Software Competency Profile Summary
Project Planning & Management
Software:
Primavera P6, MS Project (MSP), ERP
Designing & Drafting Software:
STAAD.Pro, AutoCAD, Computer
Aided Engineering Drawing, SketchUp
Computer Programming:
MS-DOS, Basics of C-Programming
Others:
ORACLE Hospitality, Microsoft Office
Technical Memberships
CHARTERED ENGINEER (India)
@ IEI, The Institution of Engineers
M.S., Aff. M. ASCE
@ ASCE, American Society of Civil
Engineers (USA)
Project Management Reports
MIS Report, Daily Progress Report
Project’s Ahead Vs Delayed Report
Project performance Tracking Report
Budgeted Vs Actual- Comparison
Report for: Value of Balanced works,
Project’s Cash Flow, Summary of
Project Cost, Material Consumption
Target Vs Achievement Report
Report to track Contractor’s Efficiency
& minimize the project variances
Quality Report, Construction Checklist
Reports in Graphical form: Bar
Chart, Gantt Chart, Network Diagram,
Critical Tasks, Schedule & Cost
Performances Index, Over-Allocated
Resource Report, Milestone Chart
Material Tracking Reports:
Consumption, Inventory Control
Wastages & Reconciliation Report
Project Progress Reporting to Client /
Stakeholders (Regional & Global)
Gulf/Overseas experienced, certified Chartered Engineer, with Masters/PG in
Construction Management & 4-year, regular/full-time Bachelor’s Degree (with
Distinction marks) in Civil Engineering from NBA ‘A’ Grade & ISO 9001:2015
Certified Institute
Almost 8 years of experience, with profile ranging from Junior Engineer, reporting
to a Senior Engineer for the construction of high rise building i.e., (G+32) Tower
to a current profile of Chief Engineer, reporting directly to an Australian CEO for
the construction of 168,916 m2 (41.74 Acre) township project
$ 0.25 Million USD Annual Profit, due to the successful implementation of a
plan, in FY’2018-19, to Design, Train and independently manage, the entire team
of Engineer(s), Sub-Contractor, Vendors, Store, Purchase, Accounts &
Finance Department, by linking them altogether through 17 Reports
Direct interactions/coordination with various local & international Consultants, to
make corrective actions on their supplied Designs & Drawings, so as to,
maintain the flawless execution of each and every project(s)
Bagged and Successfully accomplished- 15% contract value of total Lusail City &
Msheireb Down Town Doha Project, in tough economy, at Qatar during
FY’2015-16 (Its a 38 km2 area project with 25,000 residential units in a High-
rise Apartments, 22 hotels, 4 Islands) by competent submission of Tender
Documents & using Contract Managerial & Negotiation skills
Saved $ 0.5 Million USD by directly participating and providing supports (to the
purchase team), as a Technical Consultant for International Procurement’s
Achieved 60% annual increase in the Efficiency/Usage of Machines, Tools and
Manpower by performing the levelling of Over allocated Resources, prior to the
initiation of Site Mobilization to any of the ongoing or new projects
Saved 0.38 Million QAR (104,367 US$) in FY’2016, by accomplishing Phase 1st
of
Msheireb and (G+2) Labor Accommodation Constructions project, 02 months,
ahead of its deadline, by strict monitoring and controlling over the Critical
Task(s) and projects variances (Time, Cost and Scope)
16% reduction in project cost, by negotiating with 4 new civil contractors to
work at a reasonable rate and thereby, tracking their output/deliverables with
predefined performance benchmark, Quality Reports and Checklist
Well experienced in Strategic Planning & Management of all the ongoing project-
Scope, Schedule, Resource, Cost/budget, Quality, Monitoring & Controlling,
Risk Management, Procurement, Contractor, Client and Stakeholder Management,
independently for all types of Civil Constructions works in Deserts area (@ Qatar),
Flat & Hilly terrain (@ India), on or nearby Sea Beaches (@ S.I, nearby Australia)
Education / Qualifications
4-year, regular/full-time Bachelor’s
Degree in Civil Engineering from
V.T.U, India- First Class 71.29%
(Distinction Marks) in July’12
PMP certified and trained from an
Institute, registered under PMI, USA
Pursuing, Masters/PG in
Construction Management from
NICMAR (National Institute of
Construction Management and
Research), Pune, India
Career Timeline
Jul’12 - Mar’13
Junior
Engineer
Mar’13 - May’15
Site Engineer
(Promoted from Assistant Engineer & CRE post)
May’15 - May’17
Project
Engineer
Oct’17 – Oct’2019
Chief Engineer
(Promoted from Project Engineer post)
B. E Civil; PMP Trained (PMI, USA); PG in Construction Management; AutoCAD-2D/3D; MSP; Primavera; SketchUp
CIVIL ENGINEERING / CONSTRUCTIONS / PROJECT MANAGEMENT
Independently Managed & accomplished multiple Projects on time and ensured projects complied with Cost, Quality & Scope
specifications, right from scratch to its completion, as per the International regulatory requirements of PMP (PMI, USA) etc.
E-mail: aman.rray@gmail.com Mobile No. :+91 7856952967 (Mumbai, India)
: www.linkedin.com/in/aman-ray : +91 7856952967 : Qataraman
S.J. Contracts
Pvt. Limited
(@ Pune, India)
AMAN
RAY
Ashiana Housing Limited
(@ Pune, India)
Pacific Casino Hotel
(@ S.I, nearby Australia)
GASCO
(@ Doha, Qatar)
Work Experience
Oct’17 to Oct’2019 with Pacific Casino Hotel, Honiara, Solomon Islands (S.I Nearby Australia)
Current Designation: Chief Engineer; Reporting To: CEO (An Australian)
Budget: $ 492 Million (SBD)
Projects Accomplished: Constructions of a Hotel Resort, of an area 168,916 m2 (41.74 Acre) @ an Isolated Islands with, 20
Budget Apartments, 10 Private Water Bungalows (along with 1 Km Deck / Bridge over the sea, constructed with
Prestressed Concrete Pile), Double Story Casino, Supermarket, Service Roads with Storm Water Drainage systems, Sewer &
Water lines, Jetty, Restaurant, Infinity Swimming Pool, Pavilion, Tree top bar, Spa, Under-Water Constructions etc.
Significant Achievements:
Promoted from Project Engineer to Chief Engineer, soon after completion of one year of Contract
Saved $ 1.15 Million SBD and reduced project’s duration by 60 days in FY’2017-18 by planning, managing and negotiating
with multiple sub-contractors to work, as a Joint Venture for Sheet Piling and 63 Hotel’s Room Renovation Project
Prepare Contractor’s Agreements/Contract and accordingly check & certify their Work-Variations Quotations & R.A Bills raised
Successfully accomplished the EPC (Engineering, Procurement and Construction) along with Design and Drawing (Structural,
Architectural- 2D & 3D, MEP etc.,) for a multi-purpose Building with new commercial kitchen construction (along with world
class Grease Trap Interceptor), Canoe Bar, Billiard’s Room, Roof Top- Garden and a Party yard in FY’2019
Successfuly liaise with the Client/Stakeholders, local & Provincial government officers, for obtaining the Govt. clearances
May’15 - May’17 with GASCO, Doha, Qatar
Designation: Project Engineer; Reporting To: Operations Manager
Budget: 95 Million Qatari Riyals (QAR)
Projects Accomplished: Construction of 4 Villas @ Umm Salal Ali, 6 Kindergartens Schools @ Galfar Al Misnad, Woqod
Petrol Station, Under Ground Fire Water Tank & Fire Pump Room (as per WOQOD & Civil Defence, QCDD regulations),
Retaining Wall, Gym, Portable Cabins, Electrical Sub-Station, Steel Framed- Warehouse, All Civil constructions work involved in
the installation of L.P.G, S.N.G & N.G Gas Pipelines (@ Sheraton & Ezdan Hotel, Al-Jazeera, Lagoona Mall, Zig-Zag Tower)
Significant Achievements:
Saved 600,000 QAR due to on-time Building Permit clearances from Civil Defense for a Fire-resistant Apartment &
6 Kindergarten Schools @ Galfar Al Misnad by efficient implementation of ACMV, Fire Alarm, Fire Fighting & Fire Safety
Mar’13 - May’15 with Ashiana Housing Limited, Pune, India
“Ashiana Housing Limited: The only Indian Real Estate Company to be recognized by ‘FORBES’ as Asia’s 200 Best under a
Billion Company, consecutively for 2 years- 2010 & 2011”
Designation: Site Engineer (Promoted from Assistant Engineer + CRE); Reporting To: Project Manager
Budget: 2 Billion Indian Rupees (INR)
Projects Accomplished: Ashiana Utsav (A 30.5 Acre township project @ Lavasa Hill Station with all amenities & Club House)
Significant Achievements:
Promoted from Assistant Engineer to Site Engineer within 1 year of joining
Saved 4.5 Lakhs INR on worker’s overtime by accomplishing the constructions works within Budget & on time
(altogether of total built-up area 20,234 m2, i.e., 5 acre), right from scratch to its handing over stage for 03 Apartments
of 148 flats and another project of 24 Bungalows/ Duplex Villas
Successfully served dual ownership/skill of Site Engineer & C.R.E (Customer Relation Engineer) by Customer
Management, while possession of 73 units (Phase 1st of Ashiana Utsav, Active Senior Living Project, Lavasa)
Commenced career with S.J. Contracts Pvt. Limited, Pune, India (Jul’12 - Mar’13)
Designation: Junior Engineer; Reporting To: Senior Engineer
Budget: 1.76 Billion Indian Rupees (INR)
Project: Amanora Park Town- Future Tower (G+32)
Significant Achievements: Only Junior Engineer in the entire Project to get a tower of high rose building (G+32), of 64
flats, to execute and supervise independently with Mivan Shuttering Technology
Certifications
Project Management Certification from S.I, Nearby Australia Certification in Primavera P6 from MMTI, Doha, Qatar
BIM-Revit Architecture & MEP from CADD Arabia, Qatar Certificate in National Level Paper Presentation- Won 1st
Prize, twice
Diploma in Information Technology with 78.5% - RCSM, India CPW Authorization Certificate- WOQOD, Qatar Petroleum (85% marks)
Certification in MS Project (MSP), AutoCAD- 2D/3D, SketchUp from CADD Centre, Mumbai, India
Personal Details
Full Name: Aman Kumar Ray; Date of Birth: 02/01/1988; Nationality: Indian; Hobby: Singing Song
International Languages Known: English, Pijin (French mixed), Fiji, Nepali; Regional Languages: Hindi, Marathi, Punjabi, Gujrati
Valid Driving License (3 Countries): 1. Qatar (Also valid for almost all GCC countries); 2. S.I (nearby Australia); 3. India
References
Available on Request

Resume: Aman ray

  • 1.
    Software Competency ProfileSummary Project Planning & Management Software: Primavera P6, MS Project (MSP), ERP Designing & Drafting Software: STAAD.Pro, AutoCAD, Computer Aided Engineering Drawing, SketchUp Computer Programming: MS-DOS, Basics of C-Programming Others: ORACLE Hospitality, Microsoft Office Technical Memberships CHARTERED ENGINEER (India) @ IEI, The Institution of Engineers M.S., Aff. M. ASCE @ ASCE, American Society of Civil Engineers (USA) Project Management Reports MIS Report, Daily Progress Report Project’s Ahead Vs Delayed Report Project performance Tracking Report Budgeted Vs Actual- Comparison Report for: Value of Balanced works, Project’s Cash Flow, Summary of Project Cost, Material Consumption Target Vs Achievement Report Report to track Contractor’s Efficiency & minimize the project variances Quality Report, Construction Checklist Reports in Graphical form: Bar Chart, Gantt Chart, Network Diagram, Critical Tasks, Schedule & Cost Performances Index, Over-Allocated Resource Report, Milestone Chart Material Tracking Reports: Consumption, Inventory Control Wastages & Reconciliation Report Project Progress Reporting to Client / Stakeholders (Regional & Global) Gulf/Overseas experienced, certified Chartered Engineer, with Masters/PG in Construction Management & 4-year, regular/full-time Bachelor’s Degree (with Distinction marks) in Civil Engineering from NBA ‘A’ Grade & ISO 9001:2015 Certified Institute Almost 8 years of experience, with profile ranging from Junior Engineer, reporting to a Senior Engineer for the construction of high rise building i.e., (G+32) Tower to a current profile of Chief Engineer, reporting directly to an Australian CEO for the construction of 168,916 m2 (41.74 Acre) township project $ 0.25 Million USD Annual Profit, due to the successful implementation of a plan, in FY’2018-19, to Design, Train and independently manage, the entire team of Engineer(s), Sub-Contractor, Vendors, Store, Purchase, Accounts & Finance Department, by linking them altogether through 17 Reports Direct interactions/coordination with various local & international Consultants, to make corrective actions on their supplied Designs & Drawings, so as to, maintain the flawless execution of each and every project(s) Bagged and Successfully accomplished- 15% contract value of total Lusail City & Msheireb Down Town Doha Project, in tough economy, at Qatar during FY’2015-16 (Its a 38 km2 area project with 25,000 residential units in a High- rise Apartments, 22 hotels, 4 Islands) by competent submission of Tender Documents & using Contract Managerial & Negotiation skills Saved $ 0.5 Million USD by directly participating and providing supports (to the purchase team), as a Technical Consultant for International Procurement’s Achieved 60% annual increase in the Efficiency/Usage of Machines, Tools and Manpower by performing the levelling of Over allocated Resources, prior to the initiation of Site Mobilization to any of the ongoing or new projects Saved 0.38 Million QAR (104,367 US$) in FY’2016, by accomplishing Phase 1st of Msheireb and (G+2) Labor Accommodation Constructions project, 02 months, ahead of its deadline, by strict monitoring and controlling over the Critical Task(s) and projects variances (Time, Cost and Scope) 16% reduction in project cost, by negotiating with 4 new civil contractors to work at a reasonable rate and thereby, tracking their output/deliverables with predefined performance benchmark, Quality Reports and Checklist Well experienced in Strategic Planning & Management of all the ongoing project- Scope, Schedule, Resource, Cost/budget, Quality, Monitoring & Controlling, Risk Management, Procurement, Contractor, Client and Stakeholder Management, independently for all types of Civil Constructions works in Deserts area (@ Qatar), Flat & Hilly terrain (@ India), on or nearby Sea Beaches (@ S.I, nearby Australia) Education / Qualifications 4-year, regular/full-time Bachelor’s Degree in Civil Engineering from V.T.U, India- First Class 71.29% (Distinction Marks) in July’12 PMP certified and trained from an Institute, registered under PMI, USA Pursuing, Masters/PG in Construction Management from NICMAR (National Institute of Construction Management and Research), Pune, India Career Timeline Jul’12 - Mar’13 Junior Engineer Mar’13 - May’15 Site Engineer (Promoted from Assistant Engineer & CRE post) May’15 - May’17 Project Engineer Oct’17 – Oct’2019 Chief Engineer (Promoted from Project Engineer post) B. E Civil; PMP Trained (PMI, USA); PG in Construction Management; AutoCAD-2D/3D; MSP; Primavera; SketchUp CIVIL ENGINEERING / CONSTRUCTIONS / PROJECT MANAGEMENT Independently Managed & accomplished multiple Projects on time and ensured projects complied with Cost, Quality & Scope specifications, right from scratch to its completion, as per the International regulatory requirements of PMP (PMI, USA) etc. E-mail: aman.rray@gmail.com Mobile No. :+91 7856952967 (Mumbai, India) : www.linkedin.com/in/aman-ray : +91 7856952967 : Qataraman S.J. Contracts Pvt. Limited (@ Pune, India) AMAN RAY Ashiana Housing Limited (@ Pune, India) Pacific Casino Hotel (@ S.I, nearby Australia) GASCO (@ Doha, Qatar)
  • 2.
    Work Experience Oct’17 toOct’2019 with Pacific Casino Hotel, Honiara, Solomon Islands (S.I Nearby Australia) Current Designation: Chief Engineer; Reporting To: CEO (An Australian) Budget: $ 492 Million (SBD) Projects Accomplished: Constructions of a Hotel Resort, of an area 168,916 m2 (41.74 Acre) @ an Isolated Islands with, 20 Budget Apartments, 10 Private Water Bungalows (along with 1 Km Deck / Bridge over the sea, constructed with Prestressed Concrete Pile), Double Story Casino, Supermarket, Service Roads with Storm Water Drainage systems, Sewer & Water lines, Jetty, Restaurant, Infinity Swimming Pool, Pavilion, Tree top bar, Spa, Under-Water Constructions etc. Significant Achievements: Promoted from Project Engineer to Chief Engineer, soon after completion of one year of Contract Saved $ 1.15 Million SBD and reduced project’s duration by 60 days in FY’2017-18 by planning, managing and negotiating with multiple sub-contractors to work, as a Joint Venture for Sheet Piling and 63 Hotel’s Room Renovation Project Prepare Contractor’s Agreements/Contract and accordingly check & certify their Work-Variations Quotations & R.A Bills raised Successfully accomplished the EPC (Engineering, Procurement and Construction) along with Design and Drawing (Structural, Architectural- 2D & 3D, MEP etc.,) for a multi-purpose Building with new commercial kitchen construction (along with world class Grease Trap Interceptor), Canoe Bar, Billiard’s Room, Roof Top- Garden and a Party yard in FY’2019 Successfuly liaise with the Client/Stakeholders, local & Provincial government officers, for obtaining the Govt. clearances May’15 - May’17 with GASCO, Doha, Qatar Designation: Project Engineer; Reporting To: Operations Manager Budget: 95 Million Qatari Riyals (QAR) Projects Accomplished: Construction of 4 Villas @ Umm Salal Ali, 6 Kindergartens Schools @ Galfar Al Misnad, Woqod Petrol Station, Under Ground Fire Water Tank & Fire Pump Room (as per WOQOD & Civil Defence, QCDD regulations), Retaining Wall, Gym, Portable Cabins, Electrical Sub-Station, Steel Framed- Warehouse, All Civil constructions work involved in the installation of L.P.G, S.N.G & N.G Gas Pipelines (@ Sheraton & Ezdan Hotel, Al-Jazeera, Lagoona Mall, Zig-Zag Tower) Significant Achievements: Saved 600,000 QAR due to on-time Building Permit clearances from Civil Defense for a Fire-resistant Apartment & 6 Kindergarten Schools @ Galfar Al Misnad by efficient implementation of ACMV, Fire Alarm, Fire Fighting & Fire Safety Mar’13 - May’15 with Ashiana Housing Limited, Pune, India “Ashiana Housing Limited: The only Indian Real Estate Company to be recognized by ‘FORBES’ as Asia’s 200 Best under a Billion Company, consecutively for 2 years- 2010 & 2011” Designation: Site Engineer (Promoted from Assistant Engineer + CRE); Reporting To: Project Manager Budget: 2 Billion Indian Rupees (INR) Projects Accomplished: Ashiana Utsav (A 30.5 Acre township project @ Lavasa Hill Station with all amenities & Club House) Significant Achievements: Promoted from Assistant Engineer to Site Engineer within 1 year of joining Saved 4.5 Lakhs INR on worker’s overtime by accomplishing the constructions works within Budget & on time (altogether of total built-up area 20,234 m2, i.e., 5 acre), right from scratch to its handing over stage for 03 Apartments of 148 flats and another project of 24 Bungalows/ Duplex Villas Successfully served dual ownership/skill of Site Engineer & C.R.E (Customer Relation Engineer) by Customer Management, while possession of 73 units (Phase 1st of Ashiana Utsav, Active Senior Living Project, Lavasa) Commenced career with S.J. Contracts Pvt. Limited, Pune, India (Jul’12 - Mar’13) Designation: Junior Engineer; Reporting To: Senior Engineer Budget: 1.76 Billion Indian Rupees (INR) Project: Amanora Park Town- Future Tower (G+32) Significant Achievements: Only Junior Engineer in the entire Project to get a tower of high rose building (G+32), of 64 flats, to execute and supervise independently with Mivan Shuttering Technology Certifications Project Management Certification from S.I, Nearby Australia Certification in Primavera P6 from MMTI, Doha, Qatar BIM-Revit Architecture & MEP from CADD Arabia, Qatar Certificate in National Level Paper Presentation- Won 1st Prize, twice Diploma in Information Technology with 78.5% - RCSM, India CPW Authorization Certificate- WOQOD, Qatar Petroleum (85% marks) Certification in MS Project (MSP), AutoCAD- 2D/3D, SketchUp from CADD Centre, Mumbai, India Personal Details Full Name: Aman Kumar Ray; Date of Birth: 02/01/1988; Nationality: Indian; Hobby: Singing Song International Languages Known: English, Pijin (French mixed), Fiji, Nepali; Regional Languages: Hindi, Marathi, Punjabi, Gujrati Valid Driving License (3 Countries): 1. Qatar (Also valid for almost all GCC countries); 2. S.I (nearby Australia); 3. India References Available on Request