● Professional Experience:
M/S, Lanco Solar Energy Pvt. Ltd., Gurgaon (Haryana)
Projects:
1. 200MW Solar-Thermal PowerPlant(CSP), Jaisalmer,Rajasthan.
2. 35MW SolarPV Project,Jaisalmer,Rajasthan.
3. 75MW SolarPV Project, Dhule,Maharashtra.
Designation:Graduate EngineerTrainee-Electrical.
Duration:Since December2011 to April 2013.
M/S, Godawari GreenEnergyLtd., (HIRA GROUP), Raipur (Chattisgarh)
Plant : 50MW Solar-Thermal PowerPlant(CSP),Jaisalmer,Rajasthan.
Designation : Electrical Engineer(Operation&Maintenance).
Duration : April 2013 till date.
● Job Responsibilities:
■ Review of Electrical DrawingsfromEngineeringTeamandCoordinating forErection.
■ Preparation of work schedules fordifferentElectrical packages.
■ Handlingof 33kV constructionpowerforuninterruptedsupply.
■ Erectionof 132 kV Switchyardequipment involvingC.T, PT, C.V.T, IsolatorandSF6CircuitBreakersetc.
■ Supervised Erectionandtestingof 2nos.of PowerTransformers (132kV/33kV), (20/25MVA).
■ HandlingProject activitiesinvolvingworkingoutvarious requirements withrespecttoutilities,machines,
manpower&monitoringprojectsoperationforensuringtimely completion.
■ Erection, Testing&Commissioningof differentratingof DGSets.
■ Commissioningof AMFPanelsandverifiedautochange overscheme.
■ Erectionandfabricationof Cable Trays&Supports incable trenches.
■ Have experiencerightfrompiling,erectionof SolarPV Modules,dealingwithcomplete DCareato ACsystem.
■ Laying& Termination of 33kV and 6.6 kV UndergroundCables.
■ Supervised Erection&Testingof all StationServiceTransformers inthe plantincludingall IsolationTransformers.
■ Involved inTestingandcommissioningof DCDB, Battery ChargerandBattery bank(860Ah& 900Ah).
■ Involved inearthingandarealightingsystem includinghighmastandlow mastlights.
■ Supervision &Adherenceof quality assurance plan.
■ Preparation of day to day progress reportand reconciliation of erections withdesign andinstallation according
to drawings andtimely completion of project.
■ Operation androutinepreventive maintenanceof all Electricdrives,electrical packagesand HTdrives like CWP’s
(510KW), BFP’s(875KW),HTF’s (900KW).
■ Maintenance andtrouble shootingof switchGearPanels,MotorControl Centre (LT& HT), Control & Relay
Panels,Powertransformer(132kV/10.5kV,75MVA,ONAF),VFD’s(Make- Siemens,CG,Vacon,TMEIC).
■ Erectionof PLCC system.
■ Involvedintestingof Turbine-Generator(50MW).
■ Operationof AVR,Synchronizingpanels.
■ ImplementationandworkonSAP.
■ Calculationof energyreportweeklybasisanddailybasis.
■ CommunicationwithLoadDispatchCentre.
■ InvolvedinIMS-ISOdocumentationworkandaudit.
■ MonthlyplantReading(JMR) byMeter ReadingInstrument andco-ordinationwithconcernedgovernment
officials.
Skills Set:
Exposure to the configuration and programming of following PLC’s,SCADA, and Drives.
S.No. PLC Make Model Programming Software
1. ALLEN BRADLEY SLC500 RS LOGIX 5000
2. SIEMENS S7 300/312C SIMATIC MANAGER
3. MODICON TSX/3721 MICRO PL 7 PRO V 4.3
SCADA Software:
S.No. Company Package
1. Wonderware Intouch 9.5
● Trainingat 220kV GSS,RRVPNL,JODHPUR (Rajasthan)
■ Overviewof substation.
■ Detailed trainingof varioussystems usedin220kV GSS.
■ StudiedSLDof substation.
■ Studieddeeply aboutCircuitBreakers, CT, PT, CVT, Wave trapsandotherequipments.
■ Studieddrawings of various Control &Relay panels.
● Professional Educational Qualifications
■ PassedB.TechinElectrical EngineeringfromJodhpurInstitute of Engineering&Technology, Jodhpur
(RajasthanTechnical University,Kota) with62.41% marksin2010.
■ PresentlydoingM.TechinPowerSystemsfromJodhpurNational University,Jodhpur.
● ProjectsUndertakeninCollege
■ MinorProjectonUnique WaterPumpController.
■ Major ProjectonSunTrackingSystem byMicrocontrollers.
● Educational Qualifications
■ 10th
fromRajasthanBoardof SecondaryEducation,Ajmer,Rajasthan in2004.
■ 12th
fromRajasthanBoardof SecondaryEducation,Ajmer, Rajasthanin2006.
● ComputerSkills
■ MS OFFICE, MATLAB, Pspice(CircuitDesigning)&Internet.
■ Elementary knowledge of C,C++, JAVA &all Windows OperatingSystems.
● Personal Details
●
●
Name :
Father’sName :
:
Nikhil Dhaka.
Sh. B.Ram Dhaka.
.● Mother’s Name : Smt. VimlaDhaka.
● Date of Birth : 28/Feb./1989
● Marital Status : Married.
● LanguagesKnown : Hindi, English.
● Sex : Male.
● DECLARATION
I hereby declare that the above particulars are true to the best of my knowledge and belief.
NIKHIL DHAKA
NIKHIL-RESUME

NIKHIL-RESUME

  • 1.
    RESUME Nikhil Dhaka 3M/28,Kudi Bhagtasni HousingBoard, Jodhpur Mobile: +91-9784085724, 9001293420 Rajasthan, Pin: 342005 E-mail: nikhildhaka89@gmail.com ● CareerObjective To be a valuable asset to organization for which I am working by applying the best of my Technical Skills in the progress of the company in whichI am workingbyacceptingchallengingjobandhavinga positiveattitude towards my employer. ● Professional Experience: M/S, Lanco Solar Energy Pvt. Ltd., Gurgaon (Haryana) Projects: 1. 200MW Solar-Thermal PowerPlant(CSP), Jaisalmer,Rajasthan. 2. 35MW SolarPV Project,Jaisalmer,Rajasthan. 3. 75MW SolarPV Project, Dhule,Maharashtra. Designation:Graduate EngineerTrainee-Electrical. Duration:Since December2011 to April 2013. M/S, Godawari GreenEnergyLtd., (HIRA GROUP), Raipur (Chattisgarh) Plant : 50MW Solar-Thermal PowerPlant(CSP),Jaisalmer,Rajasthan. Designation : Electrical Engineer(Operation&Maintenance). Duration : April 2013 till date. ● Job Responsibilities: ■ Review of Electrical DrawingsfromEngineeringTeamandCoordinating forErection. ■ Preparation of work schedules fordifferentElectrical packages. ■ Handlingof 33kV constructionpowerforuninterruptedsupply. ■ Erectionof 132 kV Switchyardequipment involvingC.T, PT, C.V.T, IsolatorandSF6CircuitBreakersetc. ■ Supervised Erectionandtestingof 2nos.of PowerTransformers (132kV/33kV), (20/25MVA). ■ HandlingProject activitiesinvolvingworkingoutvarious requirements withrespecttoutilities,machines, manpower&monitoringprojectsoperationforensuringtimely completion. ■ Erection, Testing&Commissioningof differentratingof DGSets. ■ Commissioningof AMFPanelsandverifiedautochange overscheme. ■ Erectionandfabricationof Cable Trays&Supports incable trenches. ■ Have experiencerightfrompiling,erectionof SolarPV Modules,dealingwithcomplete DCareato ACsystem. ■ Laying& Termination of 33kV and 6.6 kV UndergroundCables. ■ Supervised Erection&Testingof all StationServiceTransformers inthe plantincludingall IsolationTransformers.
  • 2.
    ■ Involved inTestingandcommissioningofDCDB, Battery ChargerandBattery bank(860Ah& 900Ah). ■ Involved inearthingandarealightingsystem includinghighmastandlow mastlights. ■ Supervision &Adherenceof quality assurance plan. ■ Preparation of day to day progress reportand reconciliation of erections withdesign andinstallation according to drawings andtimely completion of project. ■ Operation androutinepreventive maintenanceof all Electricdrives,electrical packagesand HTdrives like CWP’s (510KW), BFP’s(875KW),HTF’s (900KW). ■ Maintenance andtrouble shootingof switchGearPanels,MotorControl Centre (LT& HT), Control & Relay Panels,Powertransformer(132kV/10.5kV,75MVA,ONAF),VFD’s(Make- Siemens,CG,Vacon,TMEIC). ■ Erectionof PLCC system. ■ Involvedintestingof Turbine-Generator(50MW). ■ Operationof AVR,Synchronizingpanels. ■ ImplementationandworkonSAP. ■ Calculationof energyreportweeklybasisanddailybasis. ■ CommunicationwithLoadDispatchCentre. ■ InvolvedinIMS-ISOdocumentationworkandaudit. ■ MonthlyplantReading(JMR) byMeter ReadingInstrument andco-ordinationwithconcernedgovernment officials. Skills Set: Exposure to the configuration and programming of following PLC’s,SCADA, and Drives. S.No. PLC Make Model Programming Software 1. ALLEN BRADLEY SLC500 RS LOGIX 5000 2. SIEMENS S7 300/312C SIMATIC MANAGER 3. MODICON TSX/3721 MICRO PL 7 PRO V 4.3 SCADA Software: S.No. Company Package 1. Wonderware Intouch 9.5 ● Trainingat 220kV GSS,RRVPNL,JODHPUR (Rajasthan) ■ Overviewof substation. ■ Detailed trainingof varioussystems usedin220kV GSS. ■ StudiedSLDof substation. ■ Studieddeeply aboutCircuitBreakers, CT, PT, CVT, Wave trapsandotherequipments. ■ Studieddrawings of various Control &Relay panels. ● Professional Educational Qualifications ■ PassedB.TechinElectrical EngineeringfromJodhpurInstitute of Engineering&Technology, Jodhpur (RajasthanTechnical University,Kota) with62.41% marksin2010. ■ PresentlydoingM.TechinPowerSystemsfromJodhpurNational University,Jodhpur.
  • 3.
    ● ProjectsUndertakeninCollege ■ MinorProjectonUniqueWaterPumpController. ■ Major ProjectonSunTrackingSystem byMicrocontrollers. ● Educational Qualifications ■ 10th fromRajasthanBoardof SecondaryEducation,Ajmer,Rajasthan in2004. ■ 12th fromRajasthanBoardof SecondaryEducation,Ajmer, Rajasthanin2006. ● ComputerSkills ■ MS OFFICE, MATLAB, Pspice(CircuitDesigning)&Internet. ■ Elementary knowledge of C,C++, JAVA &all Windows OperatingSystems. ● Personal Details ● ● Name : Father’sName : : Nikhil Dhaka. Sh. B.Ram Dhaka. .● Mother’s Name : Smt. VimlaDhaka. ● Date of Birth : 28/Feb./1989 ● Marital Status : Married. ● LanguagesKnown : Hindi, English. ● Sex : Male. ● DECLARATION I hereby declare that the above particulars are true to the best of my knowledge and belief. NIKHIL DHAKA