SlideShare a Scribd company logo
Field Monitoring and Information Management.
By Nyeapa Yakubu
Data
CQA
Monitoring The process of regularly and
systematically collecting and analyzing,
information about a project and, when
appropriate, using it to make adjustments to
the project. Project monitoring data may be
used to adjust project implementation, enable
internal and external reporting, inform project
design and advocacy, and promote
accountability to beneficiaries.
Evaluation A formal analysis at the
beginning, middle and end of a project that
investigates whether a project has achieved its
intended objectives. An important goal of
evaluation is to provide recommendations and
lessons to the project managers and
implementation teams that have worked on the
projects and for the ones that will implement
and work on similar projects.
Monitoring and Evaluation informs
end-of-project learning- to evaluate
what worked, lessons learnt and
planning for future project.
Monitoring Work Plan
WHAT The Monitoring Work Plan is a calendar of
the monitoring-related events that will occur during the
project. These can include trainings, baseline surveys,
routine monitoring, and donor deadlines.
WHO The Monitoring Work Plan should be
completed by the M&E and the Program.
WHEN The Monitoring Work Plan should be done
early in the project set-up and updated when the timing of
events change. It should be done after the indicator
matrix is complete.
HOW The Monitoring Work Plan should be completed
based on data collection events required for each
indicator (baseline, end line, routine data collection,
surveys, etc.), team-based data review, and donor report
deadlines.
The Work plan should also include key events that you
anticipate will occur. This can include trainings, data
quality reviews, and field visits. Once completed, you
should present the Data Workflow to the M&E and
Program staff.
Simple M&E Work Plan
Activity Indicator
definition
Target Frequency of
data
collection
Reporting
time lines
Who is
responsib
le
Indicator 1:
Activity 1
Activity 2
Indicator 2:
Activity 1
Activity 2
• DATA QUALITY AUDIT An assessment of the
validity, reliability, precision, integrity, and timeliness of
data. A data quality audit enables a manager to identify
and respond to data quality issues and determine the
extent to which existing data can be trusted and used to
influence project implementation decisions.
• DATA REVIEW MEETINGS Regular
meetings that should be held throughout the project
cycle to review monitoring data and assess project
progress, identify trends, and develop plans for course
correction.
Review meetings should come after most
data quality audit have been done on
monitoring data collected over time.
Review meetings should have a focus of
finding what works and what does not
work.
Measuring Quality Data
The data is only as good as its quality. The quality of data is
measured against six criteria:
Validity – data which clearly, directly and adequately
represents the result that was intended to be measured.
Reliability – if the process were repeated over and over again
it would yield the same result
Integrity – data have been protected from deliberate bias or
manipulation for political/personal reasons
Precision – data are accurate with sufficient detail
Timeliness – data are current and information is available on
time
Confidentiality – clients are assured that their data will be
maintained according to national and/or international
standards for data
Good quality data can be recognized by checking the
FACTS
F – Formatted Properly
A – Accurate
C – Complete
T – Timely
S – Segmented properly
Why FACTS?
It enables better program designing, better program
level decisions, better inputs to policy makers and
demonstrates dedication to accountability to funding
agencies.
How Best We Manipulate Data
Let’s use RATS to achieve this:
R – Raw data (i.e. forms)
A – Aggregated data (i.e. tables)
T – Trends (i.e. consistent changes over time)
S – Segmented data (i.e. split by sex, age,
etc.)
Feed Back
How would you feel if you wrote your girl/boyfriend a
letter and they didn’t respond?”
“What would you do if you deposited money into the
bank but they wouldn’t let you withdraw it?”
What is feedback?”
”What are the moments/stations for feedback within
the project?”
”Who mostly provides feedback for
improvement/modification of the intervention?
“Why?”
Whose feedbacks to whom and why?”
A free flow of information between team members is
essential. If one side is required to report to another,
it is equally important for the receiver of the report to
deliver feedback for improvement.
For example: The community mobiliser who compiles
weekly reports needs to provide feedback to the
project manager, who, in turn, needs to provide
feedback to the entire team. In this way the team is
all on the same page and accessing the same
information; this allows for a more comprehensive
effort.
Any Question/Comments or Recommendations
ThankYou

More Related Content

What's hot

Presentation on M&E, Presented by Sushanta Kumar Sarker
Presentation on M&E, Presented by Sushanta Kumar SarkerPresentation on M&E, Presented by Sushanta Kumar Sarker
Presentation on M&E, Presented by Sushanta Kumar Sarker
Sushanta Kumar Sarker
 
Monitoring and Evaluation
Monitoring and Evaluation Monitoring and Evaluation
Monitoring and Evaluation
Beta-Research.org
 
Difference between monitoring and evaluation
Difference between monitoring and evaluationDifference between monitoring and evaluation
Difference between monitoring and evaluation
Doreen Ty
 
M & e indicators
M & e indicatorsM & e indicators
M & e indicators
Krishna Mishra
 
TTIPEC: Monitoring and Evaluation (Session 1)
TTIPEC: Monitoring and Evaluation (Session 1)TTIPEC: Monitoring and Evaluation (Session 1)
TTIPEC: Monitoring and Evaluation (Session 1)
Research to Action
 
Program Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringProgram Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post Monitoring
Thabang Nare
 
Project monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino MokayaProject monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino Mokaya
Discover JKUAT
 
Effective M&E System and How to Avoid Common Mistakes in Logframe -Sushanta K...
Effective M&E System and How to Avoid Common Mistakes in Logframe -Sushanta K...Effective M&E System and How to Avoid Common Mistakes in Logframe -Sushanta K...
Effective M&E System and How to Avoid Common Mistakes in Logframe -Sushanta K...
Sushanta Kumar Sarker
 
Monitoring and evaluation Learning and Development
Monitoring and evaluation Learning and DevelopmentMonitoring and evaluation Learning and Development
Monitoring and evaluation Learning and Development
SESH SUKHDEO
 
Monitoring and evaluation (2)
Monitoring and evaluation (2)Monitoring and evaluation (2)
Monitoring and evaluation (2)
Dr.RAJEEV KASHYAP
 
Monitoring and evaluation presentation equi gov
Monitoring and evaluation presentation equi govMonitoring and evaluation presentation equi gov
Monitoring and evaluation presentation equi gov
EquiGov Institute
 
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE SHOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
Abraham Ncunge
 
Resume_-_Jayson_Sepe_
Resume_-_Jayson_Sepe_Resume_-_Jayson_Sepe_
Resume_-_Jayson_Sepe_
Andy (Jayson) Sepe
 
Indicator Analysis Steps and Techniques, M&E training part-2, sushanta, fao, ...
Indicator Analysis Steps and Techniques, M&E training part-2, sushanta, fao, ...Indicator Analysis Steps and Techniques, M&E training part-2, sushanta, fao, ...
Indicator Analysis Steps and Techniques, M&E training part-2, sushanta, fao, ...
Sushanta Kumar Sarker
 
Monitoring and Evaluating
Monitoring and EvaluatingMonitoring and Evaluating
Monitoring and Evaluating
GlobalGiving
 
Estimation
EstimationEstimation
Estimation
Cristina Grigore
 
Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT
Gus Prakash
 
Proactive evaluation
Proactive evaluationProactive evaluation
Proactive evaluation
Carlo Magno
 
Evaluating Process in Education by Mariver C. Mangulabnan
Evaluating Process in Education by Mariver C. MangulabnanEvaluating Process in Education by Mariver C. Mangulabnan
Evaluating Process in Education by Mariver C. Mangulabnan
Mariver Mangulabnan
 
Program Evaluations
Program EvaluationsProgram Evaluations
Program Evaluations
Dumas F. Lafontant
 

What's hot (20)

Presentation on M&E, Presented by Sushanta Kumar Sarker
Presentation on M&E, Presented by Sushanta Kumar SarkerPresentation on M&E, Presented by Sushanta Kumar Sarker
Presentation on M&E, Presented by Sushanta Kumar Sarker
 
Monitoring and Evaluation
Monitoring and Evaluation Monitoring and Evaluation
Monitoring and Evaluation
 
Difference between monitoring and evaluation
Difference between monitoring and evaluationDifference between monitoring and evaluation
Difference between monitoring and evaluation
 
M & e indicators
M & e indicatorsM & e indicators
M & e indicators
 
TTIPEC: Monitoring and Evaluation (Session 1)
TTIPEC: Monitoring and Evaluation (Session 1)TTIPEC: Monitoring and Evaluation (Session 1)
TTIPEC: Monitoring and Evaluation (Session 1)
 
Program Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringProgram Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post Monitoring
 
Project monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino MokayaProject monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino Mokaya
 
Effective M&E System and How to Avoid Common Mistakes in Logframe -Sushanta K...
Effective M&E System and How to Avoid Common Mistakes in Logframe -Sushanta K...Effective M&E System and How to Avoid Common Mistakes in Logframe -Sushanta K...
Effective M&E System and How to Avoid Common Mistakes in Logframe -Sushanta K...
 
Monitoring and evaluation Learning and Development
Monitoring and evaluation Learning and DevelopmentMonitoring and evaluation Learning and Development
Monitoring and evaluation Learning and Development
 
Monitoring and evaluation (2)
Monitoring and evaluation (2)Monitoring and evaluation (2)
Monitoring and evaluation (2)
 
Monitoring and evaluation presentation equi gov
Monitoring and evaluation presentation equi govMonitoring and evaluation presentation equi gov
Monitoring and evaluation presentation equi gov
 
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE SHOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
 
Resume_-_Jayson_Sepe_
Resume_-_Jayson_Sepe_Resume_-_Jayson_Sepe_
Resume_-_Jayson_Sepe_
 
Indicator Analysis Steps and Techniques, M&E training part-2, sushanta, fao, ...
Indicator Analysis Steps and Techniques, M&E training part-2, sushanta, fao, ...Indicator Analysis Steps and Techniques, M&E training part-2, sushanta, fao, ...
Indicator Analysis Steps and Techniques, M&E training part-2, sushanta, fao, ...
 
Monitoring and Evaluating
Monitoring and EvaluatingMonitoring and Evaluating
Monitoring and Evaluating
 
Estimation
EstimationEstimation
Estimation
 
Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT
 
Proactive evaluation
Proactive evaluationProactive evaluation
Proactive evaluation
 
Evaluating Process in Education by Mariver C. Mangulabnan
Evaluating Process in Education by Mariver C. MangulabnanEvaluating Process in Education by Mariver C. Mangulabnan
Evaluating Process in Education by Mariver C. Mangulabnan
 
Program Evaluations
Program EvaluationsProgram Evaluations
Program Evaluations
 

Similar to Data quality field monitoring and information management by Nyeapa Yakubu +2348027277228

Training on data collection 1
Training  on data collection 1Training  on data collection 1
Training on data collection 1
saminu lewi
 
EMIS
EMIS EMIS
M&E Concepts.pptx
M&E Concepts.pptxM&E Concepts.pptx
M&E Concepts.pptx
FranciscoSingano1
 
Monitoring and evaluation by Olashore Emmanuel
Monitoring and evaluation by Olashore EmmanuelMonitoring and evaluation by Olashore Emmanuel
Monitoring and evaluation by Olashore Emmanuel
Emmanuel Olashore
 
PROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptx
PROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptxPROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptx
PROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptx
leamangaring12
 
Monitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptxMonitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptx
Vallentine Okumu
 
Monitoring & Evaluation.pptx
Monitoring & Evaluation.pptxMonitoring & Evaluation.pptx
Monitoring & Evaluation.pptx
GeorgeKabongah2
 
Monitoring process
Monitoring processMonitoring process
Monitoring process
Dr.Shazia Zamir
 
Unit IV_Monitoring_and_Evaluation.pptx
Unit IV_Monitoring_and_Evaluation.pptxUnit IV_Monitoring_and_Evaluation.pptx
Unit IV_Monitoring_and_Evaluation.pptx
MusondaMofu2
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandra
Sandra Guevara
 
CPE Monitoring and Evaluation
CPE Monitoring and EvaluationCPE Monitoring and Evaluation
CPE Monitoring and Evaluation
Samuel Baker
 
Monitoring & Evaluation Framework - Fiinovation
Monitoring & Evaluation Framework - FiinovationMonitoring & Evaluation Framework - Fiinovation
Monitoring & Evaluation Framework - Fiinovation
Fiinovation | Innovative Financial Advisors Pvt.Ltd
 
M & E Presentation DSK.ppt
M & E Presentation DSK.pptM & E Presentation DSK.ppt
M & E Presentation DSK.ppt
ShafayetHossain30
 
M & E Fundamentals.
M & E Fundamentals.M & E Fundamentals.
M & E Fundamentals.
PrestonAssociates
 
monitoring and evaluation
monitoring and evaluationmonitoring and evaluation
monitoring and evaluation
Tarek Sallam
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]
skzarif
 
Importance of M&E
Importance of M&EImportance of M&E
Importance of M&E
clearsateam
 
Monitoring & Evaluation
Monitoring & EvaluationMonitoring & Evaluation
Monitoring & Evaluation
Devegowda S R
 
Monitoring and evaluation1
Monitoring and evaluation1Monitoring and evaluation1
Monitoring and evaluation1
PCPD Palestine
 
Module slide for evaluation and learning
Module slide for evaluation and learningModule slide for evaluation and learning
Module slide for evaluation and learning
nzekwesiliekenedilic
 

Similar to Data quality field monitoring and information management by Nyeapa Yakubu +2348027277228 (20)

Training on data collection 1
Training  on data collection 1Training  on data collection 1
Training on data collection 1
 
EMIS
EMIS EMIS
EMIS
 
M&E Concepts.pptx
M&E Concepts.pptxM&E Concepts.pptx
M&E Concepts.pptx
 
Monitoring and evaluation by Olashore Emmanuel
Monitoring and evaluation by Olashore EmmanuelMonitoring and evaluation by Olashore Emmanuel
Monitoring and evaluation by Olashore Emmanuel
 
PROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptx
PROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptxPROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptx
PROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptx
 
Monitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptxMonitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptx
 
Monitoring & Evaluation.pptx
Monitoring & Evaluation.pptxMonitoring & Evaluation.pptx
Monitoring & Evaluation.pptx
 
Monitoring process
Monitoring processMonitoring process
Monitoring process
 
Unit IV_Monitoring_and_Evaluation.pptx
Unit IV_Monitoring_and_Evaluation.pptxUnit IV_Monitoring_and_Evaluation.pptx
Unit IV_Monitoring_and_Evaluation.pptx
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandra
 
CPE Monitoring and Evaluation
CPE Monitoring and EvaluationCPE Monitoring and Evaluation
CPE Monitoring and Evaluation
 
Monitoring & Evaluation Framework - Fiinovation
Monitoring & Evaluation Framework - FiinovationMonitoring & Evaluation Framework - Fiinovation
Monitoring & Evaluation Framework - Fiinovation
 
M & E Presentation DSK.ppt
M & E Presentation DSK.pptM & E Presentation DSK.ppt
M & E Presentation DSK.ppt
 
M & E Fundamentals.
M & E Fundamentals.M & E Fundamentals.
M & E Fundamentals.
 
monitoring and evaluation
monitoring and evaluationmonitoring and evaluation
monitoring and evaluation
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]
 
Importance of M&E
Importance of M&EImportance of M&E
Importance of M&E
 
Monitoring & Evaluation
Monitoring & EvaluationMonitoring & Evaluation
Monitoring & Evaluation
 
Monitoring and evaluation1
Monitoring and evaluation1Monitoring and evaluation1
Monitoring and evaluation1
 
Module slide for evaluation and learning
Module slide for evaluation and learningModule slide for evaluation and learning
Module slide for evaluation and learning
 

Recently uploaded

快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
yemqpj
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
ssuser05e8f3
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Jamesadhikaram land matter consultancy 9447464502
 
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
OECDregions
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
ahcitycouncil
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
uu1psyf6
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
Christina Parmionova
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
CFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon CanadaCFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon Canada
pmenzies
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
elmerdalida001
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
Christina Parmionova
 
A guide to the International day of Potatoes 2024 - May 30th
A guide to the International day of Potatoes 2024 - May 30thA guide to the International day of Potatoes 2024 - May 30th
A guide to the International day of Potatoes 2024 - May 30th
Christina Parmionova
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 

Recently uploaded (20)

快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
 
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
CFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon CanadaCFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon Canada
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
 
A guide to the International day of Potatoes 2024 - May 30th
A guide to the International day of Potatoes 2024 - May 30thA guide to the International day of Potatoes 2024 - May 30th
A guide to the International day of Potatoes 2024 - May 30th
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 

Data quality field monitoring and information management by Nyeapa Yakubu +2348027277228

  • 1. Field Monitoring and Information Management. By Nyeapa Yakubu Data CQA
  • 2. Monitoring The process of regularly and systematically collecting and analyzing, information about a project and, when appropriate, using it to make adjustments to the project. Project monitoring data may be used to adjust project implementation, enable internal and external reporting, inform project design and advocacy, and promote accountability to beneficiaries.
  • 3. Evaluation A formal analysis at the beginning, middle and end of a project that investigates whether a project has achieved its intended objectives. An important goal of evaluation is to provide recommendations and lessons to the project managers and implementation teams that have worked on the projects and for the ones that will implement and work on similar projects.
  • 4. Monitoring and Evaluation informs end-of-project learning- to evaluate what worked, lessons learnt and planning for future project.
  • 5. Monitoring Work Plan WHAT The Monitoring Work Plan is a calendar of the monitoring-related events that will occur during the project. These can include trainings, baseline surveys, routine monitoring, and donor deadlines. WHO The Monitoring Work Plan should be completed by the M&E and the Program. WHEN The Monitoring Work Plan should be done early in the project set-up and updated when the timing of events change. It should be done after the indicator matrix is complete.
  • 6. HOW The Monitoring Work Plan should be completed based on data collection events required for each indicator (baseline, end line, routine data collection, surveys, etc.), team-based data review, and donor report deadlines. The Work plan should also include key events that you anticipate will occur. This can include trainings, data quality reviews, and field visits. Once completed, you should present the Data Workflow to the M&E and Program staff.
  • 7. Simple M&E Work Plan Activity Indicator definition Target Frequency of data collection Reporting time lines Who is responsib le Indicator 1: Activity 1 Activity 2 Indicator 2: Activity 1 Activity 2
  • 8. • DATA QUALITY AUDIT An assessment of the validity, reliability, precision, integrity, and timeliness of data. A data quality audit enables a manager to identify and respond to data quality issues and determine the extent to which existing data can be trusted and used to influence project implementation decisions. • DATA REVIEW MEETINGS Regular meetings that should be held throughout the project cycle to review monitoring data and assess project progress, identify trends, and develop plans for course correction.
  • 9. Review meetings should come after most data quality audit have been done on monitoring data collected over time. Review meetings should have a focus of finding what works and what does not work.
  • 10. Measuring Quality Data The data is only as good as its quality. The quality of data is measured against six criteria: Validity – data which clearly, directly and adequately represents the result that was intended to be measured. Reliability – if the process were repeated over and over again it would yield the same result Integrity – data have been protected from deliberate bias or manipulation for political/personal reasons Precision – data are accurate with sufficient detail Timeliness – data are current and information is available on time Confidentiality – clients are assured that their data will be maintained according to national and/or international standards for data
  • 11. Good quality data can be recognized by checking the FACTS F – Formatted Properly A – Accurate C – Complete T – Timely S – Segmented properly Why FACTS? It enables better program designing, better program level decisions, better inputs to policy makers and demonstrates dedication to accountability to funding agencies.
  • 12. How Best We Manipulate Data Let’s use RATS to achieve this: R – Raw data (i.e. forms) A – Aggregated data (i.e. tables) T – Trends (i.e. consistent changes over time) S – Segmented data (i.e. split by sex, age, etc.)
  • 13. Feed Back How would you feel if you wrote your girl/boyfriend a letter and they didn’t respond?” “What would you do if you deposited money into the bank but they wouldn’t let you withdraw it?” What is feedback?” ”What are the moments/stations for feedback within the project?” ”Who mostly provides feedback for improvement/modification of the intervention? “Why?”
  • 14. Whose feedbacks to whom and why?” A free flow of information between team members is essential. If one side is required to report to another, it is equally important for the receiver of the report to deliver feedback for improvement. For example: The community mobiliser who compiles weekly reports needs to provide feedback to the project manager, who, in turn, needs to provide feedback to the entire team. In this way the team is all on the same page and accessing the same information; this allows for a more comprehensive effort.
  • 15. Any Question/Comments or Recommendations ThankYou