SlideShare a Scribd company logo
Benjamin (Ben) J. Santos
19815 EllisHenry Ct., Newhall,CA,91321 Contact Number: (661) 5137917
E-mail Address: benjamin4santos@gmail.com
SUMMARYOF QUALIFICATIONS
I have 6 yearsof ProjectManagementpositionhandlingmultiple technical projects. Capable and
talentedprojectmanagerwhohasthe requiredqualificationstohandle multipleprojectsfrominitiation,
executionthrucompletionalongwith comparable experience of workingtothe higheststandards.Long
track record of ensuringprojectsare deliveredtothe highestquality,withinbudgetbyeffectively
organizing,managingandutilizingall resources.Abletoleadteamswhere the higheststandardsare
routinelydemanded.Alwayswantingtobe activelyinvolvedinall aspectsof the projectlife-cycle and
can deliverhigh-value projectsinorganizationsandacrossdifferentgeographies.Itake directionwell
and workshard to manage stakeholder expectations. A teamleaderandplayeraswell asa committed
collaboratorandsetgoals as team.Hard-workingwithgoodproblemsolvingskills.Adaptseasilytonew
workingenvironmentandsituations.Canhandle multipriorityprojectsasperneedbydate sequence
and prerequisite.Resourcefulinwaystodo thingswhenthere are noobvioussolutionsavailable.
AREAS OF EXPERTISE:
 Project management/implementation
 Change management
 Project planning
 Project reporting
 Resource management
 Risk management
 Processimprovement
 Managing project quality
 Agile projectmanagement
 Analytic and problemsolvingskills
 Systemintegration and testing
PROFESSIONAL EXPERIENCE:
SENIOR- TECH PROJECT PROGRAMMANAGEMENT FEBRUARY 2011 – MARCH 2016
AT&T WIRELESS
Accountable formanagingthe deliveryof critical projects,andforprovidingmanagerial supportforall
the projectsconductedbythe company.Alsoresponsible forprovidingmonthlytechnical updatesof any
knownissues/riskstoSeniorManagement.
Job discription:
 Manage small tolarge scale systems,networkandsoftware deploymentprojectsforthe
company withfull oversightfortestinganddeployment.
 Define technical requirementsanddocumentplansforprojectlifecycle deployment
includingthe schedulingof projectdeliverables,budgetsandtimelines.
 Directall technical deploymentsandjobschedulingwithoversightforvendorand
operations management.
 Coordinate bothinternal andexternal projectsensuringthatimplementations are readyas
requiredbyneedbydates/deadlines.
 Analyze,prepare anddocumentoperationalproceduresandtechnical guidelines.
 Plan,developanddeploychange managementinitiativesfortechnical implementation
includingproductivitysoftware,systems,technical applicationandhardware release inthe
cellularnetwork.
 Define newprocessesfortrackingbyutilizingSharePointreducingemail requiredto
communicate updates.
 Coordinate activities,schedule withappropriate parties,provide regularupdatesand
communication usingpropertoolsforlocal andinternational stakeholders.
 Coordinate andconductsprojectmeetingstoensure the appropriateactionplansare in
place to minimize the riskof delaysandprovideinputsintostrategiestoreduce company
costs while maintainingcompany’squalitystandards.
TECHNICAL PROJECT MANAGER(Contractor) APRIL 2010 – JANUARY2011
AT&T MobilityWestRegion– NorCal
Job Description
 ProjectTimelineplanning,prioritizingandexecutingthe RNC/ NodeBrehomesand
rebalancesinMarketsof the WestRegion.
 Managing frequentchangestothe scope andprioritiesdue tothe dynamicstructure of the
cellularnetworkevaluatingthe impacttothe projecttimelinesandcommunicatingtoall
involvedparties.
 ProjectExecution coordinationof activities,schedule withappropriate parties,provide
regularupdatesandcommunicationusingpropertoolsforinternal andexternal
stakeholders,andmanage changesinscope.
 Developingprojectdocumentation,creatingbestpracticesforthe Westregionidentifying
projectgoals and tasks
 Coordinate the teamtoensure the appropriate actionplansare inplace to minimize the risk
of delaysandextracostswhile maintainingcompany’squalitystandards.
 Knowledgeof organizational structure toensure properprojectteamrepresentation
 Coordinateswithmultiple teamsdomesticandinternational stakeholders thatare involved
inthe project.
TELECOM ENGINEER DEC 2009 – APRIL 2010
Project: Team Lead Quality Audit Site Survey for Ericsson Third Carrier to AT&T
TELECOM ENGINEER May 2009 - November2009
Project: Switching Maintenance and EngineeringforTmobile Wireless.
 TelephonyEngineerwill be responsibleforthe day-to-dayoperations,implementation,
administration,configuration,problemresolutionand/ortechnical supportfor
telephony/voice/software.
 Scope includesof workalsoinvolve consultingwithclients,hardware/software vendors,and
varioustelephony/voice groups.Responsibilitywill include respondingtotechnical
hardware and software designquestionsandtechniquesinsupportof the telephony.
 Engineerassigntooversee routinehardware/software audits,ensure adherence to
companysecurity/compliancepolicies,andmaintaintelephonyapplicationand/or
hardware/softwareconfigurationdocumentation.Workingexperience withnetwork
topologiessuchas:ISDN,Frame Relay,T1, T3, DS3, ATM, OC-N,SONET
TECHNICAL ENGINEERING : June 2000 – May 2009
Amatel Inc.
5055 Wilshire Blvd.,Suite 740, Los Angeles,CA90036
Project:SwitchingOperation & Maintenance for AT&T and Tmobile Wireless
 ProvidedOperationsandMaintenance servicesforTmobile Wireless
 . Dutiesincludedthe following:
o Performedroutine maintenance proceduresfor AXE810 Switches(GMSC,MSC’s&BSC’s)
locatedwithinthe same facility.
o Initiatedlifeline procedurestotestswitchSystemBackupfromexternal storage.
o 2G Cell site reconfiguration,re-hominganddeletion.
o Performedmonthlysystembackupandlifeline forthe switch.
o T1, DS3, OC12 testingandacceptance to transmissionlevel uptoprovisioning.
o Initiated1stlevel troubleshootingonswitchingfaults,software andhardware.
o Trouble ticketgenerationtoperformfaultisolationandcorrectionfromswitchtoT1
level inthe eventof cell site outage.
 - Work OrderimplementationandtestingforNew andAugmenttrunkswithin the own
networkandotherTelcocompanies.
o Basic TroubleshootingEricssonRNCUMTS switchandNode B UMTS BTS eqpmt.
o Trunk turnup and testingIMT and TelcoInterconnectsthruAlcatel MGW.
Project:Operation& Maintenance RBS for CingularWireless
 ProvidedOperationsandMaintenance forBTSEquipmentsmostlyEricsson2000 familyi.e.
RBS2102, 2106, 2206 pico cells..
 Initiate faultisolationandtestinginthe eventof cell site outagesbothBTSandBSC side, either
on the BSC local terminal orremotelyviathe OSS/CITRIXtool.
 IncludesloadingscriptsforRadioexpansionsanddeactivationasperRF engineerstatisticsand
requirements.
 Performsperiodicandannual preventive maintenance onall cell sitesassignedinsidethe zone.
Project:EDGE Project/RBS Tester
Job Functions
 Radiochange out from3 X 2 configurationsto3 X 3 upgrade for GSM cell sites.
 Re configurationof OMTand itsrequirements.
Project: Switch Tech Engineerfor CingularWireless.
Job Functions
 ProvidedOperationsandMaintenance servicesforCingularWireless
 . Dutiesincludedthe following:
- Performedroutine maintenance proceduresfor AXE501 Switches(GMSC,MSC’s&BSC’s)
locatedwithinthe same facility.
- Initiatedlifeline procedurestotestswitchSystemBackupfromexternal storage.
- Assistedincell site re-hominganddeletion.
- Performedmonthlysystembackupandlifeline forthe switch.
- T1 activation,testingandacceptance totransmissionlevel andupto verificationonthe
NewBridge Facilities.
- Initiated1stlevel troubleshootingonswitchingfaults,software andhardware.
- Trouble ticketgenerationtoperformfaultisolationandcorrectionfromswitchtoT1
level inthe eventof cell site outage.
 - Work OrderimplementationandtestingforNew andAugmenttrunkswithin the own
networkandotherTelcocompanies.
Project: Switch TestEngineerfor EXi Parsons TelecomLLC
Job Functions
 CommissioningandTestingof newlyinstalledEricssonAXE10(BYB501) hardware frompowerup
to RFA
 TroubleshootingfaultsbasedonidentifiedpunchlistitemsafterRFA
 TestedandCommissioned4BSC’sand 2 MSC’s
 PerformedPCUupgrade andExpansion
o DTI expansionforAXE501 and 202 hardware’s.
Project: Operationand Maintenance EngineerforEricsson Inc.
Job Functions
 ProvidedOperationsandMaintenance servicesforEricsson’sclientAT&Twireless.
Dutiesincludedthe following:
 Performedroutine maintenance proceduresfor3AXE 10 Switches(MSC’s) located
withinthe same facility.
 Initiatedlifeline procedurestotestswitchSystemBackupfromexternal storage.
 Assistedincell site re-hominganddeletion.
 Performedmonthlysystembackupandlifeline forthe switch.
 T1 activation,testingandacceptance totransmission level.
 Initiated1stlevel troubleshootingonswitchingfaults,software andhardware.
 Trouble ticketgenerationtoperformfaultisolationandcorrectionfromswitchtoT1
level inthe eventof cell site outage.
TRAININGSATTENDED :
Agile Scrum Bootcamp/Project Manage Management- September2015 AT&T Wireless
ATO Transformation Series - September2015 AT&T Wireless
Online API Boot Camp – October 2015 AT&T Wireless
Big Data & Basic Hadoops Overviewand Architecture – September2015 AT&T Wireless
Finance Essentials- January 2015 AT&T Wireless
ATM and TCP/IP in UMTS - January 2008 Tmobile Wireless
LTE Overview– September2015 AT&T Wireless
EDUCATIONAL BACKGROUND:
ELECTRONICS AND COMMUNICATIONSENGINEERING
Central College ofthe Philippines,
REFERENCE:
Tom Coztanzo – Operationand Maintenance Manager
Tmobile Wireless
(805) 3047046
AlmerSantiago – Operation and Maintenance Manager (RBS)
Tmobile Wireless
(805) 5749225
Andre Mccoy Professional Technical ProjectManagement
AT&T Wireless
Contact number : (510) 918-9911
AlbertAscarate Area Manager
AT&T Wireless
Contact Number: (480) 492-2863
Harika Kayi Level 4 DesignEngineerAT&T Wireless
Contact Number : (714) 326-7526

More Related Content

What's hot

BRIAN D ALDRIDGE Resume 2016
BRIAN D ALDRIDGE Resume 2016BRIAN D ALDRIDGE Resume 2016
BRIAN D ALDRIDGE Resume 2016Brian Aldridge
 
Resume Timothy Roscoe 07-07-2015
Resume Timothy Roscoe 07-07-2015Resume Timothy Roscoe 07-07-2015
Resume Timothy Roscoe 07-07-2015tproscoe
 
Amer malik resume
Amer malik resumeAmer malik resume
Amer malik resume
Amer Malik
 
edenobrero(resume)
edenobrero(resume) edenobrero(resume)
edenobrero(resume) Eden Obrero
 
Paul cliff-2014 combo resume
Paul cliff-2014 combo resumePaul cliff-2014 combo resume
Paul cliff-2014 combo resumePaul Cliff
 
A comprehensive hiring guide for test environment managers
A comprehensive hiring guide for test environment managersA comprehensive hiring guide for test environment managers
A comprehensive hiring guide for test environment managers
Enov8
 
WilliamBosch_2016Resume
WilliamBosch_2016ResumeWilliamBosch_2016Resume
WilliamBosch_2016ResumeWilliam Bosch
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation EngineerVikas Pandey
 
LawrenceWhaleyCVFeb2016 jacobs (Repaired)
LawrenceWhaleyCVFeb2016 jacobs (Repaired)LawrenceWhaleyCVFeb2016 jacobs (Repaired)
LawrenceWhaleyCVFeb2016 jacobs (Repaired)lawrence whaley
 
Dicks Resume 2012
Dicks Resume 2012Dicks Resume 2012
Dicks Resume 2012
LagomLeadership
 
Jerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3aJerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3aJerry Schwab
 
CV - Jeff Lloyd - Engineering Manager and Automation Specialist
CV - Jeff Lloyd - Engineering Manager and Automation SpecialistCV - Jeff Lloyd - Engineering Manager and Automation Specialist
CV - Jeff Lloyd - Engineering Manager and Automation Specialist
Jeff Lloyd
 

What's hot (20)

BRIAN D ALDRIDGE Resume 2016
BRIAN D ALDRIDGE Resume 2016BRIAN D ALDRIDGE Resume 2016
BRIAN D ALDRIDGE Resume 2016
 
Eds Resume 063015
Eds Resume 063015Eds Resume 063015
Eds Resume 063015
 
Prabal_CV
Prabal_CVPrabal_CV
Prabal_CV
 
Resume Timothy Roscoe 07-07-2015
Resume Timothy Roscoe 07-07-2015Resume Timothy Roscoe 07-07-2015
Resume Timothy Roscoe 07-07-2015
 
Amer malik resume
Amer malik resumeAmer malik resume
Amer malik resume
 
edenobrero(resume)
edenobrero(resume) edenobrero(resume)
edenobrero(resume)
 
Paul cliff-2014 combo resume
Paul cliff-2014 combo resumePaul cliff-2014 combo resume
Paul cliff-2014 combo resume
 
Larry W Shackelford V1
Larry W Shackelford V1Larry W Shackelford V1
Larry W Shackelford V1
 
A comprehensive hiring guide for test environment managers
A comprehensive hiring guide for test environment managersA comprehensive hiring guide for test environment managers
A comprehensive hiring guide for test environment managers
 
8-10-2016 resume
8-10-2016 resume8-10-2016 resume
8-10-2016 resume
 
resume_2016
resume_2016resume_2016
resume_2016
 
DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
 
WilliamBosch_2016Resume
WilliamBosch_2016ResumeWilliamBosch_2016Resume
WilliamBosch_2016Resume
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation Engineer
 
LawrenceWhaleyCVFeb2016 jacobs (Repaired)
LawrenceWhaleyCVFeb2016 jacobs (Repaired)LawrenceWhaleyCVFeb2016 jacobs (Repaired)
LawrenceWhaleyCVFeb2016 jacobs (Repaired)
 
Dicks Resume 2012
Dicks Resume 2012Dicks Resume 2012
Dicks Resume 2012
 
CV J McGowan
CV J McGowanCV J McGowan
CV J McGowan
 
Jerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3aJerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3a
 
Hari Vikram
Hari VikramHari Vikram
Hari Vikram
 
CV - Jeff Lloyd - Engineering Manager and Automation Specialist
CV - Jeff Lloyd - Engineering Manager and Automation SpecialistCV - Jeff Lloyd - Engineering Manager and Automation Specialist
CV - Jeff Lloyd - Engineering Manager and Automation Specialist
 

Similar to Benjamin Santos Resume V1

CV_PraveenKonda_CCIVR
CV_PraveenKonda_CCIVRCV_PraveenKonda_CCIVR
CV_PraveenKonda_CCIVRPraveen K
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16Robin White, PMP
 
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...Ricky Chan
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume Rebecca Selinger
 
9 yrs of Testing Exp_STB and DSL gateway products
9 yrs of Testing Exp_STB and DSL gateway products9 yrs of Testing Exp_STB and DSL gateway products
9 yrs of Testing Exp_STB and DSL gateway productsPrakash S M
 
SK Project Management Resume
SK Project Management ResumeSK Project Management Resume
SK Project Management ResumeStephen Kramer
 
ResumeSagli_Nov14
ResumeSagli_Nov14ResumeSagli_Nov14
ResumeSagli_Nov14Jerry Sagli
 
Rolston Rene _Resume
Rolston Rene _ResumeRolston Rene _Resume
Rolston Rene _ResumeRolston Rene
 
Gregory yee _resume
Gregory yee _resumeGregory yee _resume
Gregory yee _resume
Greg Yee
 
Frank Politi's Resume
Frank Politi's ResumeFrank Politi's Resume
Frank Politi's Resume
Frank Politi
 

Similar to Benjamin Santos Resume V1 (20)

SRN_11
SRN_11SRN_11
SRN_11
 
CV_PraveenKonda_CCIVR
CV_PraveenKonda_CCIVRCV_PraveenKonda_CCIVR
CV_PraveenKonda_CCIVR
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16
 
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
 
LinJie_Resume_English
LinJie_Resume_EnglishLinJie_Resume_English
LinJie_Resume_English
 
Shannon Mays 2016
Shannon Mays 2016Shannon Mays 2016
Shannon Mays 2016
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume
 
Gary Blakeley CV
Gary Blakeley CVGary Blakeley CV
Gary Blakeley CV
 
GAP.CV.Profile
GAP.CV.ProfileGAP.CV.Profile
GAP.CV.Profile
 
9 yrs of Testing Exp_STB and DSL gateway products
9 yrs of Testing Exp_STB and DSL gateway products9 yrs of Testing Exp_STB and DSL gateway products
9 yrs of Testing Exp_STB and DSL gateway products
 
SK Project Management Resume
SK Project Management ResumeSK Project Management Resume
SK Project Management Resume
 
Resume_Serma_Professional (2)
Resume_Serma_Professional (2)Resume_Serma_Professional (2)
Resume_Serma_Professional (2)
 
Mohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CVMohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CV
 
JTroianoJulyPDF
JTroianoJulyPDFJTroianoJulyPDF
JTroianoJulyPDF
 
ResumeSagli_Nov14
ResumeSagli_Nov14ResumeSagli_Nov14
ResumeSagli_Nov14
 
Resume
ResumeResume
Resume
 
TC-CV-2015
TC-CV-2015TC-CV-2015
TC-CV-2015
 
Rolston Rene _Resume
Rolston Rene _ResumeRolston Rene _Resume
Rolston Rene _Resume
 
Gregory yee _resume
Gregory yee _resumeGregory yee _resume
Gregory yee _resume
 
Frank Politi's Resume
Frank Politi's ResumeFrank Politi's Resume
Frank Politi's Resume
 

Benjamin Santos Resume V1

  • 1. Benjamin (Ben) J. Santos 19815 EllisHenry Ct., Newhall,CA,91321 Contact Number: (661) 5137917 E-mail Address: benjamin4santos@gmail.com SUMMARYOF QUALIFICATIONS I have 6 yearsof ProjectManagementpositionhandlingmultiple technical projects. Capable and talentedprojectmanagerwhohasthe requiredqualificationstohandle multipleprojectsfrominitiation, executionthrucompletionalongwith comparable experience of workingtothe higheststandards.Long track record of ensuringprojectsare deliveredtothe highestquality,withinbudgetbyeffectively organizing,managingandutilizingall resources.Abletoleadteamswhere the higheststandardsare routinelydemanded.Alwayswantingtobe activelyinvolvedinall aspectsof the projectlife-cycle and can deliverhigh-value projectsinorganizationsandacrossdifferentgeographies.Itake directionwell and workshard to manage stakeholder expectations. A teamleaderandplayeraswell asa committed collaboratorandsetgoals as team.Hard-workingwithgoodproblemsolvingskills.Adaptseasilytonew workingenvironmentandsituations.Canhandle multipriorityprojectsasperneedbydate sequence and prerequisite.Resourcefulinwaystodo thingswhenthere are noobvioussolutionsavailable. AREAS OF EXPERTISE:  Project management/implementation  Change management  Project planning  Project reporting  Resource management  Risk management  Processimprovement  Managing project quality  Agile projectmanagement  Analytic and problemsolvingskills  Systemintegration and testing PROFESSIONAL EXPERIENCE: SENIOR- TECH PROJECT PROGRAMMANAGEMENT FEBRUARY 2011 – MARCH 2016 AT&T WIRELESS Accountable formanagingthe deliveryof critical projects,andforprovidingmanagerial supportforall the projectsconductedbythe company.Alsoresponsible forprovidingmonthlytechnical updatesof any knownissues/riskstoSeniorManagement. Job discription:  Manage small tolarge scale systems,networkandsoftware deploymentprojectsforthe company withfull oversightfortestinganddeployment.  Define technical requirementsanddocumentplansforprojectlifecycle deployment includingthe schedulingof projectdeliverables,budgetsandtimelines.
  • 2.  Directall technical deploymentsandjobschedulingwithoversightforvendorand operations management.  Coordinate bothinternal andexternal projectsensuringthatimplementations are readyas requiredbyneedbydates/deadlines.  Analyze,prepare anddocumentoperationalproceduresandtechnical guidelines.  Plan,developanddeploychange managementinitiativesfortechnical implementation includingproductivitysoftware,systems,technical applicationandhardware release inthe cellularnetwork.  Define newprocessesfortrackingbyutilizingSharePointreducingemail requiredto communicate updates.  Coordinate activities,schedule withappropriate parties,provide regularupdatesand communication usingpropertoolsforlocal andinternational stakeholders.  Coordinate andconductsprojectmeetingstoensure the appropriateactionplansare in place to minimize the riskof delaysandprovideinputsintostrategiestoreduce company costs while maintainingcompany’squalitystandards. TECHNICAL PROJECT MANAGER(Contractor) APRIL 2010 – JANUARY2011 AT&T MobilityWestRegion– NorCal Job Description  ProjectTimelineplanning,prioritizingandexecutingthe RNC/ NodeBrehomesand rebalancesinMarketsof the WestRegion.  Managing frequentchangestothe scope andprioritiesdue tothe dynamicstructure of the cellularnetworkevaluatingthe impacttothe projecttimelinesandcommunicatingtoall involvedparties.  ProjectExecution coordinationof activities,schedule withappropriate parties,provide regularupdatesandcommunicationusingpropertoolsforinternal andexternal stakeholders,andmanage changesinscope.  Developingprojectdocumentation,creatingbestpracticesforthe Westregionidentifying projectgoals and tasks  Coordinate the teamtoensure the appropriate actionplansare inplace to minimize the risk of delaysandextracostswhile maintainingcompany’squalitystandards.  Knowledgeof organizational structure toensure properprojectteamrepresentation  Coordinateswithmultiple teamsdomesticandinternational stakeholders thatare involved inthe project. TELECOM ENGINEER DEC 2009 – APRIL 2010 Project: Team Lead Quality Audit Site Survey for Ericsson Third Carrier to AT&T TELECOM ENGINEER May 2009 - November2009 Project: Switching Maintenance and EngineeringforTmobile Wireless.  TelephonyEngineerwill be responsibleforthe day-to-dayoperations,implementation, administration,configuration,problemresolutionand/ortechnical supportfor telephony/voice/software.
  • 3.  Scope includesof workalsoinvolve consultingwithclients,hardware/software vendors,and varioustelephony/voice groups.Responsibilitywill include respondingtotechnical hardware and software designquestionsandtechniquesinsupportof the telephony.  Engineerassigntooversee routinehardware/software audits,ensure adherence to companysecurity/compliancepolicies,andmaintaintelephonyapplicationand/or hardware/softwareconfigurationdocumentation.Workingexperience withnetwork topologiessuchas:ISDN,Frame Relay,T1, T3, DS3, ATM, OC-N,SONET TECHNICAL ENGINEERING : June 2000 – May 2009 Amatel Inc. 5055 Wilshire Blvd.,Suite 740, Los Angeles,CA90036 Project:SwitchingOperation & Maintenance for AT&T and Tmobile Wireless  ProvidedOperationsandMaintenance servicesforTmobile Wireless  . Dutiesincludedthe following: o Performedroutine maintenance proceduresfor AXE810 Switches(GMSC,MSC’s&BSC’s) locatedwithinthe same facility. o Initiatedlifeline procedurestotestswitchSystemBackupfromexternal storage. o 2G Cell site reconfiguration,re-hominganddeletion. o Performedmonthlysystembackupandlifeline forthe switch. o T1, DS3, OC12 testingandacceptance to transmissionlevel uptoprovisioning. o Initiated1stlevel troubleshootingonswitchingfaults,software andhardware. o Trouble ticketgenerationtoperformfaultisolationandcorrectionfromswitchtoT1 level inthe eventof cell site outage.  - Work OrderimplementationandtestingforNew andAugmenttrunkswithin the own networkandotherTelcocompanies. o Basic TroubleshootingEricssonRNCUMTS switchandNode B UMTS BTS eqpmt. o Trunk turnup and testingIMT and TelcoInterconnectsthruAlcatel MGW. Project:Operation& Maintenance RBS for CingularWireless  ProvidedOperationsandMaintenance forBTSEquipmentsmostlyEricsson2000 familyi.e. RBS2102, 2106, 2206 pico cells..  Initiate faultisolationandtestinginthe eventof cell site outagesbothBTSandBSC side, either on the BSC local terminal orremotelyviathe OSS/CITRIXtool.  IncludesloadingscriptsforRadioexpansionsanddeactivationasperRF engineerstatisticsand requirements.  Performsperiodicandannual preventive maintenance onall cell sitesassignedinsidethe zone. Project:EDGE Project/RBS Tester Job Functions  Radiochange out from3 X 2 configurationsto3 X 3 upgrade for GSM cell sites.  Re configurationof OMTand itsrequirements.
  • 4. Project: Switch Tech Engineerfor CingularWireless. Job Functions  ProvidedOperationsandMaintenance servicesforCingularWireless  . Dutiesincludedthe following: - Performedroutine maintenance proceduresfor AXE501 Switches(GMSC,MSC’s&BSC’s) locatedwithinthe same facility. - Initiatedlifeline procedurestotestswitchSystemBackupfromexternal storage. - Assistedincell site re-hominganddeletion. - Performedmonthlysystembackupandlifeline forthe switch. - T1 activation,testingandacceptance totransmissionlevel andupto verificationonthe NewBridge Facilities. - Initiated1stlevel troubleshootingonswitchingfaults,software andhardware. - Trouble ticketgenerationtoperformfaultisolationandcorrectionfromswitchtoT1 level inthe eventof cell site outage.  - Work OrderimplementationandtestingforNew andAugmenttrunkswithin the own networkandotherTelcocompanies. Project: Switch TestEngineerfor EXi Parsons TelecomLLC Job Functions  CommissioningandTestingof newlyinstalledEricssonAXE10(BYB501) hardware frompowerup to RFA  TroubleshootingfaultsbasedonidentifiedpunchlistitemsafterRFA  TestedandCommissioned4BSC’sand 2 MSC’s  PerformedPCUupgrade andExpansion o DTI expansionforAXE501 and 202 hardware’s. Project: Operationand Maintenance EngineerforEricsson Inc. Job Functions  ProvidedOperationsandMaintenance servicesforEricsson’sclientAT&Twireless. Dutiesincludedthe following:  Performedroutine maintenance proceduresfor3AXE 10 Switches(MSC’s) located withinthe same facility.  Initiatedlifeline procedurestotestswitchSystemBackupfromexternal storage.  Assistedincell site re-hominganddeletion.  Performedmonthlysystembackupandlifeline forthe switch.  T1 activation,testingandacceptance totransmission level.  Initiated1stlevel troubleshootingonswitchingfaults,software andhardware.
  • 5.  Trouble ticketgenerationtoperformfaultisolationandcorrectionfromswitchtoT1 level inthe eventof cell site outage. TRAININGSATTENDED : Agile Scrum Bootcamp/Project Manage Management- September2015 AT&T Wireless ATO Transformation Series - September2015 AT&T Wireless Online API Boot Camp – October 2015 AT&T Wireless Big Data & Basic Hadoops Overviewand Architecture – September2015 AT&T Wireless Finance Essentials- January 2015 AT&T Wireless ATM and TCP/IP in UMTS - January 2008 Tmobile Wireless LTE Overview– September2015 AT&T Wireless EDUCATIONAL BACKGROUND: ELECTRONICS AND COMMUNICATIONSENGINEERING Central College ofthe Philippines, REFERENCE: Tom Coztanzo – Operationand Maintenance Manager Tmobile Wireless (805) 3047046 AlmerSantiago – Operation and Maintenance Manager (RBS) Tmobile Wireless (805) 5749225 Andre Mccoy Professional Technical ProjectManagement AT&T Wireless Contact number : (510) 918-9911 AlbertAscarate Area Manager AT&T Wireless Contact Number: (480) 492-2863
  • 6. Harika Kayi Level 4 DesignEngineerAT&T Wireless Contact Number : (714) 326-7526