More Related Content More from Nilanjana Pal (11) Data collection to design art and craft villege3. Administration
1. Reception=35 sq.m
2. Directors office=20 sq.m
3. Managers room=14 sq.m
4. Accountants sections=18 sq.m
5. Marketing Section=18 sq.m
6. Meeting room(15 person)=25
sq.m
7. Toilets=20 sq.m
4. Art and Craft Gallery
1. Gallery permant
collection=500
sq.m
2. Store Area=100
sq.m
3. Curators
Office=40 sq.m
4. Toilets=40 sq.m
5. Wood carving
1. Display Area=25 sq.m
2. Raw Material Store=30 sq.m
3. Seasoning=25 sq.m
4. Equipment room=50 sq.m
5. Design room=15 sq.m
6. Carving-big (10 craftsman)=80 sq.m
7. Carving-small=16 sq.m
8. Assembling + Finishing=20 sq.m
9. Finish Store=32 sq.m
10. Staff Area=20 sq.m
11. Learners Area=20 sq.m
12. Toilets=16 sq.m
13. Pantry=6 sq.m
6. Metal craft
1. Display area=25 sq.m
2. Raw metal store=20 sq.m
3. Design=10 sq.m
4. Waxing/Mud moulding=30
sq.m
5. Klin (2 electric klins)=40 sq.m
6. Assembly=15 sq.m
7. Finishing=10 sq.m
8. Polishing=10 sq.m
9. Store=30 sq.m
10. Staff Area=20 sq.m
11. Casting=10 sq.m
12. Learners Area=20 sq.m
13. Face Painting=30 sq.m
14. Toilets=15 sq.m
15. Pantry=6 sq.m
7. Clay craft
1. Display Area=25 sq.m
2. Clay Storage=20 sq.m
3. Mixing=25 sq.m
4. Design Room=10 sq.m
5. Working Area=250 sq.m
6. Klin(2 courtyard klins)=20
sq.m
7. Unglazed items store=25 sq.m
8. Staff Are=20 sq.m
9. Learners Area=20 sq.m
10. Toilets=15 sq.m
11. Pantry=6 sq.m
8. Mask Making
1. Raw material At store=15
sq.m
2. Frame=20 sq.m
3. Paint=25 sq.m
4. Finish Store=20 sq.m
5. Staff room=20 sq.m
6. Learners Area=20 sq.m
7. Toilet=16 sq.m
8. Pantry=6 sq.m
9. Textile weaving
1. Raw material at Store=20 sq.m
2. Design room=10 sq.m
3. Cone roll=30 sq.m
4. Beam roll=15 sq.m
5. Weaving=160 sq.m
6. Cutting/Check=18 sq.m
7. Packing=18 sq.m
8. Store=20 sq.m
9. Staff Area=20 sq.m
10. Learnrs Area=20 sq.m
11. Toilets=16 sq.m
12. Pantry=6 sq.m
10. Stone craft
1. Raw material Store=20 sq.m
2. Klin=40 sq.m
3. Welding=15 sq.m
4. Enggraving=42 sq.m
5. Polishing =6.8 sq.m
6. Gold and silver Plating=38
sq.m
7. Face Painting=30 sq.m
8. Design room=30 sq.m
9. Lab=13 sq.m
11. Thanka painting
1. Work studio=100
sq.m
2. Raw material
store=20 sq.m
3. Preparation=45 sq.m
4. Store=10 sq.m
5. Toilet=10 sq.m
12. Multipurpose hall
1. Main hall with stage(100
people)=150 sq.m
2. Projection control
room=25 sq.m
3. Store=12 sq.m
4. Green room with
wash=36 sq.m
5. Rest room=35 sq.m
13. Open air theatre
1. Administration+
Conference+Product
development=115 sq.m
2. Traning halls=75 sq.m
3. computer lab+drawing
room+a/v room=70 sq.m
14. Refrence Liabray
1. Main stack area=75 sq.m
2. Reading area=50 sq.m
3. Issue counter=100 sq.m
4. Photocopy=12 sq.m
5. Catalouge+baggage=15 sq.m
6. Reference area=125 sq.m
7. Liabraian Office=15 sq.m
8. Toilet=30 sq.m
18. MISLANNIUS
1. Cafeteria=100 sq.m
2. Washroom=20 sq.m
3. Toilets=20 sq.m
4. Store=20 sq.m
5. Generater room/machine
room=120 sq.m
6. First aid=20 sq.m
7. Guard room(3x20)=60
sq.m