1. Deepak Kumar
Mobile: +91-7838268267
E- Mail : deepak_pmd84@yahoo.com
In quest of assignments in Project Management with a growth oriented organisation
SYNOPSIS
A result oriented professional with around 6.5 years of experience in Project Execution, Designing & Commissioning,
Site Management & Team Management. Gained experience in Resources Planning in compliance to Quality Standards,
2. ramping up projects in close co-ordination with clients and ensuring on time deliverables. Executed prestigious projects
for multiple clients along with optimising resource utilisation and contract management. Possess excellent
communication, leadership skills and learning approach.
AREAS OF EXPERTISE TOTAL EXPERIENCE: 8.0 Yr
Project Planning & Management
Study of Work order & Term conditions
Study of SOS as per Work Order
Preparation of Billing Schedule & Billing Break-up
3. Prepare Design of required Equipment
Take Approval of Drawing from client
Prepare Indents for project
Preparation of Bill of quantities and make estimation of required material
Prepare Material Dispatch Schedule as per erection
Prepare Erection Chart for Equipment Erection & commissioning
Planning time schedules and monitoring the progress.
Preparation of Billing Invoice & Performa Invoice
Payment follow ups.
To find out critical path lines of project
Working in M.S Project
4. Making monthly bill Payment Status.
Site preparations, mobilization of contractors for carrying out fabrication & erection activities.
Participating in project review meetings for evaluating project progress.
Close monitoring & Back Office support for all Site activities
EMPLOYMENT SCAN
COMPANY NAME DESIGNATION DURATION
Technofab Engineering Limited Assistant Manager (Project) Feb2012 to till date
5. A 40+ year young engineering and construction Company, serving the Power, Industrial and Infrastructure Sectors, by
executing comprehensive balance of plant (BOP) and auxiliary systems on a complete Turnkey EPC basis
Key Responsibilities:
• Prepare Project schedule as per completion date line
• Preparation Billing Break-Up
• Bill of Material
• Preparing Cost Estimation sheet for Project
• Preparing of Material requirement Sheet for Project
• Submission of Drg’s & Document for Client approval
• Preparing of Indents for project
6. • Preparation of Material Dispatch Schedule
• Prepare payment details and Billing status of Project
Major Projects handling
Client : M/s SAIL-Bhilai
Project : DM Water Plant
Client : Jayprakash Power Venture Limited
Project : 2x660 MW Super Thermal Power Plant (Nigrie,MP)
Package : Fuel Oil Handling System
7. Client : Jindal Power Limited
Project : 4x600 MW Thermal Power Plant (Tamnar,Chhattisgarh)
Package : L P Piping
Client : Hindalco Industries Limited
Project : 6x125 MW Thermal Power Plant (Sambalpur,Orrissa)
Package : L P Piping
Package : Fuel Oil Handing System
Client : Gammon India Limited
Project : Rural Water Supply
8. Package : L P Piping
Package : Fuel Oil Handing System
.
COMPANY NAME DESIGNATION DURATION
Himachal Engineering Pvt.Ltd Project Co-ordinator July 2010 to Feb 2012
Himachal Environmental Engineering Co. (P) Ltd. was promoted in early nineties with the objective to provide one point
solution for industrial pollution control problems Himachal provide turnkey solution for Air pollution control equipment
9. like (Bag Filter & ESP), Wastewater, Air Cooling & Ventilation problems for Steel Plant, Cement industry, Power,
Textile, Sugar industry, Woodworking, Paper Hospital, Captive boiler industry
Key Responsibilities:
• Prepare Project schedule as per completion date line
• Preparation activity chat for project completion.
• Develop Drawing for client & get approval from client
• Preparation Billing Break-Up
• Preparing Billing Invoice & Performa Invoice
• Preparing Cost Estimation sheet for Project
• Preparing of Material requirement Sheet
• Preparing of Indents for project
10. • Preparation of Material Dispatch Schedule along billing Break-up
• Prepare payment details and Billing status of Project
• Preparation of Delivery schedule of Project
• Extraction of M.T.O
• Preparing bill of material.
• Making Daily progress report
• Making monthly progress report
• Client Coordination
• Client Handling
• Overall handling of project
Major Projects handling
11. Client : M/s Bhavnagar Biomass Power Project Pvt Ltd., Bag filter (EPC), as Project Co-ordinator
Client : M/s A2Z powercom Ltd., Bag filter (EPC), as Project Co-ordinator
Client : Chaderpur Work, Bag filter (Engineering, Exection & Commissioning), as Project Co-
ordinator
Client : Shree Jaipur Cement Ltd., Bag filter (EPC), as Project Co-ordinator
Role :
Engineering and Project coordination with Chanderpur Works
Execution of Bag Filters
Responsible of project activities and manage construction.
Overall handling of project from mobilization to final commissioning and as well as Billing
Over all Handling of project
12. COMPANY NAME DESIGNATION DURATION
Grintex India Limited Structural Design Engineer Dec 2007 to July 2010
Grintex India Ltd. was set up in 1996 mainly to act as a catalyst to pursue high-tech programs with the Ministry of Space
& Civil Aviation in India. Company has emerged in ship industry and take ship related project from Indian and foreign
shipyard and also provide technical consultancy
Client : Bharti shipyard Limited/Cochin Shipyard Limited/Mazgaon Dockyard Limited etc
Project : Cadet Training Ship/Novel Offshore Petrol Vessel
13. Role :
Perform details design/drafting of ship structure for new shipbuilding. Generate production
information for ship structure, hull machinery/equipment installation, etc.
Perform naval architecture calculation .e.g., longitudinal hull strength, calculation weight
distribution,MTO of steel etc.
Structural weight calculation of different blocks using Tribon as well as using CAD Drawing.
Preparation of structural sectional drawings of various frames and bulkheads using AutoCAD,
Tribon Drafting &Tribon Planer Hull Software.
COMPANY NAME DESIGNATION DURATION
14. Manaksia Limited Design Engineer May 2005 to Dec 2007
Client : Indian Navy
Project : Air Defence Ship (ADS)
Role :
Preparation of structural 3-D of Decks and Bulkheads of ship incorporating Seams, Plating,
Stiffener, Cutouts, Clips, Brackets and Openings using Tribon Planar Hull.
Preparation of Section Drawing and production Drawing for manufacturing
Structural weight calculation on Excel sheet with respect to different blocks using Auto CAD
Drawing.
Checking of Yard Plan Drawing and do amendment as per requirement
Preparing a manufacturing chart of each section drawing for yard
15. Modification of deck plan as per changes in GA
ACADEMIC & PROFESSIONAL QUALIFICATION
Qualification Board of Institution /University Year %CGPA
B.Tech (Mechanical Engg) JRNV University, Delhi 2007-2010 65.71%
Post Diploma ( Mold Design) CIPET,Lucknow 2004-2005 73.53%
Diploma ( Mechanical Engg) Guru Nanak Dev Polytechnic, Delhi 2001-2004 62.49%
10th Guru Nanak High school, Jamshedpur 1998 67%
SOFTWARE ORIENTATION
16. Auto CAD (6 yr Exp)
M.S Office (6 yr Exp)
Unigraphic Nx5 (2 yr Exp)
PDMS (6 Month)
MS Project (1 yr Exp)
PERSONAL DETAILS
Date of Birth : January 01, 1984
Sex : Male
Nationality : Indian
Father’s name : Mr.Rajendra Singh
Languages Known : English, Hindi
Marital Status : Married
17. Present Address : Delhi
Passports No : H6055897
Place of Issue : Delhi
Date of Issue : 24/6/2010
Date of Expiry : 23/6/2020
Phone Number : +91-7838268267
Email ID : deepak_pmd84@yahoo.com
DECLARATION
I hereby by declare that the information furnished above is true to best of my knowledge.