
and Internal and External Service handover.
2. As Fire Alarm system, Public addressable system, CCTV system, Access control system
Building management system, Networking for DATA Voice, Lighting management system,
Chiller Plant manager
3. Project Execution, Engineering Documentation, Material Delivery for Local and import, man
power mobilization schedule is submitted to client and get the approval
4. Identify the I&C Vendor and arrange the PO and Make sure they suppose available the ESI
&PF , make the Registration to as a register vendor
5. Design co-ordination and arrive the BOQ qty and make and Module No to Engineering team
6. Site Drawing co-ordination and approval of Drawings from consultant and PMC
7. Purchase Order validation raise the query to client
8. Validate the Engineer BOQ and raise the query to Engg team
9. BG and Profoma Invoice to submit and collect the payment
10. Supply Invoice is submitted and follow the payment, Collect the same
11. Installation Bills to submit and coordinate with Commercial team for Invoicing
12. EAR and CAR policy to arrange the Projects
13. Release the Indents and Posted to SCM and make sure place the PO to Supplier
14. Attend the Site Progress weekly meetings
15. Attend the all contractor meetings and attend then Collection and revenue Conf call with
internal team and archive the targeted projection
16. Arrange the project Engineer training for the particular project details
17. Monitoring the Project execution and make sure progress is happen as per schedule
18. Conduct the EH&S audit address the identify violation arrange the same.
19. To Push the team to compete the cabling and make the check list for cabling
20. To Push the team to complete the Installation for the device and make the Installation check
list and share to the commissioning team
21. Arrange the Commissioning Engineer to site explain the site status and warm up the
commissioning activities
22. Arrange the 3rd party meeting with commissioning engineer and make sure understanding
and accept the requirements
23. Get the sample graphics and logics to share to client and get the approval, Understand the
client requirement if any
24. To push and start the pre-commissioning checklist to systems to ready with testing
25. Testing and commissioning is to completed and demonstrate to client
26. If any 3rd party System side support required , address the concerns arrange the solutions
27. If, any technical issue to provide the support over the conf call and remote PC, If required will
3. visit to site resolve the same.
28. Critical case will arrange the Technical specialist to resolve the same
29. Make the commissioning and testing report and get the sign off from client
30. Training is given to Maintenance team and ONM Team to operate the system as well
31. Handing over the system and Material consolidation is done with vendor and BOQ
32. Handover Documents to be submitted and get the sign off
33. Service hand over is done with Service team and QC is conducted
34. Snag points received if any, attend the project team to monitor the same.
Profile: 3
SCHNEIDER ELECTRIC (I) PVT LTD
20/06/2011 to 03/12/2012
Designation: Assistant Manager-BMS-IBMS -Solution Center India
Job Profile:
1. Project Execution, Engineering Documentation, Material Delivery for Local and import,
man power mobilization schedule is submitted to client and get the approval
2. Identify the I&C Vendor and arrange the PO and Make sure they suppose available the
ESI &PF , make the Registration to as a register vendor
3. Design co-ordination and arrive the BOQ qty and make and Module No to Engineering
team
4. Site Drawing co-ordination and approval of Drawings from consultant and PMC
5. Purchase Order validation raise the query to client
6. Validate the Engineer BOQ and raise the query to Engg team
7. Release the Indents and Posted to SCM and make sure place the PO to Supplier
8. Arrange the project Engineer training for the particular project details
9. Monitoring the Project execution and make sure progress is happen as per schedule
10. Conduct the EH&S audit address the identify violation arrange the same.
11. To Push the team to compete the cabling and make the check list for cabling
12. To Push the team to complete the Installation for the device and make the Installation
check list and share to the commissioning team
13. Arrange the Commissioning Engineer to site explain the site status and warm up the
commissioning activities
14. Arrange the 3rd party meeting with commissioning engineer and make sure understanding
and accept the requirements
15. Get the sample graphics and logics to share to client and get the approval, Understand
the client requirement if any
16. To push and start the pre-commissioning checklist to systems to ready with testing
17. Testing and commissioning is to completed and demonstrate to client
18. Make the commissioning and testing report and get the sign off from client
19. Training is given to Maintenance team and ONM Team to operate the system as well
20. Handover Documents to be submitted and get the sign off
21. Service hand over is done with Service team and QC is conducted
22. Snag points received if any, attend the project team to monitor the same.
Profile: 2
JOHNSON CONTROLS (I) PVT LTD
01/02/2008 to 19/06/2011
Designation: Commissioning Engineer
Job profile:
1. Independently handling Controls Chiller Plant Manager systems.
2. Designed HVAC control system application for more than six different Johnson controls
controllers.
3. Designed various control system application in preprogrammed and freely programmable
controllers.
4. 4. Working experience in Modbus, Lon Bus, Bacnet IP, N2 and Bacnet MSTP riser
protocols
5. Based on Project team Cabling checklist and Installation check list will start up the Per-
commissioning activities
6. If any, changes in filed address to concern project team and if required will support it.
7. Sample logic ,Trend graphics is prepared and submitted to client and get the approval
8. Downloading and configuring the Field controllers and Integrators
9. Calibration of the parameters for Soft and hard points like, IO Points from controllers and
Modbus, Bacnet IP
10. Test the all respected points Hard and soft to make the system is ready for logic checking
11. Demonstrate the logic with client and project team make the system under observation.
12. Programming HVAC application in Johnson controls Direct Digital Controllers.
13. Generating Front End Graphics for HVAC Systems.
14. Chiller Integration to chiller plant manager system.
15. Generate the plant manager Graphics and trends.
16. Provide demo and training to maintenance and customer for handover of the system
17. Designing HVAC controls DDC panel system as per the requirement of customer.
18. Selection of appropriate sensors (example: Temperature, Humidity, C02 etc.)
19. Designing of DDC Controllers N2-Bus, LonBus, Bacnet MSTP, Bacnet IP & Modbus
protocols for all the projects
20. Implementing the engineering design through AutoCAD and VISIO Graphics
21. Designed DDC Controller Panels for JCI, Schneider ALC ( Carrier) Cylon Controllers
22. Wiring checking and Field devices device termination and calibration of All Controllers
23. Experience in DDC scheduling and for all field and panel devices
24. Preparing of IO Summary of All Type of DDC Controller
Profile: 1
DATS India Ltd (Siemens Building Technologies Ltd)
09/04/2003 to31/01/2008
Designation: Installation Engineer.
Job Profile:
1. Taking care of all kind of installation and monitoring the installation with Sub venders
2. Install the All kind of devices like Detector, Speaker Dome Cameras, PTZ Cameras,
Access Card readers, EMLs, Access Controllers.
3. Install the All software and adding and Modifying the with reference of Client
requirements
4. Top to bottom giving the support for Commissioning team from site.
5. Address the design issues to design team
6. Address the sales issue to sales team
7. Demonstrate the system to client and giving the training with support from
Commissioning team
8. Cylon Controller checking of communication bus from Router to all the DDC Controller
9. Checking the termination with all IO Points which is assigned for respective DDC
Controllers
10. All Field Device termination is checked and confirm to Commissioning team
11. Handing over the system to client and attending the snag points.
12. To do the all system check list and submission.
13. Checking the All field the wiring and support to commissioning team.
14. Sensor parameter checking and Comparing with system parameter
15. ALC controller checking and 3rd party co-ordination and confirming their parameter
confirmation
16. All Kind of BMS termination and checking locally and confirm to Commissioning Team
17. All Joint Measurement certification
18. All EH&S related issues to be addressed
5. Worked Site on Project Management:
I have worked with the project management Installation and Commissioning of below systems.
1. Access Control System
1. M5E1 M5+ and M100, Bosch Systems
2. Metasys Access Controls System (JCI cardkey/CK721/CK722)
3. INET Access Control System (Schneider)
4. Matrix Access controllers (FOW/DCFM/DCCM/RDCM)
5. Boom Barriers & Flap Barriers (Access Pro- Magnetic Auto controls)
2. Fire Alarm System:
1. Analog Addressable Fire Alarm System (Notifire, Morley IAS, Edward Quick
Start, IFC640, IFC3030, NFS640, NFS 3030)
2. Conventional Fire Alarm System.
3. NAF SIII (Gas Suppression Fire Alarm (Very Critical Area)
4. VESDA (Very Critical Area)
5. Bosch FA system Testing and commissioning (FPA 1200 & FPA 5000)
3. Closed Circuit Television:
Analog CCTV:
Euroflex DVRs, Tracer Lite DVRs, Pelco DVRs (8100, 8000, 9100&4100) &JCI DVN Used)
Bosch DVRs, Dedicated Micros DVRs& Watch Net DVRs
IP CCTV System
1. IP based camera with Pivet-3 Server/milestone Software/cisco switches
2. Hikivison Cameras, Aragon camera,
4. Public Addressable System:
AHUJA and Bosch
5. Building Automation System:
1. Cylon Controllers
2. JCI Controllers (VAV-111, FX, DX, NCE, NAE, FEC)
3. Schneider Controllers (Xenta Controllers)
4. Carrier Controllers (ALC Controllers)
5. Chiller Plant Manager & Chiller Pump Control (York, Trane Chillers)
6. Third Part Integration for VAV, VFD, Chiller (Donfoss, ABB, Trane)
Rectifier, PAHU
7. Card Based Lighting system (Access control system and BMS)
8.Lighting Management system (Clipsal by Schneider Electric)
6. Nurse Calling System (Applicable for Hospital Areas)
7. Intruder Alarm System (Bank for Walt Areas and Teller Areas) (Euroflex Technologies)
CURRICULUM PROJECT:
Project Title: Speed Control of Single Phase Induction Motor” using Micro Controller and Dynamic
Coil
PERSONAL PROFILE:
Date of birth : 15-04-1984
Father’s name : D. Kalimuthu
Sex : Male
Languages known : Tamil, English
Nationality : Indian
Marital status : Married